Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Works
Opening Date19 Aug 2023
Closing Date28 Aug 2023
Tender Amount₹ 1,55,52,503 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

16.88

6296

106246.69

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.

8.44

4514

38090.93

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-SBBS-1 Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost,and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

11.85

1848

21908.04

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.

23.7

76

1806.18

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading,unloading etc complete

121.6

1228

149385.6

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

9.12

382

3485.66

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 16mm MS square bars Vertically at 100mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. for 3.00m & above 3m span gates

270

126

34171.2

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-12-(197): Painting with Synthetic Enamel paints - Two Coats - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

72

81

5887.44

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing of M.S grill for Compound wall with M.S Tubes & MS pipes welded as per type design including cost and covneyance of all mateirals ,hire charges of Machinery, electrical etc , Labour charges for Fabrication, Fixing grills etc complete for finished item of work.

2520

132

332690.4

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-3-(170) ; Painting Walls with approved Water Proof Cement Paint over Priming Coat, One Coat (All Colours) making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.

107.04

191

20519.57

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , curing etc., complete for finished item of work with nomonal reinforcement

4.01

5736

23003.51

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

107.04

546

58453.47

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Brick masonry in C.M (1:6) prop. using 2nd class modular size bricks of locally available size of 23x11x7cm including cost and cost conveyance of materials to site, mixing of cement mortar to specified thickness, watering, curing, including all scaffolding, hire and operational charges of machinary, all labour charges and all water lead charges etc complete for finished item of work. (230mm thick walls)

12.04

8053

96969.08

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying, fitting and placing HYSD (Fe 500) bar reinforcement in foundation complete as per drawings and technical specifications of Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) (from Primary Producers like Tata, SAIL, VSP, Jindal & Shyam Steel etc.,) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., for finished item of work. ( APSS No.126).

2194.3

86

190794.39

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. For RCC Columns Below & Above Gl

7.64

9531

72823.18

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. For Plinth Beam

6.9

13319

91905.72

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. For Footings

15.61

10314

161002.94

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Plain cement concrete M10 using 20 mm graded size hard broken machine crushed granite metal as per SS including cost and conveyance of all materials, seignarage, sales tax and labour charges such as mixing concrete, laying, tamping, curing all operational, incidental charges etc., complete as per SS for finished item of work for building foundation concrete.

7.05

4514

31827.08

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-1: Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

105.69

270

28585.97

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade II making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.

50.31

261

13141.48

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Plastering to ceiling in 12mm thick in two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of all materials, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)

8.55

525

4489.69

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

5.13

546

2801.44

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Brick masonry in C.M (1:6) prop. using 2nd class modular size bricks of locally available size of 23x11x7cm including cost and cost conveyance of materials to site, mixing of cement mortar to specified thickness, watering, curing, including all scaffolding, hire and operational charges of machinary, all labour charges and all water lead charges etc complete for finished item of work. (230mm thick walls)

0.59

8053

4751.81

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying, fitting and placing HYSD (Fe 500) bar reinforcement in foundation complete as per drawings and technical specifications of Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) (from Primary Producers like Tata, SAIL, VSP, Jindal & Shyam Steel etc.,) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., for finished item of work. ( APSS No.126).

1187.9

86

103287.91

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. Slabs 125 mm thick

1.07

12144

12994.18

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. Roof beams

1.22

12705

15500.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. Plinth beams

1.62

13319

21577.87

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. Columns

4.09

9531

38985.18

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. Pedastals

1.01

11009

11119.97

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. For Footing

4.05

10314

41772.06

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Plain cement concrete M10 using 20 mm graded size hard broken machine crushed granite metal as per SS including cost and conveyance of all materials, seignarage, sales tax and labour charges such as mixing concrete, laying, tamping, curing all operational, incidental charges etc., complete as per SS for finished item of work for building foundation concrete.

1.02

4514

4604.77

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply & Filling with sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

1.02

1167

1195.1

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

16.38

270

4431.38

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

54.75

87

4787.89

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

150

297

44595

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's Specification including cost and conveyance of all material and all labour charges etc,. complete.

112.5

582

65484

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-5 (22) : Plain Cement concrete M10 using 20mm size graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.For foundation.

8.44

4514

38102.21

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with HBG 2.36 mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

16.88

1221

20623.98

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

16.88

382

6451.54

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-1: Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

22.5

270

6085.58

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 16mm MS square bars Vertically at 100mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. for 3.00m & above 3m span gates

270

126

34171.2

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-12-(197): Painting with Synthetic Enamel paints - Two Coats - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

118.8

81

9714.28

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing of M.S grill for Compound wall with M.S Tubes & MS pipes welded as per type design including cost and covneyance of all mateirals ,hire charges of Machinery, electrical etc , Labour charges for Fabrication, Fixing grills etc complete for finished item of work.

4158

132

548939.16

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-3-(170) ; Painting Walls with approved Water Proof Cement Paint over Priming Coat, One Coat (All Colours) making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.

176.04

191

33746.87

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , curing etc., complete for finished item of work with nomonal reinforcement

6.6

5736

37861.14

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

176.04

546

96133.68

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Brick masonry in C.M (1:6) prop. using 2nd class modular size bricks of locally available size of 23x11x7cm including cost and cost conveyance of materials to site, mixing of cement mortar to specified thickness, watering, curing, including all scaffolding, hire and operational charges of machinary, all labour charges and all water lead charges etc complete for finished item of work. (230mm thick walls)

19.8

8053

159467.42

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying, fitting and placing HYSD (Fe 500) bar reinforcement in foundation complete as per drawings and technical specifications of Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) (from Primary Producers like Tata, SAIL, VSP, Jindal & Shyam Steel etc.,) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., for finished item of work. ( APSS No.126).

3563.4

86

309837.63

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. For RCC Columns Below & Above Gl

12.47

9531

118861.92

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. For Plinth Beam

11.39

13319

151711.04

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work. For Footings

25.11

10314

258986.8

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Plain cement concrete M10 using 20 mm graded size hard broken machine crushed granite metal as per SS including cost and conveyance of all materials, seignarage, sales tax and labour charges such as mixing concrete, laying, tamping, curing all operational, incidental charges etc., complete as per SS for finished item of work for building foundation concrete.

11.36

4514

51284.49

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-1: Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

170.37

270

46079.97

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

32.13

261

8392.68

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Plastering to ceiling in 12mm thick in two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of all materials, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)

8.55

525

4489.69

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

5.13

546

2801.44

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Brick masonry in C.M (1:6) prop. using 2nd class modular size bricks of locally available size of 23x11x7cm including cost and cost conveyance of materials to site, mixing of cement mortar to specified thickness, watering, curing, including all scaffolding, hire and operational charges of machinary, all labour charges and all water lead charges etc complete for finished item of work. (230mm thick walls)

0.59

8053

4751.81

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying, fitting and placing HYSD (Fe 500) bar reinforcement in foundation complete as per drawings and technical specifications of Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) (from Primary Producers like Tata, SAIL, VSP, Jindal & Shyam Steel etc.,) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., for finished item of work. ( APSS No.126).

699

86

60778.05

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Slabs 125 mm thick

1.07

12144

12994.18

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Roof beams

1.22

12705

15500.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Plinth beams

0.81

13319

10788.93

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Columns

2.05

9531

19540.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Pedastals

0.51

11009

5615.03

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Footing

2.03

10314

20937.6

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

0.51

4514

2302.38

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

0.51

1167

597.55

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

8.19

270

2215.69

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-12-(193) : Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, , incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

73

87

6383.85

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-TSRA-29 : Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH using concrete mixer.

200

297

59460

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's Specification including cost and conveyance of all material and all labour charges etc,. complete.

200

582

116416

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

15

4514

67717.2

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with HBG 2.36 mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

30

1221

36654

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

30

382

11466

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

40

270

10818.8

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Saw cut joints for freshly laid concrete pavement including all material and labour charges (Grooves 2-3 mm)

151.25

97

14778.64

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work. (As per Quotation)

187.5

75

14062.5

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).

7.5

229

1722.53

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

28.12

6296

177077.81

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.

14.06

4514

63484.88

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-SBBS-1 A III: Construction of granular sub-base by providing gradation -VI well graded material / Coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.

19.75

1848

36513.41

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.

39.5

76

3010.3

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

270

126

34171.2

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, , incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

147.6

81

12069.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing of M.S grill for Compound wall with M.S Tubes & MS pipes welded as per type design including cost and covneyance of all mateirals ,hire charges of Machinery, electrical etc , Labour charges for Fabrication, Fixing grills etc complete for finished item of work.

5166

132

682015.32

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-3-(170) & 17 amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

219

191

41982.3

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement

8.21

5736

47096.96

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

219

546

119593.71

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

24.64

8053

198448.34

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

4366.3

86

379649.79

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deductedFor RCC Columns Below & Above Gl

15.18

9531

144693.18

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deductedFor Plinth Beam

14.15

13319

188473.33

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deductedFor Footings

30.73

10314

316951.99

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

13.91

4514

62796.42

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

208.59

270

56417.34

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

32.13

261

8392.68

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work.

8.55

525

4489.69

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

5.13

546

2801.44

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

0.59

8053

4751.81

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

699

86

60778.05

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Slabs 125 mm thick

1.07

12144

12994.18

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Roof beams

1.22

12705

15500.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Plinth beams

0.81

13319

10788.93

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Columns

2.05

9531

19540.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Pedastals

0.51

11009

5615.03

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deductedFor Footing

2.03

10314

20937.6

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

0.51

4514

2302.38

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

0.51

1167

597.55

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

8.19

270

2215.69

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-12-(193) : Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, , incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

109.5

87

9575.78

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-TSRA-29 : Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH using concrete mixer.

300

297

89190

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's Specification including cost and conveyance of all material and all labour charges etc,. complete.

225

582

130968

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

16.88

4514

76204.42

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with HBG 2.36 mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

33.75

1221

41235.75

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

33.75

382

12899.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

45

270

12171.15

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying and fixing of 100mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge

6.88

205

1414.8

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

51.6

382

19721.52

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Carting of surplus excavated material such as Earth, Rock and debries from the site to a suitable distance including loading & unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

163.74

72

11887.52

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

6220

86

540829

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Culvert slabs.

9.8

6155

60321.06

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 II(iii): Providing P.C.C grade M 15 concrete for structuresusing 20mm size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. For Tappered Portion.

4.3

4761

20475.27

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 C (i): Providing R.C.C grade M 20 (Nominal Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Side Wall

79.12

5680

449464.1

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 C (i): Providing R.C.C grade M 20 (Nominal Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTHBaseslab

43.86

5370

235568.99

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.

29.24

4514

132003.4

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with HBG 2.36 mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

43.86

1221

53588.15

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper etc, complete,

240

68

16502.4

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

70.18

270

18981.58

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-FNDN-1: B i: Earthwork excavation in ordinary soil by mechanical means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH.

163.74

127

20826.09

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply of fresh air exhaust fan of light duty 250V A.C.50Hz.. 225 mm (9") 1350 R.P.M Metallic body plastic blades, wire mesh, etc., complete. Makes : Crompton / Havells Ventilair-DB / Orient hill air.

6

1764

10586.64

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply, Transportation and fixing of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

4

1559

6239.72

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply, Transportation and fixing of 18/20W CFL Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Makes : Bajaj / Crompton / Surya

6

490

2944.92

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B'class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powderfrom the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

1

6630

6630.57

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

40

111

4472.4

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Earth Continuity including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

44

29

1279.52

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (2 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

2

310

620.34

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

4

172

688.56

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

21

816

17143.79

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-ELEC-1-3-2 : Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro.

31.5

117

3704.09

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-ELEC-1-4-2C :Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

42

105

4445.28

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement

0.09

5514

496.28

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

6.46

593

3835.69

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Manufacture,supply and delivery and Fixing of encapsulated plastic steps including cost of materials packing ,loading, transportation, unloading and stacking at site of work etc, complete. (Public Health Items (Part ?IV) SoR 2022-23 28.II)

6

221

1329.3

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

608.4

86

52900.38

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply, delivery and fixing of 100mm dia PVC vent pipe including vent cowl, cost of material and labour charges etc., complete for fixing it to the septic tank for 15m height above GL (Rates of Materials (Part-1) SL.NO.61)

5

205

1028.2

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames anywhere in TS., F.O.R. destination including, loading, un-loading & stacking at site as applicable (Public Health Items (Part ?IV) SoR 2022-23 28.I. a)

2

2232

4465.06

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)

18.9

204

3863.92

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.150mm thick Slab

0.63

11228

7074.26

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.for long walls - 0.2 m Thickfor short walls - 0.2 m Thick

3.78

13919

52617.11

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deductedfor base slab including Toe

1.5

10314

15471.14

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

1.5

4514

6771.72

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-4 (12): Earth work excavation in Ordinary rock (not requiring blasting) by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

2.5

386

965.95

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

22.5

270

6085.58

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

2000

11

22883

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply,fixing and testing of PVC SWR 4 KG/Sq.cm on wall surface pipe with necessary special like shoe and bends including providing holder clamps etc., complete as required by the engineer-in-charge for Rain Water Down Comer pipes - 110mm Dia.

40

215

8619.59

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

1

9959

9959.49

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. (TBSP-B.II-02)

3

5237

15712.95

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying and fixing of PVC cowls of approved make of 110 mm dia complete etc.

2

26

52.26

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Boxing of Nahany traps in RCC floors including cost and conveyance of all material like Bricks, Cement, Sand etc., to site, all labour charges, , etc., complete.

17

301

5118.36

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing of PVC Nahani trap 1st quality ISI marked conforming to IS:1729-1979 with C.P grating fixing with white cement as per site requirements with standard practice for 100mm dia inlet - 75mm (3") out let pippe 4kgs make with aluminium grating in cement concrete including cost and conveyance of all material to site, all labour charges, , etc., complete.

17

187

3187.41

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete.110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

16

368

5889.8

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete.75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

23

192

4433.64

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type, the following valves with SS Ball and SS Spindle of approved brand of manufacature,having rubber lining, including companion flanges, unions, bolts, nuts,rubber gasket , ctc., complete for finished item of work.25mm Dia

2

529

1058.89

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work.50mm Dia

60

655

39333.51

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work.25mm Dia

24

267

6407.89

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work.20mm Dia

26

202

5258.1

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work.15mm Dia

19

176

3345.96

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;TBSP-F.I-01: S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded connection conforming to IS 8931,including cost and conveyance of all materials and labour charges complete for finished item of work.

13

307

4002.66

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter turn spindle with internal threaded conforming to IS 8931 with 7 years warranty: including cost and conveyance of all materials to the site, all labour charges, etc., complete for finished item of work and as directed by the Engineer/ In-Charge.

13

978

12718.1

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

7

2617

18323.83

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying and fixing of 450mm x 900mm (1.5' x 3' 0") size, both sides Polished granite urinal partitions of black colour granite slabs of 20mm thick, grouted with cement mortar (1:3), including neat cement slurry and jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tiles, full rounding of edges etc., complete for finished item of work.

3

5596

16788.95

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm (Parry/Nicer) including Waste Plug, 32mm dia PVC waste pipe etc, complete for finished item.

4

1565

6262.46

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing 10 liters capacity PVC low level flushing tank white colour of SLIM LINE or equivalent from approved manufacturers with all internal components, necessary length of pipe with all accessories etc., complete for finished item of work.

6

2117

12706.7

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556- Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm parryware/Nycer/Hindware etc., complete.

6

2474

14847.21

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

19.21

593

11406.13

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Providing and fixing of louvered Ventilators made of pre-painted steel as per IS 513 of 0.80 mm thickgalvanized as per IS 277 with a polyester paint with and fitted with 4 mm thick plain float glass including fixing the frames in concrete/masonry wall by means of self expanding screws, etc., complete for finished item of work for (i) Single fixed Louvers Ventilator size of 2? 0?x 2? 0? (609.6 x 609.6mm) outer frame box section sizeof 80 x 45mm and (ii) Double fixed Louvers ventilator Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame box section size of 80 x 45mm, vertical mullion section size of 80 x 60 mm and (iii) Double fixed LouversVentilator size of 4?0? x 3?0? (1219.2mm x 914.4mm outerframe box section size of 80 x 45mm , Verticalmullion section size of 80 x 60 mm

3.6

5590

20127.56

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing door shutter with frame made out of PVC section and panels conforming to IS:10151-1982 having panel sizes of 100 mm x 30 mm with self extruded grooves at 40 mm x 50 mm grooves on front face and the infill panel dimension is 610 mm x 20 mm seamless hallow multi chambered PVC single panel for finished item of work.

12.6

3295

41518.51

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325 mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.

39.2

606

23779.5

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc., complete for finished item of work.

17.4

952

16576.98

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-1-(168) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls

129.85

149

19350.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-1-(168) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls

96.67

149

14405.76

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

129.85

78

10185.43

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

96.67

261

25251.17

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work.

129.85

525

68185.53

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).paraper wall-1st floor

29.4

606

17839.92

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

67.27

546

36735.47

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but including conveyance charges of materials.

21.6

998

21573

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of workparapet wall

2.84

8905

25290.57

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

10.82

8053

87143.31

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

830.9

86

72246.76

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.Roof slabs of 125 mm thick - 3.0m Lvl (toilet)

2.97

10174

30217.46

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.For Roof Beams

1.21

12705

15373.2

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.For Lintels

0.33

13894

4585.23

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.For Columns

1.63

13919

22689.39

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Plinth Beams

1.68

13319

22377.05

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Pedastals

0.73

11009

8037.21

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deductedFor Footings

2.59

10314

26713.49

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

1.56

5119

7986

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

3.89

4664

18144.09

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

4.66

4514

21037.48

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-2 (10): Earth work excavation in Ordinary Soil by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

7.09

127

901.78

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

16.54

270

4473.57

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Cutting and removing other kind of trees including stacking of girth 30 to 100 cm

10

89

897.6

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Clearing and Grubbing Road Land Including uprooting rank vegetation ,grass Bushes,Shrubs,Saplings and tress girth upto 300 mm , Removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters iincluding removal and disposable of top organic soil not exceeding 150mm in thickness70% of Site Area By Mechanical Meas

770.7

2

1972.99

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Clearing and Grubbing Road Land Including uprooting rank vegetation ,grass Bushes,Shrubs,Saplings and tress girth upto 300 mm , Removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters iincluding removal and disposable of top organic soil not exceeding 150mm in thickness30% of Site Area By Manual Means

330.3

11

3848

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading,unloading etc complete

234.66

1228

288279.81

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

351.99

382

134530.58

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

39.11

2268

88711.65

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-5 - (13) : Earth work excavation in Ordinary rock (not requiring blasting) in Mechanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

58.66

161

9445.07

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

270

126

34171.2

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-12-(197): Painting with Synthetic Enamel paints - Two Coats - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, , incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

244.8

128

31456.8

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing of M.S grill for Compound wall with M.S Tubes & MS pipes welded as per type design including cost and covneyance of all mateirals ,hire charges of Machinery, electrical etc , Labour charges for Fabrication, Fixing grills etc complete for finished item of work.

8568

132

1131147.36

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

302.8

261

79094.39

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement

13.63

5736

78188.99

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

302.8

546

165356.05

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

34.07

8053

274396.71

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

6557.5

86

570174.63

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For RCC Columns Below & Above Gl

19.25

13919

267957.5

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Plinth Beam

23.46

13319

312479.46

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Footings

48.82

10314

503533.87

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

33.22

4514

149971.03

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

265.78

270

71885.52

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Flooring with high polished granite 16 to 18 mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including labour charges for dressing of tiles etc., complete for finished item of work, including the cost of conveyance of all materials BLD-CSTN-7-7

39.02

5231

204121.71

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

129.6

86

11268.72

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

10.85

382

4147.57

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

6.67

7169

47816.44

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Column

0.43

13919

6013.38

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deductedFor Footings

1.73

10314

17822.75

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

4.64

4514

20963.35

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

7.84

270

2120.48

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH

0.43

743

321.35

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-12-(193) : Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, , incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

12.8

87

1119.36

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Supply and fixing of M.S grill for Compound wall with M.S Tubes & MS pipes welded as per type design including cost and covneyance of all mateirals ,hire charges of Machinery, electrical etc , Labour charges for Fabrication, Fixing grills etc complete for finished item of work.

299

132

39473.98

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

32.13

261

8392.68

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work.

8.55

525

4489.69

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

5.13

546

2801.44

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

0.59

8053

4751.81

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

699

86

60778.05

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Slabs 125 mm thick

1.07

12144

12994.18

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Roof beams

1.22

12705

15500.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted for Plinth beams

0.81

13319

10788.93

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Columns

2.05

9531

19540.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted For Pedastals

0.51

11009

5615.03

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deductedFor Footing

2.03

10314

20937.6

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

0.51

4514

2302.38

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

0.51

1167

597.55

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

8.19

270

2215.69

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-12-12-(193) : Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, , incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

270.1

87

23620.25

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-TSRA-29 : Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH using concrete mixer.

740

297

220002

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's Specification including cost and conveyance of all material and all labour charges etc,. complete.

555

582

323054.4

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-8 (16) : Filling with HBG 2.36 mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

55.5

1221

67809.9

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

83.25

382

31818.15

... More
Development of Parks in Choutuppal Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

83.25

270

22516.63



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.