Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Works
Civil And Construction
Civil Works Others
Consultancy Services
Civil And Architectural Services
Opening Date31 Aug 2023
Closing Date19 Sep 2023
Tender Amount₹ 6,70,94,185 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

1116.56

7174

8011217.51

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-4: Providing Plain Cement concrete nominal mix M10 grade using 20mm size Graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.

744.38

5408

4025914.97

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)(R&B Data)

1116.56

1817

2029642.65

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MORTH specification No.301 and as directed by the Engineer-in-Charge.

2977.5

76

226915.28

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete

40

4624

184994.8

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply, Transportation and fixing of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

60

1559

93595.8

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable inclduing 40A D.P.Isolator for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.

2

16000

32000.91

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and transportation of 12 W +/-10% (>= 1200 Lumens) back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec / FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

10

1559

15599.3

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and Transportation of Ceiling / Wall mounted Circular 1x13W luminaire with decorative acrylic diffuser and 1 No. 13W CFL lamp (circular type) etc., complete.

20

136

2726.8

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;ELEC data -4-1-1: Supply and erection of Panel mounting cubical type 30 / 32A TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel. ( Fuse unit makes : L&T / SCHNEIDER / C&S / ABB / SIEMENS- Fuse Links : Makes : L & T / C & S / Standard / HPL / Havells / Siemens / Indo Asian.

2

16000

32000.91

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

2

18939

37879.24

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

200

169

33970

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

280

111

31306.8

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Earth Continuity including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

600

29

17448

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (2 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

25

310

7754.25

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

35

172

6024.9

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

105

816

85718.97

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-ELEC-1-3-2 : Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro.

236.25

117

27780.64

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-ELEC-1-4-2C :Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

472.5

105

50009.4

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

2000

11

22883

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply,fixing and testing of PVC SWR 4 KG/Sq.cm on wall surface pipe with necessary special like shoe and bends including providing holder clamps etc., complete as required by the engineer-in-charge for Rain Water Down Comer pipes - 110mm Dia. 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm

60

215

12930.59

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

8

9959

79675.93

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying and fixing of PVC cowls of approved make of 110 mm dia complete etc.

10

26

261.31

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Boxing of Nahany traps in RCC floors including cost and conveyance of all material like Bricks, Cement, Sand etc., to site, all labour charges, , etc., complete.

26

301

7828.07

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and fixing of PVC Nahani trap 1st quality ISI marked conforming to IS:1729-1979 with C.P grating fixing with white cement as per site requirements with standard practice for 100mm dia inlet - 75mm (3") out let pippe 4kgs make with aluminium grating in cement concrete including cost and conveyance of all material to site, all labour charges, , etc., complete.

26

187

4874.86

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Sanitary PVC Fittings - 87.5 Degree Door Bends 75 mm dia - Door Bend 87.5 Degree

42

92

3865.18

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Sanitary PVC Fittings - 87.5 Degree Door Bends 110 mm dia - Door Bend 87.5 Degree

35

145

5089.95

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete. 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

90

368

33130.13

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete. 75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

120

192

23132.01

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type, the following valves with SS Ball and SS Spindle of approved brand of manufacature,having rubber lining, including companion flanges, unions, bolts, nuts,rubber gasket , ctc., complete for finished item of work. 50mm Dia

4

1934

7739.45

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type, the following valves with SS Ball and SS Spindle of approved brand of manufacature,having rubber lining, including companion flanges, unions, bolts, nuts,rubber gasket , ctc., complete for finished item of work. 25mm Dia

6

529

3176.74

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 54 mm Dia

100

655

65557.86

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 28.60 mm Dia

70

267

18693.87

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 22.20 mm Dia

84

202

16995.27

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 15.90 mm Dia

56

176

9863.46

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter turn spindle with internal threaded conforming to IS 8931 with 7 years warranty: including cost and conveyance of all materials to the site, all labour charges, etc., complete for finished item of work and as directed by the Engineer/ In-Charge.

28

978

27392.82

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

14

2617

36647.66

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm (Parry/Nicer) including Waste Plug, 32mm dia PVC waste pipe etc, complete for finished item.

4

1565

6262.46

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and fixing 10 liters capacity PVC low level flushing tank white colour of SLIM LINE or equivalent from approved manufacturers with all internal components, necessary length of pipe with all accessories including etc., complete for finished item of work;

14

2117

29648.97

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556- Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm parryware/Nycer/Hindware etc., complete.

4

2474

9898.14

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying & fixing of white European type W.C pan 570mm x 340mm x 400mm of approved colour of parryware/Nycer/Hindware of approved make P trap etc., and heay duty PVC seat and cover of matching colour owith desired shade etc., complete.

10

3818

38186

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

186.21

600

111815.38

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;supply and installation of Turbo Ventilators of 600 mm dia, having capacity of 2200 CFM @ 3m interval in the ridge point

8

9032

72259.12

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;supply and installation of sky light/ polycarbonate sheet (3*600*4200 mm) V-Lite make with both side UV protected 10 years life . After every 3 mtr to get more than sufficient lighting.

8

13622

108979.52

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Design, fabrication, transportation, hoisting, fixing and installation of Self Supported Arch Shaped GAL V ALUME Sheet roofing design shall confinn to IS 875 for wind loads & IS 1893 for seismic loads. Color coated Galvalume steel complying to ASTM 4792, with alloy coating AZ150 (Aluminium 55% Zinc 43.50% and Silicon 1.5%). The sheet material shall confirm to a Yield Strength of 3 50 MPA, as recommended in ASTM 4 792, Paint coating regular modified polyester top coat 25 microns and bottom coat 12 microns epoxy, Top color: Combination of Blue and Off white and Bottom color grey using makes ofThysen K.rupps, Germany/ Dongbu Steel Co. Limited, Korea/ Corus Steels, U.K / Dongkuk Steel, Korea/ Yieh phui Enterprises Ltd., The Steel sheet shall be 3'-0" (914MM) width (Tolerance+/- 0.02 MM)

622.5

2783

1732772.33

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

24.36

77

1897.16

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-12-3-(170) & 17 amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

1112.06

191

213181.9

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-12-17-9 7 Amendment: Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912. internal walls

3065.34

121

371611.17

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

3065.34

83

257182.03

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

1112.06

78

87229.99

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying and fixing of curtain Glazing made of pre painted steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 Primer coated with epoxy, finish painted with a polyester paint using the section for outer frame of 46 x 52 mm, section for mullion of 46 x 70 mm and section for beading of 18 x 25 mm and the glazing with 5 mm thick plain float glass fitted with EPDM gaskets including handle made of high grade Aluminium powder coated and nylon receiver, corner brackets made of CRCA with zinc phosphating, mullion caps made of Glass filled nylon including fixing the frames in the concrete / masonry wall with self expanding screws, etc., complete for finished item.- Fixed Glazing 3'-0 x 3'-0 (914.4x914.4mm) and Fixed Glazing 3'-0 x 4'-0 (914.4x1219.2mm)

18

6919

124544.7

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Providing and fixing of louvered Ventilators made ofpre-painted steel as per IS 513 of 0.80 mm thickgalvanized as per IS 277 with a polyester paint with andfitted with 4 mm thick plain float glass including fixingthe frames in concrete/masonry wall by means of selfexpanding screws, etc., complete for finished item ofwork for (i) Single fixed Louvers Ventilator size of 2? 0? x 2? 0? (609.6 x 609.6mm) outer frame box section sizeof 80 x 45mm and (ii) Double fixed Louvers ventilator Size of 4? 0? x 2? 0? (1219.2mm x 09.6mm) outer frame box section size of 80 x 45mm, vertical mullion section size of 80 x 60 mm and (iii) Double fixed LouversVentilator size of 4?0? x 3?0? (1219.2mm x 914.4mm outer frame box section size of 80 x 45mm , Vertical mullion section size of 80 x 60 mm

9

5590

50318.91

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and fixing of Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS with Pre-Painted Steel sections fabricated from pre-painted Cold rolled formed sections made of galvanized steel color coated sections {Base steel as per 15-512 quality, galvanized as per IS-277 with Zinc of 120 gram/sqm) with total coated thickness of 0.58mm primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns and back coated with alkyd backer of 5-7 microns), the sections for outer frame and centre mullion (duly filled with PU form of 40 kg/Cum) should be of 60mm x 50mm, with provision for fixing glazed shutter. The section for glazed/paneled shutter should be of size 48mm x 25 mm and another section of size 60mm x 23mm should be provided for separating glazed and paneled portion 5 mm thick colour pin headed glass is to be provided for glazing and providing guard bars of 10mm square rods duly welded at 150mm pitch to MS flat section of size 18mm and 3mm thick. Windows are to be fixed to wall by means of self expansion nylon Cap (75) and electroplated wooden screws of size 100mm, including aluminum powder coated fittings, A) 75mm long grip handles 1 no per shutter, B) 75 mm long tower bolts 2 nos. per shutter, C) Heavy duty 55 Pivot hinges 2 nos per shutter, D) MS Powder coated telescopic stay 1no per shutter.

81

9116

738434.07

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and fixing door shutter with frame made out of PVC section and panels conforming to IS:10151-1982 having panel sizes of 100 mm x 30 mm with self extruded grooves at 40 mm x 50 mm grooves on front face and the infill panel dimension is 610 mm x 20 mm seamless hallow multi chambered PVC single panel for finished item of work.

18.9

3303

62427.83

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and Fixing of single leaf shutter, Door Size 0.90x2.10 mtrs with Sal wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 150mm long 1 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 3Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 1 Nos, MS Hold fasts 3 Nos 230mm long , cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

18.9

9985

188727.46

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and Fixing of Main Door with Double leaf shutters, of size1.2x2.10m Door with Teak wood Frame of sections size 100mm x 125mm with Door Shutter 50mm thick teak wood including cost of fixtures such as Brass Tower Bolts 300mm long 4 Nos, ,Brass Handles 150mm long 4 Nos, 300mm long Brass Aldrops 2No, 150mm long Brass butt hinges 6Nos, Brass Door stopper 2 Nos, MS Hold fasts 8Nos 230mm long , including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

2.52

22717

57249.18

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and Fixing of of Main entrance door with Double leaf shutter, Door with Teak wood Frame of sections size 150mm x 150mm with Door Shutter 50mm thick teak including cost of fixtures such as Brass Tower Bolts 250mm long 2 Nos, Brass Handles 150mm long 2 Nos, 300mm long Brass Aldrops 1No, 125mm long Brass butt hinges 6Nos, 300 mm long Brass Flat latch 1No, Door stopper 2 Nos, Brass Hold fasts 4Nos 230mm long , Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. Size : 2.0*2.10mts

5.04

19479

98177.39

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325 mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.

72.31

622

45021.65

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325 mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.

115.45

610

70455.67

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work,including the cost and conveyance of all materials.

27.53

1010

27822.09

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work,including the cost and conveyance of all materials.

40.94

960

39318.37

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges,

24.55

1166

28648.13

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges,

37.4

1116

41764.95

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including cost and conveyance of all materials & Labour charges.

367.39

864

317432.31

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including cost and conveyance of all materials & Labour charges.

581.6

827

481122.78

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Flooring with high polished granite 16 to 18 mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including labour charges for dressing of tiles etc., complete for finished item of work, including the cost of conveyance of all materials BLD-CSTN-9-7 (105)

205.58

5302

1089993.38

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-9-5-(103) : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc. including seigniorage charges, etc., complete for finished item of work, including the cost and conveyance of all materials.

145.98

1115

162904.92

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc. to site, all operational charges , including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls). Head Room - 10.98m to 13.5m ht

49.3

693

34209.76

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc. to site, all operational charges , including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls). Second Floor head Room Ceiling at 13.5m ht

407.83

642

261888.03

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc. to site, all operational charges , including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls). Internal walls - 3.66m ht to 7.32m ht

1148.53

590

678080.63

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc. to site, all operational charges , including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls). Internal walls - GF upto 3.66m ht

1459.68

529

773148.71

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational charges, including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls). For External walls- 10.98m ht to 13.5m ht

59.42

717

42642.76

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational charges, including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls). For External walls- 7.32m ht to 10.98m ht

317.41

665

211160.18

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational charges, including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls). For External walls- 3.6m ht to 7.32m ht

372.64

613

228614.64

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational charges, including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls). For External walls-GF upto 3.66m ht

362.59

552

200436.13

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Manufacturing, supply and errection of Stainless steel hand rails using 60.30mm dia, 2.90mm thick Mirror polished Seamless tubes with Top horizontal rails and verticle posts of 33.7 mm dia 2.66 mm thick spaced not more than 1.0 m as directed by departmental officers, including fabrication buffing, polishing, lacquer finishing, welding with stainless steel welding rods and transportation to site, fixing with 100mm dia 8mm thick SS base plate including cost and conveyance of all materials, SS welding rods, fabrication charges, and labour charges for fixing in position and all other incidental and operational charges etc., complete for finished item of work.

1044.42

718

749945.78

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, including conveyance charges of materials & labour etc. First Floor

49.87

1152

57469.69

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, including conveyance charges of materials & labour etc. Ground Floor

70.2

1012

71074.69

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding , lift , curing charges etc., complete for finished item of work. 10.98m Lvl To 13.50m lvl - Head Room

11.76

10125

119072.7

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding , lift , curing charges etc., complete for finished item of work. 9.00m Lvl To 10.98m lvl - Head Room

18.37

9706

178304.18

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding , lift , curing charges etc., complete for finished item of work. 7.32m Lvl To 9.00m lvl

36.81

9287

341865.51

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding , lift , curing charges etc., complete for finished item of work. 3.66m Lvl To 7.32m lvl

100.64

8868

892504.71

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding , lift , curing charges etc., complete for finished item of work. Ground Floor upto 3.66m lvl

265.01

8114

2150503.15

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Filling Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

486.85

556

270785.97

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying, fitting and placing of HYSD Fe-500 bars as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. HYSD-Fe500, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work in all floors. ( APSS No.126) Second Floor

439.4

90

39721.76

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying, fitting and placing of HYSD Fe-500 bars as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. HYSD-Fe500, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work in all floors. ( APSS No.126) First Floor

5521.39

88

489581.65

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying, fitting and placing of HYSD Fe-500 bars as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. HYSD-Fe500, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work in all floors. ( APSS No.126) Ground Floor

22082.15

86

1920042.94

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For waist Slab 200mm thick Flight 4

1.63

11486

18723.63

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For waist Slab 200mm thick Flight 2 & 3

4.38

11058

48434.52

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For waist Slab 200mm thick Flight 1

2.74

10867

29778.1

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For FF Slab @ +13.50m

4.53

12885

58372.69

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For FF Slab @ +9.00m

28.47

12468

354987.05

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Slabs 150mm thick- +4.50m Lvl

73.14

12066

882509.51

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Roof beams (Beams at +13.50mLvl)

3.49

18963

66182.52

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Roof beams (Beams at +9.00m Lvl)

26.53

16869

447550.59

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Beams at +4.5mLvl

35.67

13643

486665.07

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Sunshade - First Floor

28.22

1023

28885.71

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Sunshade - Ground Floor

24.7

1014

25055.93

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Lintel - Second Floor

0.05

15754

787.71

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Lintel - First Floor

1.89

15031

28409.61

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Lintel - Ground Floor

1.97

14588

28739.03

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Head Room Columns 9.0M HT to 13.5 HT

2.55

16321

41620.55

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Columns (unsupported ht 3.96 m

17.53

15378

269576.78

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Columns (4.5M HT to 9.0M HT

19.32

15452

298546.84

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Columns (C6 300 x 450

2.98

14856

44272.01

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Columns (C2 &3 375 Ø @ 4.50m ht

5.81

15009

87205.42

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Columns (Footing top to Plinth beam bottom

26.63

14613

389159.1

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Plinth beams

31.02

14013

434694.12

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For Pedastals for column footings

11.92

11703

139506.44

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. For footings

75.51

11007

831197.47

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including cost & conveyance of all materials to site, labour charges on all materials, curing etc., Complete for finished item of work

49.14

111

5467.81

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

22.11

5977

132162.53

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

48.44

5312

257330.72

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-3-5 (22) : Plain Cement concrete M10 using 20mm size graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.For foundation.

116.08

5644

655237.94

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Earth work excavation in Ordinary rock (not requiring blasting) by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

21.91

386

8465.59

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

87.65

270

23706.7

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Earth work excavation in Ordinary Soil by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

328.68

127

41804.81

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Carting of surplus excavated rock/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

210.05

98

20731.44

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supplying and fixing of 100 mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge

100

205

20564

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

5441.25

86

473116.69

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for top slab

18.75

7013

131505.56

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for side walls.

22.5

9711

218514.6

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Base slab.

21.75

6631

144225.77

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

12.6

5408

68146.47

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-2-8 (16): Collection, Supply and filling with HBG stone chips 2.36 mm & below from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

12.6

1326

16710.25

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.

500

68

34380

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.

37.39

270

10112.87

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for drain work by mechanical means.

149.57

127

19023.81

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-STCL-5: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH

15.12

2470

37348.21

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-STCL-5: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH

0.68

898

606.43

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-STCL-7B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

7.29

589

4296

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply of heavy duty long barrel copper lugs confirming to I.S specifications suitable up to 16 sqmm cable etc complete with nuts, bolts and washers. Makes: DMI / Jainson / Dowels

72

34

2453.76

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply of heavy duty type single compression brass cable glands duly nickel plated complete with brass checknut, outer sheath sealing rubber ring and washers suitable for Up to 16.0 Sq.mm 4 Core XLPE insulated armoured cable etc complete. Makes: SMI / Commet / Dowels.

72

164

11861.28

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply of 6-32A SP MCB 10KA, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&TExora / Cabtree.

36

351

12638.52

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and laying of 1.5Sqmm 2 Core PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable as per IS 7098 / Part-I / 1988 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells /Polycab / RPG / KEI / Gloster / V-Guard

360

101

36403.2

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and laying of 4.0 Sqmm (56/0.3) 2 Core PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable as per IS 7098 / Part-I / 1988 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells /Polycab / RPG / KEI / Gloster / V-Guard

900

195

175878

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and laying of 35 3.5Core XLPE insulated,1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : Torrent / Unicab / Universal /Polycab / Havells / Gloster / KEI /Finolex / Payal / RR kable / Beljin /Ollvin / Finecab / RPG / V - Guard / Orbit/ Fortune Arrt / Gemscab / Bonton / SPM / Unistar / Windsor/ Avocab / Pawancab / Nakoda / Suncab

200

463

92710

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and fixing of Automatic Street Light Control System with Optical Sensor, Low volatage / High voltage trip and reset, operating voltage 380 - 450 V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs of Legrand / Schneider / L&T / Siemens of 10KA C/D curve and Contactor suitable to control the load of 12KW three phase load with necessary clamping arrangements. Makes : Swadeep Nature Switch / Light Mate / L&T / Siemens / Bajaj.

4

20392

81571.04

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and Transportation including Earth work excavation , lowering, layingand jointing charges of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II. with all accessories like couplers, bends, end caps, Ts etc., complete.

900

247

222381

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

4

6630

26522.28

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 40A 4 Pole Isolator as incomer, 6 Nos 6-32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, bus bars, shroudings, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch.

4

29858

119432.08

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Supply and transportation of 150 W LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with warranty 50,000 burning hours. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA /Capart / Fortune Art / FIEM / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs.

72

12385

891732.24

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Foundation and erection charges with special T&P, for 9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.60Mtrx0.60Mtrsx1.40 Mtr size M20 cc work vibrated concreting mixing with necessary steel (15kgs) reinforcement as directed by the field engineers during execution including centering, decentering, water curing as required, soil exacavation, back filling, muffing removal and coil earthing including all labour charges and cost and conveyance of materials etc. complete.

36

9094

327415.68

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Fabrication, Transportation and supply of - 1.5 Mtr sword type or any decorative double arm bracket with dooms. complete with all cessories with MS galvanized 50mm dia Pipe. Makes: BAJAJ / VALMONT / TRANSRAIL /SKIPPER / UTKARSH / LAASMA / CONSOUL

36

6702

241277.4

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including chain for anti theft mechanism, supply of suitable boards with bakelite sheet, din channel for MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 9 Mtrs height Pole having dimensions Bottom 155mm, Top 70mm with 3mm thick, base plate 260 x 260 x 16mm and 4 Nos of M24 x 750mm long 'J' bolts along with template or equivalent. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL

36

21168

762075

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-2-8 (16) : Collection, Supply and Filling with red earth in central divider portion with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

405

1228

497542.5

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-2-8 (16) : Filling with gravel with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

202.5

556

112630.5

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

108

6264

676567.08

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Providing raised Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including cost & conveyance of all materials to site, labour charges on all materials, curing etc., Complete for finished item of work

1080

111

120171.6

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;BLD-CSTN-6-5 : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using Coarse stone size of 30 x 30 x45 cm including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work.

216

6454

1394184.96

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

306

5922

1812379.86

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. CC bed

76.5

5408

413746.43

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-FNDN-1A (i): Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH.

76.5

270

20690.96

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and stacking of excavated materials for pipe line trench work. as directed by the departmental officers.

153

1280

195907.32

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Carting of surplus excavated earth up to 5.00 km from the site including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

222

98

21911.4

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.

466.2

10769

5020782.86

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-BASC-7 Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.

854.7

9520

8137444.85

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.

31080

11

359595.6

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion (CSS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.

4440

37

168542.4

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-SBBS-11 B: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

1110

2292

2544120

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)(R&B Data)

888

1817

1614170.88

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision)

1332

428

570175.92

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;RBR-STCL-5: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH

11.25

898

10107.23

... More
Infrastructure Development works in Thorrur Mpty with TUFIDC assistance;Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201MORD / MORTH for trees of girth above 200 cms.

50

89

4488



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.