Public Health And Municipal Engineering Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 1,35,127Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
586931Tender No
69/SE/Unit III/Turkayamjal/BT Road/176.50 L/2024-25 dt: 29-03-2025Tender Authority
Public Health And Municipal Engineering Department ViewPurchaser Address
-Website
http://http://www.appublichealth.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. -GRADE II
113.02
11132
1258223.69
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-BASC-7: Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. - Grade - II
188.38
9832
1852218.09
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.
7535
12
93660.05
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion (CSS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.
3904.5
35
139039.25
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-SBBS-11 B: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
976.13
2435
2377559.84
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-SBBS-1 A III: Construction of granular sub-base by providing well graded material / Close graded material confirming to Grading - VI of MoRT&H Table 400-1 including cost, and conveyance of all materials to work site, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete for finished item of work as per Technical Specification Clause 401 MORD / MORTH and as directed by the Engineer in Charge. For Grading VI Material
780.9
2025
1581947.22
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means by using Hydraulic excavator including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.
1757.03
76
134289.8
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per MORTH Section 803.4 and IRC: 35-2015, the material should satisfy the requirements as per MORTH specifications 803.4 and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel. In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-2015 and MORTH Section 803.4
98
728
71344
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;Collection, Supply and Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) for Shoulders
147
392
57716.61
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. -GRADE II
80.85
11132
900043.22
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-BASC-7: Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. - Grade - II
134.75
9832
1324909.16
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.
5390
12
66997.7
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion (CSS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.
2793
35
99458.73
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-SBBS-11 B: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
698.25
2435
1700727.53
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;Construction of Granular sub-base by providing close graded material confirming to Grading - VI of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.
558.6
2025
1131611.88
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means by using Hydraulic excavator including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.
1256.85
76
96061.05
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-STCL-5: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHRCC portion
0.72
2599
1871.94
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-STCL-5: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHCC portion M 15 & 20
3
940
2822.85
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-STCL-15 ; Dismantling of Existing cement concrete pavement by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials seperately including all hire & operational charges of T&P, labour charges, , complete for finished item of work as directed by Engineer-in-charge as per Technical Specification Clause 202 MORD/MORTH.
213.75
1867
399272.18
... More
Infrastructure Developmental works in Turkayamjal with TUFIDC Assistance;RBR-STCL-7B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar
6.75
614
4150.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements