Public Health And Municipal Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
518279Bid Award Id
ViewTender No
No.04/EE PH/SRD/Andole/TUFIDC/ Developmental works/ W no 20/DB/T1/2024-25Tender Authority
Public Health And Municipal Engineering Department ViewPurchaser Address
-Website
http://http://www.appublichealth.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Developmental works;RBR-FNDN-4 II(iii): Providing P.C.C grade M 15 concrete for structuresusing 20mm size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
39.24
6423
252049.9
... More
Developmental works;RBR-FNDN-4 II(iii): Providing P.C.C grade M 15 concrete for structuresusing 20mm size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. For base slab.
34.34
6072
208544.42
... More
Developmental works;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.
22.89
5540
126821.13
... More
Developmental works;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.
800
68
55008
... More
Developmental works;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.
66.38
270
17953.8
... More
Developmental works;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for drain work by mechanical means.
154.89
127
19700.46
... More
Developmental works;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.
207
72
15028.2
... More
Developmental works;Saw cut joints for freshly laid concrete pavement including all material and labour charges as directed by the Engineer in Charge
1650.01
97
161222.48
... More
Developmental works;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work.
1479
85
126025.59
... More
Developmental works;RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).
20.52
229
4712.83
... More
Developmental works;RBR-CCPV-5-Construction of M20 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
221.85
6843
1518152.83
... More
Developmental works;RBR-FNDN-4: Providing Plain Cement concrete nominal mix M10 grade using 20mm size Graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.
110.93
5540
614603.23
... More
Developmental works;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)(R&B Data)
147.9
1948
288202.38
... More
Developmental works;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means by using Hydraulic excavator including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.
295.8
76
22542.92
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements