Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Civil And Construction
Building Construction
Opening Date7 Jul 2023
Closing Date15 Jul 2023
Tender Amount₹ 1,20,60,268 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹44,500/MT*
Telangana

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Library Building at Gadwal Town;TBSP-G.I-01:Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work - 25 mm dia

200

332

66578

... More
Construction of Library Building at Gadwal Town;TBSP-G.I-01:Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work - 40 mm dia

60

519

31153.2

... More
Construction of Library Building at Gadwal Town;TBSP-G.I-01:Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work - 50 mm dia

100

568

56808

... More
Construction of Library Building at Gadwal Town;Laying GI Lines

1

-

-

... More
Construction of Library Building at Gadwal Town;Installation, Testing, Trail Run and Commissioning of Submersible Pumps set with all accessories as per the standard specifications.

1

2450

2450

... More
Construction of Library Building at Gadwal Town;Supply and Delivery of 12" long GI NIPPLE including cost and conveyance, all labour charges etc., complete - 50mm dia

1

120

120

... More
Construction of Library Building at Gadwal Town;Supply and Delivery of 7/20 Service Wire of repute make as per IS Code including cost and conveyance, all labour charges etc., complete.

175

17

2975

... More
Construction of Library Building at Gadwal Town;Providing independent Earthing for the Pumpset/ motor using 40mm dia B class GI Pipe of 2m length duly providing 12mm dia 16nos holes and required bolts, nuts and washers, check nuts humbe pipe ring etc., as per IS specifications with necessary double GI wire no.8 SWG including filling with equal proportion of salt and Charcoal in layers and all labour charges etc., complete - Earthing

1

1700

1700

... More
Construction of Library Building at Gadwal Town;Supply and Delivery of MS Angular Stand for fixing of control Panel Board - MS Angular stand consisting of L Angles of size 40mm x 40mm x 5mm with 2 nos. 6'long verticals and 3 nos. - 2 1/2' long horizontals. The two legs of the stand firmly fixed in Cement Concrete bed in CC (1:2:4) prop. of size 1m x 0.3m x 0.2m depth below Ground Level. including cost and conveyance, all labour charges etc., complete - MS Stand

1

1050

1050

... More
Construction of Library Building at Gadwal Town;ELEC-5.13.5 : Supply & fixing of 150mm Dia MS Galvanised Bore Cover including cost and conveyance, all labour charges etc., complete - Bore Cover

1

267

267

... More
Construction of Library Building at Gadwal Town;TBSP-G.III-19 : Supplying & fixing of 40mm dia Bronze Vertical Check (Non return) Valve as per IS-778 I-class heavy duty - 40 mm NB Size including cost and conveyance, all labour charges etc., complete - 40mm dia

3

1743

5231.97

... More
Construction of Library Building at Gadwal Town;Manufacture, Supply and fixing of 50mm dia Galvanised Mild steel couplings of the fallowing sizes including cost and conveyance of material and all labour charges etc,. Complete - 50mm dia

1

95

95

... More
Construction of Library Building at Gadwal Town;Supply and delivery of Gate Valves leaded in tin bronze screwed internal bends, screwed on bonnet internal seat design to IS 778/ 84 with its ammendments class -1, Indian Make Heavy Type of sizes ISI Marked including cost and conveyance, all labour charges etc., complete - 50 mm dia

1

4460

4460.52

... More
Construction of Library Building at Gadwal Town;Supply and delivery of 50mm dia MS threaded Flanges set (2Nos) of 150mm dia OD 12mm thick of each Flange with 4 Nos 15mm dia bolts and nuts including Cost and Conveyance of all materials, all labour charges etc, complete

1

362

362.43

... More
Construction of Library Building at Gadwal Town;Supply, Transportation and fixing of 50mm dia, 450mm length, 12mm thickness and 75mm wide MS Clamp set with required nuts and bolts at site of work for pump installation including cost and conveyance of all materials, etc, complete - 50mm dia

1

497

497.63

... More
Construction of Library Building at Gadwal Town;Supply and delivery of Galvanised Mild steel bends heavy duty " C" class threaded at both ends at site of work for pump installation including cost and conveyance of all materials, and etc, complete - 50mm dia 90 degree bends with arm length of 25Cm

2

281

563.54

... More
Construction of Library Building at Gadwal Town;Manufacture, supply, & delivery of 16Kg/Sqcm 40mm dia Polyethylene pipes (PE-100 grade) for water supply conforming to IS 4984 - 1995 including transportation to any where in T.G etc., complete - 40mm dia suction pipe

200

137

27494

... More
Construction of Library Building at Gadwal Town;ELEC-1.6.3 : Supply and delivery of PVC insulated and PV sheated flexible 3 core 2.50 sqmm flat Copper cables suitable for submersible pumpsets conductors composed of ennealed high conductivity copper wire, conforming to IS 694 with its revisions and ammendments from time to time and delivery at site of installation of pumpset including freight and transit. Makes : Finolex / RR Kabel / Havells / KEI /L&T

210

127

26835.9

... More
Construction of Library Building at Gadwal Town;Supply and delivery of 20 mm dia FRPP Flexible Conduit Pipe to encase the submersible cable Make: Precision or its equivalent

15

18

272.7

... More
Construction of Library Building at Gadwal Town;Supply and Transportation of control panel for three phase submersible motors up to 5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete.

1

13670

13670.16

... More
Construction of Library Building at Gadwal Town;Supply and delivery,of submersible pumpsets suitable to 150mm dia Borewell coupled with motors 3 Phase 2880 RPM 400V(-15%+10% range-340 to 440 Volts) of reputed make with minimum overall efficiency of 40% at the duty point with Radial / mixed flow with a trail run of One week.The pumpset should confirm to IS 8034/2002 & 9283/1995 with up to date amendments with ISI mark and a guarantee period of 18 months from the date of installation. The rates are inclusive of , transportation, installation, errection of pumpsets including accessories etc, complete. Makes:Texmo / CRI / KSB / Aryan Varsha / Lubi - 5.00 HP 5-10 Stage

1

40581

40581.01

... More
Construction of Library Building at Gadwal Town;Supplying and fixing of 160mm dia PVC Casing pipe of 6kg/cm2 including cost and conveyance, all labour charges

16

781

12506.72

... More
Construction of Library Building at Gadwal Town;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time - above 90.00m depth

110

542

59689.3

... More
Construction of Library Building at Gadwal Town;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time - up to 90.00m depth

90

507

45646.2

... More
Construction of Library Building at Gadwal Town;Drilling of Borewell

1

-

-

... More
Construction of Library Building at Gadwal Town;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials,, excluding conveyance charges - Second Floor

269.52

647

174459.07

... More
Construction of Library Building at Gadwal Town;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials,, excluding conveyance charges - First Floor

269.52

604

162872.48

... More
Construction of Library Building at Gadwal Town;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials,, excluding conveyance charges - Ground Floor

269.52

561

151283.2

... More
Construction of Library Building at Gadwal Town;Painting to Wood work with two coats of ready mixed synthetic enamel paint first quality all shades over a base coat of wood primer making three coats in all to give an even shade after thoroughly brushing the surface to remove all remains of loose powdered materials, including c/c of all materials, site and other taxes, all operational, incidental and labour charges etc., complete for finished item of work in all flooring for external walls. (APSS No.1201,1207 &1212).

100.8

264

26633.38

... More
Construction of Library Building at Gadwal Town;Supply and Fixing of Sal Wood Ventilators of size 0.60x0.60 Mtrs with 16mm dia Safety bars including cost and conveyance of all materials and labour charges etc., complete.

8

1824

14594.32

... More
Construction of Library Building at Gadwal Town;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor asteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work

40.95

7266

297576.28

... More
Construction of Library Building at Gadwal Town;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Paneling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work .

16.8

2604

43748.21

... More
Construction of Library Building at Gadwal Town;INTERNAL DOOR (SINGLE SHUTTER): 0.90 X 2.10 M: Supplying, Positioning and fixing of ISI mark, standard make flush door shutter of 30 mm thick , solid bond wood block board type with laminate on both side INCLUDING door frame of size 65mmx100mm , including 3 nos. of 150 mm butt hinges, 1 nos. door stoppers, 2 nos. 150 mm long door handles, 1 nos. aldrop of size 250 mm long, 1 nos. of 150 mm long tower bolts with bolts,1 no latches nuts, and screws including cost and conveyance of all materials to site,labour charges for fixing the shutter etc., including minor on fan light portion extra fixtures required if any as directed by the engineer-in-chrge of the work complete for finished item of work. (all fittings and fixtures should be of stainless steel, ISI mark, got approved by the engineer-in-charge) (apssno:1001&1002).

4

11608

46432.4

... More
Construction of Library Building at Gadwal Town;Supply and fixing of doors as per approved drawings with Medium teak wood door frame of size 65mmx100mm and shutter fully panelled door of size 1.20x 2.10m,best teak wood door shutter of 35mm thick double shutter made of top rail 35mmx180mm and bottom rail of 35mmx190mm, middle rail of 35mmx170mm of outer shutter sections and fixed with 35mm thick teak wood panelling fixed on top and bottom including cost and conveyance to site of teak wood frame ,teak wood shutter including 1No.aldrop (IS:2681) 350mm long,2No.tower bolts-250mm long at top,2 nos door stoppers and 2 nos rubber bushes, hinges, latch and door handles including fixing the fixures to door with required number of screws ,nut bolts including labour charges for fixing frame in position ,fixing the shutter to the frame etc complete

2

27210

54421.3

... More
Construction of Library Building at Gadwal Town;Flooring with Ceramic non skid tiles of not less than 7.3mm thick 1st quality laid over floor bed /VRCC slab set over 12.0 mm th.in CM (1:8 ) prop. base coat and neat grey cement slurry of honey like consistence spread at the rate of 3.3 kg of cement per Sqm and jointed with neat white cement paste mixed with pigment of matching shade including cost and conveyance of all materials to site, including cost of mixing of mortar and watering, leveling to proper slope and curing all labour charges etc., complete for finished item of work but excluding cost of CC bed and dadooing to walls

200

1159

231870

... More
Construction of Library Building at Gadwal Town;Providing dadooing to walls with 5 to 7mm thick ceramic wall tiles 1st quality of 7.30mm and of size approved by Engineer-in-Charge, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, cost of all materials like tiles, cement, sand and water etc., complete for finished item of work.

57.12

922

52716.62

... More
Construction of Library Building at Gadwal Town;Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand (unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete etc., complete for finished item of work for Foundations (APSS No. 402) - Dummy Columns - Terrace Floor

1.34

4740

6335.57

... More
Construction of Library Building at Gadwal Town;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ Litand shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ aicoat/ Indocem or quivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc, complete for finished item of work as per SS 911 for internal walls

2406.1

188

453838.96

... More
Construction of Library Building at Gadwal Town;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ Litand shade over Priming Coat with Cement Primer Waterbase Interior Gr-1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc, complete for finished item of work as per SS 912 for external walls

732.03

261

191477.09

... More
Construction of Library Building at Gadwal Town;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls - Second Floor

254.81

621

158438.93

... More
Construction of Library Building at Gadwal Town;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls - First Floor

254.81

572

145881.85

... More
Construction of Library Building at Gadwal Town;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls - Second Floor

634.85

603

383348.43

... More
Construction of Library Building at Gadwal Town;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls - First Floor

679.15

554

376632.2

... More
Construction of Library Building at Gadwal Town;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls - Ground Floor

222.41

496

110474.5

... More
Construction of Library Building at Gadwal Town;Ceiling plastering of 12mm thick with CM (1:3) including cost and conveyance of all material and labour charges, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Ceiling Plastering - Second Floor

292.45

254

74541.56

... More
Construction of Library Building at Gadwal Town;Ceiling plastering of 12mm thick with CM (1:3) including cost and conveyance of all material and labour charges, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Ceiling Plastering - First Floor

292.45

232

67938.13

... More
Construction of Library Building at Gadwal Town;Ceiling plastering of 12mm thick with CM (1:3) including cost and conveyance of all material and labour charges, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Ceiling Plastering - Ground Floor

284.8

191

54618.18

... More
Construction of Library Building at Gadwal Town;Reinforced Brick Masonary walls of 11.5cm in CM(1:4) using second class traditional size bricks and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509 - Second Floor

9.64

11282

108708.42

... More
Construction of Library Building at Gadwal Town;Reinforced Brick Masonary walls of 11.5cm in CM(1:4) using second class traditional size bricks and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509 - First Floor

9.64

10505

101219.19

... More
Construction of Library Building at Gadwal Town;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges etc., complete as per APSS No.501 for Super structure and others - Second Floor

77.92

9075

707214.24

... More
Construction of Library Building at Gadwal Town;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges etc., complete as per APSS No.501 for Super structure and others - First Floor

77.92

8636

672937.19

... More
Construction of Library Building at Gadwal Town;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges etc., complete as per APSS No.501 for Super structure and others - Ground Floor

17.29

7824

135249.5

... More
Construction of Library Building at Gadwal Town;Providing thermo mechanically treated (TMT) reinforcement (Fe-500/550D grade as per IS 1786-2008 procured invariably from the primary/integrated steel producers) of different diameters RCC works,including labour charges for straightening,cutting,bending to required sizes and shapes,placing in position with cover blocks of approved materials and size and trying and lap-splicing with binding wire,forming grills for reinforcement work as per approved designs and drawings,including cost and conveyance of binding wire, cover blocks and all overlaps, operational, labour charges such as cutting,bending,placing in position, tying etc. complete for finished item of work

25

88490

2212254.5

... More
Construction of Library Building at Gadwal Town;Plain Cement Concrete of (1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete for finished item of work (APSS No. 402) - For Bed blocks to Door Holdfasts

0.11

6550

705.11

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Sunshades of 75mm thick at fixed and 50mm at free end - Ground Floor

18.9

1130

21368.72

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Lintels - Second Floor

0.91

15204

13858.62

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Lintels - First Floor

0.91

14516

13231.58

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Lintels - Ground Floor

0.09

13828

1216.56

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Staircase Waist Slab - 175 mm Thick - Second Floor

15.4

2037

31373.53

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Staircase Waist Slab - 175 mm Thick - First Floor

15.4

1959

30183.94

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Staircase Waist Slab - 175 mm Thick - Ground Floor

15.4

1882

28994.2

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Roof Slabs - 125 mm Thick - Staircase Headroom

20.08

1729

34730.75

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Roof Slabs - 125 mm Thick - Second Floor

269.52

1648

444238.6

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Roof Slabs - 125 mm Thick - First Floor

269.52

1583

426822.34

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Roof Slabs - 125 mm Thick - Ground Floor

269.52

1519

409403.38

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Roof Beams - Second Floor

23.93

13782

329803.95

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Roof Beams - First Floor

22.23

13236

294269.18

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Roof Beams - Ground Floor

22.23

12690

282135.8

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Columns - Second Floor

12.82

15435

197930.07

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Columns - First Floor

12.82

14640

187732.8

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work - Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Columns - Ground Floor

19

13844

263106.04

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Plinth Beams

13

13283

172643.69

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Pedastals

4.87

11072

53961.2

... More
Construction of Library Building at Gadwal Town;Supply and placing of the M25 Design mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - For Footings

52.82

10410

549866.52

... More
Construction of Library Building at Gadwal Town;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)

27.76

4484

124479.17

... More
Construction of Library Building at Gadwal Town;Supply and filling of earth (ordinary soil) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, etc., complete.

350.54

415

145491.63

... More
Construction of Library Building at Gadwal Town;BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) (Rate as per RSSR 2021-22 S.No. 18)

221.77

177

39305.8

... More
Construction of Library Building at Gadwal Town;Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand (unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete etc., complete for finished item of work for Foundations (APSS No. 402).

53.36

4740

252948.81

... More
Construction of Library Building at Gadwal Town;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, etc complete - Manual means

286.15

258

73844.16

... More
Construction of Library Building at Gadwal Town;Civil Work

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.