Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Works
Water Storage And Supply
Opening Date11 Dec 2024
Closing Date30 Dec 2024
Tender Amount₹ 15,25,57,467 
Notes
Download

Costs

Summary

Comprehensive Water Supply Improvement Scheme I.e. Laying Of Balance Distribution Pipeline

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Supply and fixing of 15mm brass body CP finished bib tap of not less than 300 grams weight screw type (full turn) with internal/external threaded connection conforming to IS 8931 (TBSP-F.I-01)

7000

312

2187080

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type - 15 mm NB Size (TBSP-G.III-20)

7000

261

1829170

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;House Service Connections (Regulating Brass Ferrule) The cost shall include testing of all materials, labour, Inspection charges, Transportation upto site, transit insurance, loading, unloading, stacking, providing and fixing etc. complete as specified and directed by departmental engineers, but excluding of all taxes for 1/2" connection

7000

162

1137290

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Supply and Fixing Electro Fusion Tapping saddle complying with BS EN 12201-3-2011, PN 12.5 rating & WRAS approved raw material as per BS 6920, manufactured from virgin resin of PE-80/PE-100 having blue/black colour using food grade compounded raw material for usage in drinking water system and having working pressure of 10 bar. The cost shall include testing of all materials, labour, inspection charges, transportation upto site, transit insurance, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding of all taxes- For 110 mm OD HDPE pipes x 1/2"

7000

318

2226840

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Lowering, Laying, jointing of PVC/HDPE/MDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634 part-II/75 for HDPE pipes including earth work excavation, testing to hydraulic test pressure including cost of water with a water lead of 500m etc., complete, but excluding road cutting (BT/CC) charges., Complete. 20mm OD(15Mmm ID)

42000

49

2099580

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Manufacture, Supply & Delivery of MDPE pipe conforming to ISO 4427 Part-2 (or any equivalent Bureau of Indian Standards code) of PE-80 grade material along with all fittings, including cost of materials, manufacturing, loading, unloading, stacking, transit insurance, transportation to any where in Telangana but excluding GST.20mm OD(15Mmm ID)

42000

34

1446900

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

1260

2664

3356980.2

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

3842.78

6958

26741637.03

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Providing Plain Cement concrete nominal mix M10 grade using 20mm size Graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.

1921.39

5515

10596888.56

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

3842.78

1364

5244626.14

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for road restoration works as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete

9606.94

285

2741436.4

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets of 5 HP capacity, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete as directed by the Engineer in Charge

800

70

56280

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Carting of surplus excavated earth/soils/ rock/ debris or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

47417.69

72

3452007.83

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Supply and fixing of precast RCC chambers having the size of 900 mm (clear) at bottom and 500 mm (clear) at top with tapered wall of thickness 100mm along with FRC cover (HD-20 with 500mm dia opening) and frame, laying in M20 grade concrete with reinforcement including cost and conveyance of material, labour charges, curing, centering charges etc., complete as per standard specifications and standard drawings and as directed by the Engineer in Charge for upto 200 mm dia valves.

91

5979

544117.21

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Providing temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete as directed by the Engineer in Charge. -15mm dia

912

229

209304

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHFor Reinforced Cement Concrete and prestressed Concrete (Manual means)

182

2599

473183.62

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHFor Cement Concrete M15 & M20 (Manual means)

546

940

513758.7

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200mm dia Sluice Valves for 200mm dia

6

528

3172.92

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;150mm dia Sluice Valves for 160mm and 180mm dia pipes

18

481

8672.4

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;100mm dia Sluice Valves for 110mm dia pipes

158

321

50852.3

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200mm dia Sluice Valves for 200mm dia

3

627

1883.55

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;150mm dia Sluice Valves for 160mm and 180mm dia pipes

9

380

3425.22

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;100mm dia Sluice Valves for 110mm dia pipes

79

224

17738.66

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200mm dia Sluice Valves for 200mm dia

3

38587

115763.49

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;150mm dia Sluice Valves for 160mm and 180mm dia pipes

9

23221

208991.34

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;100mm dia Sluice Valves for 110mm dia pipes

79

14748

1165138.61

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;EF Coupler D200mm PE 100BK 4PIN

17

1462

24857.91

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;EF Coupler D180mm PE 100BK 4PIN

10

1215

12156.8

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;EF Coupler D160mm PE 100BK 4PIN

18

1119

20143.98

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;EF Coupler D110mm PE 100BK 4PIN

158

327

51699.18

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;EF Coupler D75mm PE 100BK 4PIN

10

243

2431.4

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;160 x 180 mm HDPE pipes

15

745

11179.65

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;110 x 160 mm HDPE pipes

18

401

7225.92

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200mm dia HDPE pipes

6

2070

12420.42

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;160 mm dia HDPE pipes

15

1107

16616.25

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;110mm dia HDPE pipes

132

311

41092.92

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200mm dia HDPE pipes

7

677

4740.05

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;160 mm dia HDPE pipes

18

371

6687.36

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;110mm dia HDPE pipes

158

189

29978.92

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200mm dia HDPE pipes

7

749

5249.02

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;160 mm dia HDPE pipes

18

411

7403.22

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;110mm dia HDPE pipes

158

162

25670.26

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200mm dia HDPE pipes

5

403

2016.65

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;160 mm dia HDPE pipes

12

227

2726.76

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;110mm dia HDPE pipes

106

94

9995.8

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200mm dia HDPE pipes

7

1792

12549.88

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;160 mm dia HDPE pipes

18

919

16544.7

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;110mm dia HDPE pipes

158

316

50084.42

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Manufacture, Supply and Delivery of Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) (ex-works) including loading, unloading, Transportation, stacking at site as directed by the departmental officers excluding Taxes(Diameter upto 500mm dia) Up to 500 mm dia

1155

151

175363.65

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200 mm dia HDPE Pipe 6kg/sqcm

3325

130

434444.5

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;160 mm dia HDPE Pipe 6kg/sqcm

8996

110

991449.16

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;110mm dia HDPE Pipe 6kg/sqcm

78879

80

6363168.93

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;200 mm dia HDPE Pipe 6kg/sqcm

3325

1180

3923699.5

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;160 mm dia HDPE Pipe 6kg/sqcm

8996

755

6796747.88

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;110mm dia HDPE Pipe 6kg/sqcm

78879

394

31110666.39

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

1707.02

1364

2329740.9

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officers

8208

225

1849590.72

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) - upto 3.00 Mts. below GL (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge

1796.61

2323

4174980.28

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;BLD-CSTN-2-11 - (Amendment as per SOR 2021-22) - Earth work excavation in hard rock (blasting prohibited) (Using Hydraulic Excavator with breaker attachment) upto 3m depth using hydraulic brakers for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete

4192.09

1012

4244113.84

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.In ordinary soils, by Manual means for Pipe line Trenches where depth is < 1.5 times width

5988.7

499

2990577.12

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

8983.05

285

2563403.15

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

38926.55

128

4991551.51

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

3414.98

2664

9098428.76

... More
Comprehensive water supply improvement scheme i.e. Laying of balance distribution pipeline network;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

285.2

1280

365181.49



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.