Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Works
Civil And Construction
Civil Works Others
Opening Date23 Sep 2023
Closing Date30 Sep 2023
Tender Amount₹ 1,51,27,964 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge

64.96

2231

144958.24

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II).

1

5261

5261.51

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-4-4-2A: Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.SPN 4 way D.B with IP-43 Protection, 40A D.P.Isolator / ECCB / RCCB.10 kA - 6-32A range SP MCBs.

1

4269

4269.65

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-6-1-3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. Makes : Polycab / GM / Million / VGuard/ Gold Medal / Kundancab / HPL /RPG / Nandicab / Nakoda / Payal / Finecab/ Gemini / Vimal / Suncab / Stanjo /Rajnigandha / Orbit / Airson / Beljin /Savera Champion / Rhino

20

65

1314.6

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-9.7.2A : Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete. Fan Makes : Atomberg (Efficio ) / Havells /Orient

4

4110

16442.4

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply fixing and Transportation of 18/20W Retrofit CFL with Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Retrofit CFL Makes :Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix. Bulk head fitting makes: Bajaj / Crompton / Surya

2

490

981.64

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-8.6.6: Supply fixing and Transportation of Ceiling / Wall mounted Circular 1x13W luminaire with decorative acrylic diffuser and 1 No. 13W CFL lamp (circular type) etc., complete. Retrofit CFL Makes : Phillips / Crompton / Bajaj / Surya/ Havells / HPL / Halonix. CFL fitting- Makes : Phillips / Crompton / Bajaj / Surya.

5

136

681.7

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for earth continuity including all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

135

23

3172.5

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-3-1-3: Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

120

58

7044

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

15

80

1210.35

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet (8"x6") covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

1

244

244.95

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

8

141

1134.56

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2.1.7 : Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges etc. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

9

93

841.59

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-1: Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

11

615

6769.29

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1.4.1 (a)Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

11.6

93

1087.62

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

27

84

2278.53

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

21

635

13346.13

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and fixing of 30 mm thick Flush Door shutter solid bond wood block board type with commercial ply on both faces with 1no. 300 mm long Aldrop, 2 nos. 125 mm lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch 1 No. door stopper ( all fixturs MS Powder coated ) including c/c of all materials and labour chrges etc., complete

4.2

3134

13165.32

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSC-L.I-12 : Providing and fixing of door frames factory made, internal door frames without threshold, fabricated from pre painted cold roll formed section 100 mm x 60 mm made of galvanized (base steel as per IS-513 ?D? quality galvanized as per IS-277 with Zinc of 120 Gms/sqm) steel colour coated sections with total coated thickness of 1 mm primer coated with epoxy primer of 5-7 microns thick finish painted with polyester paint of 12-16 microns and back coated with alkyd backer of 5-7 microns, the frame section filled with polyurethane (PUFoam) of 40 kg/Cum and the sections cut to length and mitre joined by means of 1.25 mm thick CRCA electroplated corner brackets of size 75 x 75 mm and 1.25 mm thick electroplated stiffeners of size 150 mm for fixing hold fastsand hinges with MS Powder coated fittings a) 6 Nos M.S. Z Type hold fasts made of 30 mm x 3 mm MS flat of 230 mm long, 3 Nos each size expandable PVC covered screw type fasteners b) 2.5 mm x 300 mm long ?T? hinges /2.5 mm x 50 mm x 50 mm x 100 mm two way but hinges (3 Nos for single leaf or 2 Nos for Double leaf/leaf) c) 12 mm Diameter MS tie rod at bottom with necessary size of nuts on either side.

12.4

498

6184.75

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSC-M.II-01 : Providing and fixing 2 Track 2 glass shutter sliding Windows fabricated from roll formed sections made of Galvanized Steel Colour Coated/ Powder Coated (Base Steel as per IS 513 ?D? quality, Galvanized as per IS 277 with Zinc of 120 GM/Sq.mtr) with total coated thicknessof 0.58 mm. Primer coat with epoxy primer of 5?7 micron thick, finish painted with polyester paint of 12-16 microns thick and back coated with alkyd backer of 5-7 microns or Powder Coated with pure Polyester Powder up to 50-60 microns thick. Section for external frame should be of 44x 59mm, Section for glass shutter should be of 35 x 49 mm Section for euro groove should be 25 x 24mm( Aluminium/Plastic)and Lap Strip should be of 30 x 41mm(Aluminium/Plastic).shutter should be provided with a glass of 5mm Plain Float Glass. Corner bracket for External frame made of Steel/Polypropylene, Corner Bracket for Internal frame made of Steel/Polypropylene, Touch Lock, Rollers, wool pile for lap strip & euro groove, Bump Stop Base & Rubber for shutter stopper. Ethyl Propylene Diamine Monomer (EPDM) Gasket should be used all around glass in shutter. The Frame Section should be cut to length and mitre joined with Corner brackets & Shutter Sections should be cut to length and mitre joined with Corner Bracket. Window Frame should be fixed to brick/ concrete masonry by using Nylon selfexpanding caps and driving MS electroplated 80mm long screws into the caps through frames.10mm square guard bars with 6? pitch (152.4mm) max to be fixed wall to wall complete for finished item of work.

8.64

7829

67644.37

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1569.3

80

126720.98

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

50.23

525

-

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-Amendment Sl No. 19 : Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls.

34.5

389

13448.45

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-17-9 15 Amendment: Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

135.04

103

13914.52

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

135.04

66

9022.02

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

146.83

71

10493.94

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-1-(76) : Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).For Ceilling

29.54

189

5589.56

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal Walls)

105.5

458

48402.35

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903)

146.83

197

29012.14

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

20.07

8227

165133.95

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

0.08

6735

538.83

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

1.48

5502

8143.79

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Foundations.

4.43

4994

22127.01

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Sun shades of 0.60 Mts wide and 75mm thick

6.96

1110

7726.92

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Roof Beams

2.27

12809

29077.88

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;150mm thick roof slab

7.54

11528

86925.49

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Lintels

0.4

13791

5516.69

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Columns

1.97

13830

27246.24

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Plinth Beams

3.21

13298

42688.54

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Pedastals

0.73

11317

8261.86

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Footings :

4.9

10715

52508.01

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

6.71

5659

37978.2

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;6.CONSTRUCTION OF OFFICE & ASH STORAGE ROOM BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

42.28

230

9756.96

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks.

2000

7

15900

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm including cost and conveyance of all materials, labour charges etc complete for finished item of work.

6

538

3231.24

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;S&F CP finish brass soap dish with NP screws etc., including cost and conveyance of all materials, labour charges, etc complete for finished item of work in all floors

1

595

595.34

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Constructing Brick masonry support for G.I pipe with C.M 304.8 x 228.6 x228.6 mm size including plastering and finishing etc. complete.including all labour charges, cost and conveyance of all materials etc. complete for finished item of work.

3

88

265.86

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type 25mm NB Size including cost and conveyance of all materials etc complete for finished item of work. For 25mm dia GI pipe

1

1295

1295.21

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and fixing of 90 mm dia 3 M single Socket PVC pipe - 4 Kg/sq.cm, supply and fixing of 90 mm dia 609.6mm (2'-0") Double Socket PVC pipe - 4 Kg/sq.cm, supply and fixing 90 mm dia - Door Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Plain Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Single 'Y' with Door - UPVC Pipe fittings, supply anf fixing of 90 mm dia - Vent Cowl - UPVC Pipe fittings,S & F of 3 nos of 40 mm nominal size holder bat clamps including cost and conveyance of all materials etc complete for finished item of work.

15

310

4652.55

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and fixing of 90 mm dia 3 M single Socket PVC pipe - 4 Kg/sq.cm, supply and fixing of 90 mm dia 609.6mm (2'-0") Double Socket PVC pipe - 4 Kg/sq.cm, supply and fixing 90 mm dia - Door Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Plain Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Single 'Y' with Door - UPVC Pipe fittings, supply anf fixing of 90 mm dia - Vent Cowl - UPVC Pipe fittings,S & F of 3 nos of 40 mm nominal size holder bat clamps including cost and conveyance of all materials etc complete for finished item of work.

20

237

4749.2

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and fixing of 90 mm dia 3 M single Socket PVC pipe - 4 Kg/sq.cm, supply and fixing of 90 mm dia 609.6mm (2'-0") Double Socket PVC pipe - 4 Kg/sq.cm, supply and fixing 90 mm dia - Door Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Plain Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Single 'Y' with Door - UPVC Pipe fittings, supply anf fixing of 90 mm dia - Vent Cowl - UPVC Pipe fittings,S & F of 3 nos of 40 mm nominal size holder bat clamps including cost and conveyance of all materials etc complete for finished item of work.

25

212

5311.5

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and fixing of 90 mm dia 3 M single Socket PVC pipe - 4 Kg/sq.cm, supply and fixing of 90 mm dia 609.6mm (2'-0") Double Socket PVC pipe - 4 Kg/sq.cm, supply and fixing 90 mm dia - Door Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Plain Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Single 'Y' with Door - UPVC Pipe fittings, supply anf fixing of 90 mm dia - Vent Cowl - UPVC Pipe fittings,S & F of 3 nos of 40 mm nominal size holder bat clamps including cost and conveyance of all materials etc complete for finished item of work.

8

273

2185.92

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping.

20

568

11361.6

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 including cost and conveyance of all materials etc complete for finished item of work.

12

628

7539.48

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying & fixing CI floor traps 1st quality ISImarked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for nominal dia 75 mm (3") and grating size 100 mm dia of weight not less than 4.0 Kgs including cost and conveyance of all materials etc complete for finished item of work.

12

377

4526.4

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover including cost and conveyance of all materials etc complete for finished item of work.

6

715

4294.62

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSP-E.VI-09:Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming to IS:2556-Part-5-1994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 600 x 400 x 250 complete for finished item of work in all floors.

-

4695

-

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;S&F CP finish brass body 32 mm dia nominal size waste coupling with half/full thread & brass check nut conforming to IS 2963: 1979 and Supply & fixing 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials and labour charges for finished item of work etc. complete.

13

274

3574.35

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Double C.P. Pillar cock and Supplying and Fixing Pedestal for Wash Hand Basin.

6

3268

19612.2

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSP-E.VII-03:Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm, Supplying & Fixing 15 mm nominal size PVC connection with brass union nut C.P coated, S&F of 15 mm brass body CP finish self closing tap push type conforming to IS 1711, Supply & Fixing 40 mm nominal size dia PVC solid waste pipe outlet, S & F of 2 nos of 76.2 x 101.6 mm teak wood block complete as directed by th eEngineer-in-charge and conveyance of all materials to site, labour charges etc., complete for finished item of work for all floors.

7

3515

24606.75

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap,Supplying and Fixing best Indian make plastic seatand lid for European water closets with rubber or plastic Buffers as per IS2548-1996 and low down porcelain flushing tank with lid 10 Lit Capacity with internal components, Supplying & Fixing 15 mm nominal size PVC connection with brass union nut C.P coated, S & F 15 mm nominal size brass concealed stop valve screw type with internal /external threaded conforming to IS 8931, S&F CP short bend, S & F 76.2 x 101.6 mm teak wood block complete including cost and conveyance of all materials to site, for finished item of work for all floors.

6

5756

34541.22

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II).

1

5261

5261.51

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-4-4-2A: Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.SPN 4 way D.B with IP-43 Protection, 40A D.P.Isolator / ECCB / RCCB.10 kA - 6-32A range SP MCBs.

1

4269

4269.65

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-6-1-3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. Makes : Polycab / GM / Million / VGuard/ Gold Medal / Kundancab / HPL /RPG / Nandicab / Nakoda / Payal / Finecab/ Gemini / Vimal / Suncab / Stanjo /Rajnigandha / Orbit / Airson / Beljin /Savera Champion / Rhino

20

65

1314.6

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-8.6.6B: Supply and Transportation of 18/20W CFL Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Makes : Bajaj / Crompton / Surya

2

490

-

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-8.6.6: Supply fixing and Transportation of Ceiling / Wall mounted Circular 1x13W luminaire with decorative acrylic diffuser and 1 No. 13W CFL lamp (circular type) etc., complete. Retrofit CFL Makes : Phillips / Crompton / Bajaj / Surya/ Havells / HPL / Halonix. CFL fitting- Makes : Phillips / Crompton / Bajaj / Surya.

10

136

1363.4

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply fixing and Transportation of 18/20W Retrofit CFL with Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Retrofit CFL Makes :Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix. Bulk head fitting makes: Bajaj / Crompton / Surya

4

490

1963.28

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for earth continuity including all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

60

23

1410

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-3-1-3: Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

30

58

1761

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

30

80

2420.7

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet (8"x6") covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

2

244

489.9

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

2

141

283.64

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2.1.7 : Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges etc. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

4

93

374.04

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-1: Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

16

615

9846.24

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1.4.1 (a)Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

17.9

93

1678.3

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

22.7

84

1915.65

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSC-R.I-22 :S&F of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibro-compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation & erection etc.

4.73

651

3079.28

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-11-8-(165): Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, including conveyance charges of materials

125.49

72

9094.26

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-11-2-(159) : White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, including conveyance charges of materials

165.39

48

7989.99

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Observed data : Providing and fixing 30mm thick WPC ( Wood Plastic Composition ) Door Shutters as per manufacture specification fitted with Hinges, 1 Nos of 300 mm long MS Power coated Aldrop, 2 Nos of 150 mm long Aluminium door handle, 1 No.of 250 mm long 10mm Aluminium tower bolt, 1 no. 250 mm long Aluminium flat latch & 2 nos of heavy duty aluminium door stopper, including cost and conveyance of all material , all fixtures and all labour charges etc, for fixing etc, complete.the ?C? channel using Pac solvent cement adhesive etc. complete as per direction of Engineer ? in- charge, manufacture specification and drawing

13.23

3815

50481.05

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSC-L.I-14: Supply and fixing of factory made Bathroom door frames without threshold, fabricated from prepainted cold roll formed section 50mm x 50 mm made of galvanized steel as per IS ? 513 ?D? quality, galvanized as per IS-277 steel colour coated sections primer coated with epoxyprimer finish painted with polyester paint the frame section filled with polyurethane (P.U. Foam) of 40 Kg/Cum; and the sections joined by means of 1.25mm thick CRCA electroplated corner brackets of size 75 x 75 mm and 1.25mm thick electroplated stiffeners of size 150mm for fixing hold fasts and hinges together with the following MS Power coated fitting (Supply and fixing) of approved make. a) 6 Nos M.S. Z. Type hold fasts made of 30mm x 3 mm MS flat of 230mm long, 3 Nos each side expandable PVC covered screw type fasteners b) 2.5 mm x 300 mm long ?T? hinges / 2.5mm x 50 mm x 100mm two way but hinges (3 Nos for single leaf or 2 Nos for Double leaf /leaf )c) 12 mm Diameter MS tie rod at bottom with necessary size of nuts on either side.

39.9

449

17951.81

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

2008.25

89

179417.06

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with plain white glazed ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and of 6 mm thick 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed with neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work (for toilets).

125.82

608

76538.82

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work,including the cost and conveyance of all materials.

48

1172

56259.84

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-1-(76) : Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).For Ceilling

24.58

218

5361.88

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal Walls)

266.63

538

143489.6

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-1-(76) Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).For Ceilling

125.49

218

27374.39

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

21.53

469

10101.88

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, including conveyance charges of materials.

78.42

1025

80382.85

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

23.92

8227

196811.37

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

0.09

6055

545.02

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

5.94

5684

33767.3

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Foundations.

7.91

5238

41436.46

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Roof Beams

2.99

12809

38300.82

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Roof Slab 125mm thick-

9.06

13203

119620.81

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Lintels

0.3

13791

4137.52

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Columns

2.82

13830

39002.24

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Plinth Beams

3.55

13298

47210.07

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Footings

3.89

10715

41684.93

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

7.34

5659

41543.96

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;5.CONSTRUCTION OF TOILET BLOCKS BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

45.18

230

10426.19

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II).

2

5261

10523.02

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-4-4-2A: Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.SPN 4 way D.B with IP-43 Protection, 40A D.P.Isolator / ECCB / RCCB.10 kA - 6-32A range SP MCBs.

1

4269

4269.65

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-6-1-3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. Makes : Polycab / GM / Million / VGuard/ Gold Medal / Kundancab / HPL /RPG / Nandicab / Nakoda / Payal / Finecab/ Gemini / Vimal / Suncab / Stanjo /Rajnigandha / Orbit / Airson / Beljin /Savera Champion / Rhino

30

65

1971.9

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-9.7.2A : Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete. Fan Makes : Atomberg (Efficio ) / Havells /Orient

8

4110

32884.8

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply fixing and Transportation of 18/20W Retrofit CFL with Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Retrofit CFL Makes :Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix. Bulk head fitting makes: Bajaj / Crompton / Surya

13

490

6380.66

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-8-5-1 : Supply, fixing and transportation of 1X28W surface pendant mounting T- 5 extruded Aluminium with Aluminium reflector luminaire with all standard accessories and connections etc., complete with 1 No. 28 W tube.

8

139

1118

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for earth continuity including all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

60

23

1410

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-3-1-3: Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

60

58

3522

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

50

80

4034.5

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet (8"x6") covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

2

244

489.9

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

4

141

567.28

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2.1.7 : Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges etc. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

17

93

1589.67

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-1: Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

25

615

15384.75

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1.4.1 (a)Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

69.9

93

6553.82

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

33.4

84

2818.63

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-12-(197): Painting with Synthetic Enamel paints - Two Coats - for New Iron Work including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

28.35

102

2893.97

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-7 ( 174) : Painting, Priming Coat on New Iron Work including cost and conveyance of all material and all labour charges etc, including preperation of the surface duly removing all rusts and scales with steel wire brushes and wiping away all dust and dirt from the proposed surface before applying the priming coat etc, complete as per (APSS No. 1201, 1207 & 1212).

28.35

60

1701.85

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Fabrication, supply and fixing in position of MS tubular section for elevation etc including cost and conveyance of all material and all labour chages etc complete.

548.57

124

578.1

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Providing and instalation of Stainless Steel Waiting Bench 3 Seat overall minimum length: 1750 mm, Height: 760 mm and Back Height: 460 mm etc, complete for finished item of work as directed engineer incharge.

12

9600

115200

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-17-9 15 Amendment: Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

173.59

121

21044.32

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

109.08

58

6412.81

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

64.51

71

4610.53

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1005.25

89

89809.04

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

49.02

834

40884.15

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-1-(76) : Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).For Ceilling

49.02

218

10693.22

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal Walls)

60.06

538

32321.89

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-1-(76) :Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).For Ceilling

64.51

218

14072.21

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

14.71

469

6901.93

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

11.84

8227

97418.34

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

0.37

6705

2481.1

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Foundations.

9.29

5238

48665.57

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Beams

2.52

14008

35302.5

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Roof Slab 150mm thick

8.37

11405

95467.97

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-14-(31) -B : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS

1.08

14978

16177.28

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Plinth Beams

0.71

14378

10208.91

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Pedestals

0.35

12068

4224.14

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Footings

1.45

11373

16491.11

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

6.91

6055

41845.51

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;4.CONSTRUCTION OF SITTING GALLERY BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Machanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

15.43

127

1962.54

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply fixing and Transportation of 18/20W Retrofit CFL with Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Retrofit CFL Makes :Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix. Bulk head fitting makes: Bajaj / Crompton / Surya

6

490

2944.92

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-1: Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

6

615

3692.34

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1.4.1 (a)Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

21.2

93

-

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

30.7

84

2590.77

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSP-A.I-02: Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:10 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping.

10

465

4658.2

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSP-B.II-02 Construction of Ash drop chamber and Ash collecting chamber at burning platform Constructing with 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg.

2

4412

8825.62

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying and fixing of MS Grill for Burining Platform using 20mm MS Square Bars Horizantally and Vertically at 100mm centre to centre including fixing with 8 Nos of MS angle (3 on each side and 2 at center) duly making cutting concrete / brick/ CRS masonry, fixing and making to original surface neatly including cost and conveyance of all materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work as per drawing and as directed by the Engineer-in-charge.

613.69

118

72513.61

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;DATA Based on BLD-CSTN-9-1-(99) - A : Flooring with 30% Alumina Refractory Fire Brick- Std. Size :24x12x3? set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, charges, labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

29.57

4019

118861.64

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

920.05

89

82197.27

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-17-9 15 Amendment: Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

29.05

121

3521.73

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm. (External walls).

29.05

230

6696.61

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-1-(76) :Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).For Ceilling

32.87

218

7170.26

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 150 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls..

1.65

8227

13576.04

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

7.93

469

3720.76

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding . for Foundations.

2.46

5238

12886.69

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Foundations.

3.28

5238

17182.25

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-14-(31) -B : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS

1.38

14978

20670.96

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Plinth Beams

1.36

14378

19555.1

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Pedastals

0.26

12068

3137.93

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Footings

0.97

11373

11031.98

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

5.13

6055

31066.2

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;1.CONSTRUCTION OF BURNING UNIT BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Machanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

13.71

127

1743.77

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete

40

4354

174164.8

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply, Transportation and fixing of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

60

1534

92096.4

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable inclduing 40A D.P.Isolator for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.

2

15236

30473.91

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and transportation of 12 W +/-10% (>= 1200 Lumens) back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec / FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

10

1534

15349.4

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and Transportation of Ceiling / Wall mounted Circular 1x13W luminaire with decorative acrylic diffuser and 1 No. 13W CFL lamp (circular type) etc., complete.

20

136

2726.8

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;ELEC data -4-1-1: Supply and erection of Panel mounting cubical type 30 / 32A TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel. ( Fuse unit makes : L&T / SCHNEIDER / C&S / ABB / SIEMENS- Fuse Links : Makes : L & T / C & S / Standard / HPL / Havells / Siemens / Indo Asian.

2

15236

30473.91

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

2

18939

37879.24

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR). for 16A 3pin

200

161

32322

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

280

106

29786.4

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Earth Continuity including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

600

27

16584

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (2 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

25

301

7532.75

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

35

166

5817

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

105

778

81762.32

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1-3-2 : Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro.

236.25

113

26755.31

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-ELEC-1-4-2C :Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

472.5

101

48119.4

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

2000

10

20450.7

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply,fixing and testing of PVC SWR 4 KG/Sq.cm on wall surface pipe with necessary special like shoe and bends including providing holder clamps etc., complete as required by the engineer-in-charge for Rain Water Down Comer pipes - 110mm Dia.

60

207

12474.93

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

8

9778

78230.74

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying and fixing of PVC cowls of approved make of 110 mm dia complete etc.

10

16

159.96

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Boxing of Nahany traps in RCC floors including cost and conveyance of all material like Bricks, Cement, Sand etc., to site, all labour charges, , etc., complete.

26

304

7916.69

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and fixing of PVC Nahani trap 1st quality ISI marked conforming to IS:1729-1979 with C.P grating fixing with white cement as per site requirements with standard practice for 100mm dia inlet - 75mm (3") out let pippe 4kgs make with aluminium grating in cement concrete including cost and conveyance of all material to site, all labour charges, , etc., complete.

26

179

4667.3

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;75 mm dia - Door Bend 87.5 Degree

42

88

3722.03

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;110 mm dia - Door Bend 87.5 Degree

35

139

4891.13

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

90

355

31971.26

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

120

185

22313.99

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;50mm Dia

4

1866

7466.78

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;25mm Dia

6

510

3060.79

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;54 mm Dia for Mains from Tank over head tank

100

631

63169.94

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;22.20 mm Dia

84

194

16319.66

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;15.90 mm Dia

56

169

9480.04

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter turn spindle with internal threaded conforming to IS 8931 with 7 years warranty: including cost and conveyance of all materials to the site, all labour charges, etc., complete for finished item of work and as directed by the Engineer/ In-Charge.

28

943

26404.13

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

14

2525

35359.24

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm (Parry/Nicer) including Waste Plug, 32mm dia PVC waste pipe etc, complete for finished item.

4

1162

4649.25

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and fixing 10 liters capacity PVC low level flushing tank white colour of SLIM LINE or equivalent from approved manufacturers with all internal components, necessary length of pipe with all accessories including etc., complete for finished item of work;

14

2042

28599.17

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556- Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm parryware/Nycer/Hindware etc., complete.

4

2387

9548.2

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying & fixing of white European type W.C pan 570mm x 340mm x 400mm of approved colour of parryware/Nycer/Hindware of approved make P trap etc., and heay duty PVC seat and cover of matching colour owith desired shade etc., complete.

10

3684

36845.34

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSC-M.I-24 -Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) casement windows openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections for two or more openable shutters 75 mm x 60 mm x 2.40 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC and accessories for casement window ? friction hinges of stainless steel grade 304/430- 2 Nos., per sash, handle with mazak alloy casting 1 No. per sash, multipoint locking system suitably concealed 1 No., per sash provided with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

20.16

8544

172266.8

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and Fixing of single leaf shutter, Door Size 0.90x2.10 mtrs with Sal wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 150mm long 1 No, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 3Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 1 Nos, MS Hold fasts 3 Nos 230mm long , cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. -Door D1 0.9*2.10m

1.89

4917

9293.92

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and Fixing of Main Door with Double leaf shutters, of size1.20x2.10m Door with Sal wood Frame of sections size 100mm x 125mm with Door Shutter 50mm thick Sal wood including cost of fixtures such as Brass Tower Bolts 300mm long 4 Nos, ,Brass Handles 150mm long 4 Nos, 300mm long Brass Aldrops 2No, 150mm long Brass butt hinges 6Nos, Brass Door stopper 2 Nos, MS Hold fasts 8Nos 230mm long , including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. -Door D 1.2*2.10m

5.04

12352

62255.09

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-1-(99) : skirring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

11.42

870

9944.65

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

20.25

870

17633.9

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-5-(103) :Flooring with soluble salt porcelain vitrified tiles screen printed and polised of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work, including the cost and conveyance of all materials.

221.14

1097

242685.67

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-17-9 7 Amendment: Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

656.21

121

79552.34

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

307.37

191

58922.83

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

656.21

58

38578.59

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

307.37

83

25788.34

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supplying and fixing of stainless steel ( grade 204 ) hand railing with top rail of 50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 20mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges , overheads & contractors profit etc., complete for finished item of work.

381.95

789

301652.65

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Ceiling plastering - 2nd floor

22.46

281

6312.61

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Ceiling plastering -1st floor

259.68

230

59796.51

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Internal Plastering(Second Floor)

119.01

649

77266.05

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Internal plastering- First Floor

255.06

584

148955.04

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;External Plastering- Second floor

66.69

677

45195.81

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;External Plastering- First floor

240.68

625

150651.24

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work,including conveyance charges of materials.

6.55

1164

-

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;2nd Floor:

17.01

9400

-

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;First Floor

42.87

8981

385031.76

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Second Floor

971.2

92

90107.94

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;First Floor

6746.33

91

614320.81

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Sunshades

13.94

15396

214633.2

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;175mm thick Staircase Waist slab

3.73

11849

44197.68

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Roof slabs of 150mm thick - Second Floor

4.2

11564

48568.84

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Roof slabs of 150mm thick - First Floor

38.51

11405

439243.9

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Roof Beams (First Floor)

22.62

14008

316882

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Lintels

1.35

15396

20785.86

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For columns- Second floor

3.08

15761

48545.54

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For columns- First floor

12.58

15422

194010.74

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;TBSC-M.I-24 -Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) casement windows openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections for two or more openable shutters 75 mm x 60 mm x 2.40 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC and accessories for casement window ? friction hinges of stainless steel grade 304/430- 2 Nos., per sash, handle with mazak alloy casting 1 No. per sash, multipoint locking system suitably concealed 1 No., per sash provided with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

4.32

8544

36914.31

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and fixing door shutter with frame made out of PVC section and panels conforming to IS:10151-1982 having panel sizes of 100 mm x 30 mm with self extruded grooves at 40 mm x 50 mm grooves on front face and the infill panel dimension is 610 mm x 20 mm seamless hallow multi chambered PVC single panel for finished item of work. Door D2 0.75*2.10m

6.3

3277

20645.67

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and Fixing of single leaf shutter, Door Size 0.90x2.10 mtrs with Sal wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 150mm long 1 No, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 3Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 1 Nos, MS Hold fasts 3 Nos 230mm long , cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. Door D1 0.9*2.10m

3.78

4917

18587.85

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and Fixing of Door with Double leaf shutters, of size1.20x2.10m Door with Sal wood Frame of sections size 100mm x 125mm with Door Shutter 50mm thick Sal wood including cost of fixtures such as Brass Tower Bolts 300mm long 4 Nos, ,Brass Handles 150mm long 4 Nos, 300mm long Brass Aldrops 2No, 150mm long Brass butt hinges 6Nos, Brass Door stopper 2 Nos, MS Hold fasts 8Nos 230mm long , including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. Door D 1.2*2.10m

2.52

12352

31127.54

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Supply and Fixing of Door with Double leaf shutter, Door with Teak wood Frame of sections size 100mm x 125mm with Door Shutter 50mm thick teak including cost of fixtures such as Brass Tower Bolts 300mm long 2 Nos, Brass Handles 150mm long 2 Nos, 300mm long Brass Aldrops 2Nos, 125mm long Brass butt hinges 6Nos, Door stopper 2 Nos, Brass Hold fasts 6Nos 230mm long ,including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work. Door D 1.50*2.10m

12.6

19614

247147.11

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325 mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy spread at the rate of 3.30 Kg of cement per One Square Meter and jointed with neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.

121.17

608

73710.13

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Providing skirting to internal walls to 15 cm height/risers of steps with 15 mm thick polished Shahabad stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Cuddapah stone, cement, sand and water etc., complete including charges, etc., complete for finished item of work

12.99

834

10834.05

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete for finished item of work.

31.57

1172

37002.57

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Flooring with high polished granite 16 to 18 mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including labour charges for dressing of tiles etc., complete for finished item of work, including the cost of conveyance of all materials BLD-CSTN-7-7

20.96

5221

109433.21

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

97.91

834

81659.88

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

276.44

121

33512.82

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

192.12

121

23290.71

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

468.56

76

35727.7

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-12-12-(193) : Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, , incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

216.68

134

29074.12

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-7-4-(75) : Providing raised / Cut Pointing on coursed or Ashlar stone Masonary or concrete block walling in White Cement Mortor (1:3) Prop, ( 1 cement : 3 Marble dust). including cost & conveyance of all materials to site and all labour charges etc., Complete for finished item of work

21.92

112

2476.08

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls).

276.44

538

148768.95

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

192.12

565

108591.99

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, including conveyance charges of materials.

44.06

1025

45162.82

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work.

46.98

8227

386546.74

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Filling gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

78.81

469

36977.65

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

10176.79

89

909194.42

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Sunshades -75mmth

6.97

1149

8010.13

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;175mm thick Staircase waist slab

2.62

11554

30273.76

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Roof slabs of 125 mm thick

41.48

13203

547667.91

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;Roof slabs of 150 mm thick

41.48

11405

473119.64

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Floor Beams

22.62

14008

316882

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Lintels

0.32

15396

4927.02

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Columns

16.55

14978

247901.79

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Plinth Beams

10.44

14378

150114.15

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Pedastals

5.43

12068

65534.45

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;For Footings

42.81

11373

486885.84

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-6-6-(61) : Construction of Coursed Rubble Stone Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

9.87

5684

56108.29

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-6-12-(67) : Construction of Random Rubble stone Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

19.72

5238

103303.02

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 20 mm size Grded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

81.13

6055

491306.24

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-2-2 (10): Earth work excavation in Ordinary Soil by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

567.09

127

72128.18

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

106.33

270

28759.08

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;RCC

23.2

2470

57306.78

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;CC

13.34

898

11984.92

... More
Infrastructural developmental works i.e Construction of community halls at various locations, constr;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

31.33

589

18462.77



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.