Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Road Construction
Opening Date25 Apr 2023
Closing Date2 May 2023
Tender Amount₹ 2,60,69,258
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
408426Bid Award Id
ViewTender No
NIT No. 4/2Non-Plan/E-in-C(SR&CRN)/SE(D&P)-II/EE(SR)/DEE/AEE/2023-24, Dt: 17.04.2023.Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Proving and laying Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure for Abutments, Piers & wing walls, weir/check dam.
302
6318
1908036
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing and laying Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2100 (5th Revision ) and as directed by the Engineer-in-Charge for RAFT foundation
522
6466
3375252
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for Abutment Bed blocks & Backing walls, (Sub Structure)
24
6855
164520
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing and placing reinforced cement concrete in Super Structure of VRCC M30 grade as per drawing and Technical Specification and MoRT&H Specification No.1500, 1600, 1700, 1900 & 2300 excluding cost of steel & its fabrication charges including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed by the Engineer-in-Charge . As per MOST Drg.No:SD/114
532
7524
4002768
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing and laying Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges, centering, machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 2700 (5th Revision) for Levelling course below approach slab.
8
6354
50832
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing and laying Vibrated reinforced cement concrete M30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as per MOST Drg. SD/104 and as directed by the Engineer-in-Charge for Approach slab.
29
6382
185078
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing and laying Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing SD/205 but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.
49
6373
312277
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing and laying Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing SD/205 but excluding cost of steel and its fabrication charges as per MoRT&H specification nos 809, 1500, 1700 & 2200 -for Crash Barriers.
41
7328
300448
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Supplying, fitting, and placing uncoated HYSD bars Fe-500 of different diameters procured from primary producers like TATA,SAIL,VSP,J.S.W & Shyam as approved by Ministry of Steel, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including overlapping wastage and welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for Superstructure of R.C.C items.
47
94769
4454143
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Supplying, fitting, and placing uncoated HYSD bars Fe-500 of different diameters procured from primary producers like TATA,SAIL,VSP,J.S.W & Shyam as approved by Ministry of Steel, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including overlapping wastage and welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
6
92721
556326
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Supplying, fitting, and placing uncoated HYSD bars Fe-500 of different diameters procured from primary producers like TATA,SAIL,VSP,J.S.W & Shyam as approved by Ministry of Steel, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including overlapping wastage and welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.
33
92421
3049893
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.25 cum of CC (1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., but excluding labour charges complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for revetment.
27
2732
73764
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing rough stone revetment 300 mm thick using 300mm size rough stonevariety including cost, and conveyance of all materials to site,including labour chargesfor packing the stones for revetment etc., but excluding labour charges complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for toe walls.
11
1783
19613
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 305, 309 & 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.
14
359
5026
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Back filling behind Abutments with selected Soil including cost ,conveyance of all materials to site etc., but excluding seigniorage charges complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work
89
359
31951
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBT metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.
77
2071
159467
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing weep holes in plain/ reinforced concrete abutment,wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure at 1.00 m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction staggered from the weep holes laying above and below lines as shown in drawing including cost and coveyance of the A.C. pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., but excluding seigniorage charges complete for finished item of work for weep holes as per MORT&H specification No 2706 & 2200 (5th revision)
167
458
76486
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulders laid dry without wire crates.
430
1697
729710
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Supplying & fixing of Drainage spouts complete as per MoRT&H specification No. 2705 and as per drawing No. SD/203 complete for finished item of work
10
1416
14160
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Forming embankment with borrowed useful earth (Selected earth a lead of 10.0km) from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work).
5684
376
2137184
... More
Reconstruction of HLB at Km.1 6 8 in place of existing Cause way on NH 7 to Paragatoor road in Jogul;Construction of Granular sub-base by providing HBG material confirming to Grading-VI of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator/approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment will be made based on levels for finished item of work ).
1088
2051
2231488
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements