Public Health And Municipal Engineering Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Works
Civil And Construction
Opening Date6 Mar 2025
Closing Date24 Mar 2025
Tender Amount₹ 2,27,14,85,050 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Laying of Internal CC Roads and Construction of RCC Culverts at Various Locations in Kosgi Municipality

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

2746.17

2664

7316538.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-15 ; Dismantling of Existing cement concrete pavement by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials seperately including all hire & operational charges of T&P, labour charges, complete for finished item of work as directed by Engineer-in-charge as per Technical Specification Clause 202 MORD/MORTH.

2745.83

1866

5125942.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.

55035.31

76

4206348.74

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-SBBS-1 A III: Construction of granular sub-base by providing well graded material / Close graded material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with Vibratory Roller to achieve the desired density, complete for finished item of work as per Technical Specification Clause 401 MORD / MORTH and as directed by the Engineer in Charge. For Grading VI Material

36690.2

2048

75148867.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

18345.11

4961

91023849.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

27517.66

6472

178106678.47

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Vaccum dewatering of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length,vaccum pump to maintain vaccum pressure 0.7-0.8 atmosphere as per the standard procedure,floating with power floater,vibrating using Screed vibrator, mechanical trowelling, finishing with sound edges and corners,including hire and operational charges of machinery, labour,fuel etc,complete for finished item as directed by the Engineer-in-Charge.

183451

85

15631859.71

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Groove Cutting of 2-4 mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond studded saw within 24 hours of casting of CC pavement including labour charges etc,complete for finished item as directed by the Engineer-in-Charge

110826

68

7555008.42

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).

12454

229

2862302.82

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

27518

72

2003310.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Construction of RCC Box Culvert of size 1.0m x 1.0m

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for Structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by mechanical means.

211.58

128

27130.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

11.14

285

3178.91

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

19.2

1557

29900.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

14.4

4961

71449.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge. For Culvert / Drain Base Slab

24

5901

141627.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge. For Culvert / Drain walls

28.8

6241

179758.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 G: Providing R.C.C. grade M 30 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M30 Grade - Culvert / Drain Top Slab

23.04

6927

159611.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)

7451.52

77

575927.98

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-15 ; Dismantling of Existing cement concrete pavement by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials seperately including all hire & operational charges of T&P, labour charges, complete for finished item of work as directed by Engineer-in-charge as per Technical Specification Clause 202 MORD/MORTH.

2.22

1866

4144.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar (Manual means)

1.8

614

1106.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH CC Walls, beds etc,. Cement Concrete M15 & M20 (Manual means)

1.6

940

1505.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH RCC slabs Reinforced Cement Concrete and prestressed Concrete (Manual means)

1.2

2599

3119.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

162.72

72

11846.31

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Construction of RCC Box Culvert of size 1.5m x 1.5m

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for Structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by mechanical means.

474.81

128

60884.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

24.99

285

7131.15

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

35

1557

54505.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

26.25

4961

130245.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge. For Culvert / Drain Base Slab

43.75

5901

258175.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M25 Grade - Culvert / Drain Walls

57.75

8920

515147.33

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 G: Providing R.C.C. grade M 30 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M30 Grade - Culvert / Drain Top Slab

44.1

6927

305506.28

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)

14424.55

77

1114873.47

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-15 ; Dismantling of Existing cement concrete pavement by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials seperately including all hire & operational charges of T&P, labour charges complete for finished item of work as directed by Engineer-in-charge as per Technical Specification Clause 202 MORD/MORTH.

2.78

1866

5189.73

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar (Manual means)

2.25

614

1383.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH CC Walls, beds etc,. Cement Concrete M15 & M20 (Manual means)

2

940

1881.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH RCC slabs Reinforced Cement Concrete and prestressed Concrete (Manual means)

1.5

2599

3899.87

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

358.39

72

26090.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Construction of RCC Box Culvert of size 2.0m x 2.0m

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for Structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by mechanical means.

490.91

128

62949.39

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

25.84

285

7373.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

30

1557

46719

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

22.5

4961

111639.38

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge. For Culvert / Drain Base Slab

45

5901

265552.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M25 Grade - Culvert / Drain Walls

60

8652

519144

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 G: Providing R.C.C. grade M 30 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M30 Grade - Culvert / Drain Top Slab

39

6927

270175.62

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)

14352

77

1109266.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-15 ; Dismantling of Existing cement concrete pavement by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials seperately including all hire & operational charges of T&P, labour charges complete for finished item of work as directed by Engineer-in-charge as per Technical Specification Clause 202 MORD/MORTH.

2.78

1866

5189.73

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar (Manual means)

2.25

614

1383.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH CC Walls, beds etc,. Cement Concrete M15 & M20 (Manual means)

2

940

1881.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH RCC slabs Reinforced Cement Concrete and prestressed Concrete (Manual means)

1.5

2599

3899.87

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

370.25

72

26954.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Construction of RCC Box Culvert of size 3.0m x 2.0m

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for Structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by mechanical means.

493.76

128

63314.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

25.99

285

7416.51

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

31.57

1557

49163.96

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

23.68

4961

117494.24

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge. For Culvert / Drain Base Slab

55.25

5901

326039.09

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 170 0 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M25 Grade - Culvert / Drain Walls

50.05

8420

421431.51

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 G: Providing R.C.C. grade M 30 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M30 Grade - Culvert / Drain Top Slab

49.86

6927

345409.14

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)

14842.93

77

1147210.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-15 ; Dismantling of Existing cement concrete pavement by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials seperately including all hire & operational charges of T&P, labour charges complete for finished item of work as directed by Engineer-in-charge as per Technical Specification Clause 202 MORD/MORTH.

3.05

1866

5693.77

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar (Manual means)

2.48

614

1524.78

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH CC Walls, beds etc,. Cement Concrete M15 & M20 (Manual means)

2.2

940

2070.09

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH RCC slabs Reinforced Cement Concrete and prestressed Concrete (Manual means)

1.65

2599

4289.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

373.2

72

27169.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Construction of RCC Box Culvert of size 5.0m x 2.0m

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for Structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by mechanical means.

658.35

128

84420.22

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

34.65

285

9887.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

44.1

1557

68676.93

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

33.08

4961

164134.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge. For Culvert / Drain Base Slab

88.2

5901

520482.31

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M25 Grade - Culvert / Drain Walls

56

7906

442776.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4 G: Providing R.C.C. grade M 30 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including cost towards material, labour, formwork and staging and all other incidental charges for complete finished item of work as directed by the Engineer in Charge RCC M30 Grade - Culvert / Drain Top Slab

82.6

6927

572218.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)

20972

77

1620925.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-15 ; Dismantling of Existing cement concrete pavement by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials seperately including all hire & operational charges of T&P, labour charges complete for finished item of work as directed by Engineer-in-charge as per Technical Specification Clause 202 MORD/MORTH.

3.89

1866

7261.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar (Manual means)

3.15

614

1936.71

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH CC Walls, beds etc,. Cement Concrete M15 & M20 (Manual means)

2.8

940

2634.66

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH RCC slabs Reinforced Cement Concrete and prestressed Concrete (Manual means)

2.1

2599

5459.81

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

497.04

72

36184.51

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing Street lighting with Single arm LED Lamp

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of suitable boards with bakelite sheet and MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 7.50 Mtrs height Pole having dimensions Bottom 130mm, Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700mm long 'J' bolts along with template. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA/CONSOUL/ Lysaght pole /BPP / Surya

1334

15031

20051700.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Fabrication, Transportation and supply of 1.50 Mtr Length Single Arm standard Bracket made with MS galvanized 50mm dia Pipe. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARS / LAASMA / CONSOUL/ Lysaght pole /BPP / Surya complete with all accomponentories.

1334

2158

2879692.46

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x 0.45Mtrs x 1.20 Mtr size M20 cc work vibrated concreting mixing with necessary steel (10kgs) reinforcement as directed by the field engineers during execution including all labour charges and cost and conveyance of materials etc. complete.

1334

7498

10003119.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and transportation of 90W +/-10% (>=7200 Lumens) LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover / temperature protective custom molded polycarbonate diffuser, Thermal shock and impact resistant IK07 fixed to the housing by SS screws Suitable lense on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens / watt, with Ingress protection IP66, BIS approved Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. Kashyap Blue / Prolite / Scintilla / Mulex / Kiran / Benlo / Savitha / Deepal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

1334

6271

8366247.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 40A, 4 Pole isolator as incomer, 6 Nos 6-32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch with following.

133

28040

3729343.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;ELEC-5.10.2 : Supply and Transportation of control panel for three phase submersible motors up to 5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete. Panel board up to 5HP Motors

1

17042

17042.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and delivery of FRPP Flexible Conduit Pipe to encase the submersible cable Make: Precision or its equivalent

15

20

306.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;ELEC-1.6.3 : Supply abd delivery of PVC insulated and PV sheated flexible 3 core flat type submersible cables suitable for submersible pumpsets conductors composed of ennealed high conductivity copper wire, conforming to IS 694 with its revisions and ammendments from time to time and delivery at site of installation of pumpset including freight and transit3 core 2.50 Sqmm cable, for bore wells ;

116

140

16342.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Manufacture, supply, & delivery of 16Kg/Sqcm HDPE pipes conforming to IS 4984 - 1995 including transportation to any where in A.P, excise duty, sale tax etc., complete.40mm dia suction pipe

110

119

13123

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and delivery of Galvanised Mild steel bends heavy duty " C" class threaded at both ends at site of work for pump installation including cost and conveyance of all materials, all taxes and duties and transit insurance etc, complete.50mm dia 900 bends with arm length of 25Cm

2

180

360

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and delivery of MS Clamp set 50mm dia, 450mm length, 12mm thickness and 75mm wide MS Clamp e with 6Nos of 16mm dia Bolts & Nuts at site of work for pump installation including cost and conveyance of all materials, all taxes and duties and transit insurance etc, complete.

1

545

545.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and delivery of 50mm dia MS Flange set (2Nos) of 150mm dia OD 12mm thick of each Flange with 4 Nos 15mm dia bolts and nuts as per RWS RC includin C/C, transit, insurance all labour charges and taxes and duties etc, complete

1

420

420.38

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and delivery of Gate Valves leaded in tin bronze screwed internal bends, screwed on bonnet internal seat design to IS 778/ 84 with its ammendments class - 2 of sizes ISI Marked including cost and conveyance, transit insurance all labour charges and taxes and duties etc., complete.-50mm dia

1

4622

4622.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Manufacture, Supply and fixing of Galvanised Mild steel couplings of the fallowing sizes including cost and conveyance of material and all labour charges etc,. Complete.50mm dia

1

95

95

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supplying & fixing Bronze Vertical Check (Non return) Valve as per IS-778 I-class heavy duty - 40 mm NB Size including cost and conveyance, all labour charges etc., complete.

3

1807

5422.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply & fixing of 150mm Dia MS Galvanised Bore Cover including cost and conveyance, transit insurance all labour charges and taxes and duties etc., complete

1

295

295.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and Delivery of MS Angular Stand for fixing of control Panel Board - MS Angular stand consisting of L Angles of size 40mm x 40mm x 5mm with 2 nos. 6'long verticals and 3 nos. - 2 1/2' long horizontals. The two legs of the stand firmly fixed in Cement Concrete bed in CC (1:2:4) prop. of size 1m x 0.3m x 0.2m depth below Ground Level. including cost and conveyance, transit insurance all labour charges and taxes and duties etc., complete

1

1050

1050

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing independent Earthing for the Pumpset/ motor using 40mm dia B class GI Pipe of 2m length duly providing 12mm dia 16nos holes and required bolts, nuts and washers, check nuts humbe pipe ring etc., as per IS specifications with necessary double GI wire no.8 SWG including filling with equal proportion of salt and Charcoal in layers and all labour charges etc., complete.

1

1700

1700

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and Delivery of 7/20 Service Wire of repute make as per IS Code including cost and conveyance, transit insurance all labour charges and taxes and duties etc., complete.

175

17

2975

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and Delivery of 12" long GI NIPPLE including cost and conveyance, transit insurance all labour charges and taxes and duties etc., complete.50mm dia

1

120

120

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Installation, Testing, Trail Run and Commissioning of Submersible Pumps set with all accessories as per the standard specifications.

1

2450

2450

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Laying GI Lines

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work.50mm dia GI pipe from Bore well to Sheds

60

621

37288.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work.40mm dia GI pipe

30

579

17383.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work.25mm dia GI pipe

70

370

25926.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze)50mm dia

1

4622

4622.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze)40mm dia

1

3151

3151.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze)25mm dia

1

1538

1538.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Welcome Arch

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Construction of Entry and Exit Welcome Arches at Narayanpet Road

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTBLD-CSTN-2-2(10) :Excavation in ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for Structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by mechanical means.

105.89

128

13578.27

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-2-1 (9): Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

11.77

285

3358.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing P.C.C grade M 10 concrete using 20 mm graded size hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Footing

6.54

4961

32449.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-A: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for FOUNDATIONS, PLINTH, PEDESTALS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Footing

19.18

10821

207563.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-A: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for FOUNDATIONS, PLINTH, PEDESTALS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Pedestals

1.34

11561

15492.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-A: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for FOUNDATIONS, PLINTH, PEDESTALS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Plinth Beam

3.05

14066

42903.53

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Columns-Below the Ground level

3.26

14643

47738.07

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Columns - upto 3.05m

19.06

14643

279106.63

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Columns - upto 5.45m

15

16927

253910.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Columns - upto 8.48m

18.92

20794

393428.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Columns - upto 10.28m

11.18

23092

258169.45

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Columns at @8.88+0.5=9.38M

0.53

21943

11629.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Roof beam @ 3.05m

3.05

13476

41104.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Roof beam @ 5.45m

3.05

16263

49602.39

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Beams @8.48m

27.11

21678

587698.71

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Beams @9.58m

6.73

23646

159143.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Beams @10.28m

6.73

24896

167550.48

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Slab @ 8.88m

19.05

15986

304542.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Slab @ 9.61m

19.05

16745

319005.59

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Slab @ 10.31m & pillar Slab

20.04

17474

350187.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)

19919.5

77

1539578.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

36.42

7402

269582.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-5-1 (39) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:3 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

13.54

8245

111647.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-8-11-(86) : RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials materials, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903)

233.2

3044

710035.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-8-17 (94) : 20 mm thick plain cement mortar bands in cement mortar 1: 4 (1 cement 4 sand) upto 300 mm in width including cost & conveyance of all materials like cement, Sand, Water, etc., to site, all operational, including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing etc., complete for finished item of work ( Raised Band)

616.4

75

46297.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, sand, water, etc., to site, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls.(External walls)

396.07

551

218416.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

396.07

87

34608.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;TBSC-R.I-22 :S&F of pre-cast RCC Grills of any design of 50mm thick manufactured with M-30 grade of concrete using vibro-compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation & erectionetc.,etc., complete for finished item of work.

90

755

67998.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Ammendment (Sl No19): Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls - excluding cost of access scaffolding

396.07

473

187392.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing 1.5m wide Footpath with terrazzo chequered tiles on either side of road

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-2-1 (9): Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

560

285

159801.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

280

1557

436044

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

280

4961

1389290

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-9-4-(102) : Flooring with precast terrazzo chequered tiles conforming to IS: 13801 Supplying precast terrazzo chequered tiles conforming to IS:13801 using marble aggregates of size 10mm, sand, marble powder, white cement pigments etc., with terrazzo topping not less than 6 mm of tiles overall size not less than 20 mm thick any coloured shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete for finished item of work, including the cost and conveyance of all materials.

2400

938

2252232

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

1600

322

516032

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-TSRA-6-i : Painting Two Coats on New Concrete Surfaces : Painting primer coat with water based Cement Primer of Exterior Grade-2 on newly plastered / concrete surfaces after through cleaning of surface to give an even shade and then painting two coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. as per drawing and Technical Specification Clause 1701MORD.Plastering to the Kerb walls above GL+ top face (0.2+0.115)

664

186

124081.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing Greenery at Footpath on either side Road

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Based on Item No.3.b of HMDA (FSR 2019-20 ), Pg.39- Hedge/shrub planting: Digging the trench of size 30cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and perticides etc., @ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @ 20 gms/pit/sqmt) and plant material Ornamental/Rose Plants in Activity Area

800

756

605192

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Based on Item No.6.a.i. of HMDA (FSR 2019-20), Pg.40 -Ground Covers : Bed preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and river sand and application of fertilizers (@ 20 gms/pit/sqmt), smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation. Ground Covers like Roses

800

305

244256

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Based on Item No.5.a of HMDA (FSR 2019-20), Pg.40-Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material. Ornamental/Rose Plants in Activity Area

1600

194

310512

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Construction of Welcome Arch at Doulthabad Road

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTBLD-CSTN-2-2(10) :Excavation in ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for Structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by mechanical means.

48.56

128

6226.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-2-1 (9): Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

5.4

285

1540.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing P.C.C grade M 10 concrete using 20 mm graded size hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.Footings

4.05

4961

20095.09

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-A: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for FOUNDATIONS, PLINTH, PEDESTALS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.For Entrance

11.43

10821

123694.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-A: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for FOUNDATIONS, PLINTH, PEDESTALS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Plinth Beam

0.66

14066

9284.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Below the Ground Level Column

1.7

14643

24894.09

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Above the Ground Level Column @7 mts unsupported height

8.51

18902

160863.17

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Floating columns @8.2 mts unsupported height

0.64

20434

13078.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Tie Beam @ 3.50m

0.66

13476

8894.81

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.SB1 @ 7.75m & SB2 @ 7.75m

15.21

19441

295706.28

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-3-14-(31)-B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.Slabs-150mm Thick - Slab @ 7.75m

4.83

17206

83108.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)

4539.25

77

350838.63

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-5-1 (39) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:3 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

1.99

8245

16409.02

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, sand, water, etc., to site, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls.(External walls)

62.32

551

34366.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

62.32

87

5445.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Ammendment (Sl No19): Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls - excluding cost of access scaffolding

62.32

473

29485.46

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-2-1 (9): Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.Footpath along the Road (Entry & Exit) Kerb wall along the Road Both side of footpath (Entry & Exit)

440

285

125558.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing 1.5m wide Footpath with terrazzo chequered tiles on either side of road

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

220

1557

342606

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

220

4961

1091585

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-9-4-(102) : Flooring with precast terrazzo chequered tiles conforming to IS: 13801 Supplying precast terrazzo chequered tiles conforming to IS:13801 using marble aggregates of size 10mm, sand, marble powder, white cement pigments etc., with terrazzo topping not less than 6 mm of tiles overall size not less than 20 mm thick any coloured shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete for finished item of work, including the cost and conveyance of all materials.

1800

938

1689174

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

1600

322

516032

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-TSRA-6-i : Painting Two Coats on New Concrete Surfaces : Painting primer coat with water based Cement Primer of Exterior Grade-2 on newly plastered / concrete surfaces after through cleaning of surface to give an even shade and then painting two coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. as per drawing and Technical Specification Clause 1701MORD.Plastering to the Kerb walls above GL+ top face (0.2+0.115)

664

186

124081.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing Greenery at Footpath on either side Road

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Based on Item No.3.b of HMDA (FSR 2019-20 ), Pg.39- Hedge/shrub planting: Digging the trench of size 30cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and perticides etc., @ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @ 20 gms/pit/sqmt) and plant material Ornamental/Rose Plants in Activity Area

300

756

226947

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Based on Item No.6.a.i. of HMDA (FSR 2019-20), Pg.40 -Ground Covers : Bed preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and river sand and application of fertilizers (@ 20 gms/pit/sqmt), smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation. Ground Covers like Roses

300

305

91596

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI/equivalent.

40017

318

12730208.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply of 6-32A SP MCB 10KA, C/D Curve ISI Mark.Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / LK (L&T) Exora / Crabtree / Indo Asian / BCH

1334

369

492579.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and fixing of heavy duty type single compression brass cable glands duly nickel plated complete with brass checknut, outer sheath sealing rubber ring and washers suitable for Up to 16.0 Sq.mm 4 Core XLPE insulated armoured cable, including all labour charges and miscellaneous items etc complete. Makes: SMI / Commet / Dowels.

3335

261

871468.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply of heavy duty long barrel copper lugs confirming to I.S specifications suitable for 16 sqmm cable etc complete with nuts, bolts and washers. Makes: DMI / Jainson / Dowels

2668

56

151569.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Junction Improvement

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Development of Junction

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-2-1 (9): Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

15.08

285

4303.23

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.Rotary

3.77

4961

18705.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)Rotary

87.92

392

34520.03

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;RBR-FNDN-4-C.ii : Providing concrete for R.C.C. grade M 20 Design Mix using 20 mm & 10mm nominal size/ Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. ( With Form work) Rotary

16.97

5583

94752.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)Rotary

1357.34

77

104908.81

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Based on Item No.5.a of HMDA (FSR 2019-20), Pg.40-Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

50

194

9703.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Drilling of Bore well and laying of pipeline etc at Junction

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and all taxes, but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.Depth of the Borewells Point No.1 - up to 90.00m depth (Q)

90

507

45646.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and all taxes, but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.

20

542

10852.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supplying and fixing of 160mm dia PVC Casing pipe of 6kg/cm2 including cost and conveyance, all labour charges Depth of the casing as per Geologist report

25

621

15536.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and delivery,of submersible pumpsets suitable to 150mm dia Borewell coupled with motors Single phase 2880 RPM 340V(-15%+10% range-290 to 375 Volts) / 3 Phase 2880 RPM 400V(-15%+10% range-340 to 440 Volts) of reputed make with minimum overall efficiency of 40% at the duty point with Radial / mixed flow with a trail run of One week.The pumpset should confirm to IS 8034/2002 & 9283/1995 with up to date amendments with ISI mark and a guarantee period of 18 months from the date of installation. The rates are inclusive of , transportation, installation, errection of pumpsets including duties and accessories etc, complete. Makes:Texmo / CRI / KSB / Aryan Varsha / Lubi 3.00 HP 5-10 Stage Rate as per SoR item ELEC-5.6.1 .a

1

45446

45446

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) NOTE : Whenever providing full length of electrode is not possible due to the obstruction of water tube / rock, the length of electrode may be reduced and additional earthing may be done to meet earth resistance.

133

6635

882470.96

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and Transportation including Earth work excavation , lowering, laying and jointing charges of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II. with all accessories like couplers, bends, end caps, Ts etc., complete. Makes: DURA LINE (Dura Guard) / Bajaj / Gamson / Ultra Plus.

40017

258

10362802.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;S& F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

2668

579

1545945.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply and fixing of Automatic Street Light Control System based on daywise users settable mode of astronomical timer or digital timer with Optical Micro Sensor, Low voltage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ and shall withstand surge level of 8 KV. The electronic controller with IP 65 protection and suitable SMC / PC enclousure with IP 54 protection, MCBs of Legrand / Schneider / LK / Siemens / BCH of 10kA the load of 5KW Single phase load with necessary hardware, Allen key set and clamping arrangements with 3 years warranty. Makes : Nature switch / Light Mate / Havells

31

12213

378621.91

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Road Infrastructure;Supply of 1.5 Sqmm 3 core PVC / XLPE Insulated Sheathed Multi Core Bright Annealed Bare Copper Conductor Heavy Duty Industrial Cables for Voltage Grade upto 1100 Volts as per IS: 694:2010 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells / Polycab / RPG / KEI / Gloster / V-Guard / Finecab / SPM / Gemini / Unistar / Windsor / Payal / Fortune Arrt / Avocab / Pawancab / Nakoda / HPL / Sudhakar / Bonton / Rajnigandha

26680

96

2576487.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Carting of surplus excavated Earth within a lead of 5Km from the site including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

161

72

11720.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from HIPS(HIImpact Polysterene) or ABS or ASA ( Acrylic Strene Acrylonitrite and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 13635 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 ? DO III Dt 11.06. 1997. The height and width shall not exceed 20 mm and 130 mm with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer?s recommendation and complete as directed by the engineer.

1235

399

492765

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and installation of delineators (Roadway indicators) not less than 800mm high above ground level. The delineator shall have a core and shell construction which shall be made of tough, high impact resistant, injection-molded, thermoplastic outer body. The inner core shall consist of powder coated or painted Mild steel of minimum thickness 1.0mm. The delineator should have top retro-reflective unit consisting of white color micro prismatic non metallic retro-reflective sheeting of minimum exposed area of 125 cm2 and bottom retroreflective unit consisting of red color micro prismatic non metallic retro-reflective sheeting of minimum exposed area of 35 cm2 confirming to ASTM D4956 type XI standards. The delineators shall be fixed to the ground by inserting the root of the delineator up to the marked portion and by firm concrete filling as per the instructions by engineer in-charge.Single side

10

2037

20370

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing and fixing Mandatory / Regulatory sign boards size 600 mm circle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

3

6915

20745

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Application of Alluminium Backed flexible prismatic sheeting (AFP) which shall be of 1ft width Sq ft) and laminated at the back with a 50 micron thick Aluminum (Al) foil with pressure sensitive adhesive and liner. Further, this flexible prismatic sheeting shall have screen printed arrow/slant line pattern in black color on top in a continuous roll format. Neither AFP sheeting nor the flexible prismatic sheeting used in it shall crack when slowly bent in 1 second time around a 1/8th inch mandrel after being conditioned for 24hrs at 0°C and tested as per section S2.2.2. of ASTM D 4956-09. The AFP sheeting, with the liner removed, shall be applied with a neoprene contact adhesive with Polychloroprene as base, viscosity of 200-450 cps and solid content of 20-30%. Once applied, the edges of the product shall be sealed all around with a two-part epoxy based structural adhesive and shall be extremely resistant to peel-off. A test report from institutes like ARAI/CRRI confirming to above mentioned flexibility and ASTM-D4956-09 Type-VI retro reflectivity performance of the flexible prismatic sheeting used in AFP shall be submitted by the tenderer during prequalification and supply of material.

30

597

17910

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and installation of Hazard Marker 300x900 mm using M.S. angle of size 55x55x6mm and 120cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand,colour, with 30cm x 90cm Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC 67:2012 fixed over 3MM Alluminium Composite Material having minimum 0.30 mm thick Aluminium skin on both sides with standard supports consisting of alternately black and Yellow with black stripes in screen printing sloping downward at an angle of 45 degrees towards the side of the obstruction on which the traffic is to pass and buried into the ground in a trench of size 30cm x 30cm and 50cm depth filled with CC M-20 including cost and conveyance of all materials, equipment, machinery and labour with all leads and lifts, loading and un-loading charges necessary for successfull completion of the work on any road in division as directed by Engineer-in-Charge and conforming to IRC 67-2012 &MORT&H specification No.805 and approved drawings etc., complete for finished item of work.

4

5158

20632

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 4MM Aluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading chages necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

2

8192

16384

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing & fixing junctin boards of size 1500 x 1200 mm made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of Green Colour & White Letters and fixed over 4MM Alluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

3

34327

102981

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-2015 and MORTH Section 803.4

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per MORTH Section 803.4 and IRC: 35-2015, the material should satisfy the requirements as per MORTH specifications 803.4 and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel.

338.6

728

246500.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.

120.75

10938

1320839.57

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-7: Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.

201.25

9675

1947152.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.

4025

12

49145.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion (CSS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.

4025

40

161925.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-SBBS-11 ; Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

1006.25

2359

2374538.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-SBBS-1 A III: Construction of granular sub-base by providing well graded material / Close graded material confirming to Grading - VI of MoRT&H Table 400-1 including cost, and conveyance of all materials to work site, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete for finished item of work as per Technical Specification Clause 401 MORD / MORTH and as directed by the Engineer in Charge. For Grading VI Material

805

2048

1648801

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means by using Hydraulic excavator including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.

2012.5

76

153815.38

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing BT Road on the Bund

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC- 4.4.1(a) : Supply of heavy duty long barrel copper lugs confirming to I.S specifications suitable for 16 sqmm cable etc complete with nuts, bolts and washers. Makes: DMI / Jainson / Dowels or equivalent make as approved by the department. Heavy duty long barrel copper lugs for 16.0 Sq.mm 4 Core XLPE insulated armoured cable

152

56

8635.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and fixing of heavy duty type single compression brass cable glands duly nickel plated complete with brass checknut, outer sheath sealing rubber ring and washers suitable for Up to 16.0 Sq.mm 4 Core XLPE insulated armoured cable, including all labour charges and miscellaneous items etc complete. Makes: SMI / Commet / Dowels.

152

261

39719.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-2.14.1 (a) : Supply of 6-32A SP MCB 10KA, C/D Curve ISI Mark.Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / LK (L&T) Exora / Crabtree / Indo Asian / BCH

76

369

28063

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-1.5.5(i): Supply of 4.0 Sqmm (56/0.3) 2 Core PVC / XLPE Insulated Sheathed Multi Core Bright Annealed Bare Copper Conductor Heavy Duty Industrial Cables for Voltage Grade upto 1100 Volts as per IS: 694:2010 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells / Polycab / RPG / KEI / Gloster / V-Guard / Finecab / SPM / Gemini / Unistar / Windsor / Payal / Fortune Arrt / Avocab / Pawancab / Nakoda / HPL / Sudhakar / Bonton / Rajnigandha - PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable

760

159

120885.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI/equivalent.16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable

575

318

182919

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-4.1.1 h : Supply and laying of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Payal / RR kable / Beljin / Ollvin / Finecab / RPG / V - Guard / Orbit / Fortune Arrt / Gemscab / Bonton / SPM / Unistar / Windsor/ Avocab / Pawancab / Nakoda / Suncab 35 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable

115

488

56182.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and fixing of Automatic Street Light Control System based on daywise users settable mode of astronomical timer or digital timer with Optical Micro Sensor, Low voltage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ and shall withstand surge level of 8 KV. The electronic controller with IP 65 protection and suitable SMC / PC enclousure with IP 54 protection, MCBs of Legrand / Schneider / LK / Siemens / BCH of 10kA the load of 5KW Single phase load with necessary hardware, Allen key set and clamping arrangements with 3 years warranty. Makes : Nature switch / Light Mate / Havells

16

12213

195417.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Transportation including Earth work excavation , lowering, laying and jointing charges of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II. with all accessories like couplers, bends, end caps, Ts etc., complete.Makes: DURA LINE (Dura Guard) / Bajaj / Gamson / Ultra Plus.63mm and Inner dia 51mm double walled corrugated HDPE duct

575

258

148902

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)NOTE : Whenever providing full length of electrode is not possible due to the obstruction of water tube / rock, the length of electrode may be reduced and additional earthing may be done to meet earth resistance.

16

6635

106161.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 40A, 4 Pole isolator as incomer, 6 Nos 6-32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch with following.1 No of 0.9m x 1.20m size Box

16

28040

448642.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Heritage architectural ornamental decorative Light fixtures: Installation and fixing of Aluminium casted street light fittings hanging type with IP66 certified of total height nearly 540mm having suitable adopter/connector for fixing on required post.

76

23280

1769280

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Heritage architectural ornamental decorative Brackets: the ornamental custom made pelican with arched tubular combo brackets details of nearly 1000mm width, 1000 height & which is made in combination of heavy duty mild steel hollow pipe section nearly 48mm dia, 3mm thick & aesthetically arched/bent armed with cast iron elements. A decorative element provided on top of the circular shape for Aesthetics including painting etc complete

76

11950

908200

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Heritage architectural ornamental decorative combo street light pole having provision to fix decorative singe arm bracket. The pole is nearly 6.0 mtr length. The pole has ornamental decorative base (approx overall dimenstion height 940mm bottom dia 300mm shall have a provision of in-built junction box for fixing MCBs or cutouts with detachable window cover. The part above ground level with ornamental base of nearly 4.7 mtr length having mild steel hallow heavy duty hot dipped galvanized round pipe with top dia 65mm and base dia 125mm.

76

42000

3192000

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing decorative lighting along the BT Road

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Carting of surplus excavated material such as Earth from the site to a suitable distance including loading & unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

232.88

72

16953.66

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

164.41

7983

1312646.15

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-18:Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including cost of all materials and all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707)

2242.5

2164

4853285.78

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Fixing of Heritage Ornamental decorative Cast Iron railling of weight 66.80 kgs/meter (height of the railling is 1.20 mts) including loading, unloading and stacking at site but excluding the taxes, as applicable complete for finished item of work ad as directed by the Engineer-In-Charge. both sides

76808.5

144

11114189.95

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

258.75

5809

1503117.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

77.63

4666

362262.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

232.88

285

66454.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing Ornamental Cast Iron Railing including Granite Cladding

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-FNDN-4 II (iii) : Providing PCC Grade M15 concrete (nominal mix) for using nominal size 20 mm Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.For base slab below ground level.Toe Drain Walls

120.75

5365

647930.01

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-FNDN-4 II (iii) : Providing PCC Grade M15 concrete (Nominal mix) for using nominal size 20 mm Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.For base slab below ground level.Toe Drain Base Slab & Chute drain

66.54

5073

337570.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.For chute drain & Toe Drain on land side

53.28

4961

264362.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for Structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by mechanical means.

490.19

128

62857.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;IRR-DAW-6-15: Providing and laying Hariyala or other approved quality turfing sods for the slopes of earthen embankments over 20 mm thick sand backing including cost of all materials, machinery,labour including preparing surface, spreading sand, watering for 15 days etc., complete with initial lead upto 1 km and all lifts.Slant area of D/s side of bund

3858.25

216

836661.51

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;IRR-CAW-5-6: Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 50 m and all lifts.For chute drain

157.84

1293

204184.98

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;IRR-CAW-5-11: Providing and constructing graded filter media below and behind rock-toe consisting of 20 cm thick sand, 15 cm thick 20 mm down and 15 cm thick 40 mm down size graded coarse aggregates satisfying filter creteria behind rock-toe and 15 cm thick sand, 20 cm thick 20 mm down coarse aggregate and 65 cm thick 40 mm down size coarse aggregate satisfying filter creiteria below rock-toe as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

1267.88

1754

2224888.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;IRR-CAW-8-10: Providing and Constructing 30 cm thick rubble stone pitching set in CM 1:5 Proportion including cost of all materials,labour, packing chips and mortar ,finishing etc.,complete ( rubble stones : 0.33 cum/sqm )stone pitching along the slopes on water side of the bund

3858.25

683

2635763.49

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;IRR-CAW-5-5 : Providing and laying sand blanket below embankment including cost of all materials, machinery, labour, spreading to specified thickness etc., complete with initial lead upto 50 m and all lifts.For water side levelling of embankment

578.74

1529

885304.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

598

285

170645.28

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;IRR-DAW-5-5: Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation, sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 90 percent using 2 Tonne Roller as stipulated etc.,complete with initial lead upto 1 km and all lifts. (For Maintenance Works)

8538.75

206

1765813.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Strengthening and Widening of Bund, Stone Pitching, Rock toe and filter media, Chute & Toe Drains

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Development of Bandham Cheruvu Bund

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Bund Development & Water Bodies Beautification

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;BLD-CSTN-12-12-(197): Painting with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit - Two Coats - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

279.81

133

37488.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;BLD-CSTN-12-7 ( 174) : Painting, Priming Coat on New Iron Work including cost and conveyance of all material and all labour charges etc, including preperation of the surface duly removing all rusts and scales with steel wire brushes and wiping away all dust and dirt from the proposed surface before applying the priming coat etc, complete as per (APSS No. 1201, 1207 & 1212).

279.81

74

20739.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Supply and Fixing G.I.Nuts, Bolts and Washers each set including cost & conveyance of material & labour charges etc. complete ELEC-9.4.21

2697

17

45956.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Drilling of 16 Nos through holes of 12mm dia to G.I pipe including cost & conveyance of all material & Labour charges ELEC-9.4.20

168.56

7

1340.05

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Supply & Fixing Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge TBSC-E.II-04

3232.5

685

2214585.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Supply, Fabrication and Fixing of Structural steel using all kinds of material viz., flats, tubes or any other sections as per the design approved by the authority including cost of conveyance of all material, loading & unloading charges, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position and any other incidental charges etc. complete for finished item of work as directed by the Engineer in Charge

14429

121

1754133.53

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Supply & Fixing of 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete TBSP-G.I-12

1887.9

621

1173273.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-4 II iii: Providing P.C.C grade M 15 using Concrete mixer (Nominal Mix) using 20 mm Graded Metal (MORD) for structures, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Pedastals

136.54

5073

692693.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-4 I(i) -Providing concrete for plain/reinforced concrete M10 in open foundations using 20 mm Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and flooring bed

13.65

4961

67727.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-1 - In ordinary soils by Mechanical means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for structures by mechanical means. For structures upto 3m depth below GL by Mechanical Means - For Pedastals (0.45x0.45m)

199.41

128

25570.34

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Providing Chainlink Fencing

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Carting of surplus excavated earth/soils/ rock/ debris or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge. Dismatling existing drain structure

2939.42

74

218692.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Carting of surplus excavated earth/soils/ rock/ debris or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

57765.63

72

4205337.86

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Supplying and fixing of MS Grating over drain using Structural Steel of size and shape as per design approved by the Engineer in Charge each including fixing in masonry duly making cutting masonry, fixing and making to original surface neatly including cost and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

109067.65

121

13259354.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH Reinforced Cement Concrete and prestressed Concrete (Manual means)

517.2

2599

1344673.45

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH Cement Concrete M15 & M20 (Manual means)

689.6

940

648879.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar.existing CRS walls

775.8

614

476985.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-STCL-15 ; Dismantling of Existing cement concrete pavement by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials seperately including all hire & operational charges of T&P, labour charges, complete for finished item of work as directed by Engineer-in-charge as per Technical Specification Clause 202 MORD/MORTH. Dismantling of existing CC road for the construction of Covered Drain

956.82

1866

1786201.14

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including on all materials etc., complete for finished item of work in all floors.( APSS No.126

2304049.75

77

178080005.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH - RCC Drain Top Slabs

5742

6241

35839324.62

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-4 C i: Providing R.C.C grade M 25 using Concrete mixer (Design mix) using 20 mm Graded Metal (MORD) for structures, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH - RCC Drain & Silt Trap Wall

10140.54

9643

97791717.17

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-4 C i: Providing R.C.C grade M 20 using Concrete mixer (Nominal Mix) using 20 mm Graded Metal (MORD) for structures, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH - RCC Drain & Silt Trap Wall

4084.4

5829

23809560.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-4 C i: Providing R.C.C grade M 25 using Concrete mixer (Design mix) using 20 mm Graded Metal (MORD) for structures, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH - Foundation Base Slab

16128.59

5901

95177390.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-4 C i: Providing R.C.C grade M 20 using Concrete mixer (Nominal Mix) using 20 mm Graded Metal (MORD) for structures, mechanically mixed, placed and compacted by vibration including centering, shuttering, curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH - Foundation Base Slab

3679.38

5511

20278645.31

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-4 I(i) -Providing concrete for plain/reinforced concrete M10 in open foundations using 20 mm Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and flooring bed.CC Bed for RCC Drain

9363.71

4961

46460388.09

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Bailing out water from pipeline trenches with oil engine driven pumpsets of 5 HP capacity including hire charges, fuel charges and wages for driver and helper etc. complete as directed by the Engineer in charge

17240.1

70

1212841.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;BLD-CSTN- 2-8 modified in 2022-23 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)Below CC bed for RCC drain

12484.92

1557

19442765.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officers Up to 1.50m

34480

225

7769723.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil as per drawings and technical specifications including setting out, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.

5776.56

285

1648399.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil as per drawings and technical specifications including setting out, c removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by mechanical means.

109754.7

128

14073845.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Construction of RCC Open Drains at Various locations in Kosgi Municipality

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Storm Water Drainage;Storm Water Drainage System

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

10.9

285

3110.42

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

18.15

4961

90055.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement - Steps

8.11

5809

47112.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement - Side Wall on Side Beams to steps

1.42

5809

8248.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903) - Side Wall on Side Beams to steps

24.57

198

4870.51

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-18:Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including cost of all materials and all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707)

61.67

2179

134393.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Construction of Seating Gallery Area

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and installation of delineators (Roadway indicators) not less than 800mm high above ground level. The delineator shall have a core and shell construction which shall be made of tough, high impact resistant, injection-molded, thermoplastic outer body. The inner core shall consist of powder coated or painted Mild steel of minimum thickness 1.0mm. The delineator should have top retro-reflective unit consisting of white color micro prismatic non metallic retro-reflective sheeting of minimum exposed area of 125 cm2 and bottom retroreflective unit consisting of red color micro prismatic non metallic retro-reflective sheeting of minimum exposed area of 35 cm2 confirming to ASTM D4956 type XI standards. The delineators shall be fixed to the ground by inserting the root of the delineator up to the marked portion and by firm concrete filling as per the instructions by engineer in-charge.Single side

10

2037

20370

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing and fixing Mandatory / Regulatory sign boards size 600 mm circle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

3

6915

20745

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Application of Alluminium Backed flexible prismatic sheeting (AFP) which shall be of 1ft width Sq ft) and laminated at the back with a 50 micron thick Aluminum (Al) foil with pressure sensitive adhesive and liner. Further, this flexible prismatic sheeting shall have screen printed arrow/slant line pattern in black color on top in a continuous roll format. Neither AFP sheeting nor the flexible prismatic sheeting used in it shall crack when slowly bent in 1 second time around a 1/8th inch mandrel after being conditioned for 24hrs at 0°C and tested as per section S2.2.2. of ASTM D 4956-09. The AFP sheeting, with the liner removed, shall be applied with a neoprene contact adhesive with Polychloroprene as base, viscosity of 200-450 cps and solid content of 20-30%. Once applied, the edges of the product shall be sealed all around with a two-part epoxy based structural adhesive and shall be extremely resistant to peel-off. A test report from institutes like ARAI/CRRI confirming to above mentioned flexibility and ASTM-D4956-09 Type-VI retro reflectivity performance of the flexible prismatic sheeting used in AFP shall be submitted by the tenderer during prequalification and supply of material.

30

597

17910

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and installation of Hazard Marker 300x900 mm using M.S. angle of size 55x55x6mm and 120cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand,colour, with 30cm x 90cm Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC 67:2012 fixed over 3MM Alluminium Composite Material having minimum 0.30 mm thick Aluminium skin on both sides with standard supports consisting of alternately black and Yellow with black stripes in screen printing sloping downward at an angle of 45 degrees towards the side of the obstruction on which the traffic is to pass and buried into the ground in a trench of size 30cm x 30cm and 50cm depth filled with CC M-20 including cost and conveyance of all materials, equipment, machinery and labour with all leads and lifts, loading and un-loading charges necessary for successfull completion of the work on any road in division as directed by Engineer-in-Charge and conforming to IRC 67-2012 &MORT&H specification No.805 and approved drawings etc., complete for finished item of work.

4

5158

20632

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 4MM Aluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading chages necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

2

8192

16384

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing & fixing junctin boards of size 1500 x 1200 mm made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of Green Colour & White Letters and fixed over 4MM Alluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

3

34327

102981

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-2015 and MORTH Section 803.4

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per MORTH Section 803.4 and IRC: 35-2015, the material should satisfy the requirements as per MORTH specifications 803.4 and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel.

338.6

728

246500.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.

120.75

10938

1320839.57

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-7: Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.

201.25

9675

1947152.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.

4025

12

49145.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion (CSS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.

4025

40

161925.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-SBBS-11 ; Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

1006.25

2359

2374538.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-SBBS-1 A III: Construction of granular sub-base by providing well graded material / Close graded material confirming to Grading - VI of MoRT&H Table 400-1 including cost, and conveyance of all materials to work site, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete for finished item of work as per Technical Specification Clause 401 MORD / MORTH and as directed by the Engineer in Charge. For Grading VI Material

805

2048

1648801

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Construction of Sub grade with material obtained from roadway cutting with CBR>=10% , pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th Revision) (payment will be based on level for finished item of work)

1207.5

426

514962.53

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision)

4830

372

1796856.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing of BT Road along the Lower Bund

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from HIPS(HIImpact Polysterene) or ABS or ASA ( Acrylic Strene Acrylonitrite and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 13635 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 ? DO III Dt 11.06. 1997. The height and width shall not exceed 20 mm and 130 mm with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer?s recommendation and complete as directed by the engineer.

1235

399

492765

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Carting of surplus excavated Earth within a lead of 5Km from the site including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

161

72

11720.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing Ornamental Benches

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of Ornamental benches with 3 seater facility for sitting base and back support for outer décor etc complete as directed by the Engineer in charge.

12

13500

162000

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Entrance Point Beautification

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing Entrance Arch and Security Room

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipeline trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete

34.56

285

9862.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-4 (21) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

2.16

4666

10079.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Footings

4.2

10821

45451.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH BEAM. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Plinth Beam

0.47

14066

6611.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS- Below Ground Level

1.93

14643

28262.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - Above Ground Level - For Columns

3.28

14643

48030.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - Cloumn /Walls upto a height of 5.4m

2.43

16861

40974.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - Cloumn /Walls upto a height of 6.4m

0.23

18141

4172.57

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC BEAMS - Roof Beams @ 3m Above Plinth Lvl

0.57

13476

7681.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC BEAMS - Roof Beams @ 5.40m Above Plinth Lvl

3.22

15779

50808.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC BEAMS - Roof Beams @ 6.40m Above Plinth Lvl

4.04

17571

70987.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS - Security room Slab at 3.00m height S1 125 mm thick

0.14

12870

1801.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABSSlab for arch at 5.40m height S2 & S3 Slab 150 mm thick

2.32

14030

32551.55

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABSSlab for arch at 6.40m height S2 & S3 Slab 150 mm thick

2.84

15386

43697.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)

2569.7

77

198612.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work - Security Room walls

6.98

7983

55728.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). (Ceilling)

35.45

185

6571.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). (Internal Wall)

6.3

198

1248.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, sand, water, etc., to site, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls.(External walls)

60.07

551

33126.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

60.07

87

5248.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-5 - White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

41.75

51

2159.73

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Ammendment (Sl No19): Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls - excluding cost of access scaffolding

60.07

473

28420.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) openable doors with openable shutters duly manufactured using UPVC reinforced profiles of 60 mm x 55 mm x 2.0 mm for outer frames, 70 mm x 60 mm x 2.25 mm for mullion sections as per the need and 102 mm x 60 mm x 2.0 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal resistant and accessories for openable door - hinges of stainless steel grade 304- 3 Nos., per shutter handle with mazak alloy casting 1 No. per shutter, locking system suitably concealed 1 No., with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work

1.89

9707

18346.74

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows two track sliding duly manufactured using UPVC reinforced profiles of (62 mm x 60 mm)/(60 mm x 45 mm)/ (60 mm x 52 mm) x 2.0 mm for outer frames, (66 mm x 38 mm)/(58 mm x 39 mm)/ (60 mm x 42 mm) x 2.0 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal resistant accessories like locking system 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work

2.88

7746

22309.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) Fixed Glazing - 48 series duly manufactured using UPVC reinforced profiles of 60 mm x 48 mm x 2.25 mm for outer frames and the mullion sections are of 60 mm x 76 mm x2.25 mm frames are structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm the sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with EPDM weathering seal resistant including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work

1.8

3570

6427.66

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

1835.35

121

223123.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Drilling Borewell and laying GI lines

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges , but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.

10

507

5071.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Manufacture, Supply and Delivery of 160mm dia 6.0 Kg/ sq.cm Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in TG excluding Taxes

8

621

4971.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery,of submersible pumpsets suitable to 150mm dia Borewell coupled with motors Single phase 2880 RPM 340V(-15%+10% range-290 to 375 Volts) / 3 Phase 2880 RPM 400V(-15%+10% range-340 to 440 Volts) of reputed make with minimum overall efficiency of 40% at the duty point with Radial / mixed flow with a trail run of One week.The pumpset should confirm to IS 8034/2002 & 9283/1995 with up to date amendments with ISI mark and a guarantee period of 18 months from the date of installation. The rates are inclusive of , transportation, installation, errection of pumpsets including duties and accessories etc, complete. Makes:Texmo / CRI / KSB / Aryan Varsha / Lubi 3.00 HP 5-10 Stage Rate as per SoR item ELEC-5.6.1 .a

1

45446

45446

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-5.10.2 : Supply and Transportation of control panel for three phase submersible motors up to 5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete.

1

17042

17042.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of FRPP Flexible Conduit Pipe to encase the submersible cable Make: Precision or its equivalet

10

20

204.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-1.6.3 : Supply and delivery of PVC insulated and PV sheated flexible 3 core flat type submersible cables suitable for submersible pumpsets conductors composed of ennealed high conductivity copper wire, conforming to IS 694 with its revisions and ammendments from time to time and delivery at site of installation of pumpset including freight3 core 2.50 Sqmm cable, for bore wells ;

10

140

1408.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Manufacture, supply, & delivery of 16Kg/Sqcm HDPE pipes conforming to IS 4984 - 1995 including transportation to any where in T.G., complete.40mm dia suction pipe

10

119

1193

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of Galvanised Mild steel bends heavy duty " C" class threaded at both ends at site of work for pump installation including cost and conveyance of all materials, and transit insurance etc, complete.50mm dia 900 bends with arm length of 25Cm

2

180

360

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of MS Clamp set 50mm dia, 450mm length, 12mm thickness and 75mm wide MS Clamp e with 6Nos of 16mm dia Bolts & Nuts at site of work for pump installation including cost and conveyance of all materials, and transit insurance etc, complete.

1

545

545.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of 50mm dia MS Flange set (2Nos) of 150mm dia OD 12mm thick of each Flange with 4 Nos 15mm dia bolts and nuts as per RWS RC includin C/C, transit, insurance all labour charges etc, complete

1

420

420.38

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of Gate Valves leaded in tin bronze screwed internal bends, screwed on bonnet internal seat design to IS 778/ 84 with its ammendments class - 2 of sizes ISI Marked including cost and conveyance, transit insurance all labour charges etc., complete.-50mm dia

1

4622

4622.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Manufacture, Supply and fixing of Galvanised Mild steel couplings of the fallowing sizes including cost and conveyance of material and all labour charges etc,. Complete.50mm dia

1

95

95

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;TBSP-G.III-19 : Supplying & fixing Bronze Vertical Check (Non return) Valve as per IS-778 I-class heavy duty - 40 mm NB Size including cost and conveyance, all labour charges etc., complete.

3

1807

5422.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-5.13.6 e : Supply & fixing of 150mm Dia MS Galvanised Bore Cover including cost and conveyance, transit insurance all labour charges etc., complete

1

295

295.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Delivery of MS Angular Stand for fixing of control Panel Board - MS Angular stand consisting of L Angles of size 40mm x 40mm x 5mm with 2 nos. 6'long verticals and 3 nos. - 2 1/2' long horizontals. The two legs of the stand firmly fixed in Cement Concrete bed in CC (1:2:4) prop. of size 1m x 0.3m x 0.2m depth below Ground Level. including cost and conveyance, transit insurance all labour charges etc., complete

1

1050

1050

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing independent Earthing for the Pumpset/ motor using 40mm dia B class GI Pipe of 2m length duly providing 12mm dia 16nos holes and required bolts, nuts and washers, check nuts humbe pipe ring etc., as per IS specifications with necessary double GI wire no.8 SWG including filling with equal proportion of salt and Charcoal in layers and all labour charges etc., complete.

1

1700

1700

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Delivery of 7/20 Service Wire of repute make as per IS Code including cost and conveyance, transit insurance all labour charges etc., complete.

175

17

2975

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Trackless Train Ride50mm dia

1

120

120

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Installation, Testing, Trail Run and Commissioning of Submersible Pumps set with all accessories as per the standard specifications.

1

2450

2450

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work. 50mm dia GI pipe

250

621

155367.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work. 40mm dia GI pipe

350

579

202804

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work. 25mm dia GI pipe

100

370

37038

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze) 50mm dia

5

4622

23114.95

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze) 40mm dia

7

3151

22061.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze) 25mm dia

1

1538

1538.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing of Gazebos and viewer area for lake

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

24.98

285

7128.29

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

3.26

4666

15212.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

7.32

4506

32986.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-6-6-(61) ; Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including , on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

4.94

5105

25223

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site .including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - for Footings

4.06

10821

43936.87

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site .including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Pedastals

0.82

11561

9480.45

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site .including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Columns

1.68

14643

24601.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-5-4-(42) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of , on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work - for steps

0.66

7983

5269.43

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm - for steps

4.42

198

876.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-7-(105) :Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black / regular colours slabs set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, labour charges for dressing of tilesetc., complete for finished item of work,including the cost and conveyance of all materials.

23.02

4692

108015.13

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply, fabrication and fixing in position of MS tubular trusses including cost and conveyance of all material and all labour chages etc complete.Trusses

921.32

148

137125.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-10-1-(124) : Supply and Fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved Zinc cromate yellow paint steel primer and two coats of approved Synthetic Enamel paints in all shades Grade - II having VOC (Volatile Organic Compound) content less than 50 gms / liter on over lapping of sheets complete (upto a pitch of 60 degrees), cost of conveyance of all materials complete. roof sheating

27.06

896

24266.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;TBSC-D.V-01 :Supply and fixing of Sal Wood Plancks: any thickness including cost and conveyance of all material and all fixtures etc, complete.

1.16

79704

92457.02

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply of Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, Down Pipes, Gutter etc., with 0.50mm thick, Width: 0.585, Length: Maximum 2½ Meters including cost and conveyance complete for finished item of work

39.68

343

13615

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including on all materials etc., complete for finished item of work in all floors.( APSS No.126)

203.4

77

15720.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Greenery on and around bund

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-STCL-2 : Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH -Greenary area

862.5

2

2225.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.3.a of HMDA (FSR 2019-20), Pg.39- Hedge/shrub planting: Digging the trench of size 45 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material - Near toe on land side

345

953

328795.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.3.b of HMDA (FSR 2019-20 ), Pg.39- Hedge/shrub planting: Digging the trench of size 30cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and perticides etc., @ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @ 20 gms/pit/sqmt) and plant material - On top of bund

362.25

756

274038.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.5.c of HMDA (FSR 2019-20), Pg.40-Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material - Shurbs as per Drawing - Around the Compound Wall ( Bougainvillea) 1No/Sqm

1150

129

149258.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.5.a of HMDA (FSR 2019-20), Pg.40-Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material - Green fencing to avoid encroachments

1000

194

194070

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Bathukamma Ghat

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Pathway Area Interlocking Concrete Block Pavements using precast concrete blocks

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

258.9

285

73879.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

86.3

1557

134394.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

86.3

4961

428199.03

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including cost and conveyance of all materials and all labour charges etc, complete as per drawing and Technical Specification Clause 1504 MORD

863

635

548030.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Bathukamma Immersion Area using Ceramic Tiles

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

120

285

34243.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

60

1557

93438

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.Trackless Train Ride

60

4961

297705

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete for finished item of work. Trackless Train Ride

600

973

584280

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Construction of steps to Bathukamma Immersion Area

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

10.9

285

3110.42

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

18.15

4961

90055.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement

8.11

5809

47112.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement

1.42

5809

8248.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

24.57

198

4870.51

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-18:Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including cost of all materials and all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707)

61.67

2179

134393.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Construction of Seating Gallery Area

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

5.72

285

1632.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

9.08

4961

45052.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement - Steps

0.11

5809

639.01

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement

0.49

5809

2846.48

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

2.7

198

535.22

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-18:Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including cost of all materials and all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707)

15.79

2179

34410.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing MS Railing along the road side of Bathukamma Ghat

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply, fabrication and fixing in position of MS Railing of 2m x 1.5m using 40 x 40 x 4 mm size MS Tube as Horizontal member and 40 x 40 x 4 mm size MS Tube as Vertical members for outer Frame and 25 x 25 x 3.20 mm size MS Tube vertical members @ 100mm c/c, 3 Nos of 40 x 40 x 4 mm size MS Tube of 0.75m length with 0.15m long 25mm x 6mm MS strip as hold fast embedded in CC Bed including cost and conveyance of all material and all labour charges etc complete as per Drawing and as directed by the Engineer- in- charge -MS Railing above Retaining Wall from entrance steps to open Gym.

17452.97

121

2121758.17

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing Greenery along the road side of Bathukamma Ghat

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.3.b of HMDA (FSR 2019-20 ), Pg.39- Hedge/shrub planting: Digging the trench of size 30cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and perticides etc., @ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @ 20 gms/pit/sqmt) and plant material

575

756

434981.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.6.a i of HMDA (FSR), Pg.40 -Ground Covers :Bed preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and river sand and application of fertilizers (@ 20 gms/pit/sqmt), smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation

575

305

175559

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.5.a of HMDA (FSR 2019-20), Pg.40-Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

383

194

74328.81

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Bathukamma Prototype Area development

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

1.19

285

339.58

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

1.7

1557

2647.41

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

2.55

4961

12652.46

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement - Retaining Support & Steps

9.86

5809

57278.22

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). Steps

2.16

198

428.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-4-(102) : Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete for finished item of work, .

17

937

15938.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-5-(103) : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc. etc., complete for finished item of work, including the cost and conveyance of all materials.Providing Retaining support for Fountain Tank (dia 2.5m)

5

1126

5631.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-18:Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including cost of all materials and all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707)

47.46

2179

103426.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing Single arm decorative lighting post of 6mts height

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-ELEC-13.2.2: Fabrication and Supply of M.S. Poles for garden posts with 'B' class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap including cost and conveyance of all material including fixing of luminaire and labour charges etc., complete. 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap

38

3169

120454.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-ELEC-13-4-6 : Erection charges for 6Mtrs. Long MS / GI Garden post including excavation of pit, concreting 1:3:6 and painting including cost and conveyance of all materials including fixing of luminaire and labour charges etc., complete.

38

2597

98692.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-8.13.1.b: Fabrication and erection of 16 SWG CRCA(1.6mm) sheet steel enclosure for power control cubicle panel / boxes etc., including cutting, bending drilling, welding and reveting etc., complete with cleaning with 7 tank process and painting with powder coating including cost and conveyance of all materials and labour charges.

8

6555

52444.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC.8.4.1.c: Fabrication, Transportation and supply of 1.50 Mtr Length Single Arm standard Bracket made with MS galvanized 48 / 50mm dia Pipe. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL / Lysaght pole / BPP / Surya

38

2158

82030.22

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-3.2.1.c: Supply and fixing of Automatic Street Light Control System based on daywise users settable mode of astronomical timer or digital timer with Optical Micro Sensor, Low voltage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ and shall withstand surge level of 8 KV. The electronic controller with IP 65 protection and suitable SMC / PC enclousure with IP 54 protection, MCBs of Legrand / Schneider / LK / Siemens / BCH of 10kA the load of 5KW Single phase load with necessary hardware, Allen key set and clamping arrangements with 3 years warranty. Makes : Nature switch / Light Mate / Havells

4

12213

48854.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-4.1.1 (F) : Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Payal / RR kable / Beljin / Ollvin / Finecab / RPG / V - Guard / Orbit / Fortune Arrt / Gemscab / Bonton / SPM / Unistar / Windsor/ Avocab / Pawancab / Nakoda / Suncab

1330

318

423099.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-3.3.4.a : Supply and transportation of 12 W +/-10% (>= 1200 Lumens) back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI>80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro/ Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM / Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

76

1386

105343.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) NOTE : Whenever providing full length of electrode is not possible due to the obstruction of water tube / rock, the length of electrode may be reduced and additional earthing may be done to meet earth resistance.

2

6635

13270.24

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Development of Uppusamudram Kunta

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Laying of BT Road

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision)

4032

372

1499984.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Construction of Sub grade with material obtained from roadway cutting with CBR>=10% , pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th Revision) (payment will be based on level for finished item of work)

1008

426

429881.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-SBBS-1 A III: Construction of granular sub-base by providing well graded material / Close graded material confirming to Grading - VI of MoRT&H Table 400-1 including cost, and conveyance of all materials to work site, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete for finished item of work as per Technical Specification Clause 401 MORD / MORTH and as directed by the Engineer in Charge. For Grading VI Material

672

2048

1376390.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-SBBS-11 ; Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

840

2359

1982223.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion (CSS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.

3360

40

135172.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.

3360

12

41025.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-7: Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.

168

9675

1625448.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.

100.8

10938

1102613.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per MORTH Section 803.4 and IRC: 35-2015, the material should satisfy the requirements as per MORTH specifications 803.4 and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel.

296.55

728

215888.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-2015 and MORTH Section 803.4

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing & fixing junctin boards of size 1500 x 1200 mm made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of Green Colour & White Letters and fixed over 4MM Alluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

3

34327

102981

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 4MM Aluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading chages necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

2

8192

16384

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and installation of Hazard Marker 300x900 mm using M.S. angle of size 55x55x6mm and 120cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand,colour, with 30cm x 90cm Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC 67:2012 fixed over 3MM Alluminium Composite Material having minimum 0.30 mm thick Aluminium skin on both sides with standard supports consisting of alternately black and Yellow with black stripes in screen printing sloping downward at an angle of 45 degrees towards the side of the obstruction on which the traffic is to pass and buried into the ground in a trench of size 30cm x 30cm and 50cm depth filled with CC M-20 including cost and conveyance of all materials, equipment, machinery and labour with all leads and lifts, loading and un-loading charges necessary for successfull completion of the work on any road in division as directed by Engineer-in-Charge and conforming to IRC 67-2012 &MORT&H specification No.805 and approved drawings etc., complete for finished item of work.

4

5158

20632

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Application of Alluminium Backed flexible prismatic sheeting (AFP) which shall be of 1ft width Sq ft) and laminated at the back with a 50 micron thick Aluminum (Al) foil with pressure sensitive adhesive and liner. Further, this flexible prismatic sheeting shall have screen printed arrow/slant line pattern in black color on top in a continuous roll format. Neither AFP sheeting nor the flexible prismatic sheeting used in it shall crack when slowly bent in 1 second time around a 1/8th inch mandrel after being conditioned for 24hrs at 0°C and tested as per section S2.2.2. of ASTM D 4956-09. The AFP sheeting, with the liner removed, shall be applied with a neoprene contact adhesive with Polychloroprene as base, viscosity of 200-450 cps and solid content of 20-30%. Once applied, the edges of the product shall be sealed all around with a two-part epoxy based structural adhesive and shall be extremely resistant to peel-off. A test report from institutes like ARAI/CRRI confirming to above mentioned flexibility and ASTM-D4956-09 Type-VI retro reflectivity performance of the flexible prismatic sheeting used in AFP shall be submitted by the tenderer during prequalification and supply of material.

30

597

17910

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing and fixing Mandatory / Regulatory sign boards size 600 mm circle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

3

6915

20745

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and installation of delineators (Roadway indicators) not less than 800mm high above ground level. The delineator shall have a core and shell construction which shall be made of tough, high impact resistant, injection-molded, thermoplastic outer body. The inner core shall consist of powder coated or painted Mild steel of minimum thickness 1.0mm. The delineator should have top retro-reflective unit consisting of white color micro prismatic non metallic retro-reflective sheeting of minimum exposed area of 125 cm2 and bottom retroreflective unit consisting of red color micro prismatic non metallic retro-reflective sheeting of minimum exposed area of 35 cm2 confirming to ASTM D4956 type XI standards. The delineators shall be fixed to the ground by inserting the root of the delineator up to the marked portion and by firm concrete filling as per the instructions by engineer in-charge.Single side

10

2037

20370

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from HIPS(HIImpact Polysterene) or ABS or ASA ( Acrylic Strene Acrylonitrite and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 13635 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 ? DO III Dt 11.06. 1997. The height and width shall not exceed 20 mm and 130 mm with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer?s recommendation and complete as directed by the engineer.

1044

399

416556

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Carting of surplus excavated Earth within a lead of 5Km from the site including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

134.4

72

9784.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing decorative lighting along the BT Road

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Heritage architectural ornamental decorative combo street light pole having provision to fix decorative singe arm bracket. The pole is nearly 6.0 mtr length. The pole has ornamental decorative base (approx overall dimenstion height 940mm bottom dia 300mm shall have a provision of in-built junction box for fixing MCBs or cutouts with detachable window cover. The part above ground level with ornamental base of nearly 4.7 mtr length having mild steel hallow heavy duty hot dipped galvanized round pipe with top dia 65mm and base dia 125mm.

32

42000

1344000

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Heritage architectural ornamental decorative Brackets: the ornamental custom made pelican with arched tubular combo brackets details of nearly 1000mm width, 1000 height & which is made in combination of heavy duty mild steel hollow pipe section nearly 48mm dia, 3mm thick & aesthetically arched/bent armed with cast iron elements. A decorative element provided on top of the circular shape for Aesthetics including painting etc complete

32

11950

382400

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Heritage architectural ornamental decorative Light fixtures: Installation and fixing of Aluminium casted street light fittings hanging type with IP66 certified of total height nearly 540mm having suitable adopter/connector for fixing on required post.

32

23280

744960

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 40A, 4 Pole isolator as incomer, 6 Nos 6-32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch with following.1 No of 0.9m x 1.20m size Box

7

28040

196281.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)NOTE : Whenever providing full length of electrode is not possible due to the obstruction of water tube / rock, the length of electrode may be reduced and additional earthing may be done to meet earth resistance.

7

6635

46445.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Transportation including Earth work excavation , lowering, laying and jointing charges of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II. with all accessories like couplers, bends, end caps, Ts etc., complete.Makes: DURA LINE (Dura Guard) / Bajaj / Gamson / Ultra Plus.

480

258

124300.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and fixing of Automatic Street Light Control System based on daywise users settable mode of astronomical timer or digital timer with Optical Micro Sensor, Low voltage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ and shall withstand surge level of 8 KV. The electronic controller with IP 65 protection and suitable SMC / PC enclousure with IP 54 protection, MCBs of Legrand / Schneider / LK / Siemens / BCH of 10kA the load of 5KW Single phase load with necessary hardware, Allen key set and clamping arrangements with 3 years warranty. Makes : Nature switch / Light Mate / Havells

7

12213

85495.27

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-4.1.1 h : Supply and laying of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Payal / RR kable / Beljin / Ollvin / Finecab / RPG / V - Guard / Orbit / Fortune Arrt / Gemscab / Bonton / SPM / Unistar / Windsor/ Avocab / Pawancab / Nakoda / Suncab

96

488

46899.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes : Torrent / Universal / Unicab / Polycab / Havells / Gloster / KEI/equivalent.

480

318

152697.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-1.5.5(i): Supply of 4.0 Sqmm (56/0.3) 2 Core PVC / XLPE Insulated Sheathed Multi Core Bright Annealed Bare Copper Conductor Heavy Duty Industrial Cables for Voltage Grade upto 1100 Volts as per IS: 694:2010 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells / Polycab / RPG / KEI / Gloster / V-Guard / Finecab / SPM / Gemini / Unistar / Windsor / Payal / Fortune Arrt / Avocab / Pawancab / Nakoda / HPL / Sudhakar / Bonton / Rajnigandha - PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable

320

159

50899.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-2.14.1 (a) : Supply of 6-32A SP MCB 10KA, C/D Curve ISI Mark.Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / LK (L&T) Exora / Crabtree / Indo Asian / BCH

32

369

11816

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and fixing of heavy duty type single compression brass cable glands duly nickel plated complete with brass checknut, outer sheath sealing rubber ring and washers suitable for Up to 16.0 Sq.mm 4 Core XLPE insulated armoured cable, including all labour charges and miscellaneous items etc complete. Makes: SMI / Commet / Dowels.

64

261

16723.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC- 4.4.1(a) : Supply of heavy duty long barrel copper lugs confirming to I.S specifications suitable for 16 sqmm cable etc complete with nuts, bolts and washers. Makes: DMI / Jainson / Dowels or equivalent make as approved by the department - Heavy duty long barrel copper lugs for 16.0 Sq.mm 4 Core XLPE insulated armoured cable

64

56

3635.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing Ornamental Benches

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of Ornamental benches with 3 seater facility for sitting base and back support for outer décor etc complete as directed by the Engineer in charge.

10

13500

135000

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Entrance Point Beautification

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing Entrance Arch and Security Room

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipeline trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete

34.56

285

9862.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-4 (21) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

2.16

4666

10079.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Footings

4.2

10821

45451.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH BEAM. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Plinth Beams

0.47

14066

6611.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - Below Ground Level

1.93

14643

28262.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - Above Ground Level

3.28

14643

48030.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - Cloumn /Walls upto a height of 5.4m

2.43

16861

40974.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - Cloumn /Walls upto a height of 6.4m

0.23

18141

4172.57

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC BEAMS - Roof Beams @ 3m Above Plinth Lvl

0.57

13476

7681.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC BEAMS - Roof Beams @ 5.40m Above Plinth Lvl

3.22

15779

50808.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC BEAMS - Roof Beams @ 6.40m Above Plinth Lvl

4.04

17571

70987.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS - Security room Slab at 3.00m height S1 125 mm thick

0.14

12870

1801.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS - Slab for arch at 5.40m height S2 & S3 Slab 150 mm thick

2.32

14030

32551.55

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABSSlab for arch at 6.40m height S2 & S3 Slab 150 mm thick

2.84

15386

43697.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors. (APSS No.126) (from manufactures such as AF star TMT/ MS life TMT, Radha TMT, SUGNA TMT etc.)

2569.7

77

198612.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work - Security Room walls

6.98

7983

55728.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). (Ceiling)

35.45

185

6571.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). (Internal Walls)

6.3

198

1248.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, sand, water, etc., to site, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls.(External walls)

60.07

551

33126.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

60.07

87

5248.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-5 - White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

41.75

51

2159.73

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Ammendment (Sl No19): Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls - excluding cost of access scaffolding

60.07

473

28420.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) openable doors with openable shutters duly manufactured using UPVC reinforced profiles of 60 mm x 55 mm x 2.0 mm for outer frames, 70 mm x 60 mm x 2.25 mm for mullion sections as per the need and 102 mm x 60 mm x 2.0 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal resistant and accessories for openable door - hinges of stainless steel grade 304- 3 Nos., per shutter handle with mazak alloy casting 1 No. per shutter, locking system suitably concealed 1 No., with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work

1.89

9707

18346.74

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows two track sliding duly manufactured using UPVC reinforced profiles of (62 mm x 60 mm)/(60 mm x 45 mm)/ (60 mm x 52 mm) x 2.0 mm for outer frames, (66 mm x 38 mm)/(58 mm x 39 mm)/ (60 mm x 42 mm) x 2.0 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal resistant accessories like locking system 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work

2.88

7746

22309.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) Fixed Glazing - 48 series duly manufactured using UPVC reinforced profiles of 60 mm x 48 mm x 2.25 mm for outer frames and the mullion sections are of 60 mm x 76 mm x2.25 mm frames are structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm the sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with EPDM weathering seal resistant including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work

1.8

3570

6427.66

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

1835.35

121

223123.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Drilling Borewell and laying GI lines

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges , but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time.

10

507

5071.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Manufacture, Supply and Delivery of 160mm dia 6.0 Kg/ sq.cm Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in TG excluding Taxes

8

621

4971.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery,of submersible pumpsets suitable to 150mm dia Borewell coupled with motors Single phase 2880 RPM 340V(-15%+10% range-290 to 375 Volts) / 3 Phase 2880 RPM 400V(-15%+10% range-340 to 440 Volts) of reputed make with minimum overall efficiency of 40% at the duty point with Radial / mixed flow with a trail run of One week.The pumpset should confirm to IS 8034/2002 & 9283/1995 with up to date amendments with ISI mark and a guarantee period of 18 months from the date of installation. The rates are inclusive of , transportation, installation, errection of pumpsets including duties and accessories etc, complete. Makes:Texmo / CRI / KSB / Aryan Varsha / Lubi - 3.00 HP 5-10 Stage Rate as per SoR item ELEC-5.6.1 .a

1

45446

45446

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-5.10.2 : Supply and Transportation of control panel for three phase submersible motors up to 5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete.

1

17042

17042.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of FRPP Flexible Conduit Pipe to encase the submersible cable Make: Precision or its equivalet

10

20

204.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-1.6.3 : Supply and delivery of PVC insulated and PV sheated flexible 3 core flat type submersible cables suitable for submersible pumpsets conductors composed of ennealed high conductivity copper wire, conforming to IS 694 with its revisions and ammendments from time to time and delivery at site of installation of pumpset including freight3 core 2.50 Sqmm cable, for bore wells ;

10

140

1408.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Manufacture, supply, & delivery of 16Kg/Sqcm HDPE pipes conforming to IS 4984 - 1995 including transportation to any where in T.G., complete.40mm dia suction pipe

10

119

1193

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of Galvanised Mild steel bends heavy duty " C" class threaded at both ends at site of work for pump installation including cost and conveyance of all materials, and transit insurance etc, complete.50mm dia 900 bends with arm length of 25Cm

2

180

360

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of MS Clamp set 50mm dia, 450mm length, 12mm thickness and 75mm wide MS Clamp e with 6Nos of 16mm dia Bolts & Nuts at site of work for pump installation including cost and conveyance of all materials, and transit insurance etc, complete.

1

545

545.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of 50mm dia MS Flange set (2Nos) of 150mm dia OD 12mm thick of each Flange with 4 Nos 15mm dia bolts and nuts as per RWS RC includin C/C, transit, insurance all labour charges etc, complete

1

420

420.38

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and delivery of Gate Valves leaded in tin bronze screwed internal bends, screwed on bonnet internal seat design to IS 778/ 84 with its ammendments class - 2 of sizes ISI Marked including cost and conveyance, transit insurance all labour charges etc., complete.-50mm dia

1

4622

4622.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Manufacture, Supply and fixing of Galvanised Mild steel couplings of the fallowing sizes including cost and conveyance of material and all labour charges etc,. Complete.50mm dia

1

95

95

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;TBSP-G.III-19 : Supplying & fixing Bronze Vertical Check (Non return) Valve as per IS-778 I-class heavy duty - 40 mm NB Size including cost and conveyance, all labour charges etc., complete.40mm dia

3

1807

5422.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-5.13.6 e : Supply & fixing of 150mm Dia MS Galvanised Bore Cover including cost and conveyance, transit insurance all labour charges etc., complete Bore cover

1

295

295.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Delivery of MS Angular Stand for fixing of control Panel Board - MS Angular stand consisting of L Angles of size 40mm x 40mm x 5mm with 2 nos. 6'long verticals and 3 nos. - 2 1/2' long horizontals. The two legs of the stand firmly fixed in Cement Concrete bed in CC (1:2:4) prop. of size 1m x 0.3m x 0.2m depth below Ground Level. including cost and conveyance, transit insurance all labour charges etc., complete

1

1050

1050

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing independent Earthing for the Pumpset/ motor using 40mm dia B class GI Pipe of 2m length duly providing 12mm dia 16nos holes and required bolts, nuts and washers, check nuts humbe pipe ring etc., as per IS specifications with necessary double GI wire no.8 SWG including filling with equal proportion of salt and Charcoal in layers and all labour charges etc., complete.

1

1700

1700

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply and Delivery of 7/20 Service Wire of repute make as per IS Code including cost and conveyance, transit insurance all labour charges etc., complete.

175

17

2975

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Trackless Train Ride50mm dia

1

120

120

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Installation, Testing, Trail Run and Commissioning of Submersible Pumps set with all accessories as per the standard specifications.

1

2450

2450

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work.50mm dia GI pipe

250

621

155367.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work.40mm dia GI pipe

350

579

202804

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work.25mm dia GI pipe

100

370

37038

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze) - 50mm dia

5

4622

23114.95

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze) - 40mm dia

7

3151

22061.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supplying & Fixing Gun metal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze) - 25mm dia

1

1538

1538.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing of Gazebos and viewer area for lake

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

24.98

285

7128.29

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

3.26

4666

15212.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

7.32

4506

32986.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-6-6-(61) ; Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including , on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

4.94

5105

25223

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site .including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - for Footings

4.06

10821

43936.87

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site .including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Pedastals

0.82

11561

9480.45

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site .including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Columns

1.68

14643

24601.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-5-4-(42) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of , on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work - For Steps

0.66

7983

5269.43

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm - For Steps

4.42

198

876.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-7-(105) :Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black / regular colours slabs set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, labour charges for dressing of tilesetc., complete for finished item of work,including the cost and conveyance of all materials.

23.02

4692

108015.13

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply, fabrication and fixing in position of MS tubular trusses including cost and conveyance of all material and all labour chages etc complete.Trusses(as per SP:38(S&T)-1987,Page no.216)For Base PlatePurlins (SHS 100X100X4)

921.32

148

137125.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-10-1-(124) : Supply and Fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved Zinc cromate yellow paint steel primer and two coats of approved Synthetic Enamel paints in all shades Grade - II having VOC (Volatile Organic Compound) content less than 50 gms / liter on over lapping of sheets complete (upto a pitch of 60 degrees), cost of conveyance of all materials complete. roof sheating

27.06

896

24266.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;TBSC-D.V-01 :Supply and fixing of Sal Wood Plancks: any thickness including cost and conveyance of all material and all fixtures etc, complete.

1.16

79704

92457.02

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply of Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, Down Pipes, Gutter etc., with 0.50mm thick, Width: 0.585, Length: Maximum 2½ Meters including cost and conveyance complete for finished item of work

39.68

343

13615

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including on all materials etc., complete for finished item of work in all floors.( APSS No.126)

203.4

77

15720.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Bathukamma Ghat

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Pathway Area Interlocking Concrete Block Pavements using precast concrete blocks

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

216

285

61637.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

72

1557

112125.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

72

4961

357246

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including cost and conveyance of all materials and all labour charges etc, complete as per drawing and Technical Specification Clause 1504 MORD

720

635

457221.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Bathukamma Immersion Area using Ceramic Tiles

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

120

285

34243.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

60

1557

93438

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.Trackless Train Ride

60

4961

297705

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete for finished item of work. Trackless Train Ride

600

973

584280

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Construction of steps to Bathukamma Immersion Area

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

5.27

285

1503.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

8.41

4961

41728.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement - Steps

0.11

5809

639.01

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement - Side Wall on Side Beams to steps

0.49

5809

2846.48

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903) - Side Wall on Side Beams to steps

2.7

198

535.22

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-18:Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including cost of all materials and all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707)

11.45

2179

24952.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing MS Railing along the road side of Bathukamma Ghat

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Supply, fabrication and fixing in position of MS Railing of 2m x 1.5m using 40 x 40 x 4 mm size MS Tube as Horizontal member and 40 x 40 x 4 mm size MS Tube as Vertical members for outer Frame and 25 x 25 x 3.20 mm size MS Tube vertical members @ 100mm c/c, 3 Nos of 40 x 40 x 4 mm size MS Tube of 0.75m length with 0.15m long 25mm x 6mm MS strip as hold fast embedded in CC Bed including cost and conveyance of all material and all labour charges etc complete as per Drawing and as directed by the Engineer- in- charge.

14569.44

121

1771206.82

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing Greenery along the road side of Bathukamma Ghat

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.3.b of HMDA (FSR 2019-20 ), Pg.39- Hedge/shrub planting: Digging the trench of size 30cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and perticides etc., @ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @ 20 gms/pit/sqmt) and plant material

480

756

363115.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.6.a i of HMDA (FSR), Pg.40 -Ground Covers :Bed preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and river sand and application of fertilizers (@ 20 gms/pit/sqmt), smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation

480

305

146553.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Based on Item No.5.a of HMDA (FSR 2019-20), Pg.40-Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

320

194

62102.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Bathukamma Prototype Area development

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Excavation in ordinary soils, up to 3.00 m depth below GL by Manual means: Earthwork excavation in all kinds of soil for structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for constructing structures including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

1.23

285

350.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

1.8

1557

2803.14

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing P.C.C- M 10 grade concrete for plain/reinforced concrete ( Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

2.7

4961

13396.73

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 Nominal Mix (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement - Retaining Support & Steps

9.86

5809

57278.22

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). Steps

2.16

198

428.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-4-(102) : Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete for finished item of work.

18

937

16876.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-5-(103) : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc. etc., complete for finished item of work, including the cost and conveyance of all materials.Providing Retaining support for Fountain Tank (dia 2.5m)

7

1126

7884.38

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-CSTN-9-18:Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including cost of all materials and all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707)

47.46

2179

103426.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing Single arm decorative lighting post of 6mts height

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-ELEC-13.2.2: Fabrication and Supply of M.S. Poles for garden posts with 'B' class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap including cost and conveyance of all material including fixing of luminaire and labour charges etc., complete.

32

3169

101435.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;BLD-ELEC-13-4-6 : Erection charges for 6Mtrs. Long MS / GI Garden post including excavation of pit, concreting 1:3:6 and painting including cost and conveyance of all materials including fixing of luminaire and labour charges etc., complete.

32

2597

83109.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-8.13.1.b: Fabrication and erection of 16 SWG CRCA(1.6mm) sheet steel enclosure for power control cubicle panel / boxes etc., including cutting, bending drilling, welding and reveting etc., complete with cleaning with 7 tank process and painting with powder coating including cost and conveyance of all materials and labour charges.

6

6555

39333.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC.8.4.1.c: Fabrication, Transportation and supply of 1.50 Mtr Length Single Arm standard Bracket made with MS galvanized 48 / 50mm dia Pipe. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL / Lysaght pole / BPP / Surya

32

2158

69078.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-3.2.1.c: Supply and fixing of Automatic Street Light Control System based on daywise users settable mode of astronomical timer or digital timer with Optical Micro Sensor, Low voltage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ and shall withstand surge level of 8 KV. The electronic controller with IP 65 protection and suitable SMC / PC enclousure with IP 54 protection, MCBs of Legrand / Schneider / LK / Siemens / BCH of 10kA the load of 5KW Single phase load with necessary hardware, Allen key set and clamping arrangements with 3 years warranty. Makes : Nature switch / Light Mate / Havells

3

12213

36640.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-4.1.1 (F) : Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Payal / RR kable / Beljin / Ollvin / Finecab / RPG / V - Guard / Orbit / Fortune Arrt / Gemscab / Bonton / SPM / Unistar / Windsor/ Avocab / Pawancab / Nakoda / Suncab

1120

318

356294.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;ELEC-3.3.4.a : Supply and transportation of 12 W +/-10% (>= 1200 Lumens) back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI>80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro/ Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM / Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

64

1386

88710.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Rejuvenation of Water Bodies;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) NOTE : Whenever providing full length of electrode is not possible due to the obstruction of water tube / rock, the length of electrode may be reduced and additional earthing may be done to meet earth resistance.

1

6635

6635.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

4709.83

2664

12548248.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

130.83

1280

167518.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Core Area)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Sewer line (From Inspection Chamber to Manhole) Providing DWC100mm dia sewer lines from IC to main line manholes including lowering, Jointing, and road restoration, etc Complete.

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated earth/soils/ debris or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

1847.64

72

134508.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in T.G.,F.O.R. destination including, loading, unloading& stacking at site but excluding all taxes, as applicable.I.S.I mark H.D.-20 with 560mm dia clear opening

4203

3085

12969533.34

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars ( Fe 500/550/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors.( APSS No.126)

69712.64

77

5388089.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-12 : Plain Cement concrete (M15 Nominal Mix) :using 20mm graded metal using concrete mixer including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement - for base & channelling

316.23

7128

2254414.38

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-12 : Plain Cement concrete (M15 Nominal Mix) :using 20mm graded metal using concrete mixer including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcementfor ring of size 0.60 Mts inner dia, 100mm thick wall and 0.90 m height with nomonal reinforcement

555.17

23717

13167306.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

330.24

4666

1541054.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

2639.48

285

753203.15

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated earth/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

194.51

72

14160.33

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in T.G., F.O.R. destination including, loading, un-loading & stacking at site but excluding all taxes, as applicable.450mm x 600mm - HD-20 Manhole frame and cover

467

2786

1301519.66

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-11-Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate: coarse aggregate ) using 20mm graded size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work .

12.07

5809

70116.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:3) 20mm thick using SR Cement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete for inside walls of the Inspection Chamber.

637.46

317

202565.66

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-8-8 (83): External plastering with Cement mortar ( 1:3) 20 mm thick using OPCement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete For outside walls of the Inspection Chamber.

880.3

298

262593.49

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:5) prop with Flyash Cement solid blocks of size 225 x 100 x 60 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., complete with a compresive strength not less than 75 kg/sqm for Manhole Walls.

70.05

12014

841640.24

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

39.7

4666

185261.24

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1 -Manual means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by Manual means

277.87

285

79292.98

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Merged Villages)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated earth/soils/ debris or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

3834.19

72

279129.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in T.G.,F.O.R. destination including, loading, unloading& stacking at site but excluding all taxes, as applicable.I.S.I mark H.D.-20 with 560mm dia clear opening

8722

3085

26914173.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars ( Fe 500/550/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors.( APSS No.126)

144666.58

77

11181280.03

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-12 : Plain Cement concrete (M15 Nominal Mix) :using 20mm graded metal using concrete mixer including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement - for base & channelling

656.24

7128

4678325.53

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-12 : Plain Cement concrete (M15 Nominal Mix) :using 20mm graded metal using concrete mixer including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement - for ring of size 0.60 Mts inner dia, 100mm thick wall and 0.90 m height with nomonal reinforcement

1152.09

23717

27324589.74

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

685.3

4666

3197973.01

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Structures as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for structures including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Structures by manual means.

5477.42

285

1563035.43

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated earth/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

403.59

72

29381.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in T.G., F.O.R. destination including, loading, un-loading & stacking at site but excluding all taxes, as applicable. - 450mm x 600mm - HD-20 Manhole frame and cover

969

2786

2700583.62

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-11-Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate: coarse aggregate ) using 20mm graded size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work .

25.05

5809

145519.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:3) 20mm thick using SR Cement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete for inside walls of the Inspection Chamber.

1322.69

317

420311.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-8-8 (83): External plastering with Cement mortar ( 1:3) 20 mm thick using OPCement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete For outside walls of the Inspection Chamber.

1826.57

298

544865.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:5) prop with Flyash Cement solid blocks of size 225 x 100 x 60 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., complete with a compresive strength not less than 75 kg/sqm for Manhole Walls.

145.35

12014

1746358.45

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed

82.37

4666

384382.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1 -Manual means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by Manual means

576.56

285

164527.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Core Area)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Inspection Chambers Construction of Brick Masonry Inspection Chambers of size 450mm x 600mm & Precast Chambers of 600mm dia and 600 mm depth including frame and cover with HD-20

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, Supply, Delivery and fixing of FRP Circular Safety Grill for Manholes chambers to safe guard people from falling accidentally in to the manholes and also to avoid any untoward incidents. The Safety grills shall consists of FRP frame consisting of Isothalic resin with chak powder and covering the surfaces with a mixture of Isothalic Resin, Fiber glass mat, Accelerator, Catalyst and Wax. The grill shall consists of 24mm thickness and ribs at 60mm clear distance between the ribs in both directions. A MS Chain of 0.75 rmt which is covered by 15mm dia PVC rubber pipe is to be fixed to the one end of a FRP grill with a hook arrangement .Further a Set of 3 Nos of 16mm dia MS bar for a length of 630mm shall be bent in to hook shape with sharp edges and these MS hooks are also to be covered with FRP /Cement slurry lining. This FRP grills shall withstand a weight of 100 Kgs (Static load). The rate includes the cost of all the raw materials, Manufacturing, loading, unloading ,transportation, stacking and transit risk up to destination with all incidental and operational charges complete as directed by the HMWS&SB Engineers. (Manhole frame Manhole Safety grill suitable to 560mm dia clear opening of Manhole frame) - FRP Safety Grill for Manhole above 2.5m depth

234

1150

269100

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-ChargeMan holes of 1.50m dia and 2.40m depth (2.40m to 3.00m)1.50m dia manhole extra lift of 0.1m depth up to 3.00m

1170

3066

3587383.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-ChargeMan holes of 1.50m dia and 2.40m depth (2.40m to 3.00m)1.50m dia manhole 2.30m depth

234

61726

14444073.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 1.20m dia manhole extra lift of 0.1m depth up to 2.30m

1581

2639

4172401.29

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 1.20m dia manhole 1.65m depth

351

30789

10807219.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 0.90m dia manhole extra lifts up to 1.60m depth

4384

1374

6027956.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 0.90m dia manhole up to 1.10m

1753

17802

31208010.39

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Merged Villages)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, Supply, Delivery and fixing of FRP Circular Safety Grill for Manholes chambers to safe guard people from falling accidentally in to the manholes and also to avoid any untoward incidents. The Safety grills shall consists of FRP frame consisting of Isothalic resin with chak powder and covering the surfaces with a mixture of Isothalic Resin, Fiber glass mat, Accelerator, Catalyst and Wax. The grill shall consists of 24mm thickness and ribs at 60mm clear distance between the ribs in both directions. A MS Chain of 0.75 rmt which is covered by 15mm dia PVC rubber pipe is to be fixed to the one end of a FRP grill with a hook arrangement .Further a Set of 3 Nos of 16mm dia MS bar for a length of 630mm shall be bent in to hook shape with sharp edges and these MS hooks are also to be covered with FRP /Cement slurry lining. This FRP grills shall withstand a weight of 100 Kgs (Static load). The rate includes the cost of all the raw materials, Manufacturing, loading, unloading ,transportation, stacking and transit risk up to destination with all incidental and operational charges complete as directed by the HMWS&SB Engineers. (Manhole frame Manhole Safety grill suitable to 560mm dia clear opening of Manhole frame) - FRP Safety Grill for Manhole above 2.5m depth

285

1150

327750

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 1.50m dia manhole extra lift of 0.1m depth up to 5.00m

100

4172

417251

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 1.50m dia manhole 3.10m depth

20

82994

1659884

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 1.50m dia manhole extra lift of 0.1m depth up to 3.00m

1325

3066

4062635.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 1.50m dia manhole 2.30m depth

265

61726

16357604.65

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 1.20m dia manhole extra lift of 0.1m depth up to 2.30m

2797

2639

7381534.73

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 1.20m dia manhole 1.65m depth

621

30789

19120465.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 0.90m dia manhole extra lifts up to 1.60m depth

4466

1374

6140705.34

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-1-29.a : Construction of sewer conical manhole as per type design using Fly ash cement blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x 60 and brick masonary in CM (1:5) prop; including PCC M 10 bed for foundation and of PCC M15 prop; using 20mm HG graded metal for benching and channels, inside plastering 20 mm thick in single coat of Sulphate Resisting Cement CM (1:3) prop; and outside plastering 20 mm thick in single coat of OPC slag CM (1:3) prop; the foundation concrete in PCC M10 prop; using 20mm nominal size graded hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) and Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as directed by Engineer-in-Charge - 0.90m dia manhole up to 1.10m

1786

17802

31795497.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Core Area)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manholes for Trunk Lines Construction of Manholes of Various dia and different depths with Flyash Brick Masonry Manholes of size 0.9m Dia Manhole -1.10m to 1.60m depth, 1.2m Dia Manhole -1.60m to 2.30m depth, 1.5m Dia Manhole 3.00m to 5.00m depth and FRP Safety Grill for Manhole above 2.5m depth

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

2388.63

72

173892.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in T.G., F.O.R. destination including, loading, un-loading & stacking at site but excluding all taxes, as applicable.450mm x 600mm - HD-20 Manhole frame and cover

5735

2786

15983330.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate: coarse aggregate ) using 20mm graded size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.

148.23

5809

861090.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:3) 20mm thick using SR Cement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete for inside walls of the Inspection Chamber.

7828.28

317

2487592.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-8-8 (83): External plastering with Cement mortar ( 1:3) 20 mm thick using OPCement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete For outside walls of the Inspection Chamber.

10810.48

298

3224766.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:5) prop with Flyash Cement solid blocks of size 225 x 100 x 60 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., complete with a compresive strength not less than 75 kg/sqm for Manhole Walls.

860.25

12014

10335774.71

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

487.48

4666

2274840.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1 -Manual means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by Manual means

3412.33

285

973742.49

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Merged Villages)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

2372.38

72

172709.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in T.G., F.O.R. destination including, loading, un-loading & stacking at site but excluding all taxes, as applicable.450mm x 600mm - HD-20 Manhole frame and cover

5696

2786

15874638.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate: coarse aggregate ) using 20mm graded size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work .

147.22

5809

855223.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:3) 20mm thick using SR Cement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete for inside walls of the Inspection Chamber.

7775.04

317

2470674.46

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-8-8 (83): External plastering with Cement mortar ( 1:3) 20 mm thick using OPCement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete For outside walls of the Inspection Chamber.

10736.96

298

3202835.17

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:5) prop with Flyash Cement solid blocks of size 225 x 100 x 60 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., complete with a compresive strength not less than 75 kg/sqm for Manhole Walls.

854.4

12014

10265487.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

484.16

4666

2259347.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1 -Manual means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by Manual means

3389.12

285

967119.28

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Core Area)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manholes for Shallow Sewer Line Construction of Manholes with Brick Masonry of size 450mm x 600mm & Precast Chambers of 600mm dia and 600 mm depth including frame and cover with HD-20

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

3538.45

4666

16512283.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

3538.45

1557

5510428.19

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for road restoration works as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete

6124.13

285

1747581.74

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Restoration of Roads

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85 - 500mm dia DI D/F pipe for Highway crossing

15

1235

18526.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994) - 500mm dia DI D/F pipe for Highway crossing

80

508

40689.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers - 500mm dia DI D/F pipe for Highway crossing

80

10313

825056

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Railway crossing/Road crossing/Canal crossing by adopting trenchless technology tunneling work through specialized pipe jacking method by erecting the equipment to true to the alignment and gradient, by hydraulic pipe jacking technique complete including tunneling, excavation in all types of soils including hard rock and construction of RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other required materials but excluding cost of encasing pipe, in co-ordination with the concerned authorities as per approved drawings and directed by the Engineer-in ? Charge.Highway crossing using 1000mm dia casing with - MS Pipe -12mm thick.

240

69170

16600936.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing temporary UPVC Sewer house service connections by Supply, Delivery, laying and jointing of unplasticized Non-pressure polyvinyl chloride(PVC-U) pipes of dark (any shade of brown) for use in underground drainage & sewerage system conforming to IS 5328/2003) with solvent cement jointing as per specification inclusive of transportation to the sub-divisional stores anywhere in T.G, excluding Taxes., so as not to disturb the exisitng sewer connections excluding earth work excavation including Lowering, laying, jointing and testing to hydralic test pressure including cost of water with minimum water lead of 500m for UPVC pressure pipes in ready made trenches true to alignment and gradient including all sundries but excluding cost & conveyance of pipes from source of supply and jointing materials as per BIS No. 7634 - Part III - 1975. For 110 mm dia

289

265

76752.62

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing and restoration temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.25mm dia & restoration

130

345

44900.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing and restoration temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.20mm dia

289

264

76504.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing and restoration temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.15mm dia

404

229

92718

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site with in 50m lead and disposal of un serviceable materials in to municipal dumps excluding the cost of earth work excavation. (Reference to specifications BIS No.)200mm dia

29

78

2273.31

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site with in 50m lead and disposal of un serviceable materials in to municipal dumps excluding the cost of earth work excavation. (Reference to specifications BIS No.)150mm dia

43

73

3168.67

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site with in 50m lead and disposal of un serviceable materials in to municipal dumps excluding the cost of earth work excavation. (Reference to specifications BIS No.)100mm dia

58

66

3865.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of R.C.C./ AC Pipes including breaking the collars, loosing the joint, scraping the pipe, hoisting and keeping within a lead of 10 M but excluding earthwork excavation and refilling - 200mm dia

173

99

17182.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of R.C.C./ AC Pipes including breaking the collars, loosing the joint, scraping the pipe, hoisting and keeping within a lead of 10 M but excluding earthwork excavation and refilling - 150mm dia

231

90

20951.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of R.C.C./ AC Pipes including breaking the collars, loosing the joint, scraping the pipe, hoisting and keeping within a lead of 10 M but excluding earthwork excavation and refilling - 100mm dia

289

75

21680.78

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-URCI-19 : Uprooting the existing following sizes of CI/DI water supply mains by melting the lead loosening the joints, scraping the pipes, hoisting and transporting to a suitable distance as directed by the departmental officers but excluding earth work excavation and refilling including all incidental and operational charges etc., complete 150mm dia

58

138

8027.78

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-URCI-19 : Uprooting the existing following sizes of CI/DI water supply mains by melting the lead loosening the joints, scraping the pipes, hoisting and transporting to a suitable distance as directed by the departmental officers but excluding earth work excavation and refilling including all incidental and operational charges etc., complete 100mm dia

87

110

9623.07

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-URCI-19 : Uprooting the existing following sizes of CI/DI water supply mains by melting the lead loosening the joints, scraping the pipes, hoisting and transporting to a suitable distance as directed by the departmental officers but excluding earth work excavation and refilling including all incidental and operational charges etc., complete 80mm dia

116

96

11159.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Bailing out water from pipeline trenches with oil engine driven pumpsets of 5 HP capacity including hire charges, fuel charges and wages for driver and helper etc. complete as directed by the Engineer in charge including suction and delivery hose, lead of drain in to natural drain etc, complete.

57600

70

4052160

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Reinforced Cement Concrete / prestressed Concrete (Manual means)

346.8

2599

901648.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Cement Concrete M15 & M20 (Manual means)

346.8

940

326321.46

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

696

614

427921.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Earth or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

13575.7

72

988310.96

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Rock or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

4492.84

74

334267.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering the RCC NP3 S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 - 300mm dia RCC NP3 Sewer Lines

2195

263

578514.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture,supply and delivery of RCC S/S NP3 Pipes confirming to B.I.S. 458/2003 manufactured by using Sulphate resistant cement including inling with high alumina coating including loading, unloading and Transportation to work site but excluding GST - 300mm dia RCC NP3 Sewer Lines

2195

1918

4211546.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.250mm ID DWC Sewer Lines

3821

323

1237239.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.200mm ID DWC Sewer Lines

6874

261

1796244.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.150mm ID DWC Sewer Lines

8110

238

1934964.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.150mm ID DWC Sewer Lines

34410

238

8209881.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete.250mm ID DWC Sewer Lines

3821

937

3581499.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete.200mm ID DWC Sewer Lines

6874

568

3904981.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete.150mm ID DWC Sewer Lines

8110

380

3086747.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete.150mm ID DWC Sewer Lines

34410

380

13096790.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

12115.25

1557

18867078.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officers - Pipe line trenches above 2m depth and main road junctions

5776

225

1301563.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost and conveyance of all materials, labour charges and removal of shoring and shuttering at appropriate places as directed by the departmental officers with all incidental and operational charges etc, complete.Double staging from 2.5 to 4.50 Mts.

20216

55

1131893.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost and conveyance of all materials, labour charges and removal of shoring and shuttering at appropriate places as directed by the departmental officers with all incidental and operational charges etc, complete.Single staging for up to 2.50 Mts.

12129

51

629858.97

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) - upto 3.00 Mts. below GL (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge

1885.56

2323

4381683.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- (II-B) - Ordinary rock (not requiring blasting) -up to 3.00Mts. below GL by Mechanical means: Excavation in Ordinary Rock for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by mechanical means.

1885.56

161

305291.02

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;200.0

6

177042

1062252

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;700.0

6

657313

3943878

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply & delivery of Electromagnetic Flow meter, manufacturer should have ISO 9001:2008 certification and flow meter testing conforming to ISO 17025; Flow meter Tube: SS 304;Flanges: Carbon Steel as per DIN PN 10 or higher rating as per requirement; Liner: Hard Rubber or PTFE suitable for drinking water application; Grounding: Grounding Rings SS 304/Grounding Electrodes of material SS 316; Coil Housing and Junction Box: SS 304/Die Cast Aluminum/Carbon Steel with anticorrosive epoxy coating of minimum thickness 150 microns/ equivalent as per EN ISO-12944 standard (as per the site condition) ; Ingress Protection: IP 68 for sensor and IP 67 for transmitter; Flow Transmitter Accuracy: +/- 0.5% of the measured value for velocities 0.5 m/sec and above; Display: Digital LCD/LED (backlit LCD/LED) Display, Instantaneous flow, Bi- Directional flow and Totalized flow; Cable between Flow Head and Transmitter: Maximum 25 meters including PVC conduit; Surge Arrester: To be provided;Power Supply & Output: 230 V AC or 24 V DC as applicable to Site condition & 4-20 mA HART; Compatible to SCADA/WEB Based Data acquisition System; Flow meter test lab certification should be provided from NABL approved lab/FCRI ; Excluding all taxes with 5 years Warranty. (Make: M/s Krohne Marshall/Endress+Hauser/ Yokogawa/Siemens/ Emerson/ABB/or equivalent make)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Residual Chlorine analyser Output: 2 x 0(4) ... 20 mA oder 2 x 0 ... 5 V Display: Graphic OLED 128 x 64 pixel Electric Supply: 100 ... 240 V AC, 18 ... 36 V DC Operating temperature: 0-50 °C Dimensions (W x H x D): 160x130x70 mm (W x H x D) Protection Rating: IP 65 (NEMA 4X) Electromagnetic Compatibility: EN 61326 class B, 2004 /108 / EC Relay Contacts: 3 Relay outputs

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Contoller for PH,BOD,COD,TSS, Flow form EMF Outputs: 6 x (0) 4 ... 20 mA, 6 x Relays, Ethernet interface for remote access, Ethernet field busses Display: Graphic TFT Display; Resolution: 320 x 240 pixel; backlit Electric Supply: 100 ? 240 VAC (50/60 Hz), 24 V AC/DC Operating temperature: -4 °F ? 131 °F (-20 °C ? +55 °C) Housing Material: PC ? 20 % GF (polycarbonate with 20 % fiberglass) Protection Rating: IP 67 / corresponding to NEMA 4X (not for direct conduit connections). Conduits need to be connected with flexible adapters (CC-Box), respectively with adapters CC-PM Electromagnetic Compatibility: EN 61326-1, Class A; FCC Class A Integrated Overvoltage Protection: According to EN 61326-1 enhanced overvoltage protection

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Online BOD, COD, TSS analysers Measuring Principle: UV- Visible Absorption Range: BOD:0-500 PPM, COD:0-800 PPM, TSS:0-900 PPM Accuracy: ± 3% Compensation: 550 nm Pressure Limit: 0-1 Bar Cleaning: Ultrasonic Based Cleaning Mounting: Inside pipe / channel / tank MOC Of sensor: Titanium 3.7 Light Source: Flash lamp Protection Category: IP68 Operating Temperature: 0 to 45°C

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Online pH analysers Measuring method: Potentiometric Range: 0-14 Accuracy: ±0.2 Flow Rate: 0-3 m/sec Pressure Limit: 0-10 Bar Temperature Indication: Inbuilt Mounting: Inside pipe / channel / tank MOC Of sensor: V4A stainless steel 1.4571 Temperature Accuracy: ±0.5 °C Protection Category: IP68 Operating Temperature: 0 to 60°C

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply, Installation and commissioning of Online Continuous Effluent Monitoring System

3

1875000

5625000

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing Online Continuous Emission/Effluent monitoring System (OCEMS) for STP

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;TBSP-G.III-07:Supplying & Fixing Gunmetal Gate (GM peet) valve as per IS - 778 Class of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.(Bronze) - 65mm dia GI Pipe For Tanker Filling Point

3

7135

21405.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and Transportation of control panel for Three phase submersible motors up to 5 HP @ 220V 50Hz operating range between 80 to 240V including supply and fixing of Direct - on - Line LTLK / SIEMENS / CROMPTON make Volt meter and Ammeter with starting and running capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete.

3

17042

51126.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply, Transportation and Installation of 3HP Three phase open well ISI submersible motor pumpset.Makes: Texmo / CRI / KSB / Aryan Varsha /Lubi / Falcon

3

40560

121681.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;TBSP-G.I-13:S & F 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 with GI fittings such as elbows tees couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for GI bends union and GI connectors with checkout and socket Tata or Zenith make or equivalent

10.8

1102

11902.31

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Fabrication, Supply and fixing in position of MS Tube Vertical Support for Tanker filling Point with MS Tube of 50 x 50 x 2 mm as Vertical member and 40 x 40 x 2 mm for top and Bottom including cutting, bending, welding and one coat of red oxide primer and Painting with Synthetic enamil paint including all labour charges etc., complete for finished item of work as directed by the engineer incahrge.

37.02

121

4500.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron fittings conforming to IS:9523/2000 having dimentions as per table. the rates mentioned here under are for fittings, Zinc coated externally with inside mortar lining (with finishing as per class 13/ IS 9523/2000) including transportation and excluding taxes etc.DI Specials fittings for outlet Connection - 200 x 200 mm

120

151

18219.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for FOUNDATIONS, PLINTH, PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.For Pedestal

0.55

11561

6321.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for FOUNDATIONS, PLINTH, PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.For Footing

0.22

10821

2337.53

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-2 (19) Providing PCC Grade M10 concrete using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work complete as per drawings and technical specifications as directed by the Engineer in Charge.

0.11

5209

562.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-2-1 (9) - Ordinary Soil-Manual Means-Upto 3 m depth : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

0.65

285

184.91

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing Tanker Filling Point at Proposed STP for Reusing of Treated Water with Suitable pump set and Control Panel

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cost of valve chambers for For up to 250mm dia Sluice valves

6

6401

38410.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting away the surplus excavated material i.e.Earth from the site to a suitable distance of about 5.00 Km including loading, unloading , conveyance charges and dumping the carted material at the contractors cost, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

50.89

72

3704.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)150 mm dia CI D/F Sluice Valve for inlet,outlet and Scour

12

481

5781.96

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge - 150 mm dia CI D/F Sluice Valve for inlet,outlet and Scour

6

380

2285.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure150 mm dia CI D/F Sluice Valve for inlet,outlet and Scour

6

23221

139327.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and horizontals fixed at 25 cm c/c as per aprooved drawing and as directed by the departmental officers and painting both sides with anti corrosive paint two coats over one coat of primary coat including cost of all materials fabrication, welding transportation to site, all taxex and duties, fixing in position duly embodying in CC (1:1.5:3) prop., and all other incidental and operational charges etc., complete for finished item of work.

390

121

47412.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-9-5 - White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials - Outer walls above Ground level Total Qty

16.74

50

851.73

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-8-8-(83): Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). walls above Ground level

16.74

317

5319.47

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-6-4 - Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, , finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

134.25

195

26205.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-4-1-(34) Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) bars (Fe-500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work.( APSS No.126)

6988

77

540102.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including sales & other taxes on all materials,all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vicbrating,curing etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. , 402)with minimum cement content as per IS code for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 400 Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 400 Kgs/ Cum the defference in cost shall be deducted - Roof Slab

8.03

11992

96303.15

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-2-15 : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - Sump Walls

18.69

17211

321687.23

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-2-14: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth) - Base Slab & Haunch

14.29

10930

156203.42

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-2 (19) Providing PCC Grade M10 concrete using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work complete as per drawings and technical specifications as directed by the Engineer in Charge.Base slab

11.99

5209

62459.03

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Hard rock (blasting prohibited) - upto 3.00 Mts. below GL (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge

15.19

2323

35287.05

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;In ordinary soils, by Mechanical means: Earthwork excavation in all kinds of soil as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by mechanical means.

136.66

128

17524.55

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Construction of Sump at Proposed STP for Reusing of Treated Water

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Proposed (1DWF+2DWF+3DWF) 3KW capacity pumpsets to deliver discharge of each pump 11 LPS at a head of 21 mts.

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;STANDARD ACCESSORIES Supply, Delivery and Installation of Standard accessories including Power cable of PVC+Cu Supply, Length 5mtrs, Pedestal auto rail coupling of Cast Iron (CI), Single Rail GR Pipe of SS304 Length 10mrs and along with GRP coupler, lifting chain with bow shackles and control panel including auto transformer starter Including Suction pipe delivery pipe up to manifold suitable Valves, NRV, Pressure Gauge, Manifold etc.

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply, delivery, installation, testing and commissioning of Submersible sewage, Non clog vertical type pump suitable for working on Air filled Dry type motor, three phase, 50 Hz +/-3%, 415V +/- 10%, AC supply, 1500 RPM synchronous speed with 3 core flat copper cable from pump to starter panel with cable end terminations (4) all supports, clamps, pipe fittings along with mechanical seal, bearing bush, strainer, arrangements for lifting for maintenance, guide pipes etc. complete set & following M.O.C: Casing CI, SS CF8M impeller, Bronze: wearing ring & Bearing bush, TC mechanical seal, CS/S.S. bearing, S.S shaft with sleeve, SS strainer & MS motor body, including compatible panel board consisting of Auto Transformer Starter suitable for local & remote pump control application consisting of Auto Transformer (vacuum impregnated, air cooled having three (3) tapings at 50%, 65% and 80%), incomer MCCB / MPCB, overload relay and contactors as per Type Il coordination including digital MFM with RS 485 communication port, analogue type ammeter with selector switch, run hour meter, required protective relays & control accessories.

3

50000

1350000

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply, delivery, installation of Pump sets at Collection Well for Proposed STP

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)300mm dia Sluice Valves for 350mm dia pipes

3

780

2342.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge - 300mm dia Sluice Valves for 350mm dia pipes

3

1271

3814.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure

3

80774

242323.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, Supply and Delivery of Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) (ex-works) including loading, unloading, Transportation, stacking at site as directed by the departmental officers excluding Taxes

1152

151

174908.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.350 mm dia DI K9 pipe

20

816

16336.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).350 mm dia DI K9 pipe

90

295

26597.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K9 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K9 PIPES for 5.50 Mts working Length - 350 mm dia DI K9 pipe

90

7149

643473.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means. In ordinary soils, by Manual means for Pipe line Trenches where depth is < 1.5 times width

25.7

499

12833.81

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Laying of Pumping Mains at Collection Well for Proposed STP

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour charges for fabrication and fixing in postion etc,. Complete.ISMB 350 section beams for Pump house 37.5 Kg / 1 Rmt)

2122.2

121

257995.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply delivery and installation of mannually cleaned Stainless Steel bars ( SS 304 Grade) to fit in channels with angle of screen 60 degrees flows. Coarse Screen frame with SS Angle of 25x25x5mm and 20mm x 5mm SS flat bars with 25mm c/c distance and for Fine Screen frame with SS Angle of 25x25x5mm and 20mm x 5mm SS flat bars with 12mm c/c distance includiong cost and conveyance of all material installation, transportation all labour charges, fabrication charges etc complete and directed by Engineer - in charge

154.8

768

118962.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing impervious coat with C.M. (1:3) 20 mm thick laid when the roof slab is green with water proof compound @ 1kg/bag of cement finished smooth with a floating coat of neat cement including cost & conveyance of all materials etc complete for finished item of work complete as per SS - Collection well roof

35.84

598

21435.55

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;in accordance with IRR-PMW-3-18 : Providing two coats of painting 100 micron dry film thickness each coat to embedded parts / gates with cold applied coal tar epoxy paint of approved quality including removing rust, cleaning surface, cost of all materials, labour, scaffolding etc., all lifts.complete with all leads and all lifts.

437.14

263

115260.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:3) 20mm thick using SR Cement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete

437.14

317

138909.98

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars ( Fe 500/550/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors.( APSS No.126)

70827.4

77

5474249.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Roof Beams at 4.0 metres unsuppt ht.

10.95

13586

148767.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Floor Roof Slab 250 thick @9.0 m unsupp ht.

7.74

15149

117256.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Floor level Beams at 9.00mts

7.56

22884

173003.27

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Columns for Pump Room above 3.66 to 5.5m unsupp ht.

5.96

16527

98503.01

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Columns for Pump Girder Beam upto 3.66m above GL

11.86

14752

174966.43

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Columns for Pump Girder Beam from 0 to 4m Below GL

4.32

14752

63731.45

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Columns for Pump Girder Beam from 4 to 5m Below GL

1.08

14815

16000.34

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Columns for Pump Girder Beam from 5 to 6m Below GL

1.08

14877

16067.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Columns for Pump Girder Beam from 6 to 7m Below GL

1.08

14940

16135.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Columns for Pump Girder Beam from 7 to 8m Below GL

1.08

15002

16202.81

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Columns for Pump Girder Beam from 8 to 9m Below GL

1.08

15065

16270.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Columns for Pump Girder Beam from 9 to 10m Below GL

0.65

15127

9832.93

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges - Inlet Screen Channel walls at 0m to 2m Below GL

41.58

13250

550962.86

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges - Inlet Screen Channel walls at 2m to 4m Below GL

41.58

13250

550962.86

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges - Inlet Screen Channel walls at 4m to 5m Below GL

20.8

13317

277008.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges - Inlet Screen Channel walls at 5m to 6m Below GL

20.8

13384

278402.38

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges For Inlet Screen Channel at 5m to 6m Below GL

17.72

11065

196072.15

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Sidewalls from 0 to 3m Below GLFor Collection Well

43.9

14119

619828.93

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges For Collection Well

26.51

12504

331482.63

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Sidewalls from 4 to 5m Below GLFor Collection Well

26.51

12571

333259.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Sidewalls from 5 to 6m Below GLFor Collection Well

26.51

12638

335036.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Sidewalls from 6 to 7m Below GLFor Collection Well

26.51

12705

336813.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Sidewalls from 7 to 8m Below GLFor Collection Well

19.85

12368

245522.27

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Sidewalls from 8 to 9m Below GLFor Collection Well

33.09

12435

411504.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges- Sidewalls from 9 to 10m Below GL - For Collection Well

33.09

12502

413722.28

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RCC in M 30 Grade design mix using 20mm down graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, as per mix design for Fair degree of quality control) including cost and conveyance of all materials, machinery, all labour charges , machine mixing, vibration, curingand all incidental & operational charges etc. complete conforming to standard specification but excluding cost & conveyance of reinforcement and its fabrication charges Base Slab at 9 to 10m Below GL - For Collection Well

61.84

11333

700842

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-2 (19) Providing PCC Grade M10 concrete using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work complete as per drawings and technical specifications as directed by the Engineer in Charge.For Inlet Screen Channel

11.81

5343

63104.61

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-2 (19) Providing PCC Grade M10 concrete using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work complete as per drawings and technical specifications as directed by the Engineer in Charge.For Collection Well

20.61

5611

115652.19

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-2-8 (16) Providing HBG Stone Chips 2.36mm and below for Below lean concrete in foundations as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge Below lean concrete in foundations

32.42

1557

50487.67

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for pipe line trenches & building foundations by Mechanical Means as directed by Engineer-in-Charge from above 6 metres by Mechanical means

318.21

180

57287.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for pipe line trenches & building foundations by Mechanical Means as directed by Engineer-in-Charge from 3 to 6 metres by Mechanical means

485.12

146

71094.34

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for pipe line trenches & building foundations by Mechanical Means as directed by Engineer-in-Charge Upto 3 metres depth by Mechanical Means

485.12

128

62206.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Construction of Collection Well cum Pump House for Proposed STPs

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Making drainage connection from a drainage line in to an existing junction chamber/ inspection chamber/ manhole including fixing required specials as per site condition, making a hole in to the chambers if required, placing necessary pipes in the connection and making good the junction in and out of the chambers including cost of necessary cement, sand and aggregate etc., for complete work as directed by the Engineer in Charge - For House Sewer connection

5776

199

1154968.96

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Restoration of the road , Drain , House premises with Plain Cement concrete nominal mix M-15 grade using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work as directed by Engineer in Charge

2128.74

5550

11815363.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Restoration of Roads

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated earth/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

3958.58

72

288184.74

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and delivery of 110mm dia U-PVC Specials such as Bends, Elbows, Tees, Couplers etc including cost and conveyance of all materials and labour charges etc complete as directed by Engineer-in-Charge.110 mm dia - Coupler - UPVC Pipe fittings

5776

78

452780.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and delivery of 110mm dia U-PVC Specials such as Bends, Elbows, Tees, Couplers etc including cost and conveyance of all materials and labour charges etc complete as directed by Engineer-in-Charge.110 mm dia - Single Tee - UPVC Pipe fittings

5776

146

846530.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and delivery of 110mm dia U-PVC Specials such as Bends, Elbows, Tees, Couplers etc including cost and conveyance of all materials and labour charges etc complete as directed by Engineer-in-Charge.110 mm dia - Door Bend 87.5 Degree - UPVC Pipe fittings

5776

145

840003.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and delivery of 110mm dia U-PVC Specials such as Bends, Elbows, Tees, Couplers etc including cost and conveyance of all materials and labour charges etc complete as directed by Engineer-in-Charge.110 mm dia - Plain Bend 87.5 Degree - UPVC Pipe fittings

5776

113

656269.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply, & delivery of 110mm OD class (S 16.50) Unplasticized Non-Pressure Polyvinyl Chloride(PVC-U) pipes of dark (any shade of Brown) for use in underground drainage & sewerage systemr conforming to IS 15328/2003) with solvent cement jointing as per specification inclusive of transportation to any where in Telangana excluding all taxes and also Lowering, laying, jointing and testing to hydralic test pressure including cost of water with minimum water lead of 500m for UPVC pressure pipes in ready made trenches true to alignment and gradient including all sundries but excluding cost & conveyance of pipes from source of supply and jointing materials as per BIS No. 7634 - Part III - 1975.For 110 mm dia

23104

265

6135960.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

2495.23

1557

3885824.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for road restoration works as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete

3326.98

285

949385.87

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH in Cement concrete

389.88

777

303283.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

311.9

614

191767.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH -Brick Masonry in Cement Mortar

179.34

614

110266.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

1185.24

2664

3157786.59

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

62.38

1280

79874.87

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Merged Villages)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Making drainage connection from a drainage line in to an existing junction chamber/ inspection chamber/ manhole including fixing required specials as per site condition, making a hole in to the chambers if required, placing necessary pipes in the connection and making good the junction in and out of the chambers including cost of necessary cement, sand and aggregate etc., for complete work as directed by the Engineer in Charge

8263

199

1652269.48

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Restoration of the road , Drain , House premises with Plain Cement concrete nominal mix M-15 grade using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges for mixing, laying concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work as directed by Engineer in Charge

3045.33

5550

16902761.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Restoration of Roads

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated earth/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

5663.05

72

412269.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and delivery of 110mm dia U-PVC Specials such as Bends, Elbows, Tees, Couplers etc including cost and conveyance of all materials and labour charges etc complete as directed by Engineer-in-Charge.110 mm dia - Coupler - UPVC Pipe fittings

8263

78

647736.57

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and delivery of 110mm dia U-PVC Specials such as Bends, Elbows, Tees, Couplers etc including cost and conveyance of all materials and labour charges etc complete as directed by Engineer-in-Charge.110 mm dia - Single Tee - UPVC Pipe fittings

8263

146

1211025.28

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply, & delivery of 110mm OD class (S 16.50) Unplasticized Non-Pressure Polyvinyl Chloride(PVC-U) pipes of dark (any shade of Brown) for use in underground drainage & sewerage systemr conforming to IS 15328/2003) with solvent cement jointing as per specification inclusive of transportation to any where in Telangana excluding all taxes and also Lowering, laying, jointing and testing to hydralic test pressure including cost of water with minimum water lead of 500m for UPVC pressure pipes in ready made trenches true to alignment and gradient including all sundries but excluding cost & conveyance of pipes from source of supply and jointing materials as per BIS No. 7634 - Part III - 1975.For 110 mm dia

33052

265

8777950.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

3569.62

1557

5558963

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for road restoration works as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete

4759.49

285

1358167.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH in Cemnt concrete

557.75

777

433870.09

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

446.2

614

274338.38

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH -Brick Masonry in Cement Mortar

256.57

614

157744.57

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

1695.57

2664

4517449.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

89.24

1280

114266.98

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Core Area)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Laying of House Sewer lines from Inspection Chambers to Junction Chambers and direct connections from House to Inspection Chambers by providing UPVC 110mm dia sewer lines from Junction Chamber to Inspection Chamber including lowering, Jointing etc Complete as per site condition.

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated earth/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

2062.03

72

150115.93

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and fixing of 300 mm x 450 mm opening SFRC Frame and cover

5776

1400

8086400

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:3) 20mm thick using SR Cement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete for inside walls of the Junction Chamber.

4332

317

1376579.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-8-8 (83): External plastering with Cement mortar ( 1:3) 20 mm thick using OPCement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete For outside walls of the Junction Chamber.

6642.4

298

1981427.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-12: Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-15 (Cement : fine aggregate: coarse aggregate ) using 20mm graded size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement - CC benching at Bottom

77.98

5550

432797.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:5) prop with Flyash Cement solid blocks of size 225 x 100 x 60 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., complete with a compresive strength not less than 75 kg/sqm.

548.72

12014

6592788.49

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. CC Bed

343.67

4666

1603755.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1 -Manual means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Man Holes etc. by Manual means.

2062.03

285

588421.45

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Merged Villages)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated earth/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

2949.89

72

214752.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and fixing of 300 mm x 450 mm opening SFRC Frame and cover

8263

1400

11568200

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:3) 20mm thick using SR Cement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete for inside walls of the Junction Chamber.

6197.25

317

1969300.13

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-8-8 (83): External plastering with Cement mortar ( 1:3) 20 mm thick using OPCement including cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental, labour charges etc. complete For outside walls of the Junction Chamber.

9502.45

298

2834580.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-12: Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-15 (Cement : fine aggregate: coarse aggregate ) using 20mm graded size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement - CC benching at Bottom

111.55

5550

619148.78

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:5) prop with Flyash Cement solid blocks of size 225 x 100 x 60 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., complete with a compresive strength not less than 75 kg/sqm.

784.99

12014

9431477.03

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. CC Bed

491.65

4666

2294292.47

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1 -Manual means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Man Holes etc. by Manual means

2949.89

285

841780.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Core Area)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Junction Chamber Construction of Brick Masonry Junction Chamber of Size 300 x 450 mm with Frame and Cover as per site condition.

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Making drainage connection from a drainage line in to an existing junction chamber/ inspection chamber/ manhole including fixing required specials as per site condition, making a hole in to the chambers if required, placing necessary pipes in the connection and making good the junction in and out of the chambers including cost of necessary cement, sand and aggregate etc., for complete work as directed by the Engineer in Charge

4670

199

933813.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Earth or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

7565.4

72

550761.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Rock or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

2332.66

74

173550.28

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

1197.86

1557

1865419.59

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for road restoration works as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete

2994.64

285

854549.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Restoration of Roads

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.

28020

170

4775168.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete. For 100 mm dia

28020

215

6048677.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

9456.75

285

2698578.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

2269.62

2664

6046880.48

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

63.05

1280

80725.34

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Merged Villages)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Making drainage connection from a drainage line in to an existing junction chamber/ inspection chamber/ manhole including fixing required specials as per site condition, making a hole in to the chambers if required, placing necessary pipes in the connection and making good the junction in and out of the chambers including cost of necessary cement, sand and aggregate etc., for complete work as directed by the Engineer in Charge

9691

199

1937812.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Earth or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

15699.42

72

1142917.78

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Rock or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

4840.65

74

360144.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

2485.74

1557

3871045.24

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for road restoration works as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete

6214.35

285

1773327.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Restoration of Roads

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.

58146

170

9909241.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete. For 100 mm dia

58146

215

12551977.02

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

19624.28

285

5599983.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Water Supply System

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Laying of Distribution network in Unserved Areas with Habitation

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

334.45

1280

428243.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

2508.17

2664

6682442.09

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Cutting Water Bound Macadam/ Wet Mix Macadam road including soiling and stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

501.68

327

164154.71

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

21464.07

128

2752337.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

8943.36

285

2552077.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means. In ordinary soils, by Manual means for Pipe line Trenches where depth is < 1.5 times width

1788.67

499

893208.14

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;BLD-CSTN-2-11 - (Amendment as per SOR 2021-22) - Earth work excavation in hard rock (blasting prohibited) (Using Hydraulic Excavator with breaker attachment) upto 3m depth using hydraulic brakers for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete

3577.35

1012

3621744.91

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officersfor main roads in habitation area

5505

225

1240496.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)for Bedding of Pipe line

351.85

1557

547936.01

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) of 6 kq/sqcm (SDR-21) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete including stacking as directed by the departmental officers. 75 mm dia HDPE 6Kg/Cm2 pipe

695

163

113834.05

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) of 6 kq/sqcm (SDR-21) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete including stacking as directed by the departmental officers. 90 mm dia HDPE 6Kg/Cm2 pipe

841

234

197357.47

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) of 6 kq/sqcm (SDR-21) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete including stacking as directed by the departmental officers. 110 mm dia HDPE 6Kg/Cm2 pipe

35771

392

14057645.29

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) of 6 kq/sqcm (SDR-21) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete including stacking as directed by the departmental officers. 140 mm dia HDPE 6Kg/Cm2 pipe

370

572

211754.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) of 6 kq/sqcm (SDR-21) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete including stacking as directed by the departmental officers. 160 mm dia HDPE 6Kg/Cm2 pipe

7115

752

5356243.15

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) of 6 kq/sqcm (SDR-21) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete including stacking as directed by the departmental officers. 200mm dia HDPE 6Kg/Cm2 pipe

1721

1175

2023620.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure for Outer dia of pipes in mm. 75 mm dia HDPE 6Kg/Cm2 pipe

695

55

38690.65

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure for Outer dia of pipes in mm. 90 mm dia HDPE 6Kg/Cm2 pipe

841

65

55421.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure for Outer dia of pipes in mm. 110 mm dia HDPE 6Kg/Cm2 pipe

35771

80

2885646.57

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure for Outer dia of pipes in mm. 140 mm dia HDPE 6Kg/Cm2 pipe

370

102

37832.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure for Outer dia of pipes in mm. 160 mm dia HDPE 6Kg/Cm2 pipe

7115

110

784144.15

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure for Outer dia of pipes in mm. 200mm dia HDPE 6Kg/Cm2 pipe

1721

130

224865.86

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeBends for75 mm dia HDPE 6Kg/Cm2 pipe

50

142

7101

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeBends for90 mm dia HDPE 6Kg/Cm2 pipe

50

242

12100

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeBends for110 mm dia HDPE 6Kg/Cm2 pipe

50

316

15849.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeBends for160 mm dia HDPE 6Kg/Cm2 pipe

10

919

9191.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeBends for200mm dia HDPE 6Kg/Cm2 pipe

2

1792

3585.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeEnd caps for75 mm dia HDPE 6Kg/Cm2 pipe

50

61

3067.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeEnd caps for90 mm dia HDPE 6Kg/Cm2 pipe

50

81

4090

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeEnd caps for110 mm dia HDPE 6Kg/Cm2 pipe

50

94

4715

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeEnd caps for160 mm dia HDPE 6Kg/Cm2 pipe

10

227

2272.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeEnd caps for200mm dia HDPE 6Kg/Cm2 pipe

10

403

4033.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeLong neck pipe ends for75 mm dia HDPE 6Kg/Cm2 pipe

50

90

4544.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeLong neck pipe ends for90 mm dia HDPE 6Kg/Cm2 pipe

50

117

5851

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeLong neck pipe ends for110 mm dia HDPE 6Kg/Cm2 pipe

50

162

8123.5

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeLong neck pipe ends for160 mm dia HDPE 6Kg/Cm2 pipe

10

411

4112.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeLong neck pipe ends for200mm dia HDPE 6Kg/Cm2 pipe

10

749

7498.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeMS flanges to suit HDPE pipes for110 mm dia HDPE 6Kg/Cm2 pipe

144

189

27322.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeMS flanges to suit HDPE pipes for160 mm dia HDPE 6Kg/Cm2 pipe

28

371

10402.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeMS flanges to suit HDPE pipes for200mm dia HDPE 6Kg/Cm2 pipe

6

677

4062.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeTees for75 mm dia HDPE 6Kg/Cm2 pipe

75

148

11163

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeTees for90 mm dia HDPE 6Kg/Cm2 pipe

75

261

19598.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeTees for110 mm dia HDPE 6Kg/Cm2 pipe

75

311

23348.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeTees for140 mm dia HDPE 6Kg/Cm2 pipe

1

641

641.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeTees for160 mm dia HDPE 6Kg/Cm2 pipe

15

1107

16616.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeTees for200mm dia HDPE 6Kg/Cm2 pipe

4

2070

8280.28

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeReducers for110 x 160 mm

75

401

30108

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeReducers for160 x 180 mm

4

745

2981.24

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeElectro Fusion CouplersEF Coupler D110mm PE 100BK 4PIN

25

327

8180.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeElectro Fusion CouplersEF Coupler D160mm PE 100BK 4PIN

5

1119

5595.55

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.completeElectro Fusion CouplersEF Coupler D200mm PE 100BK 4PIN

1

1462

1462.23

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length100 mm dia DI K7 pipe For Road Crossing

37

1485

54945.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length100 mm dia DI K7 pipe For Road Crossing

44

1485

65340.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length100 mm dia DI K7 pipe For Road Crossing

1883

1485

2796273.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length150 mm dia DI K7 pipe For Road Crossing

375

2104

789000

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length200 mm dia DI K7 pipe For Road Crossing

91

2796

254521.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length150 mm dia DI K7 pipes

587

2104

1235048

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length200 mm dia DI K7 pipes

1908

2796

5336561.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length250 mm dia DI K7 pipes

2201

3719

8187653.97

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length300 mm dia DI K7 pipes

1396

4819

6727924.28

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K7 PIPES for 5.50Mts working length350 mm dia DI K7 pipes

10

6013

60137.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-100 mm dia DI K7 pipe For Road Crossing

37

56

2106.78

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-100 mm dia DI K7 pipe For Road Crossing

44

56

2505.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-100 mm dia DI K7 pipe For Road Crossing

1883

56

107218.02

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-150 mm dia DI K7 pipe For Road Crossing

375

92

34781.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-200 mm dia DI K7 pipe For Road Crossing

91

134

12270.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-150 mm dia DI K7 pipes

587

92

54444.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-200 mm dia DI K7 pipes

1908

134

257274.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-250 mm dia DI K7 pipes

2201

182

400978.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-300 mm dia DI K7 pipes

1396

235

328925.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-350 mm dia DI K7 pipes

10

295

2955.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-100 mm dia DI K7 pipe For Road Crossing

8

287

2298.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-100 mm dia DI K7 pipe For Road Crossing

10

287

2873.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-100 mm dia DI K7 pipe For Road Crossing

411

287

118096.74

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-150 mm dia DI K7 pipe For Road Crossing

82

382

31378.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-200 mm dia DI K7 pipe For Road Crossing

20

442

8845.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-150 mm dia DI K7 pipes

128

382

48980.48

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-200 mm dia DI K7 pipes

416

442

183984.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-250 mm dia DI K7 pipes

480

496

238430.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-300 mm dia DI K7 pipes

305

663

202404.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-350 mm dia DI K7 pipes

2

816

1633.62

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) (ex-works) including loading, unloading, Transportation, stacking at site as directed by the departmental officers excluding Taxes Total weight of Cast (spun) ductile iron fittings - Up to 500mm dia

12704.54

151

1928930.31

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) (ex-works) including loading, unloading, Transportation, stacking at site as directed by the departmental officers excluding Taxes Total weight of Cast (spun) ductile iron fittings - Above 500mm dia

8402.4

166

1395302.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure-DI. D/F Sluice valves of PN.16 class -100mm dia Sluice Valves PN 16 Class

72

14748

1061898.48

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure-DI. D/F Sluice valves of PN.16 class -100mm dia Scour Valves PN 16 Class

8

14748

117988.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure-DI. D/F Sluice valves of PN.16 class -150mm dia Sluice Valves PN 16 Class

14

23221

325097.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure-DI. D/F Sluice valves of PN.16 class -200mm dia Sluice Valves PN 16 Class

3

38587

115763.49

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure-DI. D/F Sluice valves of PN.16 class -250mm dia Sluice Valves PN 16 Class

7

53445

374118.85

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure-DI. D/F Sluice valves of PN.16 class -300mm dia Sluice Valves PN 16 Class ( for 300mm & 350mm dia pipes)

4

80774

323097.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Butterfly Valves with GGG40/SG 400/12 or Equivalent grade as per I.S.3896-part 2-1985 and subsequent revisions, Double eccentrically Disc., with renewable soft seal on the disc and Body seat face of stainless steel / nickel weld overlay, with powder or liquid Epoxy coating with minimum thickness of 250 microns applied on both body and disc inside and outside. Face to face dimensions as per AWWA C 504 or BS 5155 or IS:13095. Drilled as per IS: 1538/ISO-150 mm dia DI PN16

3

93066

279199.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge.-100mm dia Sluice Valves PN 16 Class

72

8651

622928.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge.-100mm dia Scour Valves

8

8651

69214.24

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge.-150mm dia Sluice Valves PN 16 Class

17

12204

207473.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge.-200mm dia Sluice Valves PN 16 Class

3

17307

51921.33

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge.-250mm dia Sluice Valves PN 16 Class

7

20602

144215.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge.-300mm dia Sluice Valves PN 16 Class ( for 300mm & 350mm dia pipes)

4

32964

131857.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge-100mm dia Sluice Valves PN 16 Class

72

224

16182

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge-100mm dia Scour Valves PN 16 Class

8

224

1798

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge-150mm dia Sluice Valves PN 16 Class

14

380

5333.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge-200mm dia Sluice Valves PN 16 Class

3

628

1885.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge-250mm dia Sluice Valves PN 16 Class

7

893

6251.63

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge-300mm dia Sluice Valves PN 16 Class ( for 300mm & 350mm dia pipes)

4

1271

5086

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)-100mm dia Sluice Valves PN 16 Class

72

321

23175.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)-100mm dia Scour Valves PN 16 Class

8

321

2575.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)-150mm dia Sluice Valves PN 16 Class

14

481

6745.62

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)-200mm dia Sluice Valves PN 16 Class

3

528

1586.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)-250mm dia Sluice Valves PN 16 Class

7

731

5120.15

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)-300mm dia Sluice Valves PN 16 Class ( for 300mm & 350mm dia pipes)

4

780

3123.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality. Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per requirement of the department DI Air Valves - PN-16 - Test Pressure -50mm dia Air Valve

24

36468

875236.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality. Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per requirement of the department DI Air Valves - PN-16 - Test Pressure -80mm dia Air Valve

4

48651

194604.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete. -50mm dia Air Valve

24

357

8589.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete. -80mm dia Air Valve

4

357

1431.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Providing temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.-15mm dia

550

229

126225

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Providing temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.-20mm dia

550

264

145596

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Providing temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.-25mm dia

275

345

94982.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Supply and fixing of precast RCC chambers having the size of 900 mm (clear) at bottom and 500 mm (clear) at top with tapered wall of thickness 100mm along with FRC cover (HD-20 with 500mm dia opening) and frame, laying in M20 grade concrete with reinforcement including cost and conveyance of material, labour charges, curing, centering charges etc., complete as per standard specifications and standard drawings and as directed by the Engineer in Charge for upto 200 mm dia valves.For up to 250mm dia Sluice valves and for revamping pipe lines

97

6401

620966.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Construction of Valve chambers of size (1.5mx1.5mx1.5m height- clear dimensions) with Reinforced Cement Concrete vertical walls of 150mm thickness and RCC slab of 100mm thick fitted with RCC man hole cover and frame, laying in M20 grade concrete with reinforcement including cost and conveyance of material, labour charges, curing, centering charges etc., complete as per standard specifications and standard drawings and as directed by the Engineer in Charge. -for 250mm dia to 350 Sluice valves

8

22329

178636.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Construction of Valve chambers of size (1.5mx1.5mx1.5m height- clear dimensions) with Reinforced Cement Concrete vertical walls of 150mm thickness and RCC slab of 100mm thick fitted with RCC man hole cover and frame, laying in M20 grade concrete with reinforcement including cost and conveyance of material, labour charges, curing, centering charges etc., complete as per standard specifications and standard drawings and as directed by the Engineer in Charge. - for 100mm dia Scour Valves

2

22329

44659.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Carting of surplus excavated Rock or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.Rock Qty (Including Rock,BT, and CC Cutting)

6419.97

74

477645.77

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Carting of surplus excavated Earth or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.EWE Qty (Inluding WBM,Earth,work Qty)

16628.09

72

1210524.95

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Laying of Feeder Mains

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

310.06

1280

397013.23

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

310.05

2664

826056.91

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Cutting Water Bound Macadam/ Wet Mix Macadam road including soiling and stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

155.03

327

50727.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

8058.37

128

1033324.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

537.22

285

153301.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means. In ordinary soils, by Manual means for Pipe line Trenches where depth is < 1.5 times width

1074.45

499

536548.1

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;BLD-CSTN-2-11 - (Amendment as per SOR 2021-22) - Earth work excavation in hard rock (blasting prohibited) (Using Hydraulic Excavator with breaker attachment) upto 3m depth using hydraulic brakers for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work, excluding dewatering charges etc as per SS - 20 B (APSS 308) as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete

537.22

1012

543886.9

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) - upto 3.00 Mts. below GL (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge

537.22

2323

1248397.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officersfor main roads in habitation area

3256

225

733707.04

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)for Bedding of Pipe line (for hard rock portions)

103.35

1557

160946.96

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K9 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K9 PIPES for 5.50 Mts working Length-100 mm dia DI K7 pipe

763

1485

1133062.63

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K9 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K9 PIPES for 5.50 Mts working Length-150 mm dia DI K7 pipe

516

2104

1085664

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K9 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers DI K9 PIPES for 5.50 Mts working Length-200 mm dia DI K7 pipe

499

2796

1395673.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-100 mm dia DI K7 pipe

763

56

43445.22

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-150 mm dia DI K7 pipe

516

92

47859

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994).-200 mm dia DI K7 pipe

499

134

67285.16

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-100 mm dia DI K7 pipe

166

287

47698.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-150 mm dia DI K7 pipe

113

382

43240.58

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.-200 mm dia DI K7 pipe

109

442

48207.43

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) (ex-works) including loading, unloading, Transportation, stacking at site as directed by the departmental officers excluding TaxesCast (spun ) ductile iron fittings Up to 500mm diaAdd extra for short Pipes & Bends, Specials,.Scouring arrangements& inter connections etc as per site condition Total weight of Cast (spun) ductile iron fittings - Up to 500mm dia

708

151

107495.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure-DI. D/F Sluice valves of PN.16 class -100mm dia Sluice Valves (including Scour Valves) PN 16 Class

3

14748

44245.77

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure-DI. D/F Sluice valves of PN.16 class -150mm dia Sluice Valves (including Scour Valves) PN 16 Class

1

23221

23221.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure-DI. D/F Sluice valves of PN.16 class -200mm dia Sluice Valves (including Scour Valves) PN 16 Class

1

38587

38587.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Swing Check Valves Slanted/Straight seated with metallic, corrosion proof and wear resistant seat faces resilient seat, Body and Disc of ductile cast iron GGG 40/SG 400/15 or GGG-50/ SG-500/7 or equivalent grade as per IS 3896 (part2) - 1985 and subsequent revisions. All the inside and outside of the body is to be coated with double coating of epoxy liquid. Drilled as per requirement of department. Specification and Dimensions as per I.S 5312 or equivalent codes. For PN- 16 - Test Pressure-100mm Dia PN 16

1

40974

40974.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Swing Check Valves Slanted/Straight seated with metallic, corrosion proof and wear resistant seat faces resilient seat, Body and Disc of ductile cast iron GGG 40/SG 400/15 or GGG-50/ SG-500/7 or equivalent grade as per IS 3896 (part2) - 1985 and subsequent revisions. All the inside and outside of the body is to be coated with double coating of epoxy liquid. Drilled as per requirement of department. Specification and Dimensions as per I.S 5312 or equivalent codes. For PN- 16 - Test Pressure-150mm Dia PN 16

1

68805

68805

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of DI D/F Swing Check Valves Slanted/Straight seated with metallic, corrosion proof and wear resistant seat faces resilient seat, Body and Disc of ductile cast iron GGG 40/SG 400/15 or GGG-50/ SG-500/7 or equivalent grade as per IS 3896 (part2) - 1985 and subsequent revisions. All the inside and outside of the body is to be coated with double coating of epoxy liquid. Drilled as per requirement of department. Specification and Dimensions as per I.S 5312 or equivalent codes. For PN- 16 - Test Pressure-200mm Dia PN 16

1

99494

99494.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge.-100mm dia Sluice Valves (including Scour Valves) PN 16 Class

3

8651

25955.34

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge.-150mm dia Sluice Valves (including Scour Valves) PN 16 Class

1

12204

12204.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge.-200mm dia Sluice Valves (including Scour Valves) PN 16 Class

1

17307

17307.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge-100mm dia Sluice Valves (including Scour Valves) PN 16 Class

3

224

674.25

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge-150mm dia Sluice Valves (including Scour Valves) PN 16 Class

1

380

380.94

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CISV-15 : Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge-200mm dia Sluice Valves (including Scour Valves) PN 16 Class

1

628

628.45

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)-100mm dia Sluice Valves (including Scour Valves) PN 16 Class

9

321

2896.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)-150mm dia Sluice Valves (including Scour Valves) PN 16 Class

3

481

1445.49

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-JCIF-5: Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.)-200mm dia Sluice Valves (including Scour Valves) PN 16 Class

3

528

1586.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality. Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per requirement of the department DI Air Valves - PN-16 - Test Pressure -50mm dia Air Valve

4

36468

145872.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete as directed by the Engineer in Charge-50mm dia Air Valve

4

357

1431.56

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Supply and fixing of precast RCC chambers having the size of 900 mm (clear) at bottom and 500 mm (clear) at top with tapered wall of thickness 100mm along with FRC cover (HD-20 with 500mm dia opening) and frame, laying in M20 grade concrete with reinforcement including cost and conveyance of material, labour charges, curing, centering charges etc., complete as per standard specifications and standard drawings and as directed by the Engineer in Charge for upto 200 mm dia valves.upto 250mm dia Sluice valves

5

6401

32008.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar.Existing Drains

48

614

29511.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH-Cement Concrete M15 & M20 (Manual means)

13

940

12232.35

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH-Reinforced Cement Concrete and prestressed Concrete (Manual means)

11

2599

28599.01

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) of 10 kq/sqcm (SDR-21) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete including stacking as directed by the departmental officers. -110 mm dia HDPE 10Kg/Cm2 pipe

9000

516

4650570

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) of 10 kq/sqcm (SDR-21) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete including stacking as directed by the departmental officers. -160 mm dia HDPE 10Kg/Cm2 pipe

2500

1102

2755700

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) of 10 kq/sqcm (SDR-21) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete including stacking as directed by the departmental officers. -200 mm dia HDPE 10Kg/Cm2 pipe

3000

1711

5135910

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure for Outer dia of pipes in mm. -110 mm dia HDPE 10Kg/Cm2 pipe

9000

80

726030

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure for Outer dia of pipes in mm. -160 mm dia HDPE 10Kg/Cm2 pipe

2500

110

275525

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure for Outer dia of pipes in mm. -200 mm dia HDPE 10Kg/Cm2 pipe

3000

130

391980

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Bends for-110 mm dia HDPE 10Kg/Cm2 pipe

12

316

3803.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Bends for-160 mm dia HDPE 10Kg/Cm2 pipe

3

919

2757.45

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Bends for-200 mm dia HDPE 10Kg/Cm2 pipe

4

1792

7171.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-End caps for-110 mm dia HDPE 10Kg/Cm2 pipe

12

94

1131.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-End caps for-160 mm dia HDPE 10Kg/Cm2 pipe

3

227

681.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-End caps for-200 mm dia HDPE 10Kg/Cm2 pipe

4

403

1613.32

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Long neck pipe ends for-110 mm dia HDPE 10Kg/Cm2 pipe

12

162

1949.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Long neck pipe ends for-160 mm dia HDPE 10Kg/Cm2 pipe

3

411

1233.87

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Long neck pipe ends for-200 mm dia HDPE 10Kg/Cm2 pipe

4

749

2999.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-MS flanges to suit HDPE pipes for-110 mm dia HDPE 10Kg/Cm2 pipe

24

189

4553.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-MS flanges to suit HDPE pipes for-160 mm dia HDPE 10Kg/Cm2 pipe

6

371

2229.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-MS flanges to suit HDPE pipes for-200 mm dia HDPE 10Kg/Cm2 pipe

8

677

5417.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Tees for-110 mm dia HDPE 10Kg/Cm2 pipe

18

311

5603.58

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Tees for-160 mm dia HDPE 10Kg/Cm2 pipe

5

1107

5538.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Tees for-200 mm dia HDPE 10Kg/Cm2 pipe

6

2070

12420.42

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Reducers for-110 x 160 mm

18

401

7225.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Reducers for-160 x 180 mm

5

745

3726.55

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Reducers for-160 x 180 mm

6

745

4471.86

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Electro Fusion Couplers-EF Coupler D110mm PE 100BK 4PIN

9

327

2944.89

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Electro Fusion Couplers-EF Coupler D160mm PE 100BK 4PIN

3

1119

3357.33

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work spot, stacking but excluding taxes and duties.etc.complete-Electro Fusion Couplers-EF Coupler D200mm PE 100BK 4PIN

3

1462

4386.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means. In ordinary soils, by Manual means for Pipe line Trenches where depth is < 1.5 times width Thrust Blocks for bends and specials

205.09

499

102415.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;BLD-CSTN-3-2 (19) Providing PCC Grade M10 concrete using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work complete as per drawings and technical specifications as directed by the Engineer in Charge. For bedding under thrust blocks for bends

23.67

5209

123303.18

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement For Anchor blocksfor Thrust blocks for bends

164.07

6499

1066330.31

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) bars (Fe-500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work.( APSS No.126)

9844.2

77

760858.22

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Carting of surplus excavated Rock or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.Rock Qty (Including Rock,BT, and CC Cutting)

1694.55

74

126074.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Carting of surplus excavated Earth or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.EWE Qty (Inluding WBM,Earth,and Thrust block Qty)

6645.06

72

483760.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains whereever required for complete work as directed by the Departmental officers.-100 mm dia DI K7 pipe

3

129

389.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains whereever required for complete work as directed by the Departmental officers.-150 mm dia DI K7 pipe

2

243

486.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains whereever required for complete work as directed by the Departmental officers.-200 mm dia DI K7 pipe

2

324

648.96

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacturing ,Supplying and errection of air valve gaurd cabins of size 0.90 x0.90 x 0.90 m made with 4 nos vertical and 8 nos horizontal MS flats of size 50x8 mm and 12mm dia MS round bars fixed at 10 cm c/c with door and locking arrangements as per approved drawing and as directed by the departmental officers and painting both sides with Anti corrosive paint two coats over one coat of red oxide primer coat including cost and conveyance of all materials, Labour charges for fabrication and fixing, welding, including cost of earth work excavation, fixing in position duly embodying in PCC M10 concrete (by 0.45 mts) and all other incidental and operational charges etc complete for finished item of work

4

11560

46242.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long 16mm dia cold twisted deformed steel Anchor rods with 0.75m length driven in to the hole drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials, machinary, labour, drilling and cleaning hole, driving Anchor rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts. For providing reinforcement to anchor bars over sheet rock, where excavation is not possible

64

447

28667.52

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Providing House service Connections

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.For pipe line

495.36

2664

1319772.79

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply & Delivery of MDPE pipe conforming to ISO 4427 Part-2 (or any equivalent Bureau of Indian Standards code) of PE-80 grade material along with all fittings, including cost of materials, manufacturing, loading, unloading, stacking, transit insurance, transportation to any where in Telangana but excluding GST.20mm OD(15mm ID)

16512

34

568838.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Lowering, Laying, jointing of MDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634 part-II/75 for HDPE pipes including earth work excavation, testing to hydraulic test pressure including cost of water with a water lead of 500m etc., complete, but excluding road cutting (BT/CC) charges., Complete.20mm

16512

49

825434.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Supply and Fixing Electro Fusion Tapping saddle complying with BS EN 12201-3-2011, PN 12.5 rating & WRAS approved raw material as per BS 6920, manufactured from virgin resin of PE-80/PE-100 having blue/black colour using food grade compounded raw material for usage in drinking water system and having working pressure of 10 bar. The cost shall include testing of all materials, labour, inspection charges, transportation upto site, transit insurance, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding of all taxesFor 110 mm OD HDPE pipes

2752

318

875466.24

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;House Service Connections (Regulating Brass Ferrule) The cost shall include testing of all materials, labour, Inspection charges, Transportation upto site, transit insurance, loading, unloading, stacking, providing and fixing etc. complete as specified and directed by departmental engineers, but excluding of all taxes for 1/2" connection

2752

162

447117.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type - 15 mm NB Size (TBSP-G.III-20)

2752

261

719125.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Supply and fixing of 15mm brass body CP finished bib tap of not less than 300 grams weight screw type (full turn) with internal/external threaded connection conforming to IS 8931 (TBSP-F.I-01)

2752

312

859834.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;S& F 15 mm Nominal Bore GI pipe light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour charges complete - for stand post (TBSP-G.I-01)

2752

229

631584

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Supply and Fixing of Compression Fittings shall comply with ISO 17885 ? 2015, PN-16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be WRAS Approved as per BS 6920 for effect on water quality intended for human consumption. Compression fittings should have moulded-in SS 304 threaded insert outlet with thread dimension conforming to IS 554/ISO 7. The cost shall include testing of all materials, labour, inspection charges, transportation up to site, transit insurance, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding all taxes. Compression Male/ Female threaded adapter with SS Insert D20mmx1/2"

2752

122

337670.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Supply and Fixing of Compression Fittings shall comply with ISO 17885 ? 2015, PN-16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be WRAS Approved as per BS 6920 for effect on water quality intended for human consumption. Compression fittings should have moulded-in SS 304 threaded insert outlet with thread dimension conforming to IS 554/ISO 7. The cost shall include testing of all materials, labour, inspection charges, transportation up to site, transit insurance, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding all taxes. Compression Male/ Female threaded elbow with SS Insert D20mmx1/2"

2752

126

347054.72

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Supply of magnetically coupled, multijet, inferential type, dry dial Class-B water meters (Screwed end) AMR compatible manufactured in accordance with ISO 4064 standards and its latest ammendments/IS 779/1994 and its latest ammendments and shall have ISI/EEC/MID pattern approval (valid life cycle certificate and IP 68 protection from FCRI, GOI). (excluding all taxes-with 3 years warranty) -for 15mm dia

2752

1512

4161629.44

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Installation of magnetically coupled, multijet, inferential type, dry dial Class-B water meters (Screwed end) AMR compatible manufactured including fixing charges etc complete as directed by the Engineer in Charge - 15 mm Dia

2752

249

687862.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Water Supply;Manufacture, Supply and delivery of Water Meter protection Box of PP blue colour : 510x260x255 mm including meter box body, cover, locking plate, locking stud, spring,locking pin, key for box and bracket , including earth work, PCC M10 grade, and fixing charges

2752

721

1985045.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Underground Sewerage System

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Laying of sewer lines of various diameters Supplying, laying and lowering of DWC -SN-8 Pipes up to 300mm dia and above RCC NP3 Pipes including earthwork excavation, Barricading, bedding etc Complete

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Core Area)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

301.87

1280

386526.42

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

8150.15

2664

21714200.14

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting Water Bound Macadam/ Wet Mix Macadam road including soiling and stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

458.66

327

150078.14

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

29802.26

128

3821543.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

14901.13

285

4252186.46

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.In ordinary soils, by Manual means for Pipe line Trenches where depth is < 1.5 times width

11175.85

499

5580884.21

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means where the depth is 1.5 times or more than the width

11175.85

627

7015975.11

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- (II-B) - Ordinary rock (not requiring blasting) -up to 3.00Mts. below GL by Mechanical means: Excavation in Ordinary Rock for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by mechanical means.

3725.28

161

603160.08

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) - upto 3.00 Mts. below GL (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge

3725.28

2323

8656842.92

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- (I-B-ii) - In ordinary soils from 3.00 Mts to 6.00Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

21965.6

146

3219058.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-ii ) In ordinary soils, 3.00 Mts to 6.00Mts. depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., completee for Pipe Line trenches by manual means where the depth is less than 1.5 times the width

10982.8

642

7051506.74

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-ii ) In ordinary soils, 3.00 Mts to 6.00Mts. depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means where the depth is 1.5 times or more than the width

10982.8

807

8864767.02

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- (II-B) - Ordinary rock (not requiring blasting) -3m to 6m depth GL by Mechanical means: Excavation in Ordinary Rock for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by mechanical means.

5491.4

161

889112.57

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) - 3.00 Mts to 6 mts below GL (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge

5491.4

2323

12760970.23

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost and conveyance of all materials, labour charges and removal of shoring and shuttering at appropriate places as directed by the departmental officers with all incidental and operational charges etc, complete. Single staging for up to 2.50 Mts.

17352

51

901089.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost and conveyance of all materials, labour charges and removal of shoring and shuttering at appropriate places as directed by the departmental officers with all incidental and operational charges etc, complete.Double staging from 2.50 to 4.50 Mts.

28924

55

1619454.76

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officers Pipe line trenches above 2m depth and main road junctions

8263

225

1861984.42

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

21599.75

1557

33637290.68

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete.150mm ID DWC Sewer Lines

34176

380

13007727.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete.150mm ID DWC Sewer Lines

6503

380

2475106.83

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete.200mm ID DWC Sewer Lines

16262

568

9238116.96

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply & delivery of (DWC) structured wall polyethylene / polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double wall) for non pressure sewage & Drainage application pipes of standard length 6m, grade conforming to IS 16098 (part-II:2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete.250mm ID DWC Sewer Lines

9080

937

8510865.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.150mm ID DWC Sewer Lines

34176

238

8154051.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.150mm ID DWC Sewer Lines

6503

238

1551550.77

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.200mm ID DWC Sewer Lines

16262

261

4249423.22

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering, laying of Class SN8 Double wall corrogated (DWC) piping system in into ready made trenches, laying true to line and level and perfect linking at joints, encasing the pipe alround with soft gravel, testing and commissioning, and giving necessary hydraulic test to the required pressure as per ISS etc complete for finished item of work.250mm ID DWC Sewer Lines

9080

323

2940104

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture,supply and delivery of RCC S/S NP3 Pipes confirming to B.I.S. 458/2003 manufactured by using Sulphate resistant cement including inling with high alumina coating including loading, unloading and Transportation to work site but excluding GST 300mm dia RCC NP3 Sewer Lines

7341

1918

14085176.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture,supply and delivery of RCC S/S NP3 Pipes confirming to B.I.S. 458/2003 manufactured by using Sulphate resistant cement including inling with high alumina coating including loading, unloading and Transportation to work site but excluding GST 350mm dia RCC NP3 Sewer Lines

1264

2447

3093222.88

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture,supply and delivery of RCC S/S NP3 Pipes confirming to B.I.S. 458/2003 manufactured by using Sulphate resistant cement including inling with high alumina coating including loading, unloading and Transportation to work site but excluding GST 400mm dia RCC NP3 Sewer Lines

4362

2817

12291243.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture,supply and delivery of RCC S/S NP3 Pipes confirming to B.I.S. 458/2003 manufactured by using Sulphate resistant cement including inling with high alumina coating including loading, unloading and Transportation to work site but excluding GST 450mm dia RCC NP3 Sewer Lines

860

3116

2680448

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering the RCC NP3 S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985-300mm dia RCC NP3 Sewer Lines

7341

263

1934793.96

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering the RCC NP3 S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985-350mm dia RCC NP3 Sewer Lines

1264

295

373512

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering the RCC NP3 S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985-400mm dia RCC NP3 Sewer Lines

4362

330

1443036.84

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Lowering the RCC NP3 S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985450mm dia RCC NP3 Sewer Lines

860

365

314338.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Rock or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

13442.69

74

1000136.14

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Carting of surplus excavated Earth or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

41272.56

72

3004642.37

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

990

614

608681.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Cement Concrete M15 & M20 (Manual means)

495.6

940

466334.82

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Reinforced Cement Concrete / prestressed Concrete (Manual means)

495.6

2599

1288515.4

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Bailing out water from pipeline trenches with oil engine driven pumpsets of 5 HP capacity including hire charges, fuel charges and wages for driver and helper etc. complete as directed by the Engineer in charge including suction and delivery hose, lead of drain in to natural drain etc, complete. Bailing of water in water logging areas

81600

70

5740560

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-URCI-19 : Uprooting the existing following sizes of CI/DI water supply mains by melting the lead loosening the joints, scraping the pipes, hoisting and transporting to a suitable distance as directed by the departmental officers but excluding earth work excavation and refilling including all incidental and operational charges etc., complete - 80mm dia

165

96

15873

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-URCI-19 : Uprooting the existing following sizes of CI/DI water supply mains by melting the lead loosening the joints, scraping the pipes, hoisting and transporting to a suitable distance as directed by the departmental officers but excluding earth work excavation and refilling including all incidental and operational charges etc., complete - 100mm dia

124

110

13715.64

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-URCI-19 : Uprooting the existing following sizes of CI/DI water supply mains by melting the lead loosening the joints, scraping the pipes, hoisting and transporting to a suitable distance as directed by the departmental officers but excluding earth work excavation and refilling including all incidental and operational charges etc., complete - 150mm dia

83

138

11488.03

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of R.C.C./ AC Pipes including breaking the collars, loosing the joint, scraping the pipe, hoisting and keeping within a lead of 10 M but excluding earthwork excavation and refilling - 100mm dia

413

75

30983.26

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of R.C.C./ AC Pipes including breaking the collars, loosing the joint, scraping the pipe, hoisting and keeping within a lead of 10 M but excluding earthwork excavation and refilling - 150mm dia

331

90

30021.7

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of R.C.C./ AC Pipes including breaking the collars, loosing the joint, scraping the pipe, hoisting and keeping within a lead of 10 M but excluding earthwork excavation and refilling - 200mm dia

248

99

24631.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site with in 50m lead and disposal of un serviceable materials in to municipal dumps excluding the cost of earth work excavation. (Reference to specifications BIS No.)100mm dia

83

66

5531.12

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site with in 50m lead and disposal of un serviceable materials in to municipal dumps excluding the cost of earth work excavation. (Reference to specifications BIS No.)150mm dia

62

73

4568.78

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site with in 50m lead and disposal of un serviceable materials in to municipal dumps excluding the cost of earth work excavation. (Reference to specifications BIS No.)200mm dia

41

78

3213.99

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing and restoration temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.15mm dia

578

229

132651

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing and restoration temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.20mm dia

413

264

109329.36

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing and restoration temporary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all incidental and operational charges etc., complete.25mm dia & restoration

186

345

64242.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and delivery of 110mm dia U-PVC Specials such as Bends, Elbows, Tees, Couplers etc including cost and conveyance of all materials and labour charges etc complete as directed by Engineer-in-Charge.110 mm dia - Plain Bend 87.5 Degree - UPVC Pipe fittings

8263

113

938842.06

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Supply and delivery of 110mm dia U-PVC Specials such as Bends, Elbows, Tees, Couplers etc including cost and conveyance of all materials and labour charges etc complete as directed by Engineer-in-Charge.110 mm dia - Door Bend 87.5 Degree - UPVC Pipe fittings

8263

145

1201688.09

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.In ordinary soils, by Manual means for Pipe line Trenches where depth is < 1.5 times width

5656.67

499

2824771.3

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

7542.23

285

2152250.75

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

15084.46

128

1934280.31

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting Water Bound Macadam/ Wet Mix Macadam road including soiling and stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

286.13

327

93624.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

5028.32

2664

13396802.13

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.

186.24

1280

238469.15

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;(Merged Villages)

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

5735.3

4666

26763949.51

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

5735.3

1557

8931582.69

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for road restoration works as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete

8159.94

285

2328520.48

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Restoration of Roads

1

-

-

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85 - 500mm dia DI D/F pipe for Highway crossing

15

1235

18526.2

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994) - 500mm dia DI D/F pipe for Highway crossing

80

508

40689.6

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers - 500mm dia DI D/F pipe for Highway crossing

80

10313

825056

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Railway crossing/Road crossing/Canal crossing by adopting trenchless technology tunneling work through specialized pipe jacking method by erecting the equipment to true to the alignment and gradient, by hydraulic pipe jacking technique complete including tunneling, excavation in all types of soils including hard rock and construction of RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other required materials but excluding cost of encasing pipe, in co-ordination with the concerned authorities as per approved drawings and directed by the Engineer-in ? Charge.Highway crossing using 1000mm dia casing with - MS Pipe -12mm thick.

240

69170

16600936.8

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;Providing temporary UPVC Sewer house service connections by Supply, Delivery, laying and jointing of unplasticized Non-pressure polyvinyl chloride(PVC-U) pipes of dark (any shade of brown) for use in underground drainage & sewerage system conforming to IS 5328/2003) with solvent cement jointing as per specification inclusive of transportation to the sub-divisional stores anywhere in T.G, excluding Taxes., so as not to disturb the exisitng sewer connections excluding earth work excavation including Lowering, laying, jointing and testing to hydralic test pressure including cost of water with minimum water lead of 500m for UPVC pressure pipes in ready made trenches true to alignment and gradient including all sundries but excluding cost & conveyance of pipes from source of supply and jointing materials as per BIS No. 7634 - Part III - 1975. For 110 mm dia PVC lines

413

265

109684.54

... More
Kosgi Municipality.Providing Infrastructure Developmental works. Under Ground Sewerage;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means where the depth is 1.5 times or more than the width

5656.67

627

3551144.29



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.