Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Pipes and Pipe Related Activities
Opening Date20 Dec 2021
Closing Date6 Jan 2022
Tender Amount₹ 8,58,69,882 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Infrastructural Development works;Supply & Fixing of Roof truss using MS tubes of different sizes including all scaffolding, hire and operational charges of machinary, all labour charges and Fabrication charges etc complete for finished item of work.

5366.64

-

682904.94

... More
Infrastructural Development works;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls

249.56

-

57859.25

... More
Infrastructural Development works;Plastering to external walls in 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of seigniorage charges on all materials, all taxes, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)

249.56

-

121425.91

... More
Infrastructural Development works;11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class non modular/traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, including conveyance charges of materials.

79.92

-

66108.23

... More
Infrastructural Development works;Brick Masonry with 2nd class non modular/ traditional size 23 x 11 x 7cms Bricks in CM (1:6) prop having a crushing strength of not less than 40.00kg/cm2 including cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete

9.88

-

64904.59

... More
Infrastructural Development works;BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

99.56

-

30909.4

... More
Infrastructural Development works;Supplying, fitting and placing TMT (thermo mechanically treated)bar reinforcement complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. HYSD-Fe500, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work in all floors.( APSS No.126)

1314

-

114975

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work For Plinth Beams

7.38

-

98369.13

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work For Columns

1.94

-

26903.4

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work for Footings

6.92

-

73546.24

... More
Infrastructural Development works;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

24.4

-

131621.9

... More
Infrastructural Development works;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work

24.4

-

109517.94

... More
Infrastructural Development works;Plain cement concrete in M10 prop using 40mm nominal size machine crushed HBG metal as per S.S. 108 machine mixing incluiding cost and conveyance of materials and labour charges such as mixing concrete , laying , tamping, curing all operational charges etc complete as per S.S 402 for finished item of work.

10.96

-

57641.71

... More
Infrastructural Development works;RBR-FNDN-1: Earth work excavation for Ordinary Soil-Manual Means-Upto 3 m depth as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

85.86

-

20878.58

... More
Infrastructural Development works;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc., overheads & contractors profit complete for finished item of work as per special spn: 1108

7.2

-

34038.14

... More
Infrastructural Development works;Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.47mm thickness fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, Down Pipes, Gutter etc., with 0.50mm thick, Width: 0.585, Length: Maximum 2½ Meters (up to a pitch of 600) etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials

876.52

-

547562.04

... More
Infrastructural Development works;Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials

567.45

-

238124.26

... More
Infrastructural Development works;Supply, fabrication and fixing in position of MS tubular trusses including cost and conveyance of all material and all labour chages etc complete.

16051.01

-

2042490.48

... More
Infrastructural Development works;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.(BLD-CSTN-10-5)

689.62

-

159884.98

... More
Infrastructural Development works;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work.

341.9

-

160679.32

... More
Infrastructural Development works;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

364.22

-

177214.88

... More
Infrastructural Development works;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

71.03

-

466616.67

... More
Infrastructural Development works;BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

388.8

-

120706.85

... More
Infrastructural Development works;Supplying, fitting and placing TMT (thermo mechanically treated)bar reinforcement complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. HYSD-Fe500, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work in all floors.( APSS No.126)

7947.5

-

695406.25

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work For Tie Beams

14.63

-

186670.17

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work For Lintel

0.55

-

7615.13

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work For Plinth Beams

14.63

-

195005.46

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work For Columns

45.24

-

627376.11

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work For Footing

22.28

-

236793.4

... More
Infrastructural Development works;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

54.36

-

243991.6

... More
Infrastructural Development works;Plain cement concrete in M10 prop using 40mm nominal size machine crushed HBG metal as per S.S. 108 machine mixing incluiding cost and conveyance of materials and labour charges such as mixing concrete , laying , tamping, curing all operational charges etc complete as per S.S 402 for finished item of work.

72.01

-

378720.75

... More
Infrastructural Development works;RBR-FNDN-1: Earth work excavation for Ordinary Soil-Manual Means-Upto 3 m depth as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

154.47

-

37562.47

... More
Infrastructural Development works;Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials

109.63

-

46005.81

... More
Infrastructural Development works;Providing and fixing of louvered Ventilators made of pre-painted steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with a polyester paint with and fitted with 4 mm thick plain float glass including fixing the frames in concrete/masonry wall by means of self expanding screws, etc., complete for finished item of work for (i) Single fixed Louvers Ventilator size of 2? 0? x 2? 0? (609.6 x 609.6mm) outer frame box section size of 80 x 45mm and (ii) Double fixed Louvers ventilator Size of 4? 0?x 2? 0? (1219.2mm x 609.6mm) outer frame box section size of 80 x 45mm, vertical mullion section size of 80 x 60 mm and (iii) Double fixed Louvers Ventilator size of 4?0? x 3?0? (1219.2mm x 914.4mm) outer frame box section size of 80 x 45mm , Vertical mullion section size of 80 x 60 mm

3

-

15198.28

... More
Infrastructural Development works;Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.47mm thickness fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, Down Pipes, Gutter etc., with 0.50mm thick, Width: 0.585, Length: Maximum 2½ Meters (up to a pitch of 600) etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials

266.2

-

166295.14

... More
Infrastructural Development works;Supply & Fixing of Roof truss using MS tubes of different sizes including all scaffolding, hire and operational charges of machinary, all labour charges and Fabrication charges etc complete for finished item of work.

6295.2

-

801064.2

... More
Infrastructural Development works;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

153.6

-

74735.62

... More
Infrastructural Development works;Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904).

150.29

-

70629.35

... More
Infrastructural Development works;Brick Masonry with 2nd class non modular/ traditional size 23 x 11 x 7cms Bricks in CM (1:6) prop having a crushing strength of not less than 40.00kg/cm2 including cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete

14.41

-

94663.47

... More
Infrastructural Development works;BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

75.89

-

23560.81

... More
Infrastructural Development works;Supplying, fitting and placing TMT (thermo mechanically treated)bar reinforcement complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. HYSD-Fe500, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work in all floors.( APSS No.126)

1267.65

-

110919.38

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work for Plinth Beams.

5.01

-

66779.04

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work for Columns

4.9

-

67951.88

... More
Infrastructural Development works;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work for Footings

8.1

-

86087.37

... More
Infrastructural Development works;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

3.73

-

20120.89

... More
Infrastructural Development works;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work

7.28

-

32675.84

... More
Infrastructural Development works;Plain cement concrete in M10 prop using 40mm nominal size machine crushed HBG metal as per S.S. 108 machine mixing incluiding cost and conveyance of materials and labour charges such as mixing concrete , laying , tamping, curing all operational charges etc complete as per S.S 402 for finished item of work.

9.29

-

48858.71

... More
Infrastructural Development works;RBR-FNDN-1: Earth work excavation for Ordinary Soil-Manual Means-Upto 3 m depth as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

54.74

-

13311.13

... More
Infrastructural Development works;RBR-FNDN-22 : Collection, Supply and Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

58.8

-

18255.05

... More
Infrastructural Development works;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. -GRADE II

35.28

-

387997.8

... More
Infrastructural Development works;RBR-BASC-7: Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. - Grade - II

64.68

-

628041.51

... More
Infrastructural Development works;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.

2352

-

27330.24

... More
Infrastructural Development works;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion SS-2 (medium setting) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.

1176

-

42124.32

... More
Infrastructural Development works;RBR-SBBS-11 B: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

115.15

-

302728.2

... More
Infrastructural Development works;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)(R&B Data)

92.12

-

183742.55

... More
Infrastructural Development works;Carting of surplus excavated earth up to 5.00 km from the site including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

244.12

-

16819.87

... More
Infrastructural Development works;RBR-EECD-16-ii: Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2 MORD / 305 MORTH.

138.18

-

15279.94

... More
Infrastructural Development works;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means by using Hydraulic excavator including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.

244.12

-

17283.7

... More
Infrastructural Development works;Carting of surplus excavated soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

28

-

1929.2

... More
Infrastructural Development works;Saw cut joints for freshly laid concrete pavement including all material and labour charges (Grooves 2-3 mm)

4000

-

327200

... More
Infrastructural Development works;Curing compound, including Spraying at 0.25 ltr/sqm

2400

-

89976

... More
Infrastructural Development works;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work. (As per Quotation)

2400

-

180000

... More
Infrastructural Development works;BLD-CSTN-2-8 (16) : Filling with gravel with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

130

-

40359.8

... More
Infrastructural Development works;RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with Cement @ 400 kg/cum 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork ), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation , applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

360

-

2687410.8

... More
Infrastructural Development works;Providing Cement Concrete M10 mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.

180

-

946670.4

... More
Infrastructural Development works;Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2 MORD / 305 MORTH. RBR-EECD-16

560

-

61924.8

... More
Infrastructural Development works;RBR-FNDN-1: Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

280

-

68087.6

... More
Infrastructural Development works;Supply and filling, spreading Gravel brought from approved quarry of good quality including loading, unloading, conveyance charges, filling charges, tampingh etc complete as per S.S for finished item of work.

193.75

-

60153.56

... More
Infrastructural Development works;Carting of surplus excavated rock/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

1822.8

-

125590.92

... More
Infrastructural Development works;BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1323

-

115762.5

... More
Infrastructural Development works;BLD-CSTN-3-13-(30)-C ; RCC M- 25 design mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , exluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

18.9

-

215862

... More
Infrastructural Development works;Plain Cement concrete (M15 Nominal Mix) :using 20mm graded metal using concrete mixer including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work

372

-

2211056.4

... More
Infrastructural Development works;Plain Cement concrete (M15 Nominal Mix) :using 20mm graded metal using concrete mixer including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work

322.61

-

1812903.67

... More
Infrastructural Development works;BLD-CSTN-3-5 (22) : Plain Cement concrete nominal mix M10 prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work for foundation and under flooring bed.

186

-

978226.08

... More
Infrastructural Development works;BLD-CSTN-2-8 (16): Collection ,Supply and filling with HBG stone chips 2.36 mm & below from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

279

-

383281.83

... More
Infrastructural Development works;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.

120

-

7539.6

... More
Infrastructural Development works;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.

781.2

-

189964.4

... More
Infrastructural Development works;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for drain work by mechanical means.

1822.8

-

214689.38

... More
Infrastructural Development works;Supply of heavy duty long barrel copper lugs confirming to I.S specifications suitable up to 16 sqmm cable etc complete with nuts, bolts and washers. Makes: DMI / Jainson / Dowels

196

-

5566.4

... More
Infrastructural Development works;Supply of heavy duty type single compression brass cable glands duly nickel plated complete with brass checknut, outer sheath sealing rubber ring and washers suitable for Up to 16.0 Sq.mm 4 Core XLPE insulated armoured cable etc complete. Makes: SMI / Commet / Dowels.

196

-

26722.64

... More
Infrastructural Development works;Supply of 6-32A SP MCB 10KA, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&TExora / Cabtree.

98

-

28503.3

... More
Infrastructural Development works;Supply and laying of 4.0 Sqmm (56/0.3) 2 Core PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable as per IS 7098 / Part-I / 1988 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells /Polycab / RPG / KEI / Gloster / V-Guard

980

-

120246

... More
Infrastructural Development works;Supply and laying of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes :Torrent / Unicab / Universal /Polycab / Havells / Gloster / KEI / Finolex/ Paragon

2450

-

595693

... More
Infrastructural Development works;Supply and laying of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes :Torrent / Unicab / Universal /Polycab / Havells / Gloster / KEI / Finolex/ Paragon

245

-

90743.1

... More
Infrastructural Development works;Supply and fixing of Automatic Street Light Control System with Optical Sensor, Low volatage / High voltage trip and reset, operating voltage 380 - 450 V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs of Legrand / Schneider / L&T / Siemens of 10KA C/D curve and Contactor suitable to control the load of 12KW three phase load with necessary clamping arrangements. Makes : Swadeep Nature Switch / Light Mate / L&T / Siemens / Bajaj.

10

-

220697.1

... More
Infrastructural Development works;Supply and Transportation including Earth work excavation and laying charges of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II. with all accessories like couplers, bends, end caps, Ts etc., complete. Makes: DURA LINE (Dura Guard) / Bajaj / Gamson / Ultra Plus.

2450

-

459734.45

... More
Infrastructural Development works;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

10

-

55251

... More
Infrastructural Development works;Supply and fixing of suitable out door feeder piller box of size made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 40A 4 Pole Isolator as incomer, 6 Nos 6-32A SP MCBs as out goings, indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, bus bars, shroudings, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch.

10

-

254906.6

... More
Infrastructural Development works;Supply and transportation of 150 W LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with warranty 50,000 burning hours. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA /Capart / Fortune Art / FIEM / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs.

196

-

3006253.88

... More
Infrastructural Development works;Foundation and erection charges with special T&P, for 9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.60Mtrx0.60Mtrsx1.40 Mtr size M20 cc work vibrated concreting mixing with necessary steel (15kgs) reinforcement as directed by the field engineers during execution including centering, decentering, water curing as required, soil exacavation, back filling, muffing removal and coil earthing including all labour charges and cost and conveyance of materials etc. complete.

98

-

736531.74

... More
Infrastructural Development works;Fabrication, Transportation and supply of - 1.5 Mtr sword type or any decorative double arm bracket with dooms. complete with all cessories with MS galvanized 50mm dia Pipe. Makes: BAJAJ / VALMONT / TRANSRAIL /SKIPPER / UTKARSH / LAASMA / CONSOUL

98

-

625523.22

... More
Infrastructural Development works;Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including chain for anti theft mechanism, supply of suitable boards with bakelite sheet, din channel for MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 9 Mtrs height Pole having dimensions Bottom 155mm, Top 70mm with 3mm thick, base plate 260 x 260 x 16mm and 4 Nos of M24 x 750mm long 'J' bolts along with template or equivalent. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL

98

-

1975776.04

... More
Infrastructural Development works;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

526.75

-

2960066.36

... More
Infrastructural Development works;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 40 mm nominal size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

110.25

-

579835.62

... More
Infrastructural Development works;RBR-FNDN-1A (i): Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH.

248.06

-

60320.75

... More
Infrastructural Development works;Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and stacking of excavated materials for pipe line trench work. as directed by the departmental officers.

82.69

-

105879.58

... More
Infrastructural Development works;Supply and filling, spreading Gravel brought from approved quarry of good quality including loading, unloading, conveyance charges, filling charges, tampingh etc complete as per S.S for finished item of work.

21.29

-

6610.94

... More
Infrastructural Development works;Carting of surplus excavated rock/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

106.47

-

7335.78

... More
Infrastructural Development works;Supplying and fixing of 100 mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge

8.4

-

1565.17

... More
Infrastructural Development works;BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

4277

-

374237.5

... More
Infrastructural Development works;BLD-CSTN-3-13-(30)-C ; RCC M- 25 desing mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , exluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication of Top slab : 400mm thick for finished item of work

14.56

-

130565.34

... More
Infrastructural Development works;BLD-CSTN-3-13-(30)-C ; RCC M- 25 desing mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , exluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication of Side walls 400mm thick for finished item of work

13.65

-

179769.54

... More
Infrastructural Development works;BLD-CSTN-3-13-(30)-C ; RCC M- 25 desing mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , exluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

22.56

-

222527.33

... More
Infrastructural Development works;BLD-CSTN-3-5 (22) : Plain Cement concrete nominal mix M10 prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

6.83

-

35920.88

... More
Infrastructural Development works;BLD-CSTN-2-8 (16): Collection, Supply and filling with HBG stone chips 2.36 mm & below from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

6.83

-

9382.85

... More
Infrastructural Development works;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.

200

-

12566

... More
Infrastructural Development works;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.

30.42

-

7397.23

... More
Infrastructural Development works;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for drain work by mechanical means.

121.68

-

14331.47

... More
Infrastructural Development works;RBR-FNDN-22 : Collection, Supply and Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

735

-

228188.1

... More
Infrastructural Development works;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. -GRADE II

882

-

9699944.94

... More
Infrastructural Development works;RBR-BASC-7: Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.25 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.MORTH. 10% camber correction

1138.34

-

11053224.65

... More
Infrastructural Development works;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.

58800

-

683256

... More
Infrastructural Development works;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion SS-2 (medium setting) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.

21682.5

-

776667.15

... More
Infrastructural Development works;RBR-SBBS-11 B: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

5420.63

-

14250782.06

... More
Infrastructural Development works;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)(R&B Data)

4336.5

-

8649582.9

... More
Infrastructural Development works;Carting of surplus excavated earth up to 5.00 km from the site including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

650.48

-

44817.73

... More
Infrastructural Development works;RBR-EECD-16-ii: Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2 MORD / 305 MORTH.

6504.75

-

719295.26

... More
Infrastructural Development works;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means by using Hydraulic excavator including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge.

6504.75

-

460536.3

... More
Infrastructural Development works;RBR-STCL-5: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH RCC portion

17.28

-

38366.09

... More
Infrastructural Development works;RBR-STCL-5: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH CC portion M 15 & 20

2.7

-

1875.91

... More
Infrastructural Development works;RBR-STCL-7B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

43.2

-

22938.34

... More
Infrastructural Development works;Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201MORD / MORTH for trees of girth above 200 cms.

15

-

1210.05



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.