Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Civil And Construction
Civil Works Others
Opening Date29 Nov 2022
Closing Date6 Dec 2022
Tender Amount₹ 28,17,155 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supply of 250A 3 Pole MCCB,36/35 KA Adjustable, Confirms to IEC 60947-2 and IS 13947- Part 1&2 having Breaking Capacity 36/35 KAwith thermal magnetic release Panel Mounted. Makes: L&T- D shine / Schneider-NS NSX/Legrand -DP X3/ Siemens3VL / Hager-h3/C&S -Winbreak2/HPL-Techno

1

-

26131.45

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supply of63A / 60A 4 Pole MCCB,16 KA Adjustable, Confirms to IEC 60947-2 and IS 13947- Part 1&2 having Breaking Capacity ???. with thermal magnetic release Panel Mounted. Makes: L&T- D shine / Schneider-NS NSX/Legrand -DP X3/ Siemens3VL / Hager-h3/C&S -Winbreak2/HPL-Techno

4

-

36979.4

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI

120

-

210506.4

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

2

-

15360.36

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Providing CTPT plinth 600mm x 600mm x 2.1 mtr in size with necessary excavation in ground at the bottom with 150mm thick 1:2:4 cement concrete raft at the bottom and top duly plastered 20mm thick outsides including watering etc., complete

1

-

18281.87

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of suitable boards with bakelite sheet and MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 7.50 Mtrs height Pole having dimensions Bottom 130mm, Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700mm long 'J' bolts along with template. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA

5

-

75156.3

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Fabrication, Transportation and supply of of -------------complete with all accessories with MS galvanized 50mm dia Pipe 1.5 Mtr sword type or any decorative Single arm bracket with dooms

5

-

25677

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x 0.45Mtrs x 1.20 Mtr size M20 cc work vibrated concreting mixing with necessary steel (10kgs) reinforcement as directed by the field engineers during execution including all labour charges and cost and conveyance of materials etc. complete.

5

-

31039.6

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supply and transportation of 90W. LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket sures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Driver surge protection more than 4KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with 5 years warranty. LUMINAIRE MAKE : PHILIPS / OSRAM / GE / CROMPTON / BAJAJ / SCHREDER / VIN / HALONIX / HAVELLS / HPL / SURYA / SYSKA. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

5

-

40799.15

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 40 A-63A, 4 pole MCB As incomer,6-32A SP MCB 6 no. as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch with following.40A, 4pole isolated as incomer, 6no.s 6-32A SP MCB as outgoings.

1

-

28192.43

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supply and Transportation incluiding Earth work excavation and laying charges of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its equivalent make.51mm dia DWC pipe

100

-

24107

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Construction Wall for Transfomer Yard

-

-

-

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for finished item of work for Pipe Lines by mechanical means up to 3.00 Mts depth below GL .

27.86

-

3485.29

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH for Levelling Course.

5.95

-

5058.51

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation levelling course.

3.82

-

18228.08

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

15.84

-

66301.17

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/100 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

10.7

-

74033.94

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

31.39

-

5597.15

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Providing crusher stone 40mm HBG Metal in Transformer Yard as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including all other incidental and operational charges but excluding seignorage charges etc., complete as per detailed specification and directed by the Engineer - in - Charge.

7.5

-

17303.4

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

381.83

-

35441.46

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work.

2.97

-

29249.45

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supply and fixing of MS Ornamental Gate and fencing poles including fabrication, including cost and conveyance of all material , labour charges for fabrication and fixing in postion etc,. Complete. and painting with primary coat of red oxide and including cost and conveyance of all materials and labour charges etc completely.

568.08

-

71850.76

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supply and fixing of Hot dipped Galvanized Iron Chain link mesh 8 gauge -(4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50 mm)- 8 Gauge

33

-

21783.3

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in T.S., F.O.R. destination including, loading, un-loading & stacking at site , including central excise duty, sales tax, octroi and other Govt levies etc., as applicable. I.S.I Mark- H.D.-20 with 560mm dia clear opening

2

-

6171.56

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Carting of surplus excavated Earth from the site to a distance of 5 Kms suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

27.86

-

1638.17

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supplying,Lowering and laying of Class SN 8 Double wall corrugated ( external annual corrugated & smooth internal wall) ( DWC) pipping system in accordence with IS 16098 ( Part-II 2013) in to trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing with all labour, all lead & lift including encasing the pipe alround to a depth of not less than 15cms with soft gravel or selected earth available from the excavation etc,. complete and including hydraulic testing to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) but excluding taxes

40

-

33175.2

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Construction Wall for PUMP HOUSE

-

-

-

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for finished item of work for Pipe Lines by mechanical means up to 3.00 Mts depth below GL .

85

-

10633.5

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation levelling course.

13.93

-

66470.48

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. FOR GATE PILLARS FOOTING

0.7

-

6893.81

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. FOR GATE PILLARS COLUMNS

0.56

-

5884.8

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

100

-

9215

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

54.75

-

229165.98

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-6-6-(61) ; Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

12.25

-

64680.61

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-5-4-(42) ; Brick Masonary modular bricks in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

34.5

-

238707.57

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;RBR-FNDN-4 C (i): Providing R.C.C grade M 20 (Nominal Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

5.29

-

32152.46

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for including cost & conveyance of all materials to site, labour charges on all materials, curing etc., Complete for finished item of work

67.2

-

8003.52

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

311.46

-

55536.43

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work,

311.81

-

14870.22

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

311.81

-

58975.74

... More
Construction of Transformer Yard , Suppply of Transformer and Accessories, Construction of Compound;Supply and fixing of MS Ornamental Gate and fencing poles including fabrication, including cost and conveyance of all material , labour charges for fabrication and fixing in postion etc,. Complete. and painting with primary coat of red oxide and including cost and conveyance of all materials and labour charges etc completely.

300

-

37944



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.