Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Works
Civil And Construction
Building Construction
Opening Date27 Sep 2023
Closing Date3 Oct 2023
Tender Amount₹ 76,49,024 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

608.4

85

52176.38

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply, delivery and fixing of 100mm dia PVC vent pipe including vent cowl, cost of material and labour charges etc., complete for fixing it to the septic tank for 15m height above GL

5

195

977.1

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames anywhere in TS., F.O.R. destination including, loading, un-loading & stacking at site as applicable

2

2232

4465.06

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.(for Ceiling)

18.9

183

3464.18

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-3-14-(31) -C : Supply and placing of M30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 400Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 400 Kgs/ Cum the difference in cost shall be deducted.

0.63

11184

7046.4

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-3-14-(31)-B : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site cluding all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS

3.78

15977

60396.1

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site aincluding all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code fo FOUNDATIONS, PLINTH, PEDESTALS

1.5

10143

15214.62

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Plain cement concrete in M10 prop using 20mm nominal size machine crushed HBG metal as per S.S. 108 machine mixing incluiding cost and conveyance of materials and labour charges such as mixing concrete , laying , tamping, curing all operational charges etc complete as per S.S 402 for finished item of work.

1.5

4684

7026.33

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-2-7 - (15) ; Earth work excavation in ordinary rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

2.5

386

965.95

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

22.5

270

6085.58

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

3000

11

34084.5

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply,fixing and testing of PVC SWR 4 KG/Sq.cm on wall surface pipe with necessary special like shoe and bends including providing holder clamps etc., complete as required by the engineer-in-charge for Rain Water Down Comer pipes - 110mm Dia.

120

237

28531

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

8

9959

79675.93

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supplying and fixing of PVC cowls of approved make of 110 mm dia complete etc.

12

26

313.58

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Boxing of Nahany traps in RCC floors including cost and conveyance of all material like Bricks, Cement, Sand etc., to site, all labour charges, , etc., complete.

46

301

13849.67

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and fixing of PVC Nahani trap 1st quality ISI marked conforming to IS:1729-1979 with C.P grating fixing with white cement as per site requirements with standard practice for 100mm dia inlet - 75mm (3") out let pippe 4kgs make with aluminium grating in cement concrete including cost and conveyance of all material to site, all labour charges, , etc., complete.

46

187

8623.38

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Sanitary PVC Fittings75 mm dia - Door Bend 87.5 Degree

41

92

3773.15

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Sanitary PVC Fittings - 87.5 Degree Door Bends 110 mm dia

52

145

7562.21

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

260

368

95709.28

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete.75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

360

215

77412.72

... More
Construction of Second Floor and compound wall of New Municipal Office Building;S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type, the following valves with SS Ball and SS Spindle of approved brand of manufacature,having rubber lining, including companion flanges, unions, bolts, nuts,rubber gasket , ctc., complete for finished item of work 50mm Dia

11

1934

21283.5

... More
Construction of Second Floor and compound wall of New Municipal Office Building;S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type, the following valves with SS Ball and SS Spindle of approved brand of manufacature,having rubber lining, including companion flanges, unions, bolts, nuts,rubber gasket , ctc., complete for finished item of work.25mm Dia

12

529

6353.35

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 50mm Dia

60

655

39333.51

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work.25mm Dia

12

267

3203.94

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 20mm Dia

75

202

15167.6

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 15mm Dia

50

176

8805.16

... More
Construction of Second Floor and compound wall of New Municipal Office Building;TBSP-F.I-01: S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded connection conforming to IS 8931,including cost and conveyance of all materials and labour charges complete for finished item of work.

5

296

1482.68

... More
Construction of Second Floor and compound wall of New Municipal Office Building;S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter turn spindle with internal threaded conforming to IS 8931 with 7 years warranty: including cost and conveyance of all materials to the site, all labour charges, etc., complete for finished item of work and as directed by the Engineer/ In-Charge.

25

978

24455.63

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

22

2617

57589.18

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supplying & Fixing white glazed flat back half stallurinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm

3

4484

13453.15

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply, Installation and commissioning approved make floor mounted Close Coupled wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' ' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: White Colour

3

13571

40713.94

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and Transportation of of INVERTER Model Cool type split AC 2.0 / 1.8 TR 5 Star unit delivering 21600 BTU/hr and above with operating on refrigerant R-32 / R-410 with high wall mounted Single Split 100% copper indoor and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with with warranty of compressor for 5 years iandcomprehensive maintenance for 2 years.Makes : Daikin / Toshibha / Carrier / Blue Star / Hitachi or equivalent

14

57792

809095.7

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete

20

4309

86185

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply, Transportation and fixing of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

36

733

26422.2

... More
Construction of Second Floor and compound wall of New Municipal Office Building;ELEC data -4-1-3: Supply and erection of Panel mounting cubical type ( 100 to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel. ( Fuse unit makes : L&T / SCHNEIDER / C&S / ABB / SIEMENS- Fuse Links : Makes : L & T / C & S / Standard / HPL / Havells / Siemens / Indo Asian.

3

7167

21501.39

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

2

6630

13261.14

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

360

167

60361.2

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

990

110

109246.5

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Earth Continuity including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

1116

28

31627.44

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (2 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

36

300

10822.68

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

66

165

10938.84

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

61.74

812

50167.45

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-ELEC-1-3-2 : Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro.

178.5

100

17919.62

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-ELEC-1-4-2C :Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

357

102

36617.49

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Providing, supplying & fixing of Top hung Ventilator With Exhaust Fan Provision made from multi chambered uPVC sections with TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC and reinforced with Galvanized Iron profiles throughout the window.The outer frame having an overall size of 60mm x55 mm x 2.40 mm with reinforcement of 1 mm thickness, Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness and Sash with overall size of 75 mm x 60 mm x 2.40 mm with reinforcement of 1.0/1.2 mm thickness.(Composition of profile shall consists of a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Glazing bead for fixing of glass shall be of size 34 x 20 mm coextruded with soft PVC gasket. Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware, single point locking using cockspur handle and friction stays.Wall thickness of frame, mullion and sash shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

8.1

10241

82954.21

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) casement windows openable shutters duly manufactured using UPVC reinforced profiles of 60 mm x 60 mm x 2.60 mm for outer frames, 82 mm x 60 mm x 2.60 mm for Fix mullion (?T? or ?Z? )made of 60mm x 82mm uPVC profile section with steel reinforcement of size 35mm x 28mm x 1.5mm shall be provided in windows having fixed panel as per the requirement. The shutter of outward open able window shall be made of size 60mm x 77mm or for inward open able window shall be made of size 60mm x 78mm; ?T? shaped for outwardopen, or ?Z? shaped for Inward open extruded 3 box multi-chamber uPVC window profile section of white colour having outer wall thickness of 2.6mm (± 0.2mm) provided with reinforcement of minimum 1.5mm thick G/J/U/S/O type GI section prefabricated & welded through fusion welding.The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Gasket for sash & Glazing bead shall be coextruded with Grey colour soft PVC and accessories for casement window ? friction hinges of stainless steel grade 304- 2 Nos., per sash,handle 1 No. per sash, multipoint locking system suitably concealed 1 No., per sash provided with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

28.8

8792

253228.61

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and fixing door shutter with frame made out of PVC section and panels conforming to IS:10151-1982 having panel sizes of 100 mm x 30 mm with self extruded grooves at 40 mm x 50 mm grooves on front face and the infill panel dimension is 610 mm x 20 mm seamless hallow multi chambered PVC single panel for finished item of work.

12.6

3295

41518.51

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and Fixing of single leaf shutter, Door Size 0.90x2.10 mtrs with Sal wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 150mm long 1 No, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 3Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 1 Nos, MS Hold fasts 3 Nos 230mm long , cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

18.9

5114

96661.59

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supply and Fixing of Door with Double leaf shutter, Door with Teak wood Frame of sections size 100mm x 125mm with Door Shutter 50mm thick teak including cost of fixtures such as Brass Tower Bolts 300mm long 2 Nos, Brass Handles 150mm long 2 Nos, 300mm long Brass Aldrops 2Nos, 125mm long Brass butt hinges 6Nos, Door stopper 2 Nos, Brass Hold fasts 6Nos 230mm long ,including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

17.64

21990

387909.77

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete for finished item of work.

37.22

1345

50088.82

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Providing skirting to internal walls to 15 cm height/risers of steps with 15 mm thick polished Shahabad stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Cuddapah stone, cement, sand and water etc., complete including charges, etc., complete for finished item of work

2.17

990

2150.04

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

506.79

885

448575.03

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325 mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.

50.87

615

31295.22

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-9-20 - (118) : Providing skirting to internal walls to 15 cm height/risers of steps with soluble salt porcelain vitrified tiles screen printed and polised length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete etc., complete for finished item of work,

44.65

1458

65106.84

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Flooring with high polished granite 16 to 18 mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including labour charges for dressing of tiles etc., complete for finished item of work, including the cost of conveyance of all materials BLD-CSTN-7-7

15.7

5180

81334.01

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-9-5-(103) :Flooring with soluble salt porcelain vitrified tiles screen printed and polised of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work, including the cost and conveyance of all materials.

408.33

1187

484806.13

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-12-17-9 7 Amendment: Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

1653.65

121

200471.99

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

493.72

191

94646.12

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

1653.65

78

129712.31

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

493.72

83

41423.11

... More
Construction of Second Floor and compound wall of New Municipal Office Building;Supplying and fixing of stainless steel ( grade 204 ) hand railing with top rail of 50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 20mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges , overheads & contractors profit etc., complete for finished item of work. hand railing

110.16

718

79100.39

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-8-1-(76) : Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.(for Ceiling)Third Floor

23.76

219

5219.12

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-8-1-(76) : Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.(for Ceiling) second floor

437.23

207

90742.71

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls) Third Floor

94.2

642

60522.56

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls).second floor

1098.46

596

655396.16

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls). Third Floor

166.52

680

113363.49

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).second floor

327.2

629

205818.62

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but including conveyance charges of materials. Second Floor

59.6

1216

72530.22

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work Third Floor

15.39

9560

147132.9

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work Second Floor

159.72

9098

1453207.98

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126) Second Floor & headroom

925.3

89

82546.01

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-3-14-(31) -C : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.For RCC SLAB, BEAMS. Head room slab - 100 mm thick

3.58

14844

53142.02

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-3-14-(31) -C : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC BEAMS. Head room Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.For RCC SLAB, BEAMS.

2.43

13936

33865.35

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-3-14-(31) -B : Supply and Placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS For Lintels

2.42

14900

36059.09

... More
Construction of Second Floor and compound wall of New Municipal Office Building;BLD-CSTN-3-14-(31) -B : Supply and Placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. For Columns -Third floor Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.

2.5

15871

39679.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.