Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Opening Date28 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 12,58,752
Costs
EMD
₹ 12,588Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
564865Tender No
NIT No 28/EE/PAtoEE/D2/DB/SBD 2024-25 Dated 28-12-2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Painting to old wood works with 2 coats of approved synthetic enamel paint of approved brand and shade to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for:-Painting to wood work - Synthetic enamel paint to Old Wood Work - 2 coats
80
169
13520
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Painting to walls with 2 coats water proof cement paint or snowcem or equivalent of approved brand and shade over existing paint surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Water proof cement paint - 2 Coats
479.45
229
109794.05
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Supply & fixing of 110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings including overheads and contractor's profit complete for finished item of work
40
142
5680
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;110 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings including overheads and contractor's profit complete for finished item of work
40
93
3720
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Supply & fixing of 110 mm dia - Coupler - UPVC/SWR Pipe fittings including overheads and contractor's profit complete for finished item of work
40
76
3040
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)
400
388
155200
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Supply and fixing of roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove, including cost and conveyance of all materials, all operational, incidental labour charges, overheads and contractor's profit complete for finished item of work.
185
931
172235
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Supply and fixing of Structural Steel hollow Square & Rectangular sections of 240 MPA grade conforming to IS 4923-1997 of all sizes , cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawings, including cost and conveyance of all structural steel sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental charges, including Labour charges for fabricating all steel works like Trusses, including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, erecting and fixing in position etc., including overheads and contractor's profit complete for finished item of work.
2782
157
436774
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand(50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, complete for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm
15.34
803
12318.02
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Plain Cement Concrete (1:2:4) proportion using 20mm size (SS5) graded hard broken Granite machine crushed metal as per SS108 from approved quarry including cost and conveyance of all materials & water to work site, seigniorage and all operational, incidental, labour charges such as centering, formwork, mixing concrete, laying, lift charges, curing etc complete for finished item of work as per SS 402.
3.3
7419
24482.7
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Plastering 20 mm thick using screened sand (with 50% river sand and 50% Manufactured sand) in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) External Plastering
230
802
184460
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Clean removal of lime plaster from walls and raking out joints 20 mm deep or from terraced roof and raking out joints up to 50 mm deep
230
17
3910
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Cutting holes in RCC slab floor & repairs Labour charges only including all operational,incidental , labour charges, overheads & contractors profit etc. complete for finished item of work.
40
166
6640
... More
Removing the damaged sunshade and replacing with GI sheet and providing rain water drain pipes;Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead for RCC work
12.27
4259
52257.93
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements