Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Building Construction
Opening Date24 Jan 2025
Closing Date7 Feb 2025
Tender Amount₹ 15,63,97,399 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply Installation of 7 feet length moulded patch cord Makes: Digisol / TP Link / D link. / Legrand

30

222

6660

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Installation, Testing and Commissioningof 24 Port 10 / 100 / 1000 Gigabit Unmanageable Ethernet switch. Makes : TP Link / D link / Netfox

1

10112

10112

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply of unloaded 24 port patch panel with IO separate Makes : Digisol / TP Link / D link. / Legrand

2

7578

15156

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply & Fixing of 55 inch LED monitor 4K smart commercial display unit with VGA HDMI, USB ports. Panel Type LCD, Aspect Ration 16:9, Resolution 3480 x 2160, Brightness 350 nits, Contrast ration 4000:1, Response time 8ms Approved Make : Samsung / LG

1

98239

98239

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Installation, Testing and commissioning of16 Port, 2 GIGA fibre slots (SFP), power budget 250 W 10 / 100 / 1000 Gigabit PoE switchwith GIGA fibre slots (SFP). Makes : Digisol / TP Link / D link

2

20337

40674

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and installation of Surveillance 8 TB Hard Disk Make : WD/ Seagate

4

36200

144800

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Installation, Testing and Commissioning of 16CH Embedded 4K NVR 2 SATA expandable up to 20TB, audio input & Output, Two way communication supported, G7.11 audio format support, Min. 120Gb recording throughput, 4 alarm inputs & 2 Outputs, RS485, Esata and RS232 to be supported with max. 16 users, Op. temp -10 to 50 deg. C, NDAA compliant, UL/CE/FCC certified. Approved Makes: BOSCH /HONEYWELL / MOBOTIX/ AXIS

2

92800

185600

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Installation, Testing and Commissioning of Supply, Installation, Testing and Commissioning of 2MP or higher IR Fixed lens Clear glass type Dome camera, 1/2.7" progressive CMOS image sensor, Min. Illumination 0.005 (color), S/N Ratio: 50dB, Electronics Shutter: 1/8 ~ 1/32000, IR Distance: 30M, WDR~120dB/BLC/HLC/3D DNR, Gain Control: 0 ~100%; SD card up to 256GB, PAN: 0-330, Tilt: 0-75, Rotation: 0-330; Video Compression: H.265 HEVC/H.264/MJPEG, Smart Codec; Triple Stream; Protocals: H.265 HEVC/H.264/MJPEG, Smart Codec; ONVIF: S,G,T; Op. Temp: -40 to 60 Deg; power consumption max. 4W; IP67,IK10,UL,NDAA Compliance Approved Makes: BOSCH /HONEYWELL / MOBOTIX/ AXIS - MAF to be submitted by the vendor

4

7500

30000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Installation, Testing and Comissioning of 2MP Bullet camera 1/2.8'' CMOS progressive sensor, min. illumination 0.006 Lux F1.6 (color), 0 Lux B/w, 50dB S/N ratio; 1/8 ~1/32000 shutter speed, IR distance - 60Mtr or better, 120 dB or better WDR, triple stream;Protocal: IPv4, TLS,DHCP,IPv6, TCP / IP, HTTP, SMTP,UDP,HTTPS, RTSP / RTP / RTCP,DNS,SNMP, IGMP / Multicast, NTP, QoS, 802.1X, ICMP, ARP; Motion Detecton, People counting, Intrusion, Loitering, SMD, Tampering; local storage: up to 256Gb; Alarm IN & Outputs, Audio IN & Out; ONVIF-S/G/T; Security: HTTPS,Digest authentication, User account and password protection,TLS1.2 only, Stream encryption, AES128/ Telnet closed, IP Filter,PCI-DSS compliance; IP67,IK10, UL,CE,FCC, NDAA Compliant Approved Makes: BOSCH /HONEYWELL / MOBOTIX/ AXIS MAF to be submitted by the vendor

16

30670

490720

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Supply, transportation, installation, testing and commissioning of 10 passenger Gearless & Machine Room less elevator with following specifications with connected minor civil works required for installation of Lift including all accessories, scoffolding, requried channels, loading and unloading of materials etc,including comprehensive maintenance of lifts during the defect liability period.Makes: Schindler / Kone / OTIS / Mitsubishi?Specifications:a)Type : Machine room lessb)Pit Depth :1500 mm or as per NBCc) Minimum Floor to Floor Height (Required) : As per Standardd)Travel height : 12 mtrs approximately e)Head room Height : 4.5mtrsf)Lintel Height (Required) : 2240mm from finished floor level +/- 10%g)Number of persons : 10 Ph)Rated Load : 680 Kgsi)Number of Stops : 5j)Number of Access sides : 1k)Floor Designations : G, 1, 2,3?l)Drive Sytem : Alternating current, Voltage Frequency Drive (ACVF).m)Type of Controller : Fully collective control - Simplex / Duplex as per the site condition.n)Speed of Travel : 1 m/so)Car size : As per Standardp)Door width : =800mm or As per Standar q)Door Height : 2000 mm or as per standardr)Rated output motor : as per standards)Car Design : Car walls finish in Stainless stell hairline finish LED spot in ceiling.t)Car Doors : stainless steel hairline finish. Granite Flooring finish in Black sea. Deco ceiling finish in stainless steel Hairline. Full Height mirror on rear car panel.u)Car Operating Panel : Mechanical push button.Door open/close and alarm buttons / Touch panel or equivalent, Visual call confirmation, Car position Indicator, announcing arrows for collective controls, Segment display automatic landing doors with stainless steel hairline finish. Center Opening as per the ?site condition?w)Special Features : Closed loop control system ,Self Diagnostic control ,Overload detection ,Automatic evacuation to nearest floor(ARD) ,Light curtain on car entrance,Alarm Horn ,Fire Switch ,Handrail in stainless steel finish on rear wall ,Auto Fan off ,Auto light off ,Intercom-3way

2

1760169

3520338

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing 2 Runs of copper tubes for suction and liquid between indoor and out door unit for split air conditioners including foaming required wire etc complete with connections. 1.1 1/8" x 5/8"

120

2091

250920

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing 2 Runs of copper tubes for suction and liquid between indoor and out door unit for split air conditioners including foaming required wire etc complete with connections. 1.7/8" x 1/2"

150

1784

267600

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Transportation and Installation of 3.0 TR Three Phase Inverter Cassette type AC unit capable of delivering 42000 BTU/hr and above with operating onrefrigerant R-32/R-410 with ceiling mounted indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on AC supply capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing units etc complete with Wireless remote controller, but without refrigerent piping and cable.with 2 years warranty and annual maintenance contract. Makes:Daikin / Bluestar / Hitachi / Mitsubishi Electric /Toshibha or equivalent

5

140349

701745

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Transportation and Installation of 2.0 TR Inverter Cassette type AC unit capable of delivering 24000 BTU/hr and above with operating on refrigerant R-32/R-410 with ceiling mounted indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on AC supply capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing units etc complete with Wireless remote controller, but without refrigerent piping and cable.with 2 years warranty and annual maintenance contract. Makes:Daikin / Bluestar / Hitachi / Mitsubishi Electric /Toshibha or equivalent

2

94675

189350

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply ,Transportation and installation of 2.0 / 1.8 TR 3 Star INVERTER Model Cool type split AC unit capable of delivering 21600 BTU/hr and above with operating on refrigerant R-32 / R-410 with high wall mounted Single Split 100% copper indoor and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1 Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160 - 264 volts) and cordless remote control with with warranty of compressor for 5 years and comprehensive maintenance for 2 years. Makes : Daikin / Blue Star / Toshibha / Hitachi or equivalent

15

54263

813945

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and transportation of ?90W +/-10% (>=9000 Lumens) LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover / temperature protective custom molded polycarbonate diffuser, Thermal shockand impact resistant IK07 fixed to the housing by SS screws Suitable lense on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >120 lumens / watt, with Ingress protection IP66, BIS approved Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates.LUMINAIRE MAKE : PHILIPS / Surya / Osram / Jaquar / Panasonic / HAVELLS LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

25

7751

193775

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Supply and fixing of Automatic Street Light Control System based on daywise users settable mode of astronomical timer or digital timer with Optical Micro Sensor, Low voltage / High voltage trip and reset, operating voltage 380 - 480V AC, 50 HZ and shall withstand surge level of 8 KV. The electronic controller with IP 65 protection and suitable SMC / PC enclousure with IP 54 protection, MCBs of Legrand / Schneider / LK / Siemens / BCH of 10kA C curve and Contactor suitable to control the load 8KW Three phase load with necessary ?hardware, Allen key set and clamping arrangements. Makes : Nature switch / Light Mate / Havells

1

17042

17042

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of suitable out door feeder piller box of size 3' x 2' x 1' made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 63A, 4 Pole isolator as incomer, 6 Nos 6-32A SP MCBs as out goings. indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch with following.(for street light control)

1

25630

25630

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal / Conical pole duly erecting on base plate duly provided4 Nos foundation bolts with nuts with providing of 0.45Mtrx0.45Mtrsx1.20 Mtr size M20 cc work vibrated concreting mixing with necessary steel (10kgs) reinforcement as directed by the field engineers during execution including centering, decentering, water curing as required, soil exacavation, back filling, muffing removal and coil earthing including all labour charges and cost and conveyance of materials etc. complete.

15

7499

112485

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Fabrication, Transportation and supply of of 1.5mtrs sword type decorative double arm bracket with dooms either sides complete with all accessories with MS galvanized 50mm dia Pipe. Makes: BAJAJ / VALMONT / TRANSRAIL

5

6703

33515

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Fabrication, Transportation and supply of of 1.5mtrs sword type decorative Single arm bracket with dooms complete with all accessories with MS galvanized 50mm dia Pipe. ?Makes: BAJAJ / VALMONT / TRANSRAIL

10

5135

51350

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Fabrication, Transportation and supply of hotdip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including chain for anti theft mechanism, supply of suitable boards with bakelite sheet, din channel for MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for ?7.50 Mtrs height Pole having dimensions Bottom 130mm, Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700mm long 'J' bolts along with template or equivalentMakes: BAJAJ / VALMONT / TRANSRAIL

15

15031

225465

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing floor mounting stand for keeping 4No of fire bucket 1500mm length, 900mm height made out of 40x40x6mm angle iron welded with 4 hooks and duly painted with one coat of red lead and two coats of enamel paint.

1

1592

1592

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply of round bottom G.I sheet bucket of 9 Ltrs. Capacity as per IS:2546 made out of 24 gauge GI sheet with extra handle at bottom duly painted inside and red out side with printed with FIRE Mark for stand and hook and filled with sand and arranged to existing stand or hook.

4

390

1560

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of ABC Powder type fire extinguisher of 6 Kgs. Capacity, with initial filling in brand new cylinder with powder coated finish, fitted with Gun metal union, high pressure gas cartridge, discharge hose, wall mounting bracket / stand etc. complete, confirming to IS:15683 (For car parking) Makes: FIREX /MINIMAX/ ARMOUR /SAFEX/ KANNEX / CEASEFIRE

2

5567

11134

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of Co2 4.5 Kg capacity type extinguisher with initial filling in brand nes wcylinder with powder coated finish, fitted with Gun metal union, high pressure, discharge hose, wall mounting bracket / stand etc. complete, confirming to IS:15683. For electrical room Makes: FIREX /MINIMAX/ ARMOUR /SAFEX/ KANNEX / CEASEFIRE

2

4834

9668

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing & Fixing of Danger Notice Plates of size 250x200mm, shall comply with IS:2551-1982.

2

325

650

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing & Fixing of Shock instrution chart in English / Hindi / Telugu duly framed with front glass.

1

654

654

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of PVC synthetic elastomer electrically insulated mat with Class B insulation conforming to IS: 15652-2006 having 2.5mm thickness upto 11KV.

3

5643

16929

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Supply and fixing of heavy duty long barrel alluminium lugs confirming to I.S specifications suitable for ?16 Sq.mm cable etc complete with nuts, bolts and washers.Makes: DMI / Jainson / Dowels or equivalent make as approved by the department

60

40

2400

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Supply and fixing of heavy duty long barrel alluminium lugs confirming to I.S specifications suitable for ?50 Sq.mm cable etc complete with nuts, bolts and washers.Makes: DMI / Jainson / Dowels or equivalent make as approved by the department

6

62

372

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Supply and fixing of heavy duty long barrel alluminium lugs confirming to I.S specifications suitable for ?150 Sq.mm cable etc complete with nuts, bolts and washers.Makes: DMI / Jainson / Dowels or equivalent make as approved by the department

6

159

954

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Supply and fixing of heavy duty type single compression brass cable glands duly nickel plated complete with brass checknut, outer sheath sealing rubber ring and washers suitable for ???Up to 16.0 Sq.mm 4 Core XLPE insulated armoured cable, including all labour charges and miscellaneous items etc complete.Makes: SMI / Commet / Dowels.

15

261

3915

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Supply and fixing of heavy duty type single compression brass cable glands duly nickel plated complete with brass checknut, outer sheath sealing rubber ring and washers suitable for ??25 Sqmm to 50.0 Sq.mm 3.5 Core XLPE insulated armoured cable, including all labour charges and miscellaneous items etc complete. Makes: SMI / Commet / Dowels.

1

341

341

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of heavy duty type single compression brass cable glands duly nickel plated complete with brass checknut, outer sheath sealing rubber ring and washers suitable for ?120 Sqmm to 150.0 Sq.mm 3.5 core XLPE insulated armoured cable, including all labour charges and miscellaneous items etc complete. Makes: SMI / Commet / Dowels.

1

863

863

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Labour charges for run of U.G cable on wall / existing pipe/tray with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official) for the cables.

350

65

22750

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables up to 50 sqmm covering the cable with brick layers, back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

40

355

14200

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Earth work excavation of Trench in hard ground soil, laying of U.G cables 95 to 300Sqmm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

130

364

47320

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I).?Makes : Polycab / Havells / KEI / Finolex

300

318

95400

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply of 50 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I).?Makes : Polycab / Havells / KEI / Finolex

50

648

32400

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply of 150 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I).?Makes : Polycab / Havells / KEI / Finolex

150

1500

225000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor ounted MV panel of double door type made out of No.14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN with equal phase and neutral, suitable bus bars (with rating of 0.8A/ Sqmm) for Power load and Generator load separately, supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves. The metering shall be provided as specified. The panel shall have short-circuit with standing capacities of inimum 50KA and consists of switchgear as mentioned below.The panel shall be got manufactured from the manufacturers of CPRI test certificate only. The panel shall be mounting on U channels including supply and fixing including painting with powder coating including internal connections cost and conveyance of all materials & labour charges.Supply of 250A 4 Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 36/35 KA with thermal magnetic release Panel Mounted. 1 NoMakes : ?Legrand -DP X3?Supply ,Installation,Testing & Commissioning of 40A FP ACCL-Automatic Changeover and Current Limiter is DIN-Rail mounted in Polycarbonate housing.When the main supply fails and stand by Generator supply is on,it automatically connectss the DG power and monitor the load.When ever the load current exceeds preset limit,power must be automatically switched off for 8/10/12 seconds , and then automatically restore when the load current receds. It is Microprocessor based ,Pre trip LED indication.?Operating range 320V-430V, 50Hz Single Phase Power Suppply.Conforming to IEC 60947-6,iec 60947-3.Extremely energy efficient by consuming negligible power without heating.Minimum time delay setting for main transfer as added safety Schneider / BCH / Havells Crabtree - 15 No Supply and erection of 0-500V volt Digital meter of size 96x96mm on exisiting box / panel board including connections etc., complete. - 1 No MAKES : Supply and erection of 0-250A Digital Ammeter of size 96x96mm on existing box / panel board including nnections Etc.,complete. - 1 NoCONZERVE / ELMEASURE / L&T / SEIMENS .Supply and erection of selector switch for Ammeter on the existing box / panel including connections etc., complete. - 1 No Supply and erection of selector switch for voltmeter on the existing box / panel including connections etc., complete. - 1 NoSupply and erection of LED indication lamps on the existing panel board. - 3 Nos Makes : L&T / C&S / SALZAR MAKE. Supply and erection of LT current transformer with bar primary 250 / 5A ratio in the existing panel including connections etc., complete.3 Nos MAKE : KAPPA ?Supply and erection of L.T. 3phase Digital multifunction energy meter Class I with LED display for measuring all the parameters (Voltage, Current, Frequency, Power factor, KW, KVA, KWH, KVA, KVAH, KVAR and THD Events) on existing box panel board including connections etc., complete. MAKES : CONZERVE / ELMEASURE / LK (L&T) / SEIMENS. OUT GOING FEEDERS ?Supply of 63 A10 kA TP MCB , C/D Curve ISI Mark. - 15 NosMakes : Legrand-DX3 Provision for 3 phase energy meters in panel board as per TSNPDCL - 15 Nos

1

394054

394054

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and run of No. 8SWG GI wire including cost of all accessories and labour charges etc complete.

150

27

4050

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and run of 25mmX6mm copper strip including cost of all accessories and labour charges etc complete.

40

1778

71120

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and run of 25mmX6mm GI strip including cost of all accessories and labour charges etc complete.

75

175

13125

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 19mm dia 'B' Class G.I Pipe of 2.5Mtr lengthwith funnel as per National Electric Code and earth connection from electrode GI strip of 40mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mmX450mmX400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II).

4

18940

75760

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labourcharges complete, as per IS specifications 732/1982 (Part II)

6

6635

39810

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Supply, Transportation, erection and commissioning (Excluding Foundation) of 3 Phase, 415, 50Hz, water cooled multi cylinder diesel generator set with alternator of 58.5 KVA out put continuous rating directly coupled Engine, Alternator and radiator with guard and mounted on a common base frame of Robust construction and complete with AMF control panel having IP-52 protection, anti vibration mounts of reputed make, Acoustic Enclosure as per CPCB norms IV, sound absorbing material to restrict sound level up to 75 dB up to 1 mtr distance and etc as per the following specifications mentioned.A . Alternator : Kirloskar / Stamford / Crompton Greaves / Leroy Somer make. The alternator of the output rating shall be 3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self regulated, and shall confirm to IS:13364 of 1992 with regulation of +5% from no load to full load. degree of protections shall be IP21.B .Diesel Engine : Kirloskar / Cummins Diesel Engine start, developing suitable 65 to 72 BHP output at 1500 RPM with mechanical / electronic governing so as to enable the alternator to give 58.5 KVA continuous output at 0.8 P.F. lagging at NTP conditions. The diesel engine shall be capable of providing 10% O/L for 1 Hr for every 11 Hrs of continuous running at full load. The engine with 1st filling of oil and Diesel etc.01. Exhaust pipe of required size and length with insulation or clading.02. Diesel tank suitable for 8 to 12 Hours running capacity.03. Residential Silencer.04. SMF Batteries with leads as per the Manufacturer standardsC. AMF Control Panel:- AMF control panel shall be fabricated with 16SWG CRCA sheet shall be totally enclosed with dust and Vermin proof, floor mounted / wall mounted type and shall be comprising the following.01. Voltmeter with selector switch.02. 4 Pole MCCB incomer of 125 A rating of Schenieder / L&T make for EB and DG . 03. Ammeter with selector switch with CTs. 04. PF Meter and frequency Meter. 05. Indicator lamps (set Run, Load ON) with fuses. 06. KWH Meter of required rating.07. Set of control fuses and current transformer. 08. Input Terminal board and output Terminal Board. 09. Battery charger with transformer rectifier unit. 10. Alternator supply air break contactor of L&T make.11. Main supply air break contactor of L&T make. 12. Audio Visual announciation .13. Main supply voltage set of control relays and timers with one mode selector switch, set of push buttons. 14.Control cable up to 15 Mtrs 2.5Sqmm 6 Core

1

1138990

1138990

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and installation of 9U wall 600 mm width x 500 mm depth UL certified wall mounting net work rack with sheet steel revited metal frame,top and bottom cover with brush cable entry,confirming to following standards IEC 60529,EN 60529 ( IP 20), IEC 62262 EN 62622 (IK08) , DIN 41494, EIA 310, IEC 60927 including all accessories like horizontal PDU, metal cable manager, hardware packet and the cantilever shelf etc.,complete.Makes : Vallrack (Legrand) / Netrack.

10

9527

95270

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Installation, Testing and Commissioning of unloaded 24 port patch panel with IO separate Makes: D Link / Legrand / TPLink

10

7578

75780

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;?Supply, Installation , Testing , Commissioning of ?24 Port, 4 GIGA fibre slots (SFP), power budget 250 W. 10 / 100 / 1000 Gigabit PoE switch with GIGA fibre slots (SFP). Makes : TP Link / D link.

10

28404

284040

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of 3 feet length moulded patch cord including accessories and all labour charges etc complete Makes: TP Link / D link. / Legrand

98

199

19502

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of 7 feet length moulded patch cord including accessories and all labour charges etc completeMakes: TP Link / D link. / Legrand

108

222

23976

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of Modular telephone Jack with connector on modular box with cover frame in existing surface / consealed pipe wiring including cost and coveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Modular boxes and switches Makes : Legrand Lyncus / GM Four Five / Goldmedal Curve / Anchor Roma Plus /Crabtree Verona / Panasonic Visio

50

329

16450

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of 20 pair MDF krone pair box with MS enclosure with lock and key arrangement etc complete with all labour charges.

9

1956

17604

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and laying of 20 pair telephone wire 0.5mm copper in the existing metallic/non metallic conduit pipe with connections etc.,completeTelephone wire.Makes: Finolex / Delton / Surabi / Polycab .

500

114

57000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and run of 2 Pair, 0.5mm telephone copper wire in existing pipe inlcuding all labour charges etc., complete.Makes: Finolex / Delton / Surabi / Polycab .

2000

25

50000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate and all labour charges etc., complete Makes: D Link / AMP / Molex / Legrand /Krone.

98

670

65660

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and Run of LAN Cable cat - 6 UTP cable.in existing pipe inlcuding all labour charges etc., complete.Makes: D Link / AMP / Molex / Legrand /Krone.Makes: D Link / AMP / Molex / Legrand /Krone.

2500

45

112500

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of DB with 1 No 20A single phase plug and Socket, in sheet steel enclosure with 1 No 10A to 20A 10 KA ISI Marked C/D curveSP MCB including internal connection and labour charges for Flush Mounting etc.,complete. DB Makes :Legrand MCB Makes : Legrand-DX3

15

2734

41010

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of 8 way VTPN DB IP 43 Protection as per IS:13032 With and suitable for 1 No 125A 4 pole MCCB Incomer and 4 Nos 63A 10 kA ISI Marked C/D curveTP MCBs and 4 Nos 40A 10 kA ISI Marked C/D curveTP MCBs with 100 A tinned copper busbar, neutral bar, earth bar and cable ties for cable management, fully shrouded neutral bar, profile blanking modules for unused MCB ways, din bars and detachable gland plate etc complete with inter Connections and labour charges for Flush Mounting etc., complete. including alll connections and labour charges for Flush Mounting etc., complete.DB Makes :Legrand MCCB Makes : Legrand-DPx3 MCB Makes : Legrand-DX3

1

61619

61619

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 1 No 4 pole Incomer of 63A FP Isolator and 12No. 6-32A 10kA ISI Marked C/D Curve SP MCBs with 100 A tinned copper busbar, neutral bar, earth bar and cable ties for cable management, fully shrouded neutral bar, profile blanking modules for unused MCB ways, din bars and detachable gland plate etc complete with inter connections and labour charges for Flush Mounting etc., complete. DB Makes :Legrand Isolator Makes : Legrand-DX3 MCB Makes : Legrand-DX3

11

13108

144188

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 1 No 4 pole Incomer of 40A FP Isolator and 12Nos. 6-32A 10kA ISI Marked C/D Curve SP MCBs with 100 A tinned copper busbar, neutral bar, earth bar and cable ties for cable management, fully shrouded neutral bar, profile blanking modules for unused MCB ways, din bars and detachable gland plate etc complete with inter connections and labour charges for Flush Mounting etc., complete. DB Makes :Legrand Isolator Makes : Legrand-DX3 MCB Makes : Legrand-DX3

11

12966

142626

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of 8 Way SPN DB with IP 43,Protection as per IS:13032 and suitable for 1 No 40A DP Isolator and and 6 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs with 100 A tinned copper busbar, neutral bar, earth bar and cable ties for cable management, fully shrouded neutral bar, din bars and detachable gland plate etc complete with including all 'connections and labour charges for Flush Mounting etc., complete. DB Makes :Legrand Isolator Makes : Legrand-DX3 MCB Makes : Legrand-DX3

1

6851

6851

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of GI louver shutter including GI mesh to avoid birds entry with necessary materials suitable for 12" Exhaust fan.

14

205

2870

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Transportation and Fixing of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark and masonary work and all labour charges etc., complete. Makes: Crompton / Almonard / Havells Turbo Force SP.Twin Core Wire Makes: Finolex / RR kabel / Havells.

14

4296

60144

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Transportation and Fixing ? of ?8" (200 mm) RPM BLDC exhaust fan with necessary accessories etc., with all labour charges etc., complete as directed at site.Makes : Atomberg / Crompton / Havells / Orient.Makes : Atomberg (Efficio ) / Havells / Orient, as approved by the Department

13

3137

40781

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans including internal connections and all labour charges etc.Modular boxes and switches Makes : Legrand Lyncus / GM Four Five / Goldmedal Curve / Anchor Roma Plus /Crabtree Verona / Panasonic Vision

218

637

138866

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, Transportation and fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.0, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete.Makes : Atomberg (Efficio ) / Havells / Orient, as approved by the Department

218

3634

792212

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply,Transportation & Instatlation of 30-36 W +/-10% (>=3600 Lumens) Back lit, 2' x2' grid false ceiling / zip board (595 mm x 595 mm) Recessed / Surface mounted LED luminaire made of CRCA sheet housing with powder coated with high efficiency acrylic wide diffuser,with wide operating voltage range, Power factor > 0.9,Surge protection >2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / Wipro / Crompton / Havells / Jaquar / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM /SAMSUNG / LG LEDs.

51

3344

170544

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, transportation and Fixing of 22W, +/- 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification LUMINAIRE MAKE : Phillips / Wipro / Crompton / Havells / Jaquar / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM /SAMSUNG / LG LEDs.

191

875

167125

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply, transportation and fixing of 18 W +/-10% (>= 1800 Lumens) back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / Wipro / Crompton / Havells / Jaquar / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM /SAMSUNG / LG LEDs.

377

1860

701220

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of Ding Dong Bell of makes in lieu of Ceiling rose, including giving connections, cost of all accessories and labour charges etc., complete for New installations Makes : GM / Million / Gold Medal / Anchor/ Great white.

5

209

1045

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of Electronic Musical bell of makes in lieu of Ceiling rose, including giving connections, cost of all accessories and labour charges etc., complete for New installations Makes : GM / Million / Gold Medal / Anchor/ Great white.

10

385

3850

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of buzzer of makes in lieu of Ceiling rose, including giving connections, cost of all accessories and labour charges etc., complete for New installations Makes : GM / Million / Gold Medal / Anchor/ Great white.

5

135

675

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and Run of 5 of 10.0 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete.Wire Makes: Finolex / RR kabel / Havells

800

898

718400

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and Run of 5 of 6.0 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete.Wire Makes: Finolex / RR kabel / Havells

500

572

286000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and Run of 3 of 6.0 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable in existing pipe for run of mains inlcuding connections and all labour charges etc., complete.Wire Makes: Finolex / RR kabel / Havells

200

336

67200

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and Run of 3 of 4.0 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable in existing pipe for run of mains inlcuding connections and all labour charges etc., complete.3 Wire Makes: Finolex / RR kabel / Havells

1500

239

358500

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and Run of 3 of 2.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable. in existing pipe for run of mains inlcuding connections and all labour charges etc., complete.Wire Makes: Finolex / RR kabel / Havells

7000

157

1099000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of ISI marked 3 Nos 6A/10A Modular type switches, 3Nos 6A/10A 3/2 Pin 2 Module Modular Socket with shutter on 9 Modular box with cover frame including connections, cost and coveyance of all material and all labour charges etc., complete for Computers in N.R.B. / R.B.Modular boxes and switches Makes : Legrand Lyncus / GM Four Five / Goldmedal Curve / Anchor Roma Plus /Crabtree Verona / Panasonic Vision

98

1500

147000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of ISI marked 16A/6A 1 way Combi Socket Modular Socket with shutter, 16A / 20A 1 Way 1 Module Modular Switch on a 3 Modular box with suitable cover frame with connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B.Modular boxes and switches Makes : Legrand Lyncus / GM Four Five / Goldmedal Curve / Anchor Roma Plus /Crabtree Verona / Panasonic Vision

53

786

41658

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Wiring with run of 3 of Supply of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS17048 specification for Copper cable in existing conseled PVC pipe,ferrules including Supply and fixing of ISI Marked 6A/ 10A- 3/2 pin Modular socket with shutter, 6A/10A 1way Modular switch with required cover frame including connections, cost and conveyance of all material and all labour charges etc., complete for seperate plug points in N.R.B. / R.B.Makes: Finolex / RR kabel / Havells Modular boxes and switches Makes : Legrand Lyncus / GM Four Five / Goldmedal Curve / Anchor Roma Plus /Crabtree Verona / Panasonic Vision

46

969

44574

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of ISI Marked 6A/ 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A/10A 1way Modular switch on a common switch board Module box with cover frame with connections including cost and conveyance of all materials and all labour charges etc., complete in N.R.B. / R.B.Modular boxes and switches Makes : Legrand Lyncus / GM Four Five / Goldmedal Curve / Anchor Roma Plus /Crabtree Verona / Panasonic Vision

125

574

71750

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Wiring with run of 3 of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS17048 specification for Copper cable make in existing consealed pipe,ferrules including supply and fixing of 3 Plate Jumbo Ceiling rose of Anchor / Gold Medal Olive / Million Zoom make and 6A/10A ISI marked Modular type switch including cost and conveyance of all material and all labour charges etc., complete for fan and exhaust fan points in N.R.B.Makes: Finolex / RR kabel / Havells Modular boxes and switches Makes : Legrand Lyncus / GM Four Five / Goldmedal Curve / Anchor Roma Plus /Crabtree Verona / Panasonic Vision

245

1165

285425

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Wiring with run of 2 of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS17048 specification for Copper cable in existing PVC conduit pipe,Ferrules including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 2way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for Stair case points in N.R.B .Wire Makes: Finolex / RR kabel / Havells Modular boxes and switches Makes : Legrand Lyncus / GM Four Five / Goldmedal Curve / Anchor Roma Plus /Crabtree Verona / Panasonic Vision

18

1405

25299

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Wiring with run of 2 of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS17048 specification for Copper cable make in existing consealed pipe, ferrules including supply and fixing of 3 Plate Jumbo Ceiling rose/batten holder of Anchor / Gold Medal Olive / Million Zoom make and 6A/10A ISI marked Modular type switch including cost and conveyance of all material and all labour charges etc., complete for light and bell points in N.R.B.Wire Makes: Finolex / RR kabel / HavellsModular boxes and switches Makes : Legrand Lyncus / GM Four Five / Goldmedal Curve / Anchor Roma Plus /Crabtree Verona / Panasonic Vision

442

937

414154

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 rigid PVC pipe consealed in wall with all required Metallic Junction Boxes including masonary work and labour charges etc., complete for Run of mains.Makes : Sudhakar / Modi / VIP / Precision

3000

89

267000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 rigid PVC pipe consealed in wall with Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with including all labour charges etc., complete.Makes : Sudhakar / Modi / VIP / Precision

3000

89

267000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and Laying of ISI 25mm outer dia heavy grade IS:9537 part 3 rigid PVC pipe concealed in Roof Slabs with all required Metallic Deep Boxes including labour charges etc., complete. Makes : Sudhakar / Modi / VIP / Precision .

9000

110

990000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing 110mm Dia PVC pipes extending through the full width of the structure below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work .

200

368

73600

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting 2 coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surface as per Tech Specification 800 MORTH (5th revision) and as directed by the Engineer in charge. For kerb stone

1000

103

103000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 440 mm high as shown in drawing in M 20 grade PCC, kerb stone laid with kerb laying machine, all complete as per clause 408

2000

348

696000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for foundation to kerb stone

70

5971

417970

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water and tiles etc., overheads and contractors profit, complete for finished item of work for parking

1000

849

849000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing HYSD bars (Fe-500) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for longitudinal joints in CC pavement.

38

64108

2436104

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Vibrated cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.

535.57

5883

3150758

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

535.57

2162

1157902

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for leveling course.

401.68

5077

2039317

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Forming embankment with excavated earth obtained from roadway excavation for Embankment by mechanical means upto SDR including pre-watering of soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and complete for finished item of work as per MoRT&H specification 305 (5th revision).

1205.03

123

148219

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge

2410

52

125320

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)Ground floor.

10

481

4810

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)- Mechanical Means.

41

251

10291

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) 110mm dia

6

509

3054

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm)"," from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Cuplock scaffolding system using MS Plate shutter all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING")For Bed Blocks and Bed for Sills Ground floor

0.1

6116

612

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Manufacture as per company?s standard specification supply and delivery of encapsulated plastic steps for man holes anywhere in T.G. including cost of materials packing as per company?s standards, loading, transportation, unloading and stacking at site of work etc, complete but excluding taxes and others etc., as applicable.

24

222

5328

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). For sump

252

538

135576

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like AF star TMT/MS Life TMT, Radha TMT, SUGNA TMT as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Ground floor

6.1

72825

444233

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Slabs 125 mm thick upto an un-supported height of 3.66m Ground floor.

57

1645

93765

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 150 mm thick RCC walls

7

3350

23450

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 200 mm thick RCC walls

103

3834

394902

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings,

14.4

8860

127584

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

7.3

4949

36128

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means

118

84

9912

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work.

1000

11

11400

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F of 15 mm brass body Premium variety Chromium plated finish long neck pillar cock with aerator of not less than 500 grams weight quarter turn spindle conforming to IS 8931 and with a warranty of 10 years including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

10

1376

13760

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming to IS:2556-Part-5-1994 on cantilever brackets with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 750 x 450 x 250mm of Ist quality ncluding chiselling brick masonry wall and making good & restoring to original surfaces overheads & contractors profit complete.for finished item of work in all floors.

10

6356

63560

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying & fixing stainless steel sink size 36" x 18" (914.4x457.2mm) 1 mm thick with accessories, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc., complete for finished item of work in all floors as directed by Engineer-in-charge.

4

8601

34404

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Constructing Brick masonry support for G.I pipe with C.M 304.8 x 228.6 x228.6 mm size including plastering, cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc complete for finished item of work in all floors as directed by Engineer-in-charge.

50

107

5350

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) 110mm dia

635

509

323215

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) 75mm dia

635

339

215265

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge .50 mm Nominal Bore

1

7135

7135

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.40 mm Nominal Bore

1

4623

4623

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.32 mm Nominal Bore

5

2337

11685

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.25 mm Nominal Bore

5

1538

7690

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 20 mm Nominal Bore

5

1070

5350

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 54.00mm OD pipe

85

656

55760

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 41.30mm OD pipe

85

450

38250

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 34.90mm OD pipe

74

364

26936

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 28.60mm OD pipe

109

267

29103

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 22.20mm OD pipe

270

202

54540

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 15.90mm OD pipe

154

176

27104

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying & fixing 4 " x 24 " (101.6x609.6mm) white glazed porcelain channel fixed in brick masonry white cement pointing, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

12

1012

12144

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 3' 0" x 2' 0" for urinals including full rounding the edges , fixing in position, polishing, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work for all floors.

20

2439

48780

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm, fitted with 15 mm brass body CP finish self closing tap push type conforming to IS 1711 and 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects.

20

4879

97580

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

39

4008

156312

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F of 15 mm brass body CP finish long body bib tap of not less than 400 grams weight with quarter turn spindle internal / external threaded connection conforming to IS 8931, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

39

958

37362

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S & F 25 mm nominal size dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

32

207

6624

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F of Chromium plated finish stainless steel body towel rail 24'' with 10 years warranty including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

32

2028

64896

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm best quality glass mirror with approved make 1st quality including cost and conveyance of all materials to site, all operational, incidental, labour charges etc. overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

39

641

24999

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing CP finish brass soap dish of approved make with screws, including cost and conveyance of all materials to site, all operational, incidental, labour charges and overhead & contractor's profit etc. complete for finished item of work as directed by Engineer-in-charge.

39

716

27924

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;S&F double coat hook with 10 years warranty including cost & conveyance of all materials, labour charges, overheads & contractor's profit etc., complete for finished item of work as directed by Engineer-in-charge.

39

943

36777

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and Fixing Pedestal for Wash Hand Basin including cost and conveyance of all materials to site, labour charges, overheads & contractors profit etc. complete for finished item of work.

39

1817

70863

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying & Fixing Indian make WHITE Flat Back Wash Hand Basin of size 550 x 400 mm with Single C.P. Pillar cock 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963- 1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15 mm nominal size PVC connection with brass union nut C.P coated, 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality and standard CI brackets including wooden block, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects.

39

3552

138528

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2- 2004 of white glazed with 'S' trap with CI short Connector & 4" dia CP thimble pipe: 150 mm long, best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and 15 mm nominal size PVC connection with brass union nut C.P coated all of approved make, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

39

7324

285636

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work.

65

194

12610

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 5'-0" Depth

5

16005

80025

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 3'-0" Depth

10

9871

98710

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & constructing Brick masonry in CM 1:6 prop. over a C.C. (1:5:10) prop. Bed 100mm thick and plastering 12mm thick in CM (1:4) prop. both inside and outside surfaces and fitted with 304.8 mm x 288.6mm (12" x 9") C.I. frame and hinged cover of standard make as directed by the Engineer-in-charge including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. (APSS No 1326)

10

851

8510

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop. Masonry Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 914.4 mm x 457.2 mm (3'0"x1'6") C.I frame and cover of 40 Kg, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractors profit etc. complete for finished item of work.

10

8685

86850

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work.

10

5238

52380

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 1524mm (5'.0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc complete for finished item of work 203.20mm dia upto 1524mm (5') depth

60

1163

69780

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 1524mm (5'.0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc complete for finished item of work 152.40mm dia upto 1524.0mm (5') depth

120

1001

120120

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work 152.4 mm (6")

120

887

106440

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work 101.6 mm

150

603

90450

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. Ground floor.

272.6

747

203632

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. Ground floor.

72

139

10008

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new iron works with 2 coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit of approved brand and shade to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. including cost of overheads & contractors profit for finished item of work for:-Painting to Iron work - Synthetic enamel paint to New Iron Work - 2 coats

18.4

118

2171

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing SINGLE shutter door using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and flush door shutters of 35mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202, including cost of stainless steel fixtures, 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 3 Nos. Hinges-125 mm long and 2 Nos. handles of 150 mm size, 1 no. rubber bush & 1 No. heavy duty door stopper including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, cost of overheads & Contractor's profit etc., complete for finished item of work as per APSS 1001 & 1002 (Door size :D2 ) Ground floor.

5.76

6178

35585

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108, including cost and conveyance of all materials, all operational, incidental labour charges, overheads and contractor's profit complete for finished item of work.

2.3

5217

11999

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Ground floor.

30

504

15120

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)Ground floor.

101

481

48581

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Ground floor.

5

8038

40190

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). For sump

427

538

229726

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like AF star TMT/MS Life TMT, Radha TMT, SUGNA TMT as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Ground floor

15

72825

1092375

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Slabs 175 mm thick upto an un-supported height of 3.66m Ground floor.

9

1979

17811

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Slabs 150 mm thick upto an un-supported height of 3.66m Ground floor.

14

1800

25200

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Slabs 125 mm thick upto an un-supported height of 3.66m Ground floor.

89

1645

146405

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Roof beams @ 3.66mts level Ground floor.

14.17

13879

196621

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 230 mm thick RCC walls

214

4125

882750

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS GF

2

13969

27938

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings,

50

8860

443000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

23

4949

113827

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)- Mechanical Means.

50

251

12550

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means

576

84

48384

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification. Third floor.

291

1250

363750

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification.Second floor.

1032

1250

1290000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification. First floor.

1041

1250

1301250

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification. Ground floor.

1444

1250

1805000

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;RCM facia 50mm thick in CM (1:3) (with 50% river sand & 50% manufactured sand) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing,including cost and conveyance of all materials to site, all operationals &incidental charges,cost and conveyance of cement,wire mesh,water to work site,centering,scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903)Ground floor.

19

2599

49381

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors.Terrace floor.

19

259

4921

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors..Third floor.

46

259

11914

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors.Second floor.

225

259

58275

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors.First floor.

230

259

59570

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors. Ground floor.

226

259

58534

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty Third floor.

392

444

174048

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty.Second floor.

815

439

357785

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty First floor.

815

434

353710

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty. Ground floor.

958

428

410024

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls.Third floor.

131

452

59212

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls.Second floor.

272

447

121584

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls.First floor.

271.75

441

119842

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. Ground floor.

319

436

139084

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.Terrace floor.

494

248

122512

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.Third floor.

407

248

100936

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.Second floor.

853

248

211544

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.First floor.

815.25

248

202182

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. Ground floor.

1428

248

354144

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.Terrace floor.

205

139

28495

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.third floor.

1162

139

161518

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.Second floor.

4816

139

669424

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.First floor.

4753

139

660667

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. Ground floor.

6144

139

854016

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty.Third floor.

804

234

188136

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty.. Second floor.

3608

234

844272

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty.First floor.

3524

234

824616

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty. Ground floor.

4439

234

1038726

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.Third floor.

224.75

747

167888

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. Second floor.

224.75

747

167888

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.First floor.

224.75

747

167888

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. Ground floor.

224.75

747

167888

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing, supplying & fixing of Fixed Louvered Ventilator made from multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists of a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work. Third floor.

1.8

7279

13102

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing, supplying & fixing of Fixed Louvered Ventilator made from multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists of a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work. Second floor.

4.4

7279

32028

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing, supplying & fixing of Fixed Louvered Ventilator made from multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists of a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.First floor.

4.4

7279

32028

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing, supplying & fixing of Fixed Louvered Ventilator made from multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists of a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work. Ground floor.

4.7

7279

34211

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including overhead and contractor profit cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. Terrace floor

12.96

8088

104820

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including overhead and contractor profit cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. Third floor.

40.5

8088

327564

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including overhead and contractor profit cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. Second floor.

112.5

8088

909900

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including overhead and contractor profit cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.First floor.

112.5

8088

909900

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including overhead and contractor profit cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. Ground floor.

112.5

8088

909900

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Flush door shutters of 30 mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 and providing and fixing PVC door cladding to the flush doors shutter it shall be pasted with synthetic glue 1 mm thick including cost of Aluminium fixtures 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1 No. Latch - 300 mm long, 2 Nos. handles of 150 mm size and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work. Toilet door Third floor.

6.3

6204

39085

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Flush door shutters of 30 mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 and providing and fixing PVC door cladding to the flush doors shutter it shall be pasted with synthetic glue 1 mm thick including cost of Aluminium fixtures 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1 No. Latch - 300 mm long, 2 Nos. handles of 150 mm size and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work. Toilet door Second floor.

17.32

6204

107484

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Flush door shutters of 30 mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 and providing and fixing PVC door cladding to the flush doors shutter it shall be pasted with synthetic glue 1 mm thick including cost of Aluminium fixtures 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1 No. Latch - 300 mm long, 2 Nos. handles of 150 mm size and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work. Toilet door )First floor.

15.75

6204

97713

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Flush door shutters of 30 mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 and providing and fixing PVC door cladding to the flush doors shutter it shall be pasted with synthetic glue 1 mm thick including cost of Aluminium fixtures 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1 No. Latch - 300 mm long, 2 Nos. handles of 150 mm size and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work. Toilet door Ground floor.

15.75

6204

97713

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing SINGLE shutter door using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and flush door shutters of 35mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202, including cost of stainless steel fixtures, 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 3 Nos. Hinges-125 mm long and 2 Nos. handles of 150 mm size, 1 no. rubber bush & 1 No. heavy duty door stopper including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, cost of overheads & Contractor's profit etc., complete for finished item of work as per APSS 1001 & 1002 (Door size :D2 ) Third floor.

7.56

6178

46706

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing SINGLE shutter door using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and flush door shutters of 35mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202, including cost of stainless steel fixtures, 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 3 Nos. Hinges-125 mm long and 2 Nos. handles of 150 mm size, 1 no. rubber bush & 1 No. heavy duty door stopper including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, cost of overheads & Contractor's profit etc., complete for finished item of work as per APSS 1001 & 1002 (Door size :D2 ) Second floor.

20.79

6178

128441

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing SINGLE shutter door using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and flush door shutters of 35mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202, including cost of stainless steel fixtures, 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 3 Nos. Hinges-125 mm long and 2 Nos. handles of 150 mm size, 1 no. rubber bush & 1 No. heavy duty door stopper including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, cost of overheads & Contractor's profit etc., complete for finished item of work as per APSS 1001 & 1002 (Door size :D2 )First floor.

17.01

6178

105088

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing SINGLE shutter door using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and flush door shutters of 35mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202, including cost of stainless steel fixtures, 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 3 Nos. Hinges-125 mm long and 2 Nos. handles of 150 mm size, 1 no. rubber bush & 1 No. heavy duty door stopper including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, cost of overheads & Contractor's profit etc., complete for finished item of work as per APSS 1001 & 1002 (Door size :D2 ) Ground floor.

13.23

6178

81735

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing DOUBLE SHUTTER DOOR using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and Flush door shutters of 35 mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202 as per drawing including cost of Stainless steel fixtures of 2 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. aluminium Latche-300mm long, 4 Nos. handles of 150 mm size & 2 No. heavy duty aluminium door stopper, 2 no rubber bushes. 6Nos Hinges of 125mm and including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.cost of overhead & contractor's profit complete for finished item of work as per APSS 1001 & 1002 (Door size :D1-1.5*2.3) Third floor.

12.6

5761

72589

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing DOUBLE SHUTTER DOOR using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and Flush door shutters of 35 mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202 as per drawing including cost of Stainless steel fixtures of 2 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. aluminium Latche-300mm long, 4 Nos. handles of 150 mm size & 2 No. heavy duty aluminium door stopper, 2 no rubber bushes. 6Nos Hinges of 125mm and including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.cost of overhead & contractor's profit complete for finished item of work as per APSS 1001 & 1002 (Door size :D1-1.5*2.3) Second floor.

55.44

5761

319390

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing DOUBLE SHUTTER DOOR using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and Flush door shutters of 35 mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202 as per drawing including cost of Stainless steel fixtures of 2 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. aluminium Latche-300mm long, 4 Nos. handles of 150 mm size & 2 No. heavy duty aluminium door stopper, 2 no rubber bushes. 6Nos Hinges of 125mm and including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.cost of overhead & contractor's profit complete for finished item of work as per APSS 1001 & 1002 (Door size :D1-1.5*2.3) First floor.

63

5761

362943

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying and fixing DOUBLE SHUTTER DOOR using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and Flush door shutters of 35 mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202 as per drawing including cost of Stainless steel fixtures of 2 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. aluminium Latche-300mm long, 4 Nos. handles of 150 mm size & 2 No. heavy duty aluminium door stopper, 2 no rubber bushes. 6Nos Hinges of 125mm and including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.cost of overhead & contractor's profit complete for finished item of work as per APSS 1001 & 1002 (Door size :D1-1.5*2.3) Ground floor.

55.44

5761

319390

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of Double shutter door with fanlight at top (MAIN DOOR), using Medium Teak wood frame of section 100 x 150mm and Medium teak wood fully panelled Shutters i.e., top rail, bottom rail , middle rail and styles of section 150 x 45mm and 20mm thick teak wood planks fixed with 12mm x 12mm teak wood beading alround, 4mm thick pin headed glass fixed with 12mm x 12mm teak wood beading in fixed fan light portion as per approved drawing, including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of IS marked brass fixtures of 6 Nos butt hinges 150mm long, 1 No Latch 300mm long,1 No aldrop 300mm long, 2Nos of 10mm Tower bolt 300mm long at top, 1 No. of 10mm dia tower bolt 150mm long at bottom, 2 Nos 150mm long fancy door handles, 2 Nos brass door stoppers, 2 Nos rubber bushes inside including Labour charges for wrought and put upincluding fixing in position for Teak wood Glazed and panelled doors including fixing glass including frame , fixing the fixtures to the door with required number of screws, bolt and nutsoverhead and contractor's profit etc., complete for finished item of work.(MAIN DOOR)-MD.Ground floor.

9.36

13279

124291

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., including overheads & contractors profit complete for finished item of work for:-Polishing to wood work - Melamine Polishing to Wood Work.Ground floor.

22.46

1148

25789

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707)) Third floor.

3

4339

13017

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707)Second floor.

8

4256

34048

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707)First floor.

8

4173

33384

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707)Ground floor.

15

4089

61335

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)

210

398

83580

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of premium colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) Third floor.

9

5063

45567

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of premium colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) Second floor.

9

5008

45072

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of premium colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) First floor.

9

4953

44577

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of premium colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) Ground floor.

61

4898

298778

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Skirting with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering.Third floor.

11

1352

14872

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Skirting with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering..Second floor.

83

1308

108564

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Skirting with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. First floor.

86

1264

108704

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Skirting with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering.. Ground floor.

101

1219

123119

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.Third floor.

65

1559

101335

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.Second floor.

215

1515

325725

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. First floor.

246

1471

361866

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. Ground floor.

226

1427

322502

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing risers with 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special)third floor.

12

4592

55104

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing risers with 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special)Second floor.

24

4536

108864

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing risers with 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special))First floor.

24

4481

107544

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing risers with 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special) Ground floor.

46

4425

203550

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special)third floor.

22

7021

154462

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special)Second floor.

44

6861

301884

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special)First floor.

44

6701

294844

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special) Ground floor.

77

6542

503734

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707)third floor.

22

5268

115896

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707) Second floor.

67

5189

347663

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707)First floor.

61

5109

311649

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707) Ground floor.

72

5030

362160

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707) )third floor.

99

4828

477972

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707) Second floor.

413

4747

1960511

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707)First floor.

366

4666

1707756

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707) Ground floor.

490

4585

2246650

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand (with 50% river sand & 50% manufactured sand) and water, overheads & contractors profit, complete for finished item of work. (APSS No.701 & 710) Terace flroor

8

527

4216

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water and tiles etc., overheads and contractors profit, complete for finished item of work. Ground flooor

10

849

8490

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)third floor.

19

1028

19532

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701) Second floor.

59

984

58056

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)First floor.

65

939

61035

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)Ground floor.

61

895

54595

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707)third floor.

192

1361

261312

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) Second floor.

619

1317

815223

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707)First floor.

676

1273

860548

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) Ground floor.

1008

1229

1238832

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Screed Concrete average 50mm thick with 1: 1 1/2 :3 cement concrete Nominal mix, using 12mm hard broken stone aggregate laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m mixed excluding seigniorage charges but including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and cost of overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). terrace floor.

20

6549

130980

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). terrace floor.

398

697

277406

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Third floor.

36

657

23652

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Second floor.

71

617

43807

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). First floor.

202

577

116554

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) terrace floor.

645

664

428280

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)third floor.

1301

618

804018

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) Second floor.

4643

573

2660439

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)First floor.

4611

527

2429997

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)Ground floor.

6186

481

2975466

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) terrace floor.

54

706

38124

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) third floor.

358

656

234848

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Second floor.

1208

605

730840

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) First floor.

1229

555

682095

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Ground floor.

1649

504

831096

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing Mild steel (MS) steel bars ( (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials and cost of overheads & contractors profit etc., complete for finished item of work in all floors.( APSS No.126) Third floor

0.2

84124

16825

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing Mild steel (MS) steel bars ( (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials and cost of overheads & contractors profit etc., complete for finished item of work in all floors.( APSS No.126) second floor

1.4

82744

115842

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing Mild steel (MS) steel bars ( (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials and cost of overheads & contractors profit etc., complete for finished item of work in all floors.( APSS No.126) first floor

1.4

81363

113908

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing Mild steel (MS) steel bars ( (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials and cost of overheads & contractors profit etc., complete for finished item of work in all floors.( APSS No.126) Ground floor

1

79983

79983

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like AF star TMT/MS Life TMT, Radha TMT, SUGNA TMT as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Terrace floor

6.48

78347

507512

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like AF star TMT/MS Life TMT, Radha TMT, SUGNA TMT as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Third floor

20.1

76966

1547017

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like AF star TMT/MS Life TMT, Radha TMT, SUGNA TMT as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) second floor

61.8

75586

4671215

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like AF star TMT/MS Life TMT, Radha TMT, SUGNA TMT as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) first floor

62.2

74205

4615551

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like AF star TMT/MS Life TMT, Radha TMT, SUGNA TMT as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Ground floor

199.4

72825

14521305

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement,"," sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Cuplock scaffolding system using MS Plate shutter etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402)")Terrace floor.

4

15872

63488

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement,"," sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Cuplock scaffolding system using MS Plate shutter etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402)"). Third floor.

8

15050

120400

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work. Third floor.

9

3574

32166

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work. Second floor.

18

3413

61434

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work. First floor.

18

3251

58518

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) Third floor.

41

1121

45961

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) Second floor.

567

1041

590247

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) First floor.

573

961

550653

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) Ground floor.

347

880

305360

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Terrace floor.

29

10082

292378

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Third floor.

110

9571

1052810

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Second floor.

289

9060

2618340

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) First floor.

261

8549

2231289

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Ground floor.

309

8038

2483742

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) Terrace floor.

3

1559

4677

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) Third floor.

25

1505

37625

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) Second floor.

63

1454

91602

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903)First floor.

63

1400

88200

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903)Ground floor.

59

1348

79532

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the M-20 Grade Concrete using hand mix, using 20mm size graded machine crushed hard Granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering, including all operational, incidental and labour charges such as mixing, lifting concrete, laying concrete, curing, including HIRE CHARGES FOR CENTERING & SCAFFOLDING , and cost of overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for following (50mm Thick Cement Concrete PLATFORMS) Third floor.

4

819

3276

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the M-20 Grade Concrete using hand mix, using 20mm size graded machine crushed hard Granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering, including all operational, incidental and labour charges such as mixing, lifting concrete, laying concrete, curing, including HIRE CHARGES FOR CENTERING & SCAFFOLDING , and cost of overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for following (50mm Thick Cement Concrete PLATFORMS) Second floor.

4

795

3180

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the M-20 Grade Concrete using hand mix, using 20mm size graded machine crushed hard Granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering, including all operational, incidental and labour charges such as mixing, lifting concrete, laying concrete, curing, including HIRE CHARGES FOR CENTERING & SCAFFOLDING , and cost of overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for following (50mm Thick Cement Concrete PLATFORMS) First floor.

9

769

6921

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of the M-20 Grade Concrete using hand mix, using 20mm size graded machine crushed hard Granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering, including all operational, incidental and labour charges such as mixing, lifting concrete, laying concrete, curing, including HIRE CHARGES FOR CENTERING & SCAFFOLDING , and cost of overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for following (50mm Thick Cement Concrete PLATFORMS) Ground floor.

10

745

7450

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) Shelves third floor.

9

1249

11241

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) Shelves Second floor.

22

1208

26576

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) Shelves First floor.

27

1168

31536

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) Shelves Ground floor.

23

1128

25944

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm)"," from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Cuplock scaffolding system using MS Plate shutter all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING")For Bed Blocks and Bed for Sills Terrace floor

1

6961

6961

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm)"," from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Cuplock scaffolding system using MS Plate shutter all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING")For Bed Blocks and Bed for Sills Third floor

2.5

6749

16873

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm)"," from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Cuplock scaffolding system using MS Plate shutter all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING")For Bed Blocks and Bed for Sills second floor

8.3

6538

54265

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm)"," from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Cuplock scaffolding system using MS Plate shutter all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING")For Bed Blocks and Bed for Sills first floor

7.9

6327

49983

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm)"," from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Cuplock scaffolding system using MS Plate shutter all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING")For Bed Blocks and Bed for Sills Ground floor

4.9

6116

29968

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Slabs 175 mm thick upto an un-supported height of 3.66m third floor.

28

2080

58240

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Slabs 175 mm thick upto an un-supported height of 3.66m Second floor.

56

2046

114576

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Slabs 175 mm thick upto an un-supported height of 3.66m First floor.

56

2013

112728

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Slabs 175 mm thick upto an un-supported height of 3.66m Ground floor.

56

1979

110824

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Slabs 150 mm thick upto an un-supported height of 3.66m terrace floor.

27

1932

52164

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Slabs 150 mm thick upto an un-supported height of 3.66m third floor.

230

1899

436770

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Slabs 150 mm thick upto an un-supported height of 3.66m Second floor.

1483

1867

2768761

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Slabs 150 mm thick upto an un-supported height of 3.66m First floor.

1483

1833

2718339

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Slabs 150 mm thick upto an un-supported height of 3.66m Ground floor.

1483

1800

2669400

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Slabs 125 mm thick upto an un-supported height of 3.66m terrace floor.

80

1778

142240

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FORSlabs 125 mm thick upto an un-supported height of 3.66m third floor.

92

1745

160540

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Slabs 125 mm thick upto an un-supported height of 3.66m Second floor.

91

1713

155883

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Slabs 125 mm thick upto an un-supported height of 3.66m First floor.

91

1679

152789

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Slabs 125 mm thick upto an un-supported height of 3.66m Ground floor.

91

1646

149786

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Roof beams @ 3.66mts level terrace floor.

7

15042

105294

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Roof beams @ 3.66mts level third floor.

26

14752

383552

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Roof beams @ 3.66mts level Second floor.

107

14462

1547434

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Roof beams @ 3.66mts level First floor.

107

14172

1516404

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Roof beams @ 3.66mts level Ground floor.

116

13882

1610312

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS Terrace Floor:

1

18068

18068

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS Third Floor

3

17319

51957

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS Second Floor :

7

16568

115976

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS First floor

12

15819

189828

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS Ground floor

12

15070

180840

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 150mm thick water tank side RCC walls

32

3661

117152

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 230 mm thick RCC walls

24

4127

99048

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS Terrace floor

7

15362

107534

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS Third floor

23

15017

345391

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS SF

50

14671

733550

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS FF

50

14325

716250

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS GF

99

13979

1383921

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for steps TF

2

9154

18308

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for steps SF

4

9058

36232

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for steps FF

4

8961

35844

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for steps GF

5

8865

44325

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Plinthbeams

103

11838

1219314

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Pedestal

53

9491

503023

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings,

1014

8865

8989110

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Providing post construction anti termite treatment by drilling 1/2 inch dia., holes at the edges of wall floor junction and pouring anti termite chemical (Imidacloprid 30.5 SC, 10.5 ml for 5 Liters of water as per IS 16131.) with a hand operated pressure pump until refusal or to a maximum of one liter per hole. Holes shall be sealed with cement motor after treatment and providing spraying and injecting termiticides for treating and applying to doors, windows, frames, removing, crusting treating in Treatment along outside of foundations (i.e.,Soil in contact with external walls around the building and Concrete or Masonry apron around the building), Treatment of soil under floors - Inside Building, Treatment to voids in masonry, Treatment at points of contact of woodwork, Treatment of Wood Work, Treatment of Electrical Fixtures, as directed in IS 6313 Part 3 2013 with preventive chemicals duly taking precautions for health hazards and safety measures for the occupants including all costs, conveyances of all materials and labour charges,overheads and contractors profit etc complete for finished item of work to the satisfaction of the Engineer-in-Charge. The plinth area of the building each floor shall be taken for the purpose of payment.

1629

165

268785

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Flush Pointing to RR/ CRS Masonry in CM (1:3) (with 50% river sand & 50% manufactured sand) including cost and conveyance of all materials in site, curing, labour charges etc, and overheads & contractors profit, complete for finished item of work.

192

100

19200

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601)

91

5462

497042

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Conveyance and Stacking useful available excavated earth in open space near the work site by mechanical means and carting the same to site with total lead of 1km (i,e to and fro) for refilling in trenches and basement including all operational, incidental, labour charges , cost of overhead and contractors profit etc complete for finished item of work.

3513

44

154572

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Filling with carted gravel by mechanical means in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).

1061

535

567635

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)- Mechanical Means.

3513

251

881763

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing and cost of overheads & contractors profit etc., complete for finished item of work, for:-Machine Mix-PCC : M-20 NOMINAL MIX. FOR BED OF SUMP AND SEPTIC TANK.

37

6117

226329

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) MACHINE MIXING

336

4765

1601040

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

186

4949

920514

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Drilling holes in hard rock surfaces upto 18mm Diameter, including all operational, incidental, labour charges, and overheads & contractor's profit, complete for finished item of work.

185

419

77515

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Earth work excavation for foundations (Open excavation) for buildings in hard rock (requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges as per SS 20 B(APSS 308)

878

974

855172

... More
Construction of Integrated Divisional Level Offices Complex at Station Ghanpur Headquarters, Jangoan;Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means

3513

84

295092



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.