Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Building Construction
Opening Date9 Jan 2025
Closing Date23 Jan 2025
Tender Amount₹ 4,33,43,662 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Labour charges for run of U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles, clamps,wooden separators etc., comkplete (as directed by departmental official).

10

61

610

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables up to 50 sqmm covering the cable with back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete

80

365

29200

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and laying of 50 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - 1). Makes: Torrent/Unicab/Universal / Polycab/Havells /KEI/ Finolex/Payal / RR kable

100

648

64800

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Unicab / Universal / Polycab / Havells /KEI / Finolex / Payal / RR kable

100

409

40900

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Unicab / Universal / Polycab / Havells /KEI / Finolex / Payal / RR kable

100

318

31800

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;"Supply and fixing of DB with 1 No 20A single phase plug and Socket, in sheet steel enclosure with 1 No 10A to 20A 10 KA ISI Marked C/D curveSP MCB including internal connection and labour charges for Flush Mounting etc., complete. Plug and Socket Makes:Makes : ABB/Havells / HPL/ Gold Medal / GM or equivelant as approved by Department. Isolator Makes : Legrand-DX3 / Schneider-Acti9.

3

2845

8535

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of 4 way VTPN DB as perIS:13032 and suitable for accommodating with 1 No 125A FP MCCB and 4 Nos 63A 10kA ISI Marked C/D curveTP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes : Legrand / Schneider. "MCCB Make: L&T- D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3VL / Hager-h3/C&S -Winbreak." MCB Makes : Legrand-DX3 / Schneider-Acti9 .

2

47103

94206

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 63A FP Isolator and 12 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes : ABB/ Havells / HPL / Hager . Isolator Makes : Legrand-DX3 / Schneider-Acti9. MCB Makes : Legrand-DX3 / Schneider-Acti9 .

3

13471

40413

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 40A FP Isolator and 12 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes : Legrand / Schneider. Isolator Makes : Legrand-DX3 / Schneider-Acti9. MCB Makes : Legrand-DX3 / Schneider-Acti9.

4

13329

53316

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of 8 Way SPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 40A DP Isolator and 6 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes : Legrand / Schneider. Isolator Makes : Legrand-DX3 / Schneider-Acti9. MCB Makes : Legrand-DX3 / Schneider-Acti9.

3

7144

21432

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 19mm dia 'B' Class G.I Pipe of 2.5Mtr length with funnel as per National Electric Code and earth connection from electrode GI strip of 40mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mmX450mmX400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II).

2

18940

37880

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of Modular socket type Telephone jack with Connector. Makes : Legrand Myrius / Cabtree Thames Platinum / Million Logus / Gold Medal Curve / Anchor Roma viola / on required size Modular Box with cover frame with connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B.

11

339

3729

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply of 20 pair Telephone distribution box with back mount frame, krone connector, powder coated metal body with lock and key arrangement.

2

2067

4134

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and run of 20 Pair telephone Copper wire., in the existing PVC pipe including all labour charges etc complete.

50

117

5850

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and run of 2 pair telephone cable 0.5mm copper, in the existing PVC pipe including all labour charges etc complete

1080

28

30240

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and installation of 12U wall mounting net work rack with power spike including all accessories.

2

11055

22110

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of 24 port patch panels including accessories and all labour charges etc complete. Makes : D Link / AMP / Molex / Legrand / Krone.

2

7578

15156

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of 24 Port manageable switches including accessories and all labour charges etc complete. Makes : CISCO / Net Gear / HP / D link.

2

9941

19882

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate of makes D Link / AMP / Molex / Legrand / Krone on required size Modular Box with cover frame with connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B.

25

691

17275

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and Run of LAN Cable cat - 6 UTP cable of makes D Link / AMP / Molex / Legrand / Krone / Finolex / Polycab in existing pipe inlcuding all labour charges etc., complete as desired by the department (derived from Sd 3.1.2)

1000

48

48000

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of shutter for the exhaust fan with enamil paint matching to the wall colour.

19

205

3895

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply, Transportation and Fixing of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark and masonary work and all labour charges etc., complete. Makes: Crompton / Almonard / Havells Turbo Force SP. Twin Core Wire Makes: Finolex / RR kabel / Havells.

12

4373

52476

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply, Transportation and Fixing of light duty 9" (225mm) ISI, Fresh Air fan ISI marked, Fresh Air fan with metallic body and blades with all labour charges etc., complete as directed at site. Makes : Crompton / Havells Ventilair-DB / Orient hill air.

7

2245

15715

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply, Transportation and fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.0, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete.with twin core flat copper wire, connections and all labour charges etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient, as approved by the Department

59

3666

216294

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply,Transportation & Instatlation of 36W Back lit, 2' x2' (600mm x 600mm) Recessed / Surface mounted LED luminaire made of CRCA sheet housing with powder coated with high efficiency acrylic wide diffuser, with wide operating voltage range, Power factor > 0.9, Surge protection >2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% etc., complete with 5 years warranty. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar /Pansonic

50

3364

168200

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and transportation of 18W LED back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar or equilent as approved by the Department

27

1887

50949

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply, transportation and Fixing of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Havells / Jaquar/Panasonic.

155

906

140430

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and Run of 5 of 10.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. Wire Makes: Makes : Finolex / RR kabel / Havells.

140

913

127820

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and Run of 5 of 6.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete. Wire Makes: Makes : Finolex / RR kabel / Havells.

105

586

61530

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and Run of 3 of 6.0 Sq.mm FRLSH / HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete. for lighting TPN DBs and computer TPN DBs. Wire Makes: Makes : Finolex / RR kabel / Havells.

140

343

48020

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and Run of 3 of 4.00 Sq.mm FRLSH / HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete. Wire Makes: Makes : Finolex / RR kabel / Havells.

350

246

86100

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and Run of 3 of 2.50 Sq.mm FRLSH / HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains, ferrules inlcuding all labour charges etc., complete. Wire Makes: Makes : Finolex / RR kabel / Havells.

1348

162

218376

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 1200mm including internal connections and all labour charges etc. Makes : Legrand Myrius / GM Four Five / Goldmedal Curve /Anchor Roma Plus / Havells Fabio /Panasonic Vision

59

651

38409

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of ISI mark batten holder / angle holder in place of ceiling rose of light point but without bulb including all connections and labour charges complete

14

92

1288

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of ISI marked 3 Nos 10A Modular type switches, 3Nos 10A 3/2 pin wall plug sockets on 9 Modular box with cover frame including connections, cost and coveyance of all material and all labour charges etc., complete for Computers in N.R.B. / R.B. Makes : Legrand Myrius / GM Four Five / Goldmedal Curve /Anchor Roma Plus / Havells Fabio /Panasonic Vision

25

1561

39025

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of ISI mark 16A 3pin / 6A 3 Pin 1 way Modular combi socket, 16 Amps Modular switch, 3 Modular box with suitable cover frame and earth connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B.. Makes : Legrand Myrius / GM Four Five / Goldmedal Curve /Anchor Roma Plus / Havells Fabio /Panasonic Vision

10

830

8300

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Wiring with run of 3 of 1.5 Sqmm FRLSH / HFFR PVC insulated flexible ISI marked copper cable including Supply and fixing of ISI Marked 6 / 10A- 3/2 pin Modular socket, 6 /10A 1way Modular switch with required cover frame including connections, cost and conveyance of all material and all labour charges etc., complete for seperate plug points in N.R.B. / R.B. Wire Makes: Makes : Finolex / RR kabel / Havells. Makes : Legrand Myrius / GM Four Five / Goldmedal Curve /Anchor Roma Plus / Havells Fabio /Panasonic Vision

10

1013

10130

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of ISI marked 6 / 10A 3/2pin Modular socket with shutter, 6 / 10 Amps Modular switch on 3 modular box with suitable cover frame on a common switch board including cost and conveyance of all material and all labour charges etc., complete in R.B. Makes : Legrand Myrius / GM Four Five / Goldmedal Curve /Anchor Roma Plus / Havells Fabio /Panasonic Vision

36

590

21240

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Wiring with run of 3 of 1.5 Sqmm FRLSH / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6 / 10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for fan and exhaust fan points in R.B. Wire Makes: Makes : Finolex / RR kabel / Havells. Makes : Legrand Myrius / GM Four Five / Goldmedal Curve /Anchor Roma Plus / Havells Fabio /Panasonic Vision

78

1224

95472

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Wiring with run of 2 of 1.5 Sqmm FRLSH / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6 / 10A ISI Mark 2way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for Stair case points in R.B . Wire Makes: Makes : Finolex / RR kabel / Havells. Makes : Legrand Myrius / GM Four Five / Goldmedal Curve /Anchor Roma Plus / Havells Fabio /Panasonic Vision

2

1494

2988

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Wiring with run of 2 of 1.5 Sqmm FRLSH / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6 / 10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for light and bell points in R.B . Wire Makes: Makes : Finolex / RR kabel / Havells. Makes : Legrand Myrius / GM Four Five / Goldmedal Curve /Anchor Roma Plus / Havells Fabio /Panasonic Vision

230

996

229080

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe consealed in wall with Metallic junction boxes and all required accessories including masonary work for Run of mains,light, fan and separate plug point with including all labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP / Precision

2821

98

276458

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and Laying of ISI 25mm outer dia heavy grade with IS:9537 part 3 regid PVC pipe concealed in Roof Slabs with all required Metallic Deep Boxes including masonary work and labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP / Precision

4231

249

1053519

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers with in Telangana with minmm integrated installed production capacity of 2 Lakh MT per annum (AF star TMT/MS Life TMT, RAdha TMT, SUGUA TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126). For Internal CC Roads & Storm water drain

2

76779

153558

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR SLABS. 150mm thick. For Internal CC Roads & Storm water drain

7

1770

12390

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS, RCC WALLS 100mm thick. For Internal CC Roads & Storm water drain

7

2679

18753

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement. For Internal CC Roads & Storm water drain

14

4321

60494

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means. For Internal CC Roads & Storm water drain

61

80

4880

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Painting 2 coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surface as per Tech Specification 800 MORTH (5th revision) and as directed by the Engineer in charge. For Internal CC Roads & Storm water drain

137

105

14385

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thk, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per Clause 408 and drawings. For Internal CC Roads & Storm water drain

33

555

18315

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th Revision) and as directed by t. For Internal CC Roads & Storm water draine Engineer-in-Charge for C.C Pavement.

273

6336

1729728

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement. For Internal CC Roads & Storm water drain

137

4321

591977

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. For Internal CC Roads & Storm water drain

205

1837

376585

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Construction of embankment with material obtained from borrowed useful earth from outside road boundary MDD of 18 KN/Cum , CBR = 12%, PI < 12%, by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision). For Internal CC Roads & Storm water drain

410

375

153750

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Constructing Brick masonry support for G.I pipe with C.M 304.8 x 228.6 x228.6 mm size including plastering including cost and conveyance of all materials to site, all operational,incidental , labour charges, overhead & contractor's profit etc complete for finished item of work in all floors as directed by Engineer-in-charge.

50

107

5350

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work.

500

11

5700

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326). For 110mmdia

94

533

50102

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326). For 75mmdia

194

363

70422

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. For 40mm Nominal bore

5

3152

15760

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. For 32mm Nominal bore

5

2337

11685

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. For 25mm Nominal bore

3

1538

4614

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. For 20mm Nominal bore

2

1070

2140

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing 75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328) for 75 mm Dia

100

363

36300

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge. For 54.00 mm OD pipe

60

699

41940

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge. For 41.30mm OD pipe

87

479

41673

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge. For 28.60mm OD pipe

131

284

37204

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge. For 22.20mm OD pipe

115

237

27255

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge. For 15.90mm OD pipe

38

197

7486

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

25

4039

100975

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded conenction conforming to IS 8931, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

15

329

4935

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded conenction conforming to IS 8931, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

15

974

14610

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

40

181

7240

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm best quality glass mirror with approved make 1st quality including cost and conveyance of all materials to site, all operational,incidental , labour charges etc. overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

40

641

25640

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing CP finish brass soap dish of approved make with screws, including cost and conveyance of all materials to site, all operational,incidental , labour charges and overhead & contractor's profit etc. complete for finished item of work as directed by Engineer-in-charge.

40

746

29840

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying & Fixing Indian make WHITE Flat Back Wash Hand Basin of size 550 x 400 mm with Single C.P. Pillar cock 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963- 1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15 mm nominal size PVC connection with brass union nut C.P coated, 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality and standard CI brackets including wooden block, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects.

40

3814

152560

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying & Fixing Orissa Pan White glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap : 580 mm x 440 mm duly providing constructing Brick masonry seat using 2nd class bricks, CC Squatting plate in P.C.C 1:2:4, S&F PVC Low level system with internal components & short bend: 10 Litres capacity Single Flush, S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and S&F 15 mm nominal size PVC connection with brass union nut C.P coated including cost and conveyance of all materials , operational, incidental, labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

10

6199

61990

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2- 2004 of white glazed with 'S' trap with CI short Connector & 4" dia CP thimble pipe: 150 mm long, best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and 15 mm nominal size PVC connection with brass union nut C.P coated all of approved make, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

25

7468

186700

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work.

40

194

7760

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)

342

424

145008

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Screed Concrete average 50mm thick with 1: 1 1/2 :3 cement concrete Nominal mix, using 12mm hard broken stone aggregate laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m mixed excluding seigniorage charges but including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and cost of overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

91

5464

497224

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;ProvidingStrucutral steel hollow Tubular sections conforming to IS 1161-2014 of all diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawings, including cost and conveyance of all structural steel sections and all wastages such as overlaps, couplings, welded joints, etc., and all operational, incidental charges, including Labour charges for fabricating all heavy steel works like Trusses,Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including overheads and contractor's profit complete for finished item of work.

2926

178

520828

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing and fixing of 24 gauge alluminium sheet over expansion joint groove of width 15cm fixed to walls / columns at one edge and resting over the other block walls/columns concealing expansion joint with slotted holes for free edge of aluminium sheet to facilitate free movement of aluminium sheet over the finished surface of expansion joint and wall face using sheet metal screws with nylon receiver complete including cost and conveyance of all materials to site, all incidental, operational, labour charges , overheads & contractors profit etc., complete for finished item of work as per approved drawing (for all floors for vertical joints and bottom of slab). For Second Floor

34

62

2108

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing specialized polysulphide sealant treatment to the expansion joints (Size : 25 mm x 25 mm) duly a]. Chipping and removing of existing covering on expansion joints b]. Cleaning of the surface from dirt, dust and other contaminations c].Application of one coat of High performance specially designed SBR latex polymer based bonding agent d]. Providing and application of Acrylic Polymer modified reinstatement concrete /mortar to the damaged edges of joint and making the groove. e]. Providing and fixing of masking tape on top of the joint both sides f]. Providing and fixing of Back up support material of PVC Solid Backer rod to leave the depth of 25 mm on the joint g]. Providing and application of one coat of polysulphide primer on inner edges of Joint. h]. Providing and application of Two part Polysulphide sealant to a width of 25 mm and depth of 25 mm with putty knife and neat finish i]. Removing of masking tape and providing and application of two coats of Acrylic elastomeric cementitious coating including cost and conveyance of all materials to site, all incidental, operational, labour charges, cost of overheads & contractor profit complete for finished item of work. For Second Floor

22

906

19932

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing and fixing expansion joint filler board conforming to IS: 1838 for buildings, columns, beams and slabs 25 mm THICK including cost and conveyance of all materials to site, all incidental, operational, labour charges, cost of overheads & contractor profit complete for finished item of work. For Second Floor

12

483

5796

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing 14 mm - Mineral Fibre Sheet Grid Line False Ceiling of Tegular Edge 600 x 600 of Board / Tegular/ Micro look Edge tiles with a Humidity Resistance of 90% RH, Average NRC 0.50, Light Reflectance >80%, Thermal Conductivity ? = 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1; fixing to Gyp steel precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using precoated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanised spring steel level clip of PVC unversal holding clips system at 1200 mm c/c and fixing the 14mm Mineral Fibre Sheet of size 600 x 600 mm in position and finishing two coats of drywall topcoat including overheads & contractors profit, etc. complete for finished item of work.. For Second Floor

372

1398

520056

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Painting to new iron works with 2 coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit of approved brand and shade to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. including cost of overheads & contractors profit for finished item of work for:-Painting to Iron work - Synthetic enamel paint to New Iron Work - 2 coat. For Terrace Floor

3.24

134

434

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Painting to new iron works with 2 coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit of approved brand and shade to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. including cost of overheads & contractors profit for finished item of work for:-Painting to Iron work - Synthetic enamel paint to New Iron Work - 2 coats . For Second Floor

112

134

15008

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors. For Terrace Floor

7

297

2079

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors.. For Second Floor

108

297

32076

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. For Second Floor

994

502

498988

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. For Terrace Floor

896

289

258944

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. For Second Floor

994

289

287266

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. For Terrace Floor

140

161

22540

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.. For Second Floor

696

161

112056

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty.. For Second Floor

696

288

200448

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of box type cup board using Cement Bonded Particle Board conforming to IS 14276 for making frame of size 100mm x 35mm using two sandwiched 16MM boards, one Cement Bonded Particle Board conforming to IS 14276 and one Cement Bonded Prelaminated Particle Board with plain 35mm wood lipping. The Shutters are made of 16MM thick Cement Bonded Prelaminated Particle Board (Pre-Laminated Cement Bonded Particle Board) of approved shade inclusive of hardware like M.S. powder coated Piano hinges of size ¾? x ¾? , Aluminium powder coated handles of size 4? (101.6mm), Aluminium tower bolt 4? (101.6mm) Godrej locks, screws, wood lipping and synthetic glue, cost of overheads and contractors profit, etc., complete finish item of work. . For Second Floor

83

4764

395412

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. For Second Floor

305

766

233630

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;RCM facia 50mm thick in CM (1:3) (with 50% river sand & 50% manufactured sand) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing,including cost and conveyance of all materials to site, all operationals &incidental charges,cost and conveyance of cement,wire mesh,water to work site,centering,scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903). For Second Floor

33

3324

109692

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing of MS doors, grill to windows, ventilators / in open court yards using MS angles, flat, square bars including cost and conveyance of all materials, cutting, bending, welding, all operational charges, labour charges, overheads and contractor profit etc., complete for finished item of work. For Terrace Floor

49.5

157

7772

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing of MS doors, grill to windows, ventilators / in open court yards using MS angles, flat, square bars including cost and conveyance of all materials, cutting, bending, welding, all operational charges, labour charges, overheads and contractor profit etc., complete for finished item of work. . For Second Floor

51

157

8007

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin). Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractor profit etc., complete for finished item of work. For Second Floor

49.5

7279

360311

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work.. For Terrace Floor

3.3

8088

26690

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work.. For Second Floor

155.99

8088

1261647

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing SINGLE shutter toilet door using factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fasts, flush door shutters of 30mm thick solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping), providing and fixing 1 mm thick PVC door cladding to the flush doors shutter pasted with synthetic glue conforming to IS:2202 as per drawing including cost of Stainless Steel fixtures such as 1 No tower bolt of 200x10mm dia, 1 No. Aldrops - 200 mm long, 1No. Latche-200mm long, 2 Nos. handles of 100 mm size & & 1 no rubber bushes, including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002 (Door size : 0.75X2.15m) - TOILET DOORS-D4. For Second Floor

28.56

6426

183527

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing SINGLE shutter door using factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fasts, flush door shutters of 35 mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 as per drawing including cost of Stainless Steel fixtures such as 1 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 2 Nos. handles of 150 mm size & 1 No. Heavy duty door stopper,& 1 no rubber bushe, including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002 (Door size : 0.9X2.15m) - D3 both commercial ply. For Second Floor

22.68

6063

137509

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing SINGLE shutter door using factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fasts, flush door shutters of 35 mm thick solid bond wood block board type with teak ply on both faces conforming to IS:2202 as per drawing including cost of Stainless Steel fixtures such as 1 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 2 Nos. handles of 150 mm size & 1 No. Heavy Duty door stopper & 1 no rubber bushe , including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002 (Door size : 1.05X2.15m) - D3 teak veneer on both faces. For Terrace Floor

7

5276

36932

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing SINGLE shutter door using factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fasts, flush door shutters of 35 mm thick solid bond wood block board type with teak ply on both faces conforming to IS:2202 as per drawing including cost of Stainless Steel fixtures such as 1 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 2 Nos. handles of 150 mm size & 1 No. Heavy Duty door stopper & 1 no rubber bushe , including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002 (Door size : 1.05X2.15m) - D3 teak veneer on both faces. For Second Floor

54.6

5276

288070

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing DOUBLE SHUTTER DOOR WITH FIXED Fanlight at Top using factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fasts, flush shutters with solid bond wood block board type with teak ply on both faces: 35 mm thick conforming to IS:2202 as per drawing including cost of Stainless Steel fixtures such as 2 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 4 Nos. handles of 150 mm size & 2 No. Heavy duty door stopper, 2 no rubber bushes and 4mm thick pin headed glass in the ventilator portion including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002 (Door size 4'0" x 8'6") - with Ventilator - D2. For Second Floor

24.96

5770

144019

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying and fixing DOUBLE SHUTTER DOOR WITH FIXED Fanlight at Top using factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fasts, flush shutters with solid bond wood block board type with teak ply on both faces: 35 mm thick conforming to IS:2202 as per drawing including cost of Stainless Steel fixtures such as 2 No tower bolt of 200x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Latche-300mm long, 4 Nos. handles of 150 mm size & 2 No. Heavy duty door stopper, 2 no rubber bushes and 4mm thick pin headed glass in the ventilator portion including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002 (Door size 5'0" x 8'6") - with Ventilator - D1. For Second Floor

11.7

5341

62490

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of premium colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site , cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707). For Second Floor

42

5371

225582

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing skirting with Granite stone tiles 8 mm thick (mirror polished) of premium quality set over base coat of CM (1:5) 12mm thick with Grey cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with white cement to full depth (joints of stone should be flushed)including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, etc., to site, cost of base coat all labour charges like dressing to the required size, mixing of mortar, curing and lift charges including cutting the brick wall to place the stones and redoing the surface smooth and overheads & contractors profit, complete for finished item of works (APSS No.707 & 701). The skirting should flush online with plastering. For Second Floor

571.96

2299

1314930

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Skirting with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering.. For Second Floor

596.19

1404

837051

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707). For Second Floor

2

4574

9148

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. For Second Floor

379

1612

610948

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing 16 to 18mm thick high polished granite stone slabs of premium colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special). For Second Floor

21

7237

151977

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing 16 to 18mm thick high polished granite stone slabs of premium colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special). For Second Floor

12

4660

55920

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing Sills with 16 to 18mm thick high polished granite stone slabs of regular colour (other than black) length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using Manufactured sand(Rock sand) and natural river sand in the ratio of 50:50 over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding on both the edges of sill, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work (S.S.701 & special). For Second Floor

23

6573

151179

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707). For Second Floor

7

4440

31080

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Flooring with Granite stone tiles 8 mm thick (mirror polished) of premium quality set over a base coat of CM (1:8) prop. 12 mm thick and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., and overheads & contractors profit, complete for finished item of work. (APSS No.707 & 701). For Second Floor

664

2142

1422288

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707). For Second Floor

10

4926

49260

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707). For Second Floor

812

1414

1148168

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701). For Second Floor

111

1080

119880

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). For Terrace Floor

1807

741

1338987

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). For Second Floor

140.44

694

97463

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work.. For Second Floor

52

3965

206180

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). For Terrace Floor

1036

716

741776

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). For Second Floor

5246

662

3472852

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904). For Terrace Floor

57

760

43320

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904). For Second Floor

1257

699

878643

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Providing Mild steel (MS) steel bars ( (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials and cost of overheads & contractors profit etc., complete for finished item of work in all floors.( APSS No.126). For Second Floor

3

86057

258171

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers with in Telangana with minmm integrated installed production capacity of 2 Lakh MT per annum (AF star TMT/MS Life TMT, RAdha TMT, SUGUA TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126). For Terrace Floor

4.2

81748

343342

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers with in Telangana with minmm integrated installed production capacity of 2 Lakh MT per annum (AF star TMT/MS Life TMT, RAdha TMT, SUGUA TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126). For Second Floor

52.7

80092

4220848

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402). For Terrace Floor

20

16002

320040

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING. For Terrace Floor

0.3

6709

2013

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING. For Second Floor

10.3

6456

66497

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, and cost of overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509). For Second Floor

1027

1145

1175915

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504). For Terrace Floor

94.89

10469

993403

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504). For Second Floor

207

9856

2040192

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) for Second Floor

128

1388

177664

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Kitchen Platforms 50mm Thick. For Second Floor

59

744

43896

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) for Terrace Floor

2

1381

2762

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) for Second Floor

30

1321

39630

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. For STEPS for Second Floor

1.6

12682

20291

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. For ROOF SLAB 175mm THICK for Second Floor

30

2147

64410

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. For ROOF SLAB 150mm THICK for Second Floor

606

1936

1173216

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. For ROOF SLAB 125mm THICK for Terrace Floor

65

1819

118235

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. For ROOF SLAB 125mm THICK for Second Floor

1156

1746

2018376

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. For ROOF BEAMS for Terrace Floor

3

15223

45669

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. For ROOF BEAMS for Second Floor

86

14606

1256116

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) For Lintels for Terrace Floor

1

17710

17710

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) For Lintels for Second Floor

14

16827

235578

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. for Columns, for Terrace Floor

8

17962

143696

... More
Construction of Additional Floor ( Including Balance Works in Stilt Floor ) on the Two Court Bldg;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. for Columns for Second Floor

81.36

16967

1380435



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.