Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Building Construction
Opening Date4 Jun 2019
Closing Date18 Jun 2019
Tender Amount₹ 75,70,792 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Tender for Construction Of Shelter For Urban Homeless

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BLD-CSTN-2-7 - (15): Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

8.01

-

1162.42

... More
BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

334.43

-

299.55

... More
BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

76.48

-

4212.74

... More
BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code fo FOUNDATIONS, PLINTH, PEDESTALS(a)Footings

41.85

-

9347.63

... More
(b) Pedastals

5.34

-

9877.07

... More
c) Plinth Beams

20.19

-

11755.81

... More
BLD-CSTN-3-15- ( 31 ) -B ; Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS (a) Columns of GF.

20.11

-

11513.41

... More
Columns of FF

10.7

-

11801.27

... More
Lintels for GF

3.2

-

13914.1

... More
Lintels for FF

2.37

-

13914.1

... More
BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS(a) Roof Beams of GF

18.43

-

11332.3

... More
Roof Beams of FF

8.79

-

11523.05

... More
(b)Roof Slab 150mm thick-GF

45.81

-

10145.64

... More
Roof Slab 150mm thick-FF

35.5

-

10335.45

... More
(c)RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end and 50mm th. at free end - up to 3.66m above GL

4.32

-

992.29

... More
BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . Below Ground level

53.46

-

4141.14

... More
BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work . Above Ground level

35

-

4751.57

... More
BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work. Brick Masonry in GF - 230mm thick

122.11

-

5534.16

... More
First Floor

77.81

-

6193.01

... More
BLD-CSTN-3-10- ( 27 ) Hand mixing - Nominal: Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

0.87

-

5283.89

... More
BLD-CSTN-8-9-(84) ; Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls). Outer Walls of GF

634.73

-

432.97

... More
Outer Walls of FF

418.41

-

432.97

... More
BLD-CSTN-8-2-(77) ; Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm. Innter Walls of GF.

563.7

-

158.26

... More
Inner Walls of FF

418.41

-

158.26

... More
BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.(a) Ceiling of GF

297.95

-

169.1

... More
Ceiling of FF.

236.66

-

169.1

... More
BLD-CSTN-9-5-(103) : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc. including seigniorage charges, etc., complete for finished item of work, including the cost and conveyance of all materials.Flooring of GF

258.18

-

1059.03

... More
Flooring of FF

196.89

-

1098.04

... More
BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work,including the cost and conveyance of all materials. GF.

39.77

-

947.14

... More
First Floor

39.77

-

986.15

... More
BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

14834.9

-

63.91

... More
BLD-CSTN-12-3-(170) ; Painting Walls with approved Water Proof Cement Paint over Priming Coat, One Coat (All Colours) making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.

1074.94

-

133.43

... More
BLD-CSTN-11-10-(167) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls

982.11

-

170.32

... More
BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

534.61

-

41.86

... More
TBSC-L.I-11 : Providing and fixing door frames fabricated from sections made of galvanized steel powder coated (base steel as per IS 513, galvanized as per IS 277 with zinc of 120 grams / square metre), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to accommodate 35 mm thick door shutter, with groove to insert gasket in the frame section, frame section filled with polyurethane foam, cut to length, and joined by way of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of 100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA electroplates stiffeners of 6 Nos – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrop Receiver – 1 No. for single shutter frame. e) Tie Rod – 1 No

158.4

-

781.67

... More
TBSC-L.II-11 : Supply and Fixing 35 mm thick Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 35 mm thick conforming to IS:2202, fitted with 1no. 300 mm long MS Aldrop, 2 nos. 125 mm lond Aluminium door handle, 1 no. 250 mm long Aluminium tower bolt, 1 no. 250 mm long Aluminium door latch & 1 No.Aluminium door stopper including cost and conveyance of all material and all fixtures etc, complete.

60.48

-

3766.56

... More
TBSC-L.III-02: Providing and fixing 30mm thick FACTORY MADE BOTHSIDE PRELAM SOLID PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, top and bottom rails. MS. Frame shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5mm thick heat molded Prelam Pac ‘C’ channel of size 30mm thickness, 70mm width out of which 50mm shall be flat and 20mm shall be tapered in 450 angle on either side forming stiles; and 5mm thick, 95mm wide Prelam Pac sheet out of which 75mm shall be flat and 20mm shall be tapered in 450 on the inner side to form top and bottom rail 115mm wide Prelam Pac sheet out of which 75mm shall be flat and 20mm shall be tapered on both sides to form lock rail. Top, bottom and lock rail shall be provided either side of the panel. 10mm (5mmX2) thick, 20mmwide cross Pac sheet shall be provided as gap insert for top and bottom rail. Paneling of 5mm thick both side Prelam Pac sheet to be fitted in the MS. Frame welded/ sealed to the stiles & rails with 7mm (5mm+2mm) thick X 15mm wide Pac sheet beading on inner side, and joined together with solvent cement adhesive etc. an additional 5mm thick Pac strip of 20mm width is to be stuck on the interior side of the ‘C’ channel using Pac solvent cement adhesive etc. complete as per direction of Engineer – in- charge, manufacture specification and drawing

12.6

-

2781.3

... More
TBSC-M.II-03 : Providing and fixing of Two shutter Sliding Windows made of Galvanized Steel as per IS 513, D quality, galvanized as per IS 277 with powder coated with Pure polyester powder up to 50-60 microns thick with total coated thickness of 0.8 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks with Grill provision size of 90 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Alumimium 1 No. per each shutter including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site with complete finished item of work for Window with Two Sliding Shutters and with Grill.

43.2

-

6057.95

... More
Supplying and fixing of MS Grill for windows/ Ventilators using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 30cm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including and conveyance of all materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

8.64

-

1107.07

... More
BLD-CSTN-2-9 (17): Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

297.12

-

55.69



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.