Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Works
Civil And Construction
Opening Date30 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 44,61,420 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;ELEC-4.9.1 (b): Supply and Transportation including Earth work excavation and laying charges of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II with all accessories like couplers, bends, end caps, Ts etc., complete. Makes: DURA LINE (Dura Guard) / Bajaj /Gamson / Ultra Plus / CPE

200

153

30676

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;ELEC-4.1.1.f: Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Payal / RR kable / Beljin / Ollvin / Finecab / RPG / V - Guard / Orbit/ Fortune Arrt / Gemscab / Bonton / SPM / Unistar / Windsor/ Avocab / Pawancab / Nakoda / Suncab

100

318

31812

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;ELEC-4.1.1.e: Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Payal / RR kable / Beljin / Ollvin / Finecab / RPG / V - Guard / Orbit/ Fortune Arrt / Gemscab / Bonton / SPM / Unistar / Windsor/ Avocab / Pawancab / Nakoda / Suncab

100

284

28404

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;ELEC-8.6.1.b:Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 63A, 4 Pole isolator as incomer, 6 Nos 6-32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, bus bars, shroudings, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch

1

28193

28193.56

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;ELEC-3.5.4.c: Supply and transportation of 120 W +/-10% (>=12000 Lumens) LED Flood light Luminaire made of pressure die cast aluminum housing with powder coated, having toughened glass cover, Suitable lens on LEDs, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66 )protected, wide operating voltage range , P.F > 0.90, System having efficacy >110 lumens/watt, with Ingress protection IP66, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA./ Capart / Fortune Arrt / FIEM / Arraystorm / GM / Goldmedal / Panasonic / Silicon / Leksa / Orient / HPL LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs.

6

11043

66260.28

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;ELEC-8.7.2.: Earth work exacavation with a approximate quantity of 6.0 Cum for errection of 16 Mtrs high mast and refilling with a quantity of 0.65 Cum of PCC 1:4:8, 2.60 Cum M 20 grade concrete and (110 Kgs) reinforced steel of 12mm / 10mm / 8mm, Soil bearing capacity of 10 T/Sqm, Anchor plate with cost and conveyance of all above materials including labour charges for errection of High Mast and Carraige etc complete including soil testing.

1

46979

46979.8

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;ELEC-8.5.2: Fabrication, transportation and supply of 16 Mtrs Polygon High Mast with two sections of Bottom 4mm thick and Top section with 3mm thick with GLS type aviation lamp of Bottom 360mm and Top 150mm dia with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate, having a base plate of size 560mm dia 25mm thick with its accessories. Mast shall be in 2 sections and should be hot dip galvanized and suiatble for wind velocity of 180 KMPH as per IS 875 part 3 including head frame, 2 point suspension system with steel rope 6mm dia (7/19) construction double drum winch / power tool, and necessary cable trailer connections and single speed motor with M 24 x 800 mm foundation bolts of required quantity, suitable for 6 Flood lights, with GLS type aviation twin lamp Makes : BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL

1

172859

172859.54

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;Supply & Fixing of Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade including Labour charges for Fabrication of stainless steel railing works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges , overheads & contractors profit for finished item of work.

350

722

252906.5

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-9-18:Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including cost of seigniorage charges on all materials and all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707).

18.84

1665

31383.11

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-8-9-(84) : Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

11.3

607

6863.28

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

2.6

8491

22077.33

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

1.51

6191

9349.38

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work

6.03

5457

32906.37

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

2.26

6191

13993.11

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.

11.3

285

3224.57

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

300

78

23574

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawing to be supplied at the time of execution of work, including cost and conveyance of all Mild steel Tubes & Pipes sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental, Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, excluding cost of fixing in position, including cost of Labour charges for erecting & fixing all structural steel works like heavy iron grills, Trusses, Stanchions, Heavy Beams and Girders erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position etc. complete for finished item of work.

4644.03

179

832070.86

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-10-2-(125): Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Zinc coating Z120 GSM. Tensile Strength: 300 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours, fixing with G.I ?J? bolts & nuts 8 mm dia G.I plain washers complete including seigniorage charges etc., complete for finished item of work, but excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials ? upto 600pitch.

38.04

905

34455.49

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1426

77

110215.54

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted (PEDESTALS)

7.06

12696

89638.42

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted (FOOTINGS)

9

11957

107613.18

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)

33.8

40

1368.9

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

3.07

6191

19008.33

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-EECD-9- ii-b) -Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH Mechanical Means (with all lifts))

2.56

1302

3333.56

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-EECD-5 : Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3 MORD / 301 MORTH.

48.64

76

3717.56

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

300

78

23574

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawing to be supplied at the time of execution of work, including cost and conveyance of all Mild steel Tubes & Pipes sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental, Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, excluding cost of fixing in position, including cost of Labour charges for erecting & fixing all structural steel works like heavy iron grills, Trusses, Stanchions, Heavy Beams and Girders erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position etc. complete for finished item of work.

4644.03

179

832070.86

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-10-2-(125): Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Zinc coating Z120 GSM. Tensile Strength: 300 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours, fixing with G.I ?J? bolts & nuts 8 mm dia G.I plain washers complete including seigniorage charges etc., complete for finished item of work, but excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials ? upto 600pitch.

38.04

905

34455.49

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1426

77

110215.54

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted (PEDESTALS)

7.06

12696

89638.42

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted (FOOTINGS)

9

11957

107613.18

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)

33.8

40

1368.9

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

3.07

6191

19008.33

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-EECD-9- ii-b) -Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH Mechanical Means (with all lifts))

2.56

1302

3333.56

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-EECD-5 : Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3 MORD / 301 MORTH.

48.64

76

3717.56

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

300

78

23574

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawing to be supplied at the time of execution of work, including cost and conveyance of all Mild steel Tubes & Pipes sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental, Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, excluding cost of fixing in position, including cost of Labour charges for erecting & fixing all structural steel works like heavy iron grills, Trusses, Stanchions, Heavy Beams and Girders erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position etc. complete for finished item of work.

4644.03

179

832070.86

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-10-2-(125): Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Zinc coating Z120 GSM. Tensile Strength: 300 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours, fixing with G.I ?J? bolts & nuts 8 mm dia G.I plain washers complete including seigniorage charges etc., complete for finished item of work, but excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials ? upto 600pitch.

38.04

905

34455.49

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1426

77

110215.54

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted (PEDESTALS)

7.06

12696

89638.42

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted (FOOTINGS)

9

11957

107613.18

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)

33.8

40

1368.9

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

3.07

6191

19008.33

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-EECD-9- ii-b) -Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH Mechanical Means (with all lifts)

2.56

1302

3333.56

... More
Infrastructure Developmental works in ULBs with TUFIDC assistance Development of Junctions and Ent;RBR-EECD-5 : Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3 MORD / 301 MORTH.

48.64

76

3717.56



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.