Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Road Construction
Opening Date9 Oct 2023
Closing Date12 Oct 2023
Tender Amount₹ 1,13,072 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Engineering Works;Making up loss of material /irregularities on the shoulders to the design levels by adding fresh approved soil and compacting with the appropriate equipment as per MORT&H specification no. 3003 (As per E-in-C Circular memo no. Mainte/EE(Tec)/TA15/AE4/2005 Dt: 25-04-2005) For Gajwel- Doulthabad Road from Km 5/0 to 22/550

-

36

-

... More
Civil Engineering Works;Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-25mm HBG metal with required quantity of 10-12mm size HBG key chips and 80/100gr Bitumen at 72 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and 80/100gr Bitumen at 80 Kgs/1Cum., including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete. For Dubbak-Kothapally Road from Km 0/0 to 12/500

20

254

5080

... More
Civil Engineering Works;Providing B.T. patch work for pot holes of depth ranging from 50 to 70mm, using 40mm HBG metal with required quantity of 10-12mm size HBG key chips and medium setting bitumen emulsion at 45 Kgs/Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and medium setting bitumen emulsion at 75 Kgs/Cum including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting the finishing and blinding the surface using stone dust / sand, including cost of all materials T&P and labour charges for all operations etc., complete For Dubbak-Kothapally Road from Km 0/0 to 12/500

5

406

2030

... More
Civil Engineering Works;Manufacturing & Fixing of RCC HECTOMETRE STONES as per drawing & Technical Specification clause 804 including cost of Earth work excvation, Reinforcement, Paiting & Numbering including transporting fixing etc., complete as directed by the Engineer-in-InchargeFor Dubbak to meet Medak-Siddipet Road from Km 0/0 to 8/000

8

634

5072

... More
Civil Engineering Works;Manufacturing & Fixing of RCC KILOMETER STONES as per drawing & Technical Specification clause 804 including cost of Earth work excvation, Reinforcement, Paiting & Numbering including transporting fixing etc., complete as directed by the Engineer-in-Incharge For Dubbak to meet Medak-Siddipet Road from Km 0/0 to 8/000

2

2158

4316

... More
Civil Engineering Works;Clearing of light jungle including all baour charges etc., complete for finished item of work For Dubbak to meet Medak-Siddipet Road from Km 0/0 to 8/000

4200

3

14280

... More
Civil Engineering Works;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora Stumps including all labour charges etc., complete for finished item of work For Dubbak to meet Medak-Siddipet Road from Km 0/0 to 8/000

1400

4

5600

... More
Civil Engineering Works;Making up loss of material /irregularities on the shoulders to the design levels by adding fresh approved soil and compacting with the appropriate equipment as per MORT&H specification no. 3003 (As per E-in-C Circular memo no. Mainte/EE(Tec)/TA15/AE4/2005 Dt: 25-04-2005) For Dubbak to meet Medak-Siddipet Road from Km 0/0 to 8/000

-

36

-

... More
Civil Engineering Works;Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-25mm HBG metal with required quantity of 10-12mm size HBG key chips and 80/100gr Bitumen at 72 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and 80/100gr Bitumen at 80 Kgs/1Cum., including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete. For Dubbak to meet Medak-Siddipet Road from Km 0/0 to 8/000

40

255

10200

... More
Civil Engineering Works;Providing B.T. patch work for pot holes of depth ranging from 50 to 70mm, using 40mm HBG metal with required quantity of 10-12mm size HBG key chips and medium setting bitumen emulsion at 45 Kgs/Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and medium setting bitumen emulsion at 75 Kgs/Cum including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting the finishing and blinding the surface using stone dust / sand, including cost of all materials T&P and labour charges for all operations etc., complete For Dubbak to meet Medak-Siddipet Road from Km 0/0 to 8/000

10

409

4090

... More
Civil Engineering Works;Manufacturing & Fixing of RCC HECTOMETRE STONES as per drawing & Technical Specification clause 804 including cost of Earth work excvation, Reinforcement, Paiting & Numbering including transporting fixing etc., complete as directed by the Engineer-in-Incharge For Habsipur-Dubbak Road from Km 0/0 to 5/200

21

629

13209

... More
Civil Engineering Works;Manufacturing & Fixing of RCC KILOMETER STONES as per drawing & Technical Specification clause 804 including cost of Earth work excvation, Reinforcement, Paiting & Numbering including transporting fixing etc., complete as directed by the Engineer-in-Incharge For Habsipur-Dubbak Road from Km 0/0 to 5/200

5

2126

10630

... More
Civil Engineering Works;Clearing of light jungle including all baour charges etc., complete for finished item of work For Habsipur-Dubbak Road from Km 0/0 to 5/200

1400

3

4760

... More
Civil Engineering Works;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora Stumps including all labour charges etc., complete for finished item of work For Habsipur-Dubbak Road from Km 0/0 to 5/200

700

4

2800

... More
Civil Engineering Works;Making up loss of material /irregularities on the shoulders to the design levels by adding fresh approved soil and compacting with the appropriate equipment as per MORT&H specification no. 3003 (As per E-in-C Circular memo no. Mainte/EE(Tec)/TA15/AE4/2005 Dt: 25-04-2005) For Habsipur-Dubbak Road from Km 0/0 to 5/200

-

36

-

... More
Civil Engineering Works;Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-25mm HBG metal with required quantity of 10-12mm size HBG key chips and 80/100gr Bitumen at 72 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and 80/100gr Bitumen at 80 Kgs/1Cum., including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete. For Habsipur-Dubbak Road from Km 0/0 to 5/200

25

251

6275

... More
Civil Engineering Works;Providing B.T. patch work for pot holes of depth ranging from 50 to 70mm, using 40mm HBG metal with required quantity of 10-12mm size HBG key chips and medium setting bitumen emulsion at 45 Kgs/Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and medium setting bitumen emulsion at 75 Kgs/Cum including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting the finishing and blinding the surface using stone dust / sand, including cost of all materials T&P and labour charges for all operations etc., complete For Habsipur-Dubbak Road from Km 0/0 to 5/200

10

401

4010



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.