Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Opening Date30 Apr 2021
Closing Date10 May 2021
Tender Amount₹ 1,78,32,972 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of CC Roads and Construction of CC Drains;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. Inlcuding Cost and Conveyance of all materials and labour charges, All work upto plinth level.

83.7

-

328174.7

... More
Laying of CC Roads and Construction of CC Drains;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. [RBR-CCPV-5]

162.75

-

983101.4

... More
Laying of CC Roads and Construction of CC Drains;Vaccum drying of freshly laid cement concrete loor using 100% air tight suction mat of suitable size and length , vaccum pump to maintain vaccum pressure 0.7- 0.8 atmosphere as per the standard procedure floating with power floater ,mechanical travelling,finishing with sound edges and corners ,including hire and operational charges of machinery,labour,fuel etc.,complete for finished item of work as directed by Engineer-in-charge of the workas( As per quotation)

1085

-

97650

... More
Laying of CC Roads and Construction of CC Drains;Saw Cut Joints for freshly laid concrete pavement including all materials and labou charges

465

-

35925.06

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Gravel from approved quarry including cost and conveyance, watering,ramming layer by layer of 15cm th , tamping levelling etc .com

55.8

-

15255.6

... More
Laying of CC Roads and Construction of CC Drains;Ward No. - 20

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)Ordinary Soil-Manual Means-Upto 3 m dept

481.43

-

111096.38

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

64.19

-

47679.56

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

29.64

-

110122.33

... More
Laying of CC Roads and Construction of CC Drains;side wall

101.43

-

763105.56

... More
Laying of CC Roads and Construction of CC Drains;base slab

54.39

-

323249.42

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M15)- Nominal Mix (1:2.5:5) Prop with 40,20,10 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.

9.8

-

47343.36

... More
Laying of CC Roads and Construction of CC Drains;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

10.89

-

111422.46

... More
Laying of CC Roads and Construction of CC Drains;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded as per BLD-CSTN-2-18 (26-11-7)

871.2

-

70349.4

... More
Laying of CC Roads and Construction of CC Drains;Carting of excavated Earth up to an initial lead of 5 KM i including loading ,unloading but excludding stacking charges etc., Comp.

385.14

-

22646.23

... More
Laying of CC Roads and Construction of CC Drains;Ward No. - 21

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)Ordinary Soil-Manual Means-Upto 3 m dept

481.43

-

111096.38

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

64.19

-

47679.56

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

29.64

-

110122.33

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M10)- Nominal Mix (1:3:6) Prop with 20mm metal machine mixing including cost and conveyance of all materials and labour charges etc., complete for Walls.

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;side wall

101.43

-

763105.56

... More
Laying of CC Roads and Construction of CC Drains;base slab

54.39

-

323249.42

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M15)- Nominal Mix (1:2.5:5) Prop with 40,20,10 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.

9.8

-

47343.36

... More
Laying of CC Roads and Construction of CC Drains;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

10.89

-

111422.46

... More
Laying of CC Roads and Construction of CC Drains;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded as per BLD-CSTN-2-18 (26-11-7)

871.2

-

70349.4

... More
Laying of CC Roads and Construction of CC Drains;Carting of excavated Earth up to an initial lead of 5 KM i including loading ,unloading but excludding stacking charges etc., Comp.

385.14

-

22646.23

... More
Laying of CC Roads and Construction of CC Drains;Ward No. - 22

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)Ordinary Soil-Manual Means-Upto 3 m dept

108.08

-

24940

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

14.41

-

10703.57

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

6.66

-

24721.34

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M10)- Nominal Mix (1:3:6) Prop with 20mm metal machine mixing including cost and conveyance of all materials and labour charges etc., complete for Walls.

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;side wall

22.77

-

171309.41

... More
Laying of CC Roads and Construction of CC Drains;base slab

12.21

-

72566.2

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M15)- Nominal Mix (1:2.5:5) Prop with 40,20,10 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.

2.2

-

10628.1

... More
Laying of CC Roads and Construction of CC Drains;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

4.36

-

44568.99

... More
Laying of CC Roads and Construction of CC Drains;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded as per BLD-CSTN-2-18 (26-11-7)

348.48

-

28139.76

... More
Laying of CC Roads and Construction of CC Drains;Carting of excavated Earth up to an initial lead of 5 KM i including loading ,unloading but excludding stacking charges etc., Comp.

86.46

-

5083.85

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Ordinary soils-Mechcanical Means-Upto 3 m depth

149.85

-

15777.71

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

74.92

-

55653.39

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. Inlcuding Cost and Conveyance of all materials and labour charges, All work upto plinth level.

72.9

-

285829.58

... More
Laying of CC Roads and Construction of CC Drains;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. [RBR-CCPV-5]

141.75

-

856249.61

... More
Laying of CC Roads and Construction of CC Drains;Vaccum drying of freshly laid cement concrete loor using 100% air tight suction mat of suitable size and length , vaccum pump to maintain vaccum pressure 0.7- 0.8 atmosphere as per the standard procedure floating with power floater ,mechanical travelling,finishing with sound edges and corners ,including hire and operational charges of machinery,labour,fuel etc.,complete for finished item of work as directed by Engineer-in-charge of the workas( As per quotation)

945

-

85050

... More
Laying of CC Roads and Construction of CC Drains;Saw Cut Joints for freshly laid concrete pavement including all materials and labou charges

405

-

31289.57

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Gravel from approved quarry including cost and conveyance, watering,ramming layer by layer of 15cm th , tamping levelling etc .com

48.6

-

13287.14

... More
Laying of CC Roads and Construction of CC Drains;Ward No. - 23

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)Ordinary Soil-Manual Means-Upto 3 m dept

108.08

-

24940

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

14.41

-

10703.57

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

6.66

-

24721.34

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M10)- Nominal Mix (1:3:6) Prop with 20mm metal machine mixing including cost and conveyance of all materials and labour charges etc., complete for Walls.

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;side wall

22.77

-

171309.41

... More
Laying of CC Roads and Construction of CC Drains;base slab

12.21

-

72566.2

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M15)- Nominal Mix (1:2.5:5) Prop with 40,20,10 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.

2.2

-

10628.1

... More
Laying of CC Roads and Construction of CC Drains;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

4.36

-

44568.99

... More
Laying of CC Roads and Construction of CC Drains;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded as per BLD-CSTN-2-18 (26-11-7)

348.48

-

28139.76

... More
Laying of CC Roads and Construction of CC Drains;Carting of excavated Earth up to an initial lead of 5 KM i including loading ,unloading but excludding stacking charges etc., Comp.

86.46

-

5083.85

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Ordinary soils-Mechcanical Means-Upto 3 m depth

144.3

-

15193.35

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

72.15

-

53592.15

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. Inlcuding Cost and Conveyance of all materials and labour charges, All work upto plinth level.

70.2

-

275243.3

... More
Laying of CC Roads and Construction of CC Drains;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. [RBR-CCPV-5]

136.5

-

824536.66

... More
Laying of CC Roads and Construction of CC Drains;Vaccum drying of freshly laid cement concrete loor using 100% air tight suction mat of suitable size and length , vaccum pump to maintain vaccum pressure 0.7- 0.8 atmosphere as per the standard procedure floating with power floater ,mechanical travelling,finishing with sound edges and corners ,including hire and operational charges of machinery,labour,fuel etc.,complete for finished item of work as directed by Engineer-in-charge of the workas( As per quotation)

910

-

81900

... More
Laying of CC Roads and Construction of CC Drains;Saw Cut Joints for freshly laid concrete pavement including all materials and labou charges

390

-

30130.7

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Gravel from approved quarry including cost and conveyance, watering,ramming layer by layer of 15cm th , tamping levelling etc .com

46.8

-

12795.02

... More
Laying of CC Roads and Construction of CC Drains;Ward No. - 24

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Ordinary soils-Mechcanical Means-Upto 3 m depth

236.8

-

24932.67

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

59.2

-

43973.05

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. Inlcuding Cost and Conveyance of all materials and labour charges, All work upto plinth level.

86.4

-

338760.98

... More
Laying of CC Roads and Construction of CC Drains;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. [RBR-CCPV-5]

168

-

1014814.35

... More
Laying of CC Roads and Construction of CC Drains;Vaccum drying of freshly laid cement concrete loor using 100% air tight suction mat of suitable size and length , vaccum pump to maintain vaccum pressure 0.7- 0.8 atmosphere as per the standard procedure floating with power floater ,mechanical travelling,finishing with sound edges and corners ,including hire and operational charges of machinery,labour,fuel etc.,complete for finished item of work as directed by Engineer-in-charge of the workas( As per quotation)

1120

-

100800

... More
Laying of CC Roads and Construction of CC Drains;Saw Cut Joints for freshly laid concrete pavement including all materials and labou charges

480

-

37083.94

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Gravel from approved quarry including cost and conveyance, watering,ramming layer by layer of 15cm th , tamping levelling etc .com

57.6

-

15747.72

... More
Laying of CC Roads and Construction of CC Drains;Ward No. - 25

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)Ordinary Soil-Manual Means-Upto 3 m dept

125.76

-

29021.09

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

16.77

-

12455.07

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

7.74

-

28766.65

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M10)- Nominal Mix (1:3:6) Prop with 20mm metal machine mixing including cost and conveyance of all materials and labour charges etc., complete for Walls.

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;side wall

26.5

-

199341.86

... More
Laying of CC Roads and Construction of CC Drains;base slab

14.21

-

84440.67

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M15)- Nominal Mix (1:2.5:5) Prop with 40,20,10 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.

2.56

-

12367.25

... More
Laying of CC Roads and Construction of CC Drains;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

4.36

-

44568.99

... More
Laying of CC Roads and Construction of CC Drains;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded as per BLD-CSTN-2-18 (26-11-7)

348.48

-

28139.76

... More
Laying of CC Roads and Construction of CC Drains;Carting of excavated Earth up to an initial lead of 5 KM i including loading ,unloading but excludding stacking charges etc., Comp.

100.61

-

5915.75

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Ordinary soils-Mechcanical Means-Upto 3 m depth

166.5

-

17530.79

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

83.25

-

61837.1

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. Inlcuding Cost and Conveyance of all materials and labour charges, All work upto plinth level.

81

-

317588.42

... More
Laying of CC Roads and Construction of CC Drains;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. [RBR-CCPV-5]

157.5

-

951388.46

... More
Laying of CC Roads and Construction of CC Drains;Vaccum drying of freshly laid cement concrete loor using 100% air tight suction mat of suitable size and length , vaccum pump to maintain vaccum pressure 0.7- 0.8 atmosphere as per the standard procedure floating with power floater ,mechanical travelling,finishing with sound edges and corners ,including hire and operational charges of machinery,labour,fuel etc.,complete for finished item of work as directed by Engineer-in-charge of the workas( As per quotation)

1050

-

94500

... More
Laying of CC Roads and Construction of CC Drains;Saw Cut Joints for freshly laid concrete pavement including all materials and labou charges

450

-

34766.19

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Gravel from approved quarry including cost and conveyance, watering,ramming layer by layer of 15cm th , tamping levelling etc .com

54

-

14763.49

... More
Laying of CC Roads and Construction of CC Drains;Ward No. - 26

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)Ordinary Soil-Manual Means-Upto 3 m dept

119.87

-

27660.73

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

15.98

-

11871.24

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

7.38

-

27418.21

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M10)- Nominal Mix (1:3:6) Prop with 20mm metal machine mixing including cost and conveyance of all materials and labour charges etc., complete for Walls.

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;side wall

25.25

-

189997.71

... More
Laying of CC Roads and Construction of CC Drains;base slab

13.54

-

80482.51

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M15)- Nominal Mix (1:2.5:5) Prop with 40,20,10 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.

2.44

-

11787.53

... More
Laying of CC Roads and Construction of CC Drains;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

4.36

-

44568.99

... More
Laying of CC Roads and Construction of CC Drains;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded as per BLD-CSTN-2-18 (26-11-7)

348.48

-

28139.76

... More
Laying of CC Roads and Construction of CC Drains;Carting of excavated Earth up to an initial lead of 5 KM i including loading ,unloading but excludding stacking charges etc., Comp.

95.89

-

5638.45

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Ordinary soils-Mechcanical Means-Upto 3 m depth

166.5

-

17530.79

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

83.25

-

61837.1

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. Inlcuding Cost and Conveyance of all materials and labour charges, All work upto plinth level.

81

-

317588.42

... More
Laying of CC Roads and Construction of CC Drains;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. [RBR-CCPV-5]

157.5

-

951388.46

... More
Laying of CC Roads and Construction of CC Drains;Vaccum drying of freshly laid cement concrete loor using 100% air tight suction mat of suitable size and length , vaccum pump to maintain vaccum pressure 0.7- 0.8 atmosphere as per the standard procedure floating with power floater ,mechanical travelling,finishing with sound edges and corners ,including hire and operational charges of machinery,labour,fuel etc.,complete for finished item of work as directed by Engineer-in-charge of the workas( As per quotation)

1050

-

94500

... More
Laying of CC Roads and Construction of CC Drains;Saw Cut Joints for freshly laid concrete pavement including all materials and labou charges

450

-

34766.19

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Gravel from approved quarry including cost and conveyance, watering,ramming layer by layer of 15cm th , tamping levelling etc .com

54

-

14763.49

... More
Laying of CC Roads and Construction of CC Drains;Ward No. - 27

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)Ordinary Soil-Manual Means-Upto 3 m dept

501.08

-

115630.92

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

66.81

-

49625.66

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

30.86

-

114617.12

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M10)- Nominal Mix (1:3:6) Prop with 20mm metal machine mixing including cost and conveyance of all materials and labour charges etc., complete for Walls.

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;side wall

105.57

-

794252.73

... More
Laying of CC Roads and Construction of CC Drains;base slab

56.61

-

336443.28

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M15)- Nominal Mix (1:2.5:5) Prop with 40,20,10 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.

10.2

-

49275.74

... More
Laying of CC Roads and Construction of CC Drains;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

10.89

-

111422.46

... More
Laying of CC Roads and Construction of CC Drains;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded as per BLD-CSTN-2-18 (26-11-7)

871.2

-

70349.4

... More
Laying of CC Roads and Construction of CC Drains;Carting of excavated Earth up to an initial lead of 5 KM i including loading ,unloading but excludding stacking charges etc., Comp.

400.86

-

23570.57

... More
Laying of CC Roads and Construction of CC Drains;Ward No. - 28

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)Ordinary Soil-Manual Means-Upto 3 m dept

126.74

-

29247.82

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

16.9

-

12552.37

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (1:5:10) using 40 mm metal with Concrete Mixture. All work upto Plinth Level including cost and conveyance of all materials and labour charges etc., complete

7.8

-

28991.39

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M10)- Nominal Mix (1:3:6) Prop with 20mm metal machine mixing including cost and conveyance of all materials and labour charges etc., complete for Walls.

1

-

-

... More
Laying of CC Roads and Construction of CC Drains;side wall

26.7

-

200899.22

... More
Laying of CC Roads and Construction of CC Drains;base slab

14.32

-

85100.36

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement Concrete (M15)- Nominal Mix (1:2.5:5) Prop with 40,20,10 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.

2.58

-

12463.86

... More
Laying of CC Roads and Construction of CC Drains;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

4.36

-

44568.99

... More
Laying of CC Roads and Construction of CC Drains;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded as per BLD-CSTN-2-18 (26-11-7)

348.48

-

28139.76

... More
Laying of CC Roads and Construction of CC Drains;Carting of excavated Earth up to an initial lead of 5 KM i including loading ,unloading but excludding stacking charges etc., Comp.

101.39

-

5961.97

... More
Laying of CC Roads and Construction of CC Drains;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Ordinary soils-Mechcanical Means-Upto 3 m depth

166.5

-

17530.79

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

83.25

-

61837.1

... More
Laying of CC Roads and Construction of CC Drains;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. Inlcuding Cost and Conveyance of all materials and labour charges, All work upto plinth level.

81

-

317588.42

... More
Laying of CC Roads and Construction of CC Drains;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. [RBR-CCPV-5]

157.5

-

951388.46

... More
Laying of CC Roads and Construction of CC Drains;Vaccum drying of freshly laid cement concrete loor using 100% air tight suction mat of suitable size and length , vaccum pump to maintain vaccum pressure 0.7- 0.8 atmosphere as per the standard procedure floating with power floater ,mechanical travelling,finishing with sound edges and corners ,including hire and operational charges of machinery,labour,fuel etc.,complete for finished item of work as directed by Engineer-in-charge of the workas( As per quotation)

1050

-

94500

... More
Laying of CC Roads and Construction of CC Drains;Saw Cut Joints for freshly laid concrete pavement including all materials and labou charges

450

-

34766.19

... More
Laying of CC Roads and Construction of CC Drains;Supply and filling with Gravel from approved quarry including cost and conveyance, watering,ramming layer by layer of 15cm th , tamping levelling etc .com

54

-

14763.49



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.