For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Road Construction
Opening Date27 Feb 2024
Closing Date5 Mar 2024
Tender Amount₹ 12,87,79,532 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road work;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBT metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.

67

1803

120801

... More
Road work;Back filling behind Abutments with selected Soil including cost ,conveyance of all materials to site etc., but excluding seigniorage charges complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

76

335

25460

... More
Road work;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 305, 309 & 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

10.7

335

3585

... More
Road work;Providing rough stone revetment 300 mm thick using 300mm size rough stonevariety including cost, and conveyance of all materials to site,including labour chargesfor packing the stones for revetment etc., but excluding labour charges complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for toe walls.

9.8

1614

15817

... More
Road work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.25 cum of CC (1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., but excluding labour charges complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for revetment.

21.3

2484

52909

... More
Road work;Providing HYSD bars (Fe-500) of different diameters, Procured from Primary steel producers like TATA,SAIL, VSP wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.

18

78875

1419750

... More
Road work;Providing HYSD bars (Fe-500) of different diameters, Procured from Primary steel producers like TATA,SAIL, VSP wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

3.7

79218

293107

... More
Road work;Providing HYSD bars (Fe-500) of different diameters, Procured from Primary steel producers like TATA,SAIL, VSP wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

27.6

81529

2250200

... More
Road work;Providing and laying Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing SD/205 but excluding cost of steel and its fabrication charges as per MoRT&H specification nos 809, 1500, 1700 & 2200 -for Crash Barriers.

22

7605

167310

... More
Road work;Providing and laying Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing SD/205 but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.

27

6662

179874

... More
Road work;Providing and laying Vibrated reinforced cement concrete M30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as per MOST Drg. SD/104 and as directed by the Engineer-in-Charge for Approach slab.

29

6699

194271

... More
Road work;Providing and placing reinforced cement concrete in Super Structure of VRCC M30 grade as per drawing and Technical Specification and MoRT&H Specification No.1500, 1600, 1700, 1900 & 2300 excluding cost of steel & its fabrication charges including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed by the Engineer-in-Charge . As per MOST Drg.No:SD/163

228

7881

1796868

... More
Road work;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for Abutment Bed blocks & Backing walls, (Sub Structure)

16

7201

115216

... More
Road work;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for foundation OF Raft Foundation

240

6792

1630080

... More
Road work;Proving and laying Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure for Abutments and wing walls, check dam

168

6719

1128792

... More
Road work;Proving and laying Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings of Abutments & wing walls and check dam

144

6353

914832

... More
Road work;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Levelling course below approach slab.

11

6108

67188

... More
Road work;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Levelling course Under Abutments, Piers & wing walls

38

6108

232104

... More
Road work;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete including _ charges for finished item of work as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge.

271

130

35230

... More
Road work;Construction of reinforced cement concrete crash barriers using M 35 grade by using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for crash barriers

158

3906

617148

... More
Road work;Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision)

230

288

66240

... More
Road work;Providing 300 mm thick Flat Stone Appron embedded in 150 mm thick M15 Concrete complete as per approved drawings and technical specifications for finished item of work as per MoRT&H Specification 2505 (5th Revision)

228

5926

1351128

... More
Road work;Construction of flexible apron 750 mm thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. As per approved drawings and technical specifications for finished item of work as per MoRT&H Specification 2507 (5th Revision)

534

1734

925956

... More
Road work;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for curtain wall.

267

5914

1579038

... More
Road work;Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size including cost, (excluding seigniorage) charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes & Apron

852

1614

1375128

... More
Road work;Providing and laying filter material with Good soil underneath pitching in slopes including cost, (excluding seigniorage) charges and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge

426

1319

561894

... More
Road work;Providing HYSD bars ( Fe-500 ) of different diameters, wrought and put up bars of all diameters obtained from Primary Producers like TATA, SAIL, VSP,JSW, as approved by Ministry of Steel,including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

44.07

79218

3491137

... More
Road work;Vibrated reinforced cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Sub structure for box culvert.

551

7346

4047646

... More
Road work;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base course

233

4728

1101624

... More
Road work;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal (excluding seigniorage) charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.

185

1803

333555

... More
Road work;Back filling behind Abutments/Wing walls with good soils including cost ,conveyance and (excluding seigniorage) of all materials to site etc., complete as per Clause 710.1.4 of IRC: 78 and as per MoRT&H (5th Revision) and as per Drawing and technical specifications for finished item of work

484

941

455444

... More
Road work;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.

2524

130

328120

... More
Road work;Providing, laying Reinforced cement concrete Hume pipes , NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.

175

9346

1635550

... More
Road work;Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for footing (Body Walls)

343

6754

2316622

... More
Road work;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base course

32

4728

151296

... More
Road work;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.

569

130

73970

... More
Road work;Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete grade M-15 & M-20)

189

842

159138

... More
Road work;Construction of earthen shoulders with selective soils obtained from barrowed earth with kms. with MDD of 17.5Kn/Cum from approved sources, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P and charges, complete for finished item of work as per MoRT&H specification 305(5th revision) (Payment will be made based on level for finished item of work).

12714

334

4246476

... More
Road work;Providing and Laying 40mm thick Bituminous concrete with 100 to 120 TPH batch type using HBG crushed aggregates of Grading-2 as per table 500-17 of Specification 507 of MoRT&H (5th revesion), premixed with Bituminious binder VG-30 Grade @ 5.4% of mix and filler, transporting the hot mix to work site, laying with paver finisher to the required grade, level and alignment, rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th Revision) complete for finished item of work in all respects excluding seiniorage charges and as directed by Engineer-in-charge.(Excluding Taxes Charges)

2072

10160

21051520

... More
Road work;Providing and applying tack coat with RS1 (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

51800

11

595700

... More
Road work;Providing and applying primer coat with Bitumen Emulsion (Slow Setting-1) on the prepared surface of granular base including clearing of road surface and sparaying primer at the rate of 0.70kg/sqm using mechanical means for finished item of work as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-Charge.

51800

37

1916600

... More
Road work;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment based on levels for finished item of work)

13135

2161

28384735

... More
Road work;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).

10656

1922

20480832

... More
Road work;Forming Embankment, Shoulders with material obtained from borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision). (The soil CBR>10%, PI<18% & MDD>1.8 g/cc) Note: The work of embankment and subgrade shall be carried out as per Plan & Profile and payment shall be made based on approved Plan & Profile by the levels)

51000

380

19380000

... More
Road work;Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th revision) Specn. No.305.4.3

22500

10

240750

... More
Road work;Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete grade M-15 & M-20)

863

842

726646

... More
Road work;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness by Mechanical means as per the Techinical Specification Clause 201 MoRTH 5th Revision

4.88

40463

197459



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.