Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Civil And Construction
Excavation
Opening Date31 Jan 2022
Closing Date15 Feb 2022
Tender Amount₹ 2,58,60,990 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
NRPT Lake;Supply and fixing of Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2"(50mm x 50 mm) - 8 Gauge including cost of welding rods, power charges, and fixing in Position etc compelte.TBSC-E.II-04

1200

-

743040

... More
NRPT Lake;TBSP-G.I-12 - S& F 50 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour charges complete

480

-

275947.2

... More
NRPT Lake;Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm nominal size/ Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. R.C.C grade M 20 (Nominal Mix) using 20 mm Graded Metal (MORTH)

18.23

-

112050.15

... More
NRPT Lake;RBR-FNDN-4 I(i) -Providing PCC Grade M10 concrete using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH etc. complete for Wall Pedstal - 0.3 width pedestal of 0.45 height ( 0.15 below GL and 0.3 above GL)

81

-

382413.96

... More
NRPT Lake;RBR-FNDN-4 I(i) -Providing PCC Grade M10 concrete using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH -

31.05

-

140953.96

... More
NRPT Lake;Supply and filling with Stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH (As per Roads & Bridges Chap-11 Item No 2)

31.05

-

38385.87

... More
NRPT Lake;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

148.91

-

36210.44

... More
NRPT Lake;Providing Chainlink Mesh

1

-

-

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Fucaria(big)

10

-

3500

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Fucaria

22

-

4070

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Lantana

50

-

1000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Mandaram

10

-

500

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Plumiral Pudica

15

-

3000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Ganneru

15

-

300

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Eranthemum gold

50

-

2600

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Bottle Bush Golden(Big)

15

-

3750

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Tecoma(big)

10

-

1500

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Silver Croton

50

-

2600

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Golden Cyprus

20

-

17000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Durantho Gold

100

-

17000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Traveller palm

30

-

14400

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Royal palm

35

-

19250

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: X-Mas Tree

20

-

16000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Pagoda + Putranjaya

15

-

1800

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Ficus Gold

200

-

36000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Golden Bamboo

50

-

8900

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Gulfenia

300

-

30000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Ficus Black Mini

85

-

11475

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Red Night Queen

500

-

26000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Singapoor

500

-

14000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Terminalia Mentaly

35

-

16975

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Foxtail Palm

30

-

28500

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Bombay Border

350

-

18200

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Allamanda

550

-

28600

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Golden Bottle Bush

660

-

42900

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Ficus Black

150

-

42750

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Mini Nandhi Vardhanam

220

-

4400

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Bougain Villea

450

-

45000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Conocarpus

720

-

39600

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Spyder Lilly

180

-

18000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Pandanus

1500

-

75000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Duranta Gold

1200

-

48000

... More
NRPT Lake;Supply and delivery of Plant Material including cost of material,transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge: Akalifa

990

-

64350

... More
NRPT Lake;Based on Item No.6.a of HMDA (FSR), Pg.31 -Ground Covers : Bed preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and river sand and application of fertolizers (@ 20 gms/pit/sqmt), smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation.

587

-

203624.43

... More
NRPT Lake;CARPET GRASS-KOREAN / MEXICAN : Making lawns by Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4" thckness after rolling), Laying carpet grass and ramming and regular watering and removal of weeds , Protection etc for 45 days for initial establishment including the cost of red earth, sand and labour charges and the cost of fertlizers, chemical but excluding the cost of Grass etc,. complete as per standard practice.

400

-

254576

... More
NRPT Lake;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

1147.58

-

279057.03

... More
NRPT Lake;Providing Greenary, Landscaping

1

-

-

... More
NRPT Lake;RBR-CCPV-13 - i : Providing and Laying of Interlocking Concrete Block Pavements using PHOENIX or equivalent high strength Cement Concrete interlocking Regular Pavers of 60 mm thickness of M- 35 Grade for traffic areas confirming to IS 658:2006 in all shapes and design as Manufacturer Specification.

1800

-

936630

... More
NRPT Lake;Lowering 300 mm dia RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with Cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead upto 500 metres as per BIS No.783/85. (PH Sl.No. 11a)

40

-

14270

... More
NRPT Lake;Manufacture, Supply and Delivery of 300 mm dia NP2 class R.C.C. Spun / Vibrated Cast (Reinforced) Plain ended pipes conforming to B.I.S 458/2003,(Rate per Meter of effective length) including transportation for 5kms.

40

-

21359.6

... More
NRPT Lake;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

360

-

61938

... More
NRPT Lake;Supply of precast cc blocks of 1.00m x 0.45 x 0.115/0.150m size for kerbing made with rubberized moulds of M-20 grade hard granite machine crushed metal including cost and conveyance of all material like of precast kerbing blocks of 600mm length true to its alignment over foundation with M10 proportion of 100 mm thick as specified by the department to form divider/ median including pointing with cement mortar ( 1:3 ) prop. Cost and conveyance of all materials like cement, sand and water etc,. To site including curing and labour charges for mixing etc, complete.

1200

-

623436

... More
NRPT Lake;RBR-FNDN-4 I(i) -Providing PCC Grade M10 concrete using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH -

30

-

136187.4

... More
NRPT Lake;BLD-CSTN-2-8 (16): Collection ,Supply and filling of stone dust from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

180

-

222526.8

... More
NRPT Lake;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

255

-

62008.35

... More
NRPT Lake;Pathways - CC Kerb wall & Interlocking tiles

1

-

-

... More
NRPT Lake;TBSP-G.III-01:Supplying & Fixing Bronze Gate/Globe valve as per IS - 778 Class I , Indian Make, Heavy type of approved type including cost and conveyance of all materials & labour charges at all levels in all floors (Bronze) for25mm dia TBSP-G.III-11

5

-

6197.7

... More
NRPT Lake;TBSP-G.III-01:Supplying & Fixing Bronze Gate/Globe valve as per IS - 778 Class I , Indian Make, Heavy type of approved type including cost and conveyance of all materials & labour charges at all levels in all floors (Bronze) for40mm dia TBSP-G.III-18

2

-

3349.38

... More
NRPT Lake;TBSP-G.III-01:Supplying & Fixing Bronze Gate/Globe valve as per IS - 778 Class I , Indian Make, Heavy type of approved type including cost and conveyance of all materials & labour charges at all levels in all floors (Bronze) for50mm dia ( TBSP-G.III-19 )

3

-

7965.54

... More
NRPT Lake;TBSP-G.I-12,11 & 09: Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work - 25mm dia GI pipe

250

-

85495

... More
NRPT Lake;TBSP-G.I-12,11 & 09: Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work - 40mm dia GI pipe

90

-

48263.4

... More
NRPT Lake;TBSP-G.I-12,11 & 09: Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work - 50mm dia GI pipe from Bore well to Sheds

140

-

80484.6

... More
NRPT Lake;Installation, Testing, Trail Run and Commissioning of Submersible Pumps set with all accessories as per the standard specifications.

1

-

2450

... More
NRPT Lake;Supply and Delivery of 12" long GI NIPPLE including cost and conveyance, all labour charges etc., complete - 50mm dia

1

-

70

... More
NRPT Lake;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick masonry chamber of 450m x 450m x 400mm with R.C.C.Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as perIS specifications 732/1982 (Part II)

1

-

5525.1

... More
NRPT Lake;Supply and Delivery of MS Angular Stand for fixing of control Panel Board - MS Angular stand consisting of L Angles of size 40mm x 40mm x 5mm with 2 nos. 6'long verticals and 3 nos. - 2 1/2' long horizontals. The two legs of the stand firmly fixed in Cement Concrete bed in CC (1:2:4) prop. of size 1m x 0.3m x 0.2m depth below Ground Level. including cost and conveyance, all labour charges etc., complete

1

-

800

... More
NRPT Lake;ELEC-5.13.5 : Supply & fixing of 150mm Dia MS Galvanised Bore Cover including cost and conveyance, all labour charges etc., complete

1

-

231.77

... More
NRPT Lake;TBSP-G.III-19 : Supplying & fixing Bronze Vertical Check (Non return) Valve as per IS-778 I-class heavy duty - 40 mm NB Size including cost and conveyance, all labour charges etc., complete.50mm dia

3

-

7566.75

... More
NRPT Lake;Manufacture, Supply and fixing of Galvanised Mild steel couplings of the fallowing sizes including cost and conveyance of material and all labour charges etc,. Complete - 50mm dia

1

-

72

... More
NRPT Lake;Supply delivery and fixing of Gate Valves leaded in tin bronze screwed internal bends, screwed on bonnet internal seat design to IS 778/ 84 with its ammendments class -1, Indian Make Heavy Type of sizes ISI Marked including cost and conveyance, all labour charges etc., complete - 50mm dia

1

-

4285.56

... More
NRPT Lake;Supply and delivery of 50mm dia MS threaded Flanges set (2Nos) of 150mm dia OD 12mm thick of each Flange with 4 Nos 15mm dia bolts and nuts including Cost and Conveyance of all materials, all labour charges etc, complete

1

-

329.48

... More
NRPT Lake;Supply, Transportation and fixing of 50mm dia, 450mm length, 12mm thickness and 75mm wide MS Clamp set with required nuts and bolts at site of work for pump installation including cost and conveyance of all materials, etc, complete.

1

-

369.25

... More
NRPT Lake;Supply and delivery of Galvanised Mild steel bends heavy duty " C" class threaded at both ends at site of work for pump installation including cost and conveyance of all materials, and etc, complete - 50mm dia 900 bends with arm length of 25Cm

2

-

200

... More
NRPT Lake;Manufacture, supply, & delivery of 16Kg/Sqcm 40mm dia Polyethylene pipes (PE-100 grade) for water supply conforming to IS 4984 - 1995 including transportation to any where in T.G etc., complete.

300

-

31017

... More
NRPT Lake;ELEC-1.6.3 : Supply and delivery of PVC insulated and PV sheated flexible 3 core 2.50 sqmm flat type submersible cables suitable for submersible pumpsets conductors composed of ennealed high conductivity copper wire, conforming to IS 694 with its revisions and ammendments from time to time and delivery at site of installation of pumpset including freight and transit. Makes : Finolex / RR Kabel / Havells / KEI /L&T - 3 core 2.50 Sqmm cable, for bore wells ;

315

-

39082.05

... More
NRPT Lake;Supply and delivery of 20 mm dia FRPP Flexible Conduit Pipe to encase the submersible cable Make: Precision or its equivalet

15

-

221.55

... More
NRPT Lake;ELEC-5.10.2 : Supply and Transportation of control panel for three phase submersible motors up to 5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete.

1

-

12427.21

... More
NRPT Lake;Supply and delivery,of submersible pumpsets suitable to 150mm dia Borewell coupled with motors 3 Phase 2880 RPM 400V(-15%+10% range-340 to 440 Volts) of reputed make with minimum overall efficiency of 40% at the duty point with Radial / mixed flow with a trail run of One week.The pumpset should confirm to IS 8034/2002 & 9283/1995 with up to date amendments with ISI mark and a guarantee period of 18 months from the date of installation. The rates are inclusive of , transportation, installation, errection of pumpsets including accessories etc, complete. Makes:Texmo / CRI / KSB / Aryan Varsha / Lubi -5.00 HP capacity- 6-12 Stage

1

-

39620.96

... More
NRPT Lake;Supplying and fixing of 160mm dia PVC Casing pipe of 6kg/cm2 including cost and conveyance, all labour charges

70

-

39367.3

... More
NRPT Lake;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time - above 90.00m depth

210

-

113952.3

... More
NRPT Lake;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time - Point No.1 - up to 90.00m depth

90

-

45646.2

... More
NRPT Lake;Bore well & Pumpset

1

-

-

... More
NRPT Lake;Lowering, Laying, jointing of PVC/HDPE/MDPE 50mm dia pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634 part-II/75 for HDPE pipes including earth work excavation, Complete.

1900

-

101460

... More
NRPT Lake;Supply and Transportation of Outer dia 50mm and Inner dia 38mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II with all accessories like couplers, bends, end caps, Ts etc., complete.

1900

-

196441

... More
NRPT Lake;Supply and fixing of suitable out door feeder pillar box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board, suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schneider make 40A 4 Pole Isolator as incomer, 6 Nos 6-32A SP MCBsas out goings, indication lamps, din channel, 6 Sq.mm 3 core copper cable for individual light control, connectors, bus bars, shroudings, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch.

9

-

229692.06

... More
NRPT Lake;ELEC-7.16.5 ( SoR ) : Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

9

-

49725.9

... More
NRPT Lake;ELEC-3.5.1.b : Supply of Automatic Street Light Control System with Optical Sensor, Low volatage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs and contactor suitable to control the load of 3 KW of single phase load with necessary clamping arrangements. Makes : Swadeep Nature Switch / Light Mate / L&T / Siemens / Bajaj

9

-

121323.78

... More
NRPT Lake;BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 3 Pole, 25kA, MCCB with thermal magnetic setting / Microprocessor based release arrangement with all connections etc., complete on existing panel.

3

-

32043.72

... More
NRPT Lake;BLD-ELEC-4-1-3 Supply and erection of Panel mounting cubical type 125A TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel.

3

-

20424.33

... More
NRPT Lake;BLD-ELEC-14-1-2 :Supply, Transportation, fabrication and erection of following guage CRCA sheet steel enclosure for power control cubicle panel / boxes etc., including cutting, bending drilling, welding and reveting etc., complete with cleaning with 7 tank process and painting with powder coating including cost and conveyance of all materials and labour charges - 1 No of 0.9m x 1.20m size Box

3.24

-

15975.57

... More
NRPT Lake;ELEC- 1.5.7.u : Supply of 10 Sqmm 4 core PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable as per IS 7098 / Part-I / 1988 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells / Polycab / RPG / KEI / Gloster / V-Guard

400

-

223596

... More
NRPT Lake;ELEC-4.1.2.b : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade armoured Alluminium cable as per specification confirming to IS:7098 (Part- I). Makes : RPG / V-Guard / Fortune Art / Suncab / Finecab / Gemscab / Payal / Orbit / RR Kabel.

1500

-

211320

... More
NRPT Lake;BLD-ELEC-3-1-2 Supply and run of 1 of 22/0.3mm (1 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / V-Guard.

900

-

30222

... More
NRPT Lake;ELEC-1.5.9 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

375

-

34590

... More
NRPT Lake;ELEC-3.11.4 - Supply and transportation of 150 W (15000 LUMENS) LED Flood light Luminaire made of pressure die cast aluminum housing with powder coated, having toughened glass cover, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66 )protected, wide operating voltage range , P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor must furnish the manufacturer warranty letter, LM 79 and LM 80 certificates.

16

-

295362.72

... More
NRPT Lake;ELEC-3.9.20 - Supply and Transportation of 45 W Back lit, 2' x2' (600mm x 600mm) Recessed / Surface mounted LED luminaire made of CRCA sheet housing with powder coated with high efficiency acrylic wide diffuser, with wide operating voltage range, Power factor > 0.9,Surge protection >2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification LUMINAIRE MAKE : Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec / FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

75

-

352774.5

... More
NRPT Lake;SoR-ELEC-2-13-1 : Supply of 6-32A DP MCB 10KA, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree.

75

-

64590

... More
NRPT Lake;BLD-ELEC-4-1-1 : Supply and erection of Panel mounting cubical type 30 / 32A TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel.

75

-

151272

... More
NRPT Lake;BLD-ELEC-13-5-2 ; Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet box with hinged door and locking arrangements and din channel for fixing 2Nos MCBs duly powder coated with matching colour of poles including fixing with necessary arrangments etc., complete.

75

-

107243.25

... More
NRPT Lake;ELEC-7.11.3 - Foundation and erection charges with special T&P, for 9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.60Mtrx0.60Mtrsx1.40 Mtr size M20 cc work vibrated concreting mixing with necessary steel (15kgs) reinforcement as directed by the field engineers during execution including centering, decentering, water curing as required, soil excavation, back filling, muffing removal and coil earthing including all labour charges and cost and conveyance of materials etc. complete.

75

-

563672.25

... More
NRPT Lake;Fabrication, Transportation and supply of hot-dip galvanized PU Paint finish Curved Octagonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft Including Supply of 0.2M long Single arm bracket, IS 2062 for base plate with door opening arrangement, including the supply of suitable boards with Bakelite sheet and MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 9 Mtrs Mounting height Curved Pole having dimensions Bottom 180mm,. Top 85mm with 3mm thick, base plate 400 x 400 x 20mm and 4 Nos of M24 x 750 long 'J' bolts along with templates.

75

-

2573379.75

... More
NRPT Lake;ELEC-7.7.1 - Earth work excavation with an approximate quantity of 4.0 Cum for erecting of 12 Mtrs high mast and refilling with a quantity of 0.53 Cum of PCC 1:4:8, 1.50 Cum M 20 grade concrete and (80 Kgs) reinforced steel of 12mm / 10mm /8mm, Soil bearing capacity of 10 T/Sqm, Anchor plate with cost and conveyance of all above materials including labour charges for erecting of High Mast and Carriage etc complete including soil testing.

4

-

134088.44

... More
NRPT Lake;ELEC-7.5.1 - Fabrication, transportation, and supply of 12 Mtrs Polygon High Mast with single section of 3mm thick of Bottom 360mm and Top 150mm dia with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate, having a base plate of size 520mm dia 16mm thick with its accessories. Mast shall be in single section for 12 Mtrs . Mast shall be hot dip galvanized and suitable for wind velocity of 180 KMPH as per IS 875 part 3 including head frame, 2 point suspension system with steel rope 6mm dia (7/19) construction double drum winch / power tool , and necessary cable trailer connections and single speed motor with M 24 x 800 mm foundation bolts of required quantity, suitable for 6 luminaires with GLS type aviation twin lamp.

4

-

505814

... More
NRPT Lake;Providing Lighting and illumination

1

-

-

... More
NRPT Lake;BLD-CSTN-12-12-(197): Painting with Synthetic Enamel paints - Two Coats - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

1775

-

204444.5

... More
NRPT Lake;Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour charges for fabrication and fixing in postion etc,. Complete.

30000

-

3817500

... More
NRPT Lake;BLD-CSTN-10-4-(127); Supplying and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (up to a pitch of 600) etc., complete, excluding the cost of purlins, rafters, trusses including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work in all floors.

104.4

-

76740.26

... More
NRPT Lake;Supply and Fixing in position of steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows etc, including cost and conveyance of all material , labour charges for fabrication and fixing in postion etc,. Complete. MS Railing work

31570.54

-

3335743.26

... More
NRPT Lake;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

340.37

-

179371.59

... More
NRPT Lake;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

68.25

-

11742.41

... More
NRPT Lake;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

7462.15

-

635178.21

... More
NRPT Lake;Flooring with soluble salt/ stain free porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8- 10 mm 1st quality conforming 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, including the cost and conveyance of all materials.

63.75

-

66746.89

... More
NRPT Lake;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

42

-

20154.12

... More
NRPT Lake;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

6.63

-

42855.52

... More
NRPT Lake;BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

20.54

-

107176.69

... More
NRPT Lake;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

20.77

-

84082.36

... More
NRPT Lake;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Roof Slab 150mm thick- GF @3.3m level

6.75

-

81773.69

... More
NRPT Lake;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Beams

6

-

82936.26

... More
NRPT Lake;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted - Columns

6.52

-

88796.01

... More
NRPT Lake;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - Plinth Beams

4.97

-

68872.07

... More
NRPT Lake;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - Pedestals

5.83

-

64032.81

... More
NRPT Lake;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted - Footings

23.17

-

239357.69

... More
NRPT Lake;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

37.36

-

182047.43

... More
NRPT Lake;RBR-FNDN-2: Collection, Supply and filling with Gravel from approved quarry to work site, in low lying areas as per drawing and technical specification, including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH.

42.39

-

14656.34

... More
NRPT Lake;Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper etc, complete,

360

-

22618.8

... More
NRPT Lake;BLD-CSTN-2-1 (9):Earthwork excavation in all kinds of soil by machinery for foundation as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete Mechanical Means

208.01

-

22146.82

... More
NRPT Lake;Platform for Ganesh Nimajjan and Bathukamma Steps

1

-

-

... More
NRPT Lake;RBR-FNDN-2: Collection, Supply and filling with Gravel from approved quarry to work site, in low lying areas as per drawing and technical specification, including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH.

231

-

79868.25

... More
NRPT Lake;Carting of surplus excavated earth and other material from the site to a distance suitable with a lead of 5 Kms including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

671.95

-

45289.26

... More
NRPT Lake;TBSC-T.I-15 : Saw cut joints for freshly laid concrete pavement including all material and labour charges

1583

-

129489.4

... More
NRPT Lake;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work.

3080

-

231000

... More
NRPT Lake;RBR-CCPV-5: Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

462

-

3148774.86

... More
NRPT Lake;RBR-FNDN-4 I(i) -Providing PCC Grade M10 concrete using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH -

235.2

-

1067709.22

... More
NRPT Lake;RBR-SBBS-10 (II-i) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. (R&B and Urban Area works)

798

-

1796162.34

... More
NRPT Lake;RBR-SBBS-1 Construction of granular sub-base by providing well graded material / Close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller 8 tonne to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH. For Grading VI material

649.6

-

1206502.08

... More
NRPT Lake;RBR-EECD-8(c): Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge- (Hydraulic Excavator)

1344

-

95155.2

... More
NRPT Lake;CC Road

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.