Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Opening Date9 Feb 2024
Closing Date16 Feb 2024
Tender Amount₹ 2,07,86,892
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
496416Tender No
Chief Engineer (R&B), D&P,LWE, RSW,QC& Admn NIT No.2050/157/6th call/B51/CE (D&P, LWE, RSW, QC&Admn.)/ LWE/EE/DEE/AEE2/2023-24, Dt:05.02.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Bridge work;Reinforced cement concrete M25 grade (Design Mix) using 25 &10 mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802,804,805,806,807 , 1202 and 1204 MORD and 1500,1700 & 2200 MORTH, including contractor profit & overhead charges , excluding seigniorage charges and GST etc.,complete for finished item of work
408
7881
3215448
... More
Bridge work;Plain cement concrete M20 grade using 40, 20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802,804,805,806,807 ,1202 and 1204 MORD and 1500,1700 & 2200 MORTH, including contractor profit & overhead charges , excluding seigniorage charges and GST etc.,complete for cutoff walls and foundations
133
6414
853062
... More
Bridge work;Plain cement concrete M20 grade using 40, 20 & 10mm metal (HBG) mechanically mixed in sub structure complete as per drawings and technical specification Clauses 802,804,805,806,807 ,1202 and 1204 MORD and 1500,1700 & 2200 MORTH, including contractor profit & overhead charges , excluding seigniorage charges and GST etc.,complete for sub structure of piers, abutments and wing walls. Height Upto 5.0m
162
6784
1099008
... More
Bridge work;Providing and laying reinforced cement concrete M 25 grade(Design Mix) using 20 & 10mm metal mechanically mixed in sub structure as per drawings and technical specifications Clauses 800 ,1205.4 MORD sections 1500, 1600 & 1700 MORTH, including overhead charges & contractor profit , excluding seigniorage charges , cost of steel etc., complete for Bed Blocks / Backing walls
19
8336
158384
... More
Bridge work;Vibrated reinforced cement concrete M 25 grade (Design Mix) using 20 & 10mm metal mechanically mixed in Superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD /sections 1500, 1600 & 1700 MORTH, including overhead charges & contractors profit , excluding Seigniorage charges, and GST charges but excluding cost of steel . For super structure
346
9093
3146178
... More
Bridge work;P.C.C M15 ordinary grade leveling course below approach slab complete as drawing and technical specifications clauses 800 and 1211 MORD & 2700 MoRTH including overhead charges & contractors profit , excluding Seigniorage charges, and GST charges., complete Under Approach slabs
8
6611
52888
... More
Bridge work;Vibrated reinforced cement concrete M 30 grade (Design Mix)using 20mm & 10mm metal mechanically mixed for approach slab as per drawing and technical specifications clauses 800 and 1211 MORD/ sections 1500,1600 & 1700 & 2704 MORTH including overhead charges & contractors profit , excluding Seigniorage charges, and GST charges but excluding cost of steel ., complete For Approach slabs
18
7149
128682
... More
Bridge work;Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 & 1206.3 MORD and 2702 MORTH including overhead charges & contractors profit , excluding Seigniorage charges, and GST charges but excluding cost of steel .,complete
46
7922
364412
... More
Bridge work;Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm hard broken graded granite crushed metal (SS-5) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P and all water leads etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 809,1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Crash barrier, excluding Reinforcement.
42
8725
366450
... More
Bridge work;Cost,Supply and fixing of Bituminous Mastic Pad 25.4mm including cost & conveyance and all labour charges and including contractors profit & overhead charges, excluding seigniorage charges and GST charges etc. complete.
53
839
44467
... More
Bridge work;Supplying, fitting, and placing HYSD bar reinforcement Fe 500 in foundation complete as per drawing and technical specifications Clauses 1000 and 1202 MORD / 1100, 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & contractors profit excluding seigniorage charges and GST charges etc. complete.
28.44
81134
2307451
... More
Bridge work;Supplying, fitting, and placing HYSD bar reinforcement Fe500 in sub structure complete as per drawing and technical specifications Clauses 1000 and 1202 MORD / 1100, 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & contractors profit excluding seigniorage charges and GST charges etc. complete.
4.3
81393
349990
... More
Bridge work;Supplying, fitting, and placing HYSD bar reinforcement Fe500 in super structure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & contractors profit and etc. complete.
29.27
83140
2433508
... More
Bridge work;Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD/2706 & 2200 MoRTH including contractors profit & Over head charges,excluding Seigniorage charges, GST etc., Complete .
48
379
18192
... More
Bridge work;Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8/ 710.1.4 of IRC:78 and 2200 MoRTH including Over head charges & contractors profit excluding Seigniorage charges and GST charges etc., Complete
43
2176
93568
... More
Bridge work;Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD/ 710.1.4 of IRC, 78 & 2200 MORTH, includingOver head charges & contractors profit , excluding Seigniorage charges and GST charges.,Complete
52
698
36296
... More
Bridge work;Jeddy Stone Dry Packing for Aprons and Revetments section 1300 MORD including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges ,excluding Seigniorage charges and GST etc., complete.
249
1294
322206
... More
Bridge work;Supplying and fixing of drainage spouts complete as per drawing and Technical Specification No.2705 (As per Data communicated vide Circular Memo No. D&P/Bridge work estimates/Non SSR Items/rates/2009-1 Dt 13-08-09 of the Chief Engineer (R&B), Designs & Planning wing,) including Over head charges & contractors profit ,excluding Seigniorage charges and GST etc., complete.
20
2685
53700
... More
Bridge work;Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand 6 percent bitumen by weight including Over head charges & contractors profit ,excluding Seigniorage charges and GST etc., complete.
51
36
1867
... More
Bridge work;Construction of RCC guide posts of 250mm dia M20 grade cast-in-situ with 20mm nominal size agrregate (HBG) true to line and grade tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit &Over head charges, but excluding Seignorage& GST.
120
719
86280
... More
Bridge work;Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces as per drawing and Technical Specification Clause 1701 MoRD, including Over head charges & contractors profit ,excluding Seigniorage charges and GST etc., complete.
256
146
37376
... More
Bridge work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 (5th revision ) and as directed by the Engineer-in-Charge for quadrential revetment.
14
2211
30954
... More
Bridge work;Providing and laying filter material with gravel underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as per MOST specification Nos. 305, 309 & 2504 and as directed by the Engineer-in-Charge under revetment
7
317
2219
... More
Bridge work;Providing and laying pitching on slopes laid over prepared filter media /gravel backing as per drawing and technical specifications clause 1302 MORD/2504 MORTH including cost, and conveyance of materials to site including labour charges etc., complete including contractors profit & Over head charges excluding Seigniorage charges and GST., Complete
9
1157
10413
... More
Bridge Approaches;Approaches:Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges,excluding Seigniorage charges and GST etc., complete.
315
2
725
... More
Bridge Approaches;Construction of embankment with approved material obtained from borrow pits with all lifts ,transporting to site, spreading , grading to required slope and compacting with Vibratory Roller 80-100 KN to meet requirement of table 300.1 and 300-2 with lead upto 1000 m as per techincal specification clause 301.5 MORD including contractors profit & Over head charges,excluding Seigniorage charges and GST etc., complete.
2565
222
569430
... More
Bridge Approaches;Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR value not less than 20 and PI value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .
154
2824
434896
... More
Bridge Approaches;Construction of shoulders by providing selected earth having minimum CBR of 10 % ,MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface , and compacted at OMC with Vibratory roller 80-100 KN to meet requirement of Table 300.2 with as per Technical Specification clause 303 MORD/305 MORTH, by using machinery including contractors profit & Over head charges,excluding Seigniorage charges and GST etc., complete.
79
304
24016
... More
Bridge Approaches;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/MORTH, including contractors profit & Over head charges ,excluding Seigniorage charges and GST etc.,Complete .
184
3541
651544
... More
Bridge Approaches;Providing and applying prime coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam) ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .
735
45
33516
... More
Bridge Approaches;Providing and applying tack coat with bitumen VG 10 Grade (Bulk) using Bitumen pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge and including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .
735
17
12863
... More
Bridge Approaches;Providing and laying Bituminous Concrete with 100-120 TPH Batch Type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified Grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification clause No :509 complete in all respects, including contractors profit & Over head charges excluding Seigniorage charges and GST., Complete
23
11786
271078
... More
Bridge Approaches;Providing and laying reinforced cement concrete Hume pipes of 1000mm dia NP3 class for pipe culverts including cost and conveyance of pipes etc., complete and labour charges for laying, jointing of 1000mm dia RCC Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.
45
4161
187245