Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Bridge Construction
Opening Date16 Dec 2024
Closing Soon23 Dec 2024
Tender Amount₹ 11,29,30,493 
Notes
Download

Costs

Summary

Construction Of Minor Bridge And Major Bridge On Munugode - Nampally Road From Km 12/0 To 28/4

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Foundations using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision)for footings of abutmentsPiers, cut-off walls and Wing walls below sill Level

284

5789

1644076

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structureof abutments and Wing walls below sill Level upto 5.0m Height

263

6123

1610349

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structureof abutments and Wing walls below sill Level 5.0m - 10.0m Height

27

6346

171342

... More
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure upto 5.0m Height

11

6645

73095

... More
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure 5.0m - 10.0m Height

5

6862

34310

... More
Bridge work;V.R.C.C concrete M -30 grade for Super Structure with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 (5th revision)as per MOST Drg. No: SD/114 5.0m - 10.0m Height

170

7596

1291320

... More
Bridge work;Reinforced Cement Concrete M30 for Approach Slab with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2704(5th revision)as directed by Engineer-in-Chrge for approach slab

29

6185

179365

... More
Bridge work;V.R.C.C. M30 grade concrete with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawing BD/1-69A and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2702(5th revision)as directed by Engineer-in-Charge for wearing coat over deck slab

22

6190

136180

... More
Bridge work;Plain Vibrated Cement Concrete M15 Mix using 40mm HBG (SS5) graded M/C metal including cost and conveyance of all materials , centering, machine mixing, laying,vibrating, finishing curing including hire and operational charges of all T&P etc., and including island formation and diversion of flow of water, if necessary etc., complete for Levelling course below approach slab as per drawings and technical specifications & as per MoRT&H Spcn. No 2700.

8

5566

44528

... More
Bridge work;Vibrated Reinforced cement concrete in super structure complete as per darwing and techincal specifications as per MORT&H specification nos 1500,1700 & 2200 VRCC M-40 for Crash barriers excluding cost of steel and its fabrication charges as per approved drawing.

19

7110

135090

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Foundation

3

86228

258684

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Sub structure

5

86558

432790

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Super structure

19

88842

1687998

... More
Bridge work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for quadrantial revetment.

37

2843

105191

... More
Bridge work;Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

13

1903

24739

... More
Bridge work;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

19

368

6992

... More
Bridge work;Back filling behind Abutments with selected earth including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

125

368

46000

... More
Bridge work;Providing filter media with granular material/ crushed stone aggregates satisfying the requirements laid down in clause 2504.2.2 of MORT&H (Rev. V) specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards wall and provided over the entire surface, behind abutment, and return wall to the full height and compacted to a firm condition complete as per drawing and technical specifications as per MORT&H Spcn. No. 2200 and as per Clause No of 710.1.4 of IRC 78 .

108

2165

233820

... More
Bridge work;Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A/C pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Complete as per drawing and technical specification, complete for finished item of work for weep holes as per MORTH specification No 2706 & 2200 (5th Revision)

143

456

65208

... More
Bridge work;Supplying and fixing of C I drainage spouts complete as per MOT Drg No SD/

4

1444

5776

... More
Bridge work;Providing 25.4 mm mastic pads for longitudinal joints, Transverse expansion joints and construction joints of approved quality including cost of conveyance and placing in position etc., as directed by the engineer in charge

56

1186

66416

... More
Bridge work;Forming embankment with borrowed useful earth (Selected earth with a lead of 10.0km) from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work). For Shoulder only

3302

378

1248156

... More
Bridge work;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment will be made based on level for finished item of work)

656

2243

1471408

... More
Bridge work;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.(Payment will be made based on level for finished item of work)

443

2509

1111487

... More
Bridge work;Providing and aplying Prime coat with bitumen emulsion (Slow setting /bulk) using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.

1699

36

61674

... More
Bridge work;Providing and applying tack coat with bitumen VG-10 bitumen using pressure distributor at the rate of 0.2Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1699

12

20728

... More
Bridge work;Providing and laying 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 3 as per table 500-7 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler, including cost and conveyance of all materials to work site and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

51

10233

521883

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge a) Above LWL excluding dewatering charges in ordinary soils upto SDR, by mechanical means upto 3M depth

419

144

60336

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge b) Above LWL excluding dewatering charges in ordinary rock by mechanical means upto 3M depth

354

183

64782

... More
Bridge work;Plain Cement Concrete (1:3:6) nominal Mix in foundation with crushed stone aggregate 40 mm nominal sizemechanically mixed placed in foundation and compacted by vibration complete as per drawings and technical specifications & as per MoRT&H Spcn. No 2100

22

5741

126302

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Foundations using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision)for footings of abutmentsPiers, cut-off walls and Wing walls below sill Level

283

5789

1638287

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structureof abutments and Wing walls below sill Level upto 5.0m Height

228

6123

1396044

... More
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure upto 5.0m Height

14

6645

93030

... More
Bridge work;V.R.C.C concrete M -30 grade for Super Structure with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 (5th revision)as per MOST Drg. No: SD/114 upto 5.0m Height

213

7292

1553196

... More
Bridge work;Reinforced Cement Concrete M30 for Approach Slab with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2704(5th revision)as directed by Engineer-in-Chrge for approach slab

29

6185

179365

... More
Bridge work;V.R.C.C. M30 grade concrete with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawing BD/1-69A and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2702(5th revision)as directed by Engineer-in-Charge for wearing coat over deck slab

23

6190

142370

... More
Bridge work;Plain Vibrated Cement Concrete M15 Mix using 40mm HBG (SS5) graded M/C metal including cost and conveyance of all materials , centering, machine mixing, laying,vibrating, finishing curing including hire and operational charges of all T&P etc., and including island formation and diversion of flow of water, if necessary etc., complete for Levelling course below approach slab as per drawings and technical specifications & as per MoRT&H Spcn. No 2700.

8

5566

44528

... More
Bridge work;Vibrated Reinforced cement concrete in super structure complete as per darwing and techincal specifications as per MORT&H specification nos 1500,1700 & 2200 VRCC M-40 for Crash barriers excluding cost of steel and its fabrication charges as per approved drawing.

20

7110

142200

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Foundation

3

86228

258684

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Sub structure

4

86558

346232

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Super structure

21

88842

1865682

... More
Bridge work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for quadrantial revetment.

36

2843

102348

... More
Bridge work;Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

13

1903

24739

... More
Bridge work;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

18

368

6624

... More
Bridge work;Back filling behind Abutments with selected earth including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

121

368

44528

... More
Bridge work;Providing filter media with granular material/ crushed stone aggregates satisfying the requirements laid down in clause 2504.2.2 of MORT&H (Rev. V) specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards wall and provided over the entire surface, behind abutment, and return wall to the full height and compacted to a firm condition complete as per drawing and technical specifications as per MORT&H Spcn. No. 2200 and as per Clause No of 710.1.4 of IRC 78 .

105

2165

227325

... More
Bridge work;Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A/C pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Complete as per drawing and technical specification, complete for finished item of work for weep holes as per MORTH specification No 2706 & 2200 (5th Revision)

147

456

67032

... More
Bridge work;Supplying and fixing of C I drainage spouts complete as per MOT Drg No SD/

4

1444

5776

... More
Bridge work;Providing 25.4 mm mastic pads for longitudinal joints, Transverse expansion joints and construction joints of approved quality including cost of conveyance and placing in position etc., as directed by the engineer in charge

59

1186

69974

... More
Bridge work;Forming embankment with borrowed useful earth (Selected earth with a lead of 10.0km) from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work). For Shoulder only

3368

378

1273104

... More
Bridge work;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment will be made based on level for finished item of work)

464

2243

1040752

... More
Bridge work;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.(Payment will be made based on level for finished item of work)

314

2509

787826

... More
Bridge work;Providing and aplying Prime coat with bitumen emulsion (Slow setting /bulk) using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.

1201

36

43596

... More
Bridge work;Providing and applying tack coat with bitumen VG-10 bitumen using pressure distributor at the rate of 0.2Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1201

12

14652

... More
Bridge work;Providing and laying 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 3 as per table 500-7 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler, including cost and conveyance of all materials to work site and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

37

10233

378621

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge a) Above LWL excluding dewatering charges in ordinary soils upto SDR, by mechanical means upto 3M depth

1650

144

237600

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge a) Above LWL excluding dewatering charges in ordinary soils upto SDR, by mechanical means 3M - 6M depth

902

164

147928

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge b) Above LWL excluding dewatering charges in ordinary rock by mechanical means upto 3M depth

969

183

177327

... More
Bridge work;Plain Cement Concrete (1:3:6) nominal Mix in foundation with crushed stone aggregate 40 mm nominal sizemechanically mixed placed in foundation and compacted by vibration complete as per drawings and technical specifications & as per MoRT&H Spcn. No 2100

52

5741

298532

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Foundations using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision)for footings of abutmentsPiers, cut-off walls and Wing walls below sill Level

736

5789

4260704

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structure of abutments and Wing walls below sill Level upto 5.0m Height

610

6123

3735030

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structure of abutments and Wing walls below sill Level 5.0m - 10.0m Height

80

6346

507680

... More
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure upto 5.0m Height

13

6645

86385

... More
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure 5.0m - 10.0m Height

23

6862

157826

... More
Bridge work;V.R.C.C concrete M -30 grade for Super Structure with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 (5th revision)as per MOST Drg. No: SD/114 upto 5.0m Height

119

7292

867748

... More
Bridge work;V.R.C.C concrete M -30 grade for Super Structure with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 (5th revision)as per MOST Drg. No: SD/114 5.0m - 10.0m Height

712

7596

5408352

... More
Bridge work;Reinforced Cement Concrete M30 for Approach Slab with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2704(5th revision)as directed by Engineer-in-Chrge for approach slab

29

6185

179365

... More
Bridge work;V.R.C.C. M30 grade concrete with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawing BD/1-69A and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2702(5th revision)as directed by Engineer-in-Charge for wearing coat over deck slab

70

6190

433300

... More
Bridge work;Plain Vibrated Cement Concrete M15 Mix using 40mm HBG (SS5) graded M/C metal including cost and conveyance of all materials , centering, machine mixing, laying,vibrating, finishing curing including hire and operational charges of all T&P etc., and including island formation and diversion of flow of water, if necessary etc., complete for Levelling course below approach slab as per drawings and technical specifications & as per MoRT&H Spcn. No 2700.

8

5566

44528

... More
Bridge work;Vibrated Reinforced cement concrete in super structure complete as per darwing and techincal specifications as per MORT&H specification nos 1500,1700 & 2200 VRCC M-40 for Crash barriers excluding cost of steel and its fabrication charges as per approved drawing.

58

7110

412380

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Foundation

7

86228

603596

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Sub structure

12

86558

1038696

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Super structure

79

88842

7018518

... More
Bridge work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for quadrantial revetment.

45

2843

127935

... More
Bridge work;Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

14

1903

26642

... More
Bridge work;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

23

368

8464

... More
Bridge work;Back filling behind Abutments with selected earth including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

165

368

60720

... More
Bridge work;Providing filter media with granular material/ crushed stone aggregates satisfying the requirements laid down in clause 2504.2.2 of MORT&H (Rev. V) specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards wall and provided over the entire surface, behind abutment, and return wall to the full height and compacted to a firm condition complete as per drawing and technical specifications as per MORT&H Spcn. No. 2200 and as per Clause No of 710.1.4 of IRC 78 .

129

2165

279285

... More
Bridge work;Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A/C pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Complete as per drawing and technical specification, complete for finished item of work for weep holes as per MORTH specification No 2706 & 2200 (5th Revision)

172

456

78432

... More
Bridge work;Supplying and fixing of C I drainage spouts complete as per MOT Drg No SD/

14

1444

20216

... More
Bridge work;Providing 25.4 mm mastic pads for longitudinal joints, Transverse expansion joints and construction joints of approved quality including cost of conveyance and placing in position etc., as directed by the engineer in charge

125

1186

148250

... More
Bridge work;Forming embankment with borrowed useful earth (Selected earth with a lead of 10.0km) from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work). For Shoulder only

2599

378

982422

... More
Bridge work;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment will be made based on level for finished item of work)

313

2243

702059

... More
Bridge work;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.(Payment will be made based on level for finished item of work)

211

2509

529399

... More
Bridge work;Providing and aplying Prime coat with bitumen emulsion (Slow setting /bulk) using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.

809

36

29367

... More
Bridge work;Providing and applying tack coat with bitumen VG-10 bitumen using pressure distributor at the rate of 0.2Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

809

12

9870

... More
Bridge work;Providing and laying 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 3 as per table 500-7 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler, including cost and conveyance of all materials to work site and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

25

10233

255825

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge a) Above LWL excluding dewatering charges in ordinary soils upto SDR, by mechanical means upto 3M depth

1298

144

186912

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge b) Above LWL excluding dewatering charges in ordinary rock by mechanical means upto 3M depth

875

183

160125

... More
Bridge work;Plain Cement Concrete (1:3:6) nominal Mix in foundation with crushed stone aggregate 40 mm nominal sizemechanically mixed placed in foundation and compacted by vibration complete as per drawings and technical specifications & as per MoRT&H Spcn. No 2100

47

5741

269827

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Foundations using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision)for footings of abutmentsPiers, cut-off walls and Wing walls below sill Level

490

5789

2836610

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structure of abutments and Wing walls below sill Level upto 5.0m Height

614

6123

3759522

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structure of abutments and Wing walls below sill Level 5.0m - 10.0m Height

30

6346

190380

... More
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure upto 5.0m Height

10

6645

66450

... More
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure 5.0m - 10.0m Height

29

6862

198998

... More
Bridge work;V.R.C.C concrete M -30 grade for Super Structure with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 (5th revision)as per MOST Drg. No: SD/114 5.0m - 10.0m Height

958

7596

7276968

... More
Bridge work;Reinforced Cement Concrete M30 for Approach Slab with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2704(5th revision)as directed by Engineer-in-Chrge for approach slab

29

6185

179365

... More
Bridge work;V.R.C.C. M30 grade concrete with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawing BD/1-69A and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2702(5th revision)as directed by Engineer-in-Charge for wearing coat over deck slab

83

6190

513770

... More
Bridge work;Plain Vibrated Cement Concrete M15 Mix using 40mm HBG (SS5) graded M/C metal including cost and conveyance of all materials , centering, machine mixing, laying,vibrating, finishing curing including hire and operational charges of all T&P etc., and including island formation and diversion of flow of water, if necessary etc., complete for Levelling course below approach slab as per drawings and technical specifications & as per MoRT&H Spcn. No 2700.

8

5566

44528

... More
Bridge work;Vibrated Reinforced cement concrete in super structure complete as per darwing and techincal specifications as per MORT&H specification nos 1500,1700 & 2200 VRCC M-40 for Crash barriers excluding cost of steel and its fabrication charges as per approved drawing.

69

7110

490590

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Foundation

6

86228

517368

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Sub structure

12

86558

1038696

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Super structure

79

88842

7018518

... More
Bridge work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for quadrantial revetment.

37

2843

105191

... More
Bridge work;Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

13

1903

24739

... More
Bridge work;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

19

368

6992

... More
Bridge work;Back filling behind Abutments with selected earth including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

123

368

45264

... More
Bridge work;Providing filter media with granular material/ crushed stone aggregates satisfying the requirements laid down in clause 2504.2.2 of MORT&H (Rev. V) specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards wall and provided over the entire surface, behind abutment, and return wall to the full height and compacted to a firm condition complete as per drawing and technical specifications as per MORT&H Spcn. No. 2200 and as per Clause No of 710.1.4 of IRC 78 .

113

2165

244645

... More
Bridge work;Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A/C pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Complete as per drawing and technical specification, complete for finished item of work for weep holes as per MORTH specification No 2706 & 2200 (5th Revision)

148

456

67488

... More
Bridge work;Supplying and fixing of C I drainage spouts complete as per MOT Drg No SD/

18

1444

25992

... More
Bridge work;Providing 25.4 mm mastic pads for longitudinal joints, Transverse expansion joints and construction joints of approved quality including cost of conveyance and placing in position etc., as directed by the engineer in charge

145

1186

171970

... More
Bridge work;Forming embankment with borrowed useful earth (Selected earth with a lead of 10.0km) from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work). For Shoulder only

5617

378

2123226

... More
Bridge work;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment will be made based on level for finished item of work)

671

2243

1505053

... More
Bridge work;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.(Payment will be made based on level for finished item of work)

453

2509

1136577

... More
Bridge work;Providing and aplying Prime coat with bitumen emulsion (Slow setting /bulk) using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.

1736

36

63017

... More
Bridge work;Providing and applying tack coat with bitumen VG-10 bitumen using pressure distributor at the rate of 0.2Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1736

12

21179

... More
Bridge work;Providing and laying 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 3 as per table 500-7 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler, including cost and conveyance of all materials to work site and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

53

10233

542349

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge a) Above LWL excluding dewatering charges in ordinary soils upto SDR, by mechanical means upto 3M depth

267

144

38448

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge b) Above LWL excluding dewatering charges in ordinary rock by mechanical means upto 3M depth

283

183

51789

... More
Bridge work;Plain Cement Concrete (1:3:6) nominal Mix in foundation with crushed stone aggregate 40 mm nominal sizemechanically mixed placed in foundation and compacted by vibration complete as per drawings and technical specifications & as per MoRT&H Spcn. No 2100

19

5741

109079

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Foundations using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision)for footings of abutmentsPiers, cut-off walls and Wing walls below sill Level

264

5789

1528296

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structure of abutments and Wing walls below sill Level upto 5.0m Height

234

6123

1432782

... More
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure upto 5.0m Height

10

6645

66450

... More
Bridge work;V.R.C.C concrete M -30 grade for Super Structure with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 (5th revision)as per MOST Drg. No: SD/114 5.0m -10.0m Height

107

7596

812772

... More
Bridge work;Reinforced Cement Concrete M30 for Approach Slab with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2704(5th revision)as directed by Engineer-in-Chrge for approach slab

29

6185

179365

... More
Bridge work;V.R.C.C. M30 grade concrete with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawing BD/1-69A and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2702(5th revision)as directed by Engineer-in-Charge for wearing coat over deck slab

15

6190

92850

... More
Bridge work;Plain Vibrated Cement Concrete M15 Mix using 40mm HBG (SS5) graded M/C metal including cost and conveyance of all materials , centering, machine mixing, laying,vibrating, finishing curing including hire and operational charges of all T&P etc., and including island formation and diversion of flow of water, if necessary etc., complete for Levelling course below approach slab as per drawings and technical specifications & as per MoRT&H Spcn. No 2700.

8

5566

44528

... More
Bridge work;Vibrated Reinforced cement concrete in super structure complete as per darwing and techincal specifications as per MORT&H specification nos 1500,1700 & 2200 VRCC M-40 for Crash barriers excluding cost of steel and its fabrication charges as per approved drawing.

13

7110

92430

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Foundation

3

86228

258684

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Sub structure

4

86558

346232

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Super structure

12

88842

1066104

... More
Bridge work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for quadrantial revetment.

49

2843

139307

... More
Bridge work;Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

15

1903

28545

... More
Bridge work;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

25

368

9200

... More
Bridge work;Back filling behind Abutments with selected earth including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

169

368

62192

... More
Bridge work;Providing filter media with granular material/ crushed stone aggregates satisfying the requirements laid down in clause 2504.2.2 of MORT&H (Rev. V) specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards wall and provided over the entire surface, behind abutment, and return wall to the full height and compacted to a firm condition complete as per drawing and technical specifications as per MORT&H Spcn. No. 2200 and as per Clause No of 710.1.4 of IRC 78 .

123

2165

266295

... More
Bridge work;Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A/C pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Complete as per drawing and technical specification, complete for finished item of work for weep holes as per MORTH specification No 2706 & 2200 (5th Revision)

177

456

80712

... More
Bridge work;Supplying and fixing of C I drainage spouts complete as per MOT Drg No SD/

2

1444

2888

... More
Bridge work;Providing 25.4 mm mastic pads for longitudinal joints, Transverse expansion joints and construction joints of approved quality including cost of conveyance and placing in position etc., as directed by the engineer in charge

51

1186

60486

... More
Bridge work;Forming embankment with borrowed useful earth (Selected earth with a lead of 10.0km) from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work). For Shoulder only

4504

378

1702512

... More
Bridge work;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment will be made based on level for finished item of work)

493

2243

1105799

... More
Bridge work;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.(Payment will be made based on level for finished item of work)

333

2509

835497

... More
Bridge work;Providing and aplying Prime coat with bitumen emulsion (Slow setting /bulk) using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.

1274

36

46246

... More
Bridge work;Providing and applying tack coat with bitumen VG-10 bitumen using pressure distributor at the rate of 0.2Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1274

12

15543

... More
Bridge work;Providing and laying 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 3 as per table 500-7 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler, including cost and conveyance of all materials to work site and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

39

10233

399087

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge a) Above LWL excluding dewatering charges in ordinary soils upto SDR, by mechanical means upto 3M depth

951

144

136944

... More
Bridge work;Earth work excavation for foundation of structures as per Drawings and technical specifications,incuding settting out, construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and back filling with approved material as per MoRT&H Spn. 304 (5th revision) and as directed by the Engineer-in-Charge b) Above LWL excluding dewatering charges in ordinary rock by mechanical means upto 3M depth

442

183

80886

... More
Bridge work;Plain Cement Concrete (1:3:6) nominal Mix in foundation with crushed stone aggregate 40 mm nominal sizemechanically mixed placed in foundation and compacted by vibration complete as per drawings and technical specifications & as per MoRT&H Spcn. No 2100

29

5741

166489

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Foundations using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision)for footings of abutmentsPiers, cut-off walls and Wing walls below sill Level

403

5789

2332967

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structure of abutments and Wing walls below sill Level upto 5.0m Height

450

6123

2755350

... More
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structure of abutments and Wing walls below sill Level 5.0m - 10.0m Height

119

6346

755174

... More
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure 5.0m - 10.0m Height

13

6862

89206

... More
Bridge work;V.R.C.C concrete M -25 grade for Super Structure with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 (5th revision)as per MOST Drg. No: SD/114 5.0m - 10.0m Height

142

7524

1068408

... More
Bridge work;Reinforced Cement Concrete M30 for Approach Slab with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming ti table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2704(5th revision)as directed by Engineer-in-Chrge for approach slab

29

6185

179365

... More
Bridge work;V.R.C.C. M30 grade concrete with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental cahrges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawing BD/1-69A and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 &2702(5th revision)as directed by Engineer-in-Charge for wearing coat over deck slab

20

6190

123800

... More
Bridge work;Plain Vibrated Cement Concrete M15 Mix using 40mm HBG (SS5) graded M/C metal including cost and conveyance of all materials , centering, machine mixing, laying,vibrating, finishing curing including hire and operational charges of all T&P etc., and including island formation and diversion of flow of water, if necessary etc., complete for Levelling course below approach slab as per drawings and technical specifications & as per MoRT&H Spcn. No 2700.

8

5566

44528

... More
Bridge work;Vibrated Reinforced cement concrete in super structure complete as per darwing and techincal specifications as per MORT&H specification nos 1500,1700 & 2200 VRCC M-40 for Crash barriers excluding cost of steel and its fabrication charges as per approved drawing.

20

7110

142200

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Foundation

4

86228

344912

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Sub structure

6

86558

519348

... More
Bridge work;Providing HYSD bars (Fe-500)from primary producers like TATA, SAIL VSP, JSW & Shyam as approved by Ministry of Steel of different diameters , wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, bi nding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and opertaional charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600&2200 (5th revision) and as per I.S:1786 of 1985 for Super structure

16

88842

1421472

... More
Bridge work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for quadrantial revetment.

104

2843

295672

... More
Bridge work;Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall.

21

1903

39963

... More
Bridge work;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

52

368

19136

... More
Bridge work;Back filling behind Abutments with selected earth including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

386

368

142048

... More
Bridge work;Providing filter media with granular material/ crushed stone aggregates satisfying the requirements laid down in clause 2504.2.2 of MORT&H (Rev. V) specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards wall and provided over the entire surface, behind abutment, and return wall to the full height and compacted to a firm condition complete as per drawing and technical specifications as per MORT&H Spcn. No. 2200 and as per Clause No of 710.1.4 of IRC 78 .

180

2165

389700

... More
Bridge work;Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A/C pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Complete as per drawing and technical specification, complete for finished item of work for weep holes as per MORTH specification No 2706 & 2200 (5th Revision)

384

456

175104

... More
Bridge work;Supplying and fixing of C I drainage spouts complete as per MOT Drg No SD/

4

1444

5776

... More
Bridge work;Providing 25.4 mm mastic pads for longitudinal joints, Transverse expansion joints and construction joints of approved quality including cost of conveyance and placing in position etc., as directed by the engineer in charge

57

1186

67602

... More
Bridge work;Forming embankment with borrowed useful earth (Selected earth with a lead of 10.0km) from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work). For Shoulder only

6405

378

2421090

... More
Bridge work;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment will be made based on level for finished item of work)

746

2243

1673278

... More
Bridge work;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.(Payment will be made based on level for finished item of work)

503

2509

1262027

... More
Bridge work;Providing and aplying Prime coat with bitumen emulsion (Slow setting /bulk) using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.

1929

36

70023

... More
Bridge work;Providing and applying tack coat with bitumen VG-10 bitumen using pressure distributor at the rate of 0.2Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

1929

12

23534

... More
Bridge work;Providing and laying 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 3 as per table 500-7 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler, including cost and conveyance of all materials to work site and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

58

10233

593514



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.