Public Health And Municipal Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
451248Bid Award Id
ViewTender No
35/TUFIDC/UNIT-II/Yadagiri gutta/Drains/2023-24(4th Call)Tender Authority
Public Health And Municipal Engineering Department ViewPurchaser Address
-Website
http://http://www.appublichealth.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
302.34
6123
1851285.26
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
197.18
5789
1141514.46
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.
480
66
32155.2
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
53.78
36
1969.96
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Carting away the surplus excavated material i.e.Earth and Rock from the site to a suitable distance of about 5.00 Km including loading, unloading , conveyance charges and dumping the carted material at the contractors cost, labour charges, all leads & lifts and other incidental and operational charges etc., complete..
418.25
71
29695.75
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
572
258
147616.04
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Removal of wet silt and sludge from sullage drains,storm water drains with aid of baskets and vessels, etc with initial lift of 3m and lead of 50 m. Public Health (Part-IV) SoR 2022-23
9.75
495
4829.86
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;RBR-FNDN-2 :Providing HBG Stone Chips 2.36mm and below for Below lean concrete in foundations as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge Below lean concrete in foundations
73.13
1407
102941.44
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
48.75
5022
244849.8
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
131.95
6123
807954.92
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
73.13
5789
423364.2
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;RBR-FNDN-7 : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work ( APSS No.126).
16406.4
88
1451802.34
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.
360
66
24116.4
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
21.94
36
803.66
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Carting away the surplus excavated material i.e.Earth and Rock from the site to a suitable distance of about 5.00 Km including loading, unloading , conveyance charges and dumping the carted material at the contractors cost, labour charges, all leads & lifts and other incidental and operational charges etc., complete..
113.75
71
8076.25
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
21
258
5419.47
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-2(10) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
73.5
124
9119.15
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) -up to 3.00Mts. below GL: Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete
10.5
2202
23125.94
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Removal of wet silt and sludge from sullage drains,with aid of baskets and vessels,etc with initial lift of 3.00 mts and lead of 50 mtrs and disposing 1.50 km from site.
0.69
495
341.81
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;RBR-FNDN-2 :Providing HBG Stone Chips 2.36mm and below for Below lean concrete in foundations as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge Below lean concrete in foundations
8.55
1407
12035.41
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
5.7
5022
28628.59
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
11.4
6313
71972.65
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
35.55
6677
237389.39
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;RBR-FNDN-7 : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work ( APSS No.126).
3921
88
346969.29
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.
280
66
18757.2
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
3.38
36
123.81
... More
Construction of Drains in Yadadgirigutta Municipality under TUFIDC Loan Assistance;Carting away the surplus excavated material i.e.Earth and Rock from the site to a suitable distance of about 5.00 Km including loading, unloading , conveyance charges and dumping the carted material at the contractors cost, labour charges, all leads & lifts and other incidental and operational charges etc., complete..
10.5
71
745.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements