Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Works
Civil And Construction
Building Construction
Opening Date16 Mar 2024
Closing Date22 Mar 2024
Tender Amount₹ 76,39,743 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Office Building Balance works;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

608.4

77

47096.24

... More
Office Building Balance works;Supply, delivery and fixing of 100mm dia PVC vent pipe including vent cowl, cost of material and labour charges etc., complete for fixing it to the septic tank for 15m height above GL

5

195

977.1

... More
Office Building Balance works;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames anywhere in TS., F.O.R. destination including, loading, un-loading & stacking at site as applicable M.D. -10 with 500mm diaclear opening

2

2232

4465.06

... More
Office Building Balance works;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.(for Ceiling)

18.9

184

3479.68

... More
Office Building Balance works;BLD-CSTN-3-14-(31) -C : Supply and placing of M30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for 150mm thick Slab Note : 1) The cement content is adopted as 400Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 400 Kgs/ Cum the difference in cost shall be deducted.

0.63

11230

7075.03

... More
Office Building Balance works;BLD-CSTN-3-14-(31)-B : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site cluding all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for WALLS

3.78

16023

60567.89

... More
Office Building Balance works;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site aincluding all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code fo FOUNDATIONS, PLINTH, PEDESTALS

1.5

10186

15279.38

... More
Office Building Balance works;Plain cement concrete in M10 prop using 20mm nominal size machine crushed HBG metal as per S.S. 108 machine mixing incluiding cost and conveyance of materials and labour charges such as mixing concrete , laying , tamping, curing all operational charges etc complete as per S.S 402 for finished item of work.

1.5

4709

7063.83

... More
Office Building Balance works;BLD-CSTN-2-7 - (15) ; Earth work excavation in ordinary rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

2.5

386

965.95

... More
Office Building Balance works;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

22.5

270

6085.58

... More
Office Building Balance works;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

3000

11

34080

... More
Office Building Balance works;Supply,fixing and testing of PVC SWR 4 KG/Sq.cm on wall surface pipe with necessary special like shoe and bends including providing holder clamps etc., complete as required by the engineer-in-charge for Rain Water Down Comer pipes - 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm

120

237

28531.2

... More
Office Building Balance works;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

8

9959

79675.92

... More
Office Building Balance works;Supplying and fixing of PVC cowls of approved make of 110 mm dia complete etc.

12

26

313.56

... More
Office Building Balance works;Boxing of Nahany traps in RCC floors including cost and conveyance of all material like Bricks, Cement, Sand etc., to site, all labour charges, , etc., complete.

46

301

13849.68

... More
Office Building Balance works;Supply and fixing of PVC Nahani trap 1st quality ISI marked conforming to IS:1729-1979 with C.P grating fixing with white cement as per site requirements with standard practice for 100mm dia inlet - 75mm (3") out let pippe 4kgs make with aluminium grating in cement concrete including cost and conveyance of all material to site, all labour charges, , etc., complete.

46

187

8623.16

... More
Office Building Balance works;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete. 75 mm dia - Door Bend 87.5 Degree

41

92

3773.23

... More
Office Building Balance works;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete. Sanitary PVC Fittings - 87.5 Degree Door Bends

52

145

7562.36

... More
Office Building Balance works;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete. 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

260

368

95708.6

... More
Office Building Balance works;Supply and fixing PVC pipes of confirming to IS Standareds with fittigs, including , offsets, doorbends, junctions, cowls, etc., laid on walls with necessary clamps, including wall bores & rendering the same in cement morter etc., and complete. 75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

360

215

77414.4

... More
Office Building Balance works;S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type, the following valves with SS Ball and SS Spindle of approved brand of manufacature,having rubber lining, including companion flanges, unions, bolts, nuts,rubber gasket , ctc., complete for finished item of work. 50mm Dia

11

1934

21283.46

... More
Office Building Balance works;S&F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type, the following valves with SS Ball and SS Spindle of approved brand of manufacature,having rubber lining, including companion flanges, unions, bolts, nuts,rubber gasket , ctc., complete for finished item of work. 25mm Dia

12

529

6353.4

... More
Office Building Balance works;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 50mm Dia

60

655

39333.6

... More
Office Building Balance works;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 25mm Dia

12

267

3204

... More
Office Building Balance works;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 20mm Dia

75

202

15167.25

... More
Office Building Balance works;Supplying,laying,jointing and testing of medium quality CPVC pipes with specials such as tees, elbows, checknuts, reducing tees etc., including threading,cutting and fixing in wall ceiling, floors, etc., The rate shall include the rate for necessary excavation in trenches, chasing the walls etc., refilling, consoldation with the excavated earth and making bores in foundation, walls, ceiling etc., and making good of the chased surface in cement mortor including etc.,complete for finished item of work. 15mm Dia

50

176

8805

... More
Office Building Balance works;TBSP-F.I-01: S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded connection conforming to IS 8931,including cost and conveyance of all materials and labour charges complete for finished item of work.

5

296

1482.7

... More
Office Building Balance works;S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter turn spindle with internal threaded conforming to IS 8931 with 7 years warranty: including cost and conveyance of all materials to the site, all labour charges, etc., complete for finished item of work and as directed by the Engineer/ In-Charge.

25

978

24455.75

... More
Office Building Balance works;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

22

2617

57589.18

... More
Office Building Balance works;Supplying & Fixing white glazed flat back half stallurinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm

3

4484

13453.14

... More
Office Building Balance works;Supply, Installation and commissioning approved make floor mounted Close Coupled wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' ' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: White Colour

3

13571

40713.93

... More
Office Building Balance works;Supply, Transportation and fixing of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

36

733

26422.2

... More
Office Building Balance works;ELEC data -4-1-3: Supply and erection of Panel mounting cubical type ( 100 to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel. ( Fuse unit makes : L&T / SCHNEIDER / C&S / ABB / SIEMENS- Fuse Links : Makes : L & T / C & S / Standard / HPL / Havells / Siemens / Indo Asian.

3

7167

21501.39

... More
Office Building Balance works;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

2

6630

13261.14

... More
Office Building Balance works;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

60

167

10060.2

... More
Office Building Balance works;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

300

110

33105

... More
Office Building Balance works;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Earth Continuity including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

120

28

3400.8

... More
Office Building Balance works;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (2 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

6

300

1803.78

... More
Office Building Balance works;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

20

165

3314.8

... More
Office Building Balance works;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

36

812

29252.16

... More
Office Building Balance works;BLD-ELEC-1-3-2 : Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro.

165

100

16569.3

... More
Office Building Balance works;BLD-ELEC-1-4-2C :Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

330

102

33848.1

... More
Office Building Balance works;TBSC-G.VI-01 : Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls.

197.84

456

90339.68

... More
Office Building Balance works;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls

197.84

643

127349.61

... More
Office Building Balance works;Providing 10mm thick UV resistant multiwall polycarbonate sheets fixed to the purlins with aluminium universal glazing set 40mm wide for jointing and fixing sheets and 14 size self-drilling screws with neoprene washer. Side laps are stitched with self-tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape including cost and conveyance of all materials and labour charges, overheads and contractor's profits , etc. complete for finished item of work TBSC-D.VI-22

105

2726

286309.8

... More
Office Building Balance works;Providing and fixing false ceiling at all heights with GRG (Glass Fibre Reinforced Gypsum) false ceiling tiles of size 595 x 595 mm of approved texture, design and patterns having moisture content less than 2% humidity resistance of 99%, NRC 0.60 to 0.75 as per IS 8225:1987, Noncombustible as per BS 476 part 4 1970 and light reflectance of 85% minimum to be laid in true horizontal level suspended on inter locking metal silhouette T grid of hot dipped galvanized iron section of 0.33 mm thick galvanized @ 120 gms per sqm including both sides, comprising of main T runners of size 15x32mm of length 3600mm, cross T of size 15x32mm of length 1200 mm and secondary intermediate cross T of size 15x32mm of length 600mm to form grid module of size 600 x 600mm suspended from ceiling using galvanized mild steel items galvanizing @ 80 grams per sqm i.e. 50mm long, 8mm outer diameter, M-6 dash fasteners, 6mm dia fully threaded hanger rod up to 1000mm length and L shape level adjuster of size 85x25x2 mm. Galvanized iron permitter wall angle of size 24x24x0.40mm of length 3000mm to fixed on periphery wall/partition with help of plastic rawl plugs at 450mm centre to centre and 40mm long dry wall SS screws. The work shall be carried out as per specifications, drawing and as per directions of Engineer-in-Charge with semi perforated 12mm thick micro tegular edged GRG false ceiling tiles

90

2173

195610.5

... More
Office Building Balance works;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 16mm MS square bars Vertically at 100mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. for 3.00m & above 3m span gates

800

126

101432

... More
Office Building Balance works;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

730.8

700

512130.02

... More
Office Building Balance works;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) Fixed Glazing - 48 series duly manufactured using UPVC reinforced profiles of 60 mm x 48 mm x 2.25 mm for outer frames and the mullion sections are of 60 mm x 76 mm x 2.25 mm frames are structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm the sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with EPDM weathering seal resistant including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work

109.5

3570

391015.74

... More
Office Building Balance works;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work. for CC road

813.6

85

69326.86

... More
Office Building Balance works;RBR-CCPV-5: Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

99.66

6194

617363.8

... More
Office Building Balance works;Filling with Gravel/ excavated soils with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and rolling with 2 Tonns roller including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

579.15

199

115789.46

... More
Office Building Balance works;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

494.1

804

397374.98

... More
Office Building Balance works;Flooring with high polished granite 16 to 18 mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including labour charges for dressing of tiles etc., complete for finished item of work, including the cost of conveyance of all materials BLD-CSTN-7-7

135.7

5180

702995.21

... More
Office Building Balance works;Supplying and fixing of stainless steel ( grade 204 ) hand railing with top rail of 50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 20mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges , overheads & contractors profit etc., complete for finished item of work.

13.6

7423

100955.11

... More
Office Building Balance works;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

3596.8

77

278428.29

... More
Office Building Balance works;BLD-CSTN-12-3-(170) & amendment; Painting to walls with two coats of acrylic emulsion paint exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls.

1135.75

191

217723.28

... More
Office Building Balance works;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

1135.75

83

95289.43

... More
Office Building Balance works;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

1135.75

517

587421.26

... More
Office Building Balance works;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but including conveyance charges of materials.

197.84

977

193305.51

... More
Office Building Balance works;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls. for compound wall & room 3rd floor

73.28

7031

515255.86

... More
Office Building Balance works;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work . below plinth beam

64.8

4519

292846.75

... More
Office Building Balance works;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS . Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.

10.49

13802

144793.05

... More
Office Building Balance works;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For PLINTH Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted

8.07

13191

106458.15

... More
Office Building Balance works;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted

17.28

10186

176018.75

... More
Office Building Balance works;Plain Cement concrete M10 using 20 mm metal with hand mixing upto Plinth level including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , curing etc., complete for finished item of work outside building parking area

66.44

4709

312880.58

... More
Office Building Balance works;Plain Cement concrete M10 using 20 mm metal with hand mixing upto Plinth level including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , curing etc., complete for finished item of work For footings

9

4709

42382.98

... More
Office Building Balance works;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). For footings

135

270

36513.45



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.