Roads And Buildings Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 1,64,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
584458Tender No
e NIT No.11/VKB/2/SE R&B SRD/TS/2024-25, Date.21.03.2025Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://https://roadbuild.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
boq;Providing and applying tack coat with bitumen emulsion (Rapid settting-I) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge. for Shankarpally to Marpally road from km 11/0 to 12/7, 21/9 to 22/450, 29/0 to 31/6 & 33/0 to 38/0
7875
13
102375
... More
boq;Providing 30 mm thick compacted Bituminous Concrete with 40-60 TPH HMP/ 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and Hydrated lime, transporting the hot mix to work site, laying with full width paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge. for Shankarpally to Marpally road from km 11/0 to 12/7, 21/9 to 22/450, 29/0 to 31/6 & 33/0 to 38/0
237
11377
2696349
... More
boq;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. for Shankarpally to Marpally road from km 11/0 to 12/7, 21/9 to 22/450, 29/0 to 31/6 & 33/0 to 38/0
13500
3
53865
... More
boq;Construction of earthen shoulder with excavated earth by mechanical means up to SDR including pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-1 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision). for Shankarpally to Marpally road from km 11/0 to 12/7, 21/9 to 22/450, 29/0 to 31/6 & 33/0 to 38/0
480
98
47040
... More
boq;Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3 for Shankarpally to Marpally road from km 12/7 to 17/0, 27/0 to 29/0, 31/6 to 33/0 & 38/0 to 39/746
4067
10
42297
... More
boq;Providing, Laying, Spreading and compacting graded HBT crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work. for Shankarpally to Marpally road from km 12/7 to 17/0, 27/0 to 29/0, 31/6 to 33/0 & 38/0 to 39/746
681
2180
1484580
... More
boq;Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge. for Shankarpally to Marpally road from km 12/7 to 17/0, 27/0 to 29/0, 31/6 to 33/0 & 38/0 to 39/746
4067
42
172848
... More
boq;Providing and applying tack coat with bitumen emulsion (Rapid settting-I) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge. for Shankarpally to Marpally road from km 12/7 to 17/0, 27/0 to 29/0, 31/6 to 33/0 & 38/0 to 39/746
8281
13
107653
... More
boq;Providing 30 mm thick compacted Bituminous Concrete with 40-60 TPH HMP/ 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and Hydrated lime, transporting the hot mix to work site, laying with full width paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge. for Shankarpally to Marpally road from km 12/7 to 17/0, 27/0 to 29/0, 31/6 to 33/0 & 38/0 to 39/746
249
11292
2811708
... More
boq;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. for Shankarpally to Marpally road from km 12/7 to 17/0, 27/0 to 29/0, 31/6 to 33/0 & 38/0 to 39/746
18600
3
74214
... More
boq;Construction of earthen shoulder with excavated earth by mechanical means up to SDR including pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-1 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision). for Shankarpally to Marpally road from km 12/7 to 17/0, 27/0 to 29/0, 31/6 to 33/0 & 38/0 to 39/746
250
98
24500
... More
boq;Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3 for Shankarpally to Marpally road from km 17/0 to 21/6 & 22/450 to 27/0
5276
10
54870
... More
boq;Providing, Laying, Spreading and compacting graded HBT crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work. for Shankarpally to Marpally road from km 17/0 to 21/6 & 22/450 to 27/0
792
2039
1614888
... More
boq;Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge. for Shankarpally to Marpally road from km 17/0 to 21/6 & 22/450 to 27/0
5276
42
224230
... More
boq;Providing and applying tack coat with bitumen emulsion (Rapid settting-I) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge. for Shankarpally to Marpally road from km 17/0 to 21/6 & 22/450 to 27/0
10010
13
130130
... More
boq;Providing 30 mm thick compacted Bituminous Concrete with 40-60 TPH HMP/ 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and Hydrated lime, transporting the hot mix to work site, laying with full width paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge. for Shankarpally to Marpally road from km 17/0 to 21/6 & 22/450 to 27/0
301
11163
3360063
... More
boq;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. for Shankarpally to Marpally road from km 17/0 to 21/6 & 22/450 to 27/0
21000
3
83790
... More
boq;Construction of earthen shoulder with excavated earth by mechanical means up to SDR including pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-1 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision). for Shankarpally to Marpally road from km 17/0 to 21/6 & 22/450 to 27/0
480
98
47040
... More
boq;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. for Shankarpally to Marpally road from km 8/0 to 11/0
6600
3
26334
... More
boq;Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3 for Shankarpally to Marpally road from km 8/0 to 11/0
350
10
3640
... More
boq;Providing, Laying, Spreading and compacting graded HBT crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work. for Shankarpally to Marpally road from km 8/0 to 11/0
54
2227
120258
... More
boq;Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge. for Shankarpally to Marpally road from km 8/0 to 11/0
350
42
14875
... More
boq;Providing and applying tack coat with bitumen emulsion (Rapid settting-I) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge. for Shankarpally to Marpally road from km 8/0 to 11/0
4045
13
52585
... More
boq;Providing 30 mm thick compacted Bituminous Concrete with 40-60 TPH HMP/ 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and Hydrated lime, transporting the hot mix to work site, laying with full width paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge. for Shankarpally to Marpally road from km 8/0 to 11/0
122
11242
1371524
... More
boq;Construction of earthen shoulder with excavated earth by mechanical means up to SDR including pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-1 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision). for Shankarpally to Marpally road from km 8/0 to 11/0
560
98
54880