Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Civil And Construction
Bridge Construction
Opening Date10 Apr 2023
Closing Date18 Apr 2023
Tender Amount₹ 31,57,503 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
FDR by Construction of Box Culvert;Construction of Granular Sub-base by providing HBG/HBT material confirming to Grading-VI of MORT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator/approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th Revision) and as directed by the Engineer-in-Charge(Payment based on levels only)

10.65

1997

21268

... More
FDR by Construction of Box Culvert;Construction of subgrade and shoulders with side earth having CBR more than 10by mechanical means up to SDR with all leads and lifts including pre-watering of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation wqith 8 to 10 tonnes vibratory road roller at OMC to meet requirement of table 300-2 of MoRT&H including all hire and operational charges of T&P and (excluding seigniorage)charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision) (payment will be made based on measurements for finished tem of work).

566.25

377

213476

... More
FDR by Construction of Box Culvert;Dismantling of Structures (Superstructure, substructure, foundation and other miscellaneous structures) and pavements including disposing of resulting materials and/or salvaging useful materials up to a distance of 1Km from project road complete as per Drawings and Technical Spoecification Clause MoRT&H 202 and as directed by the Engineer.(By Mechanical means in Cement concrete gradeM-15 & M-20).

57.2

503

28772

... More
FDR by Construction of Box Culvert;Filling in between body walls with gravel including cost and conveyance and (excluding seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of IRC: 78 and as per MoRT&H Specification No.2200 & 2907 (5th Revision) and as per drawing and technical specifications for finished item of work.

105

800

84000

... More
FDR by Construction of Box Culvert;Drainage spouts for 100mm dia complete as per drwaing and technical specifications Clause 1209 MORD & 2705 MORTH at complete and as per directed by the Engineer-in-Charge.

2

2899

5798

... More
FDR by Construction of Box Culvert;Providing Weep holes in VCC Abutment/Wing wall/return wall with 100mm diameter AC pipe extending through the full width of the structure at 1.00cm cost and conveyance in both horizontal and vertical direction sothat the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C. pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V:20H towards stream side face etc., complete for finished item of work for weep holes as per SSR Data.

26.7

365

9746

... More
FDR by Construction of Box Culvert;Providing HYSD bars(Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all RCC items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H Specification 1600 & 2200 (5th revision) and as per IS 1786 of 1985 for Super structure of R.C.C. Items.

4.9

80498

394440

... More
FDR by Construction of Box Culvert;Providing HYSD bars(Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all RCC items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H Specification 1600 & 2200 (5th revision) and as per IS 1786 of 1985 for Substructure of R.C.C. Items.

3.18

78705

250282

... More
FDR by Construction of Box Culvert;Providing HYSD bars(Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all RCC items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H Specification 1600 & 2200 (5th revision) and as per IS 1786 of 1985 for foundations of RCC Items.

6.01

78443

471442

... More
FDR by Construction of Box Culvert;Vibrated reinforced cement concrete M-30 grae using 20mm & 10mm HBG/HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing bD/1-69 (A) but excluding cost of steel and its fabrication charges as per MoRT&H Specification 1500,1600,1700 & 2702 (5th Revision) and as directed by the Engineer-in-Cherage for Wearing Coat over Deck Slab.

6.4

6655

42592

... More
FDR by Construction of Box Culvert;Vibrated Cement Concrete M-25 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, weigh batcher, laying in position, compacting, vibrating curing etc., including other ioncidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Superstructue(Slab)

60.7

6733

408693

... More
FDR by Construction of Box Culvert;Vibrated Cement Concrete M-25 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, weigh batcher, laying in position, compacting, vibrating curing etc., including other ioncidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Sub-Structure.

75

6192

464400

... More
FDR by Construction of Box Culvert;Vibrated Cement Concrete M-25 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, weigh batcher, laying in position, compacting, vibrating curing etc., including other ioncidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Foundations.

85

5840

496400

... More
FDR by Construction of Box Culvert;Vibrated Cement Concrete M-15 Grade Concrete using 40mm, 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,(excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, weigh batcher, laying in position, compacting, vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700,2100 (5th Revision) for footings and Raft foundation.

20

5688

113760

... More
FDR by Construction of Box Culvert;Earth work excavation in soils up to SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., including all machinary charges, etc., complete excluding seigniorage charges and for finished item of work for trench cutting as per MoRT&H Specification 301 (5th Revision) and as directed by the Engineer-in-Charge.

249

88

21912



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.