Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Civil Works Roads
Opening Date6 Jul 2020
Closing Date13 Jul 2020
Tender Amount₹ 16,00,70,330 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

(I) Construction of Bt Road From Bareguda to Bejjur in Kumarambheem Asifabad District Length 8.53 Km

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of subgrade & earthen shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with a lead of 10 km including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance ofsoil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet requirement of table 300-2 of MoRT&H, including all hire andoperational charges of T&P ,contractors profit & Over head charges and , complete for finished item of work as per MoRT&H specification 305 (5th revision) but excluding Seigniorage charges, GST Complete . (Payment will be made based on level for finished item of work). With borrowed earth from 10 km lead.

29199

9139287

313

... More
Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C Metal +Stone dust) spreading in uniform layers with Motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

8114

27822906

3429

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .

6543

27375912

4184

... More
Providing and applying tack coat with bitumen VG 10 Grade (Bulk) using Bitumen pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge and including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .

43615

357643

8.2

... More
Providing and applying prime coat with bitumen emulsion (SS-2) Grade on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam) ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .

43615

1491633

34.2

... More
Providing 25 mm thick compacted Semi-Dense Bituminous Concrete by 100-120 TPH Batch Type hot mix plant producing an average output of 75 tonnes per hour using HBG crushed aggregates of Grading -II as per table 500-15 of specification of MoRT&H , premixed with bituminous binder VG 30 grade @ 5.0 % of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification complete for finished item of work in all respects including contractors profit & Over head charges excluding Seigniorage charges, GST Complete . as directed by Engineer-in-charge

1091

9501519

8709

... More
Panelled Cement Concrete Pavement (Panel Size 0.75 X 0.75 mts) Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork etc complete as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete slab for 14-days, using curing compound (where specified) and water and cutting the grooves of 1/3rd depth of the slab thickness for forming the panels of 0.75 X 0.75 mts size as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges, but excluding Seig Charges & GSTetc., complete. The rate is including the Grove cutting & Grove filling charges.

550

4853750

8825

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, bu excluding Seignorage& GST .- 5th KM stone

2

7960

3980

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, bu excluding Seignorage& GST - Ordinary KM Stone

7

16583

2369

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, bu excluding Seignorage& GST - 200M Stone

34

21896

644

... More
Construction of RCC guide posts of 1 m length & 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete.

342

203490

595

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges, but excluding Seignorage& GST .

4

38268

9567

... More
Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges,but excluding Seignorage & GST . up to 0.9 sqm size board

20

44000

2200

... More
Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, but excluding Seignorage& GST .with 600X 600 mm size MS sheet

10

17510

1751

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete ) as per Technical Specification Clause 202 (II) (A) of MoRD including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete

16

12288

768

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge. Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

317

32017

101

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

54

36018

667

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road -PCC M10 levelling Coarse

54

273186

5059

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

322

1919764

5962

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on C.C bedding with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause of 1100 MORD ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete - For Pipe Culverts

110

1041480

9468

... More
1V of 1000mm dia Pipe Culvert Total:

-

3314753

-

... More
Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete ) as per Technical Specification Clause 202 (II) (A) of MoRD including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete

16

12288

768

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge. Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

293

29593

101

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

54

36018

667

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road

54

273186

5059

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

246

1466652

5962

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on C.C bedding with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause of 1100 MORD ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete - For Pipe Culverts - 1000mm dia

140

1325520

9468

... More
Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete ) as per Technical Specification Clause 202 (II) (A) of MoRD including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete

16

12288

768

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge. Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

57

5757

101

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

11

7337

667

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road

11

55649

5059

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

43

256366

5962

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on C.C bedding with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause of 1100 MORD ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete - For Pipe Culverts - 1000mm dia

30

284040

9468

... More
Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete ) as per Technical Specification Clause 202 (II) (A) of MoRD including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete

16

12288

768

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge. Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

68

6868

101

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

14

9338

667

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road

14

70826

5059

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

50

298100

5962

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on C.C bedding with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause of 1100 MORD ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete - For Pipe Culverts - 1000mm dia

40

378720

9468

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge.Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

1900

191900

101

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road

285

1441815

5059

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

713

4250906

5962

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

17328

38122

2.2

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 9.0 m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete . (Payment will be made based on level for finished item of work).

1650

133815

81.1

... More
Construction of embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with a lead of 10 km including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance ofsoil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet requirement of table 300-2 of MoRT&H, including all hire andoperational charges of T&P ,contractors profit & Over head charges and , complete for finished item of work as per MoRT&H specification 305 (5th revision) but excluding Seigniorage charges, GST Complete . (Payment will be made based on level for finished item of work). With borrowed earth from 10 km lead.

6536

1947728

298

... More
Construction of subgrade & earthen shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with a lead of 10 km including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance ofsoil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet requirement of table 300-2 of MoRT&H, including all hire andoperational charges of T&P ,contractors profit & Over head charges and , complete for finished item of work as per MoRT&H specification 305 (5th revision) but excluding Seigniorage charges, GST Complete . (Payment will be made based on level for finished item of work). With borrowed earth from 10 km lead.

12729

3984177

313

... More
Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C Metal +Stone dust) spreading in uniform layers with Motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

1625

5526625

3401

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .

1625

6750250

4154

... More
Providing and applying tack coat with bitumen VG 10 Grade (Bulk) using Bitumen pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge and including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .

10830

88806

8.2

... More
Providing and applying prime coat with bitumen emulsion (SS-2) Grade on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam) ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .

10830

368220

34

... More
Providing 25 mm thick compacted Semi-Dense Bituminous Concrete by 100-120 TPH Batch Type hot mix plant producing an average output of 75 tonnes per hour using HBG crushed aggregates of Grading -II as per table 500-15 of specification of MoRT&H , premixed with bituminous binder VG 30 grade @ 5.0 % of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification complete for finished item of work in all respects including contractors profit & Over head charges excluding Seigniorage charges, GST Complete . as directed by Engineer-in-charge

271

2346047

8657

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, bu excluding Seignorage& GST. 5th Km Stone

1

3986

3986

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, bu excluding Seignorage& GST. Ordinary KM Stone

3

7119

2373

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, bu excluding Seignorage& GST. 200M Stone

12

7740

645

... More
Construction of RCC guide posts of 1 m length & 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete.

126

74970

595

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 of MORD including contractors profit & Over head charges, but excluding Seignorage& GST .

4

38284

9571

... More
Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges,but excluding Seignorage & GST . up to 0.9 sqm size board

12

26424

2202

... More
Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, but excluding Seignorage& GST .with 600X 600 mm size MS sheet

5

8765

1753

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge.Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

87

8787

101

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

15

10005

667

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road

15

76035

5069

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

88

525976

5977

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on C.C bedding with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause of 1100 MORD ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete - For Pipe Culverts

30

283680

9456

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge. Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

68

6868

101

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

14

9338

667

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road

14

70966

5069

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

50

298850

5977

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on C.C bedding with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause of 1100 MORD ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete - For Pipe Culverts

40

378240

9456

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge. Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

162

16362

101

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

32

21344

667

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road

32

162208

5069

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

114

681378

5977

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on C.C bedding with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause of 1100 MORD ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete - For Pipe Culverts

100

945600

9456

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

9780

21516

2.2

... More
Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment uoto a distance of 100m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302 (ii) MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

2083

94568

45.4

... More
Construction of embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with a lead of 10 km including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance ofsoil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet requirement of table 300-2 of MoRT&H, including all hire andoperational charges of T&P ,contractors profit & Over head charges and , complete for finished item of work as per MoRT&H specification 305 (5th revision) but excluding Seigniorage charges, GST Complete . (Payment will be made based on level for finished item of work). With borrowed earth from 10 km lead.

3437

1024226

298

... More
Construction of subgrade & earthen shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with a lead of 10 km including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance ofsoil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @OMC to meet requirement of table 300-2 of MoRT&H, including all hire andoperational charges of T&P ,contractors profit & Over head charges and , complete for finished item of work as per MoRT&H specification 305 (5th revision) but excluding Seigniorage charges, GST Complete . (Payment will be made based on level for finished item of work). With borrowed earth from 10 km lead.

4708

1473604

313

... More
Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C Metal +Stone dust) spreading in uniform layers with Motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

1002

3421830

3415

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .

917

3822973

4169

... More
Providing and applying tack coat with bitumen VG 10 Grade (Bulk) using Bitumen pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge and including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .

6113

50127

8.2

... More
Providing and applying prime coat with bitumen emulsion (SS-2) Grade on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam) ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .

6113

207842

34

... More
Providing 25 mm thick compacted Semi-Dense Bituminous Concrete by 100-120 TPH Batch Type hot mix plant producing an average output of 75 tonnes per hour using HBG crushed aggregates of Grading -II as per table 500-15 of specification of MoRT&H , premixed with bituminous binder VG 30 grade @ 5.0 % of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification complete for finished item of work in all respects including contractors profit & Over head charges excluding Seigniorage charges, GST Complete . as directed by Engineer-in-charge

153

1326816

8672

... More
Panelled Cement Concrete Pavement (Panel Size 0.75 X 0.75 mts) Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork etc complete as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete slab for 14-days, using curing compound (where specified) and water and cutting the grooves of 1/3rd depth of the slab thickness for forming the panels of 0.75 X 0.75 mts size as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges, but excluding Seig Charges & GSTetc., complete. The rate is including the Grove cutting & Grove filling charges.

113

998920

8840

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, bu excluding Seignorage& GST .- 5th KM stone

1

3987

3987

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, bu excluding Seignorage& GST - Ordinary KM Stone

1

2374

2374

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, bu excluding Seignorage& GST - 200M Stone

7

4515

645

... More
Construction of RCC guide posts of 1 m length & 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete.

150

89250

595

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges, but excluding Seignorage& GST .

4

38288

9572

... More
Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges,but excluding Seignorage & GST . up to 0.9 sqm size board

5

11010

2202

... More
Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, but excluding Seignorage& GST .with 600X 600 mm size MS sheet

6

10518

1753

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge. Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

41

4141

101

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .

4

2668

667

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road -PCC M10 levelling Coarse

6

30438

5073

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

26

155480

5980

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on C.C bedding with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause of 1100 MORD ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete - For Pipe Culverts

30

283680

9456

... More
3V of 1000mm dia Pipe Culvert Total:

-

476407

-

... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete and as directed by the Engineer-in-Charge. Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD

300

30300

101

... More
Providing and laying M10 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 complete for finished item of work including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete for levelling course to pipe or Slab culverts or CC Road

45

228285

5073

... More
Providing concrete for plain concrete M 15 grade for Pipe bedding using 40 mm , 20 mm ,10 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete

113

675740

5980

... More
Rs.15,30,45,540/- (Rupees fifteen crores thirty lakhs forty five thousand five hundred and forty only)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.