Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Building Construction
Opening Date7 Jul 2023
Closing Date10 Jul 2023
Tender Amount₹ 8,20,113
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
436905Bid Award Id
ViewTender No
EE/R&B/NGKL/DMFT Collector New Residence Complex peremises/04/2023-24/5, Dt:30-06-2023Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting, placing in position, including cost and conveyance of all materials to work site and all operational, incidental, labour charges including cost of overheads & contractors profit complete for finished item of work for purlins of roofing for Ground Floor
248.43
149
37016
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., including overheads & contractors profit complete for finished item of work for:-Polishing to wood work - Melamine Polishing to Wood Work
5.06
1237
6259
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Painting to flush shutters two coats of ready mixed synthetic enamel paint Grade-I of approved shade having VOC (Volatile organic compound)content less than 50 grams/liter over wood primer coat including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper for neat finish including sales & other taxes on cost of all materials etc., complete including cost of overheads & contractors profit complete (APSS No.1200, 1207 & 1211) in all floors.
5.06
204
1032
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Supplying and fixing of Unplasticised Poly VinylChloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR
4.44
7245
32168
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Supply and fixing single shutter doors as per drawing with PVC Toilet Door frame and Shutters
4.05
3235
13102
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Supply and fixing single shutter doors as per drawing with Medium teak wood door frames of size 125x75 mm and flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on the other face (lipping) 35 mm thick con
4.05
12545
50807
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Dadooing to walls with glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc.,scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement etc., to site, excluding seigniorage on materials but including all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge for Ground Floor
10.69
1093
11684
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed) excluding seigniorage charges on all materials but including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)
3.38
919
3106
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Skirting Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs [ Light gray shade of lighter shade , Gray, Almond ] set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) excluding cost of seigniorage charges on all materials, but including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707)
3.33
1210
4029
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Flooring with Double Charged/multi charged stain free porcelain vitrified tiles with double layer pigment of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by the consultant set over a base coat of CM (1:8) prop. 40mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistency spread @ 3.3 kgs per Sqm and filling the joints neatly with epoxy grout with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand, water, tiles, nylon spacers, epoxy grouting material and tile filler adhesive etc., to site (excluding cost of C.C. bed) excluding cost of seigniorage charges on all materials, but including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No. 701 & 707)
30.66
1218
37344
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.
163.26
139
22693
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Painting to new walls and ceiling with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer
134.78
139
18734
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges but including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge and cost of overheads & contractors profit etc., complete for finished item of work. (SS 901,903 & 904) for Ground Floor
270.87
500
135435
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, excluding seigniorage charges but including sales & other taxes on all materials and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, cost of overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504) for Ground Floor
36.3
7794
282922
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) for Ground Floor
0.31
86990
27258
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for fnished item of work for (APSS NO.309&310)
78.65
379
29808
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Cooking Platform 50 mm Thick
3
2738
8214
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Sunshades
4.32
1123
4851
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Lintels
0.26
14114
3670
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for Plinth Beams
2.05
13143
26943
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations are under flooring bed using coarse aggregate 40mm size hard machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site,excluding seigniorage charges but including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing and cost of overheads & contractors profit etc.,complete for finished item of work for levelling course under footings . (APSS No. 402)
4.16
4497
18708
... More
CONSTRUCTION OF SERVANT QUARTER FOR COLLECTOR BUNGLAW IN NAGARKURNOOL DISTRICT;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding seigniorage charges , dewatering charges etc as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means-Upto 3M depth.
24.73
220
5441
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements