Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Civil And Construction
Civil Works Others
Opening Date28 Feb 2022
Closing Date8 Mar 2022
Tender Amount₹ 2,30,39,546 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

8

-

680.96

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C; Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

1.6

-

20273.74

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

24.92

-

4078.66

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

3.12

-

20123.75

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

0.52

-

2844.38

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) : Supply & filling with Crushed stone sand / Rock sand 4.75mm to 2.36 mm in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

12

-

11211

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) :Supply, Filling 20mm metal in readymade trench icluding cost and conveyance of all material and all labour charges etc for water harvesting structure., for finished item of work. (APSS NO. 309 & 310)

8

-

12554.08

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) :Supply, Filling 40mm metal in readymade trench icluding cost and conveyance of all material and all labour charges etc for water harvesting structure., for finished item of work. (APSS NO. 309 & 310)

16

-

16814.24

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) :Supply, Filling 65mm metal in readymade trench icluding cost and conveyance of all material and all labour charges etc for water harvesting structure., for finished item of work. (APSS NO. 309 & 310)

4

-

3379.88

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) :Supply, Filling and packing Rough / soiling stone in readymade trench including cost and conveyance of all material and all labour charges etc for water harvesting structure., for finished item of work. (APSS NO. 309 & 310)

16

-

6975.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

35.2

-

8559.58

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-5.1.1: Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

-

5525.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-4-4-2A: Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.40A DP Isolator/ RCCB / ELCB - 1 No 6-32A SP MCBs - 4 Nos

1

-

4562.78

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-6-1-3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

40

-

2956

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-9-7-16 : Supply of fresh air exhaust fan of light duty 250V A.C.50Hz.. 225 mm (9") 1350 R.P.M Metallic body plastic blades, wire mesh, etc., complete.

8

-

31729.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-8.6.6B: Supply and Transportation of 18/20W CFL Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Makes : Bajaj / Crompton / Surya

1

-

490.82

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-8-6-3 : Supply and fixing and transportation of recessed mounting 1x18W CFL down light with all standard accessories with 1No. 18W CFL lamp etc., complete.

4

-

568.08

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-3-1-1: Supply and run of 2 of 14/0.3mm (1.0 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

120

-

8042.4

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

90

-

8407.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet (8"x6") covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

6

-

1569.24

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

8

-

1211.12

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2.1.7 : Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges etc. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

18

-

1791.54

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-1: Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

33

-

22893.42

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-1.4.1 (a)Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

29.7

-

2672.7

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.

48.4

-

4320.18

... More
Development of Hindu Vaikuntadhamam at Hindpur;Providing and fixing 2 Track 2 glass shutter sliding Windows fabricated from roll formed sections made of Galvanized Steel Colour Coated/ Powder Coated (Base Steel as per IS 513 ?D? quality, Galvanized as per IS 277 with Zinc of 120 GM/Sq.mtr) with total coated thickness of 0.58 mm. Primer coat with epoxy primer of 5?7 micron thick, finish painted with polyester paint of 12-16 microns thick and back coated with alkyd backer of 5-7 microns or Powder Coated with pure Polyester Powder up to 50-60 microns thick. Section for external frame should be of 44 x 59mm, Section for glass shutter should be of 35 x 49 mm Section for euro groove should be 25 x 24mm( luminium/Plastic)and Lap Strip should be of 30x 41mm(Aluminium/Plastic).shutter should be provided with a glass of 5mm Plain Float Glass. Corner bracket for External frame made of Steel/Polypropylene, Corner Bracket for Internal frame made of Steel/Polypropylene, Touch Lock, Rollers, wool pile for lap strip & euro groove, Bump Stop Base & Rubber for shutter stopper. Ethyl Propylene Diamine Monomer (EPDM) Gasket should be used all around glass in shutter. The Frame Section should be cut to length and mitre joined with Corner brackets & Shutter Sections should be cut to length and mitre joined with Corner Bracket. Window Frame should be fixed to brick/ concrete masonry by using Nylon self-expanding caps and driving MS electroplated 80mm long screws into the caps through frames.10mm square guard bars with 6? pitch (152.4mm) max to be fixed wall to wall and all taxes complete for finished item of work

18.77

-

154311.55

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSC-L.II-02 : Supply and fixing of 30 mm thick Flush Door shutter solid bond wood block board type with teak ply on both faces conforming to IS:2202 with 1no. 300 mm long Stainless steel Aldrop, 2 nos. 125 mm long Aluminium door handle, 1 no. 250 mm long Aluminium tower bolt, 1 no. 250 mm long Aluminium Flat latch, 1 No. Heavy duty aluminium door stopper including c/c of all materials and labour chrges etc., complete

11.52

-

36727.14

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSC-L.I-12: Providing and fixing of door frames factory made,internal door frames without threshold, fabricated from pre painted cold roll formed section 100 mm x 60 mm made of galvanized (base steel as per IS-513 ?D? quality galvanized as per IS-277 with Zinc of 120 Gms/sqm) steel colour coated sections with total coated thickness of 1 mm primer coated with epoxy primer of 5-7 microns thick finish painted with polyester paint of 12-16 microns and back coated with alkyd backer of 5-7 microns, the frame section filled with polyurethane (PUFoam) of 40 kg/Cum and the sections cut to length and mitre joined by means of 1.25 mm thick CRCA electroplated corner brackets of size 75 x 75 mm and 1.25 mm thick electroplated stiffeners of size 150 mm for fixing hold fastsand hinges with MS Powder coated fittings a) 6 Nos M.S. Z Type hold fasts made of 30 mm x 3 mm MS flat of 230 mm long, 3 Nos each size expandable PVC covered screw type fasteners b) 2.5 mm x 300 mm long ?T? hinges /2.5 mm x 50 mm x 50 mm x 100 mm two way but hinges (3 Nos for single leaf or 2 Nos for Double leaf/leaf) c) 12 mm Diameter MS tie rod at bottom with necessary size of nuts on either side.

32.4

-

16970.15

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-9-5-(103) :Flooring with Ordinary Soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, etc., complete for finished item of work, including the cost and conveyance of all materials.

20

-

20649.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

56.27

-

36453.96

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. ( APSS No.126)

2980.6

-

253708.67

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

60

-

31226.4

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-11-8-(164) ; Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.Qty as per external wall plastering

108.98

-

6936.58

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

337.66

-

14330.29

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). ( only for Ceiling)First Floor

38.59

-

7169.64

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). ( only for Ceiling)Ground Floor

37.68

-

6590.99

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). First Floor Inner walls

167.21

-

31412.07

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

299.98

-

49097.73

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.Outer walls of FF

150.77

-

30125.35

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

108.98

-

19166.31

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement.

1.25

-

6837.45

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials.First Floor

68.22

-

65194.44

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials.Ground Floor

5.33

-

4332.44

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work.First Floor

18.06

-

130252.15

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work.Ground Floor

22.62

-

145897.19

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Base ment.

5.29

-

22591.53

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . Below Ground Level

3.53

-

13172.94

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.First Floor

4.95

-

5366.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.RCC M -20 for Sun shades of 0.60M width, 75mm th. at fixed end and 50mm th. at free end

4.05

-

4334.84

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.Roof Beams FF

2.58

-

31398.52

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.Roof Beams GF

2.58

-

30831.23

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.175mm thick Waist Slabs FF

1.41

-

14598.38

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.175mm thick Waist Slabs GF

1.41

-

13826.98

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.150mm thick roof slab FF

7.64

-

82775.89

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.150mm thick roof slab GF

7.64

-

81096

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.First Floor

0.5

-

6710.62

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.Lintels

0.36

-

4688.27

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.Main Columns above Ground Roof to First Floor Roof level

2.76

-

37103.43

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.Main Coloumns Up to plinth level

3.6

-

46962.07

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . s on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deductedPlinth Beams

2.38

-

29765.33

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . s on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deductedFor Pedastals

2.31

-

24092.81

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . s on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deductedFor Footings :

12.13

-

118939.02

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

8.47

-

292.38

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand (50% river sand 50% rock sand), coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work

8.53

-

34451.65

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-EECD-9 -ii : Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH - Mechanical Means (with all lifts)

9.78

-

20236.09

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

88.05

-

21411.12

... More
Development of Hindu Vaikuntadhamam at Hindpur;Based on Item No.5.b of HMDA (FSR 2019-20), Pg.40- Planting of individual shrub/rose/ornamental Bamboo: Digging the pits size 0.60 x 0.60 x 0.45m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides(@20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@20 gms/pit/sqmt) and plant materialfor Golden bamboo plants

10

-

3918.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;Based on Item No.4.b of HMDA(FSR 2019-20), Pg.40-Topiary/Palms/Garden tree planting: Digging of 75x75x75 cm pit, filling with soil mixture of red soil farmyard manure, at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding the cost of the fertilizers @ 20 gms/pit/sqmt) and plant material.for Fox tail palm, Ficus & Bottle bush plants

10

-

8482.5

... More
Development of Hindu Vaikuntadhamam at Hindpur;Based on Item No.4 (a) of HMDA (FSR 2019-20), Pg.39 :Topiary/Palms/Garden tree planting- Digging of 60 x 60 x 60cm pit, filling with soil mixture of red soil, farm yard manure, sand at 3:1:1 ratio including internal transport, application of fertilizers and chemicals@ 20 grams per pit/Sqmt) internal transportation of plants and planting the plants( excluding the cost of plant material, fertilizers and chemicals@ 20 grams/pit/Sqm)Ornamental trees along roads and compound wall

10

-

4381.7

... More
Development of Hindu Vaikuntadhamam at Hindpur;Based on Item No.3.b of HMDA (FSR 2019-20 ), Pg.39- Hedge/shrub planting: : Digging the trench of size 30cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio internal transportation of plants and planting the plants including the application of fertilizers and perticides etc., (A 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @ 20 gms/pit/sqmt) and plant materialAlong the Pathways & Road

120

-

103138.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;Based on Item No.6.a(i) of HMDA (FSR 2019- 20), Pg.40 -Ground Covers : Bed preparation 6" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and river sand and application of fertolizers (@ 20 gms/ pit /sqmt), smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation.15% of total Greenary area

696

-

265872

... More
Development of Hindu Vaikuntadhamam at Hindpur;Item No.2.a (i) of HMDA (FSR-2019-20), Pg.39 -CARPET GRASS-KOREAN / MEXICAN : Making lawns by Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4" thckness after rolling), Laying carpet grass and ramming and regular watering and removal of weeds , Protection etc for 45 days for initial establishment including the cost of red earth, sand and labour charges and the cost of fertlizers, chemical but excluding the cost of Grass etc,. complete as per standard practice.10% of total Greenary area

464

-

295308.16

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) : Collection, Supply and Filling with red earth in central divider portion with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)for making mounds

69.6

-

85503.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)for making mounds

69.6

-

20480.5

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-EECD-5 Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3 MORD / 301 MORTH.

1391.4

-

66328.04

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement.

3.54

-

19363.66

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-40 grade and thickness not less than 80 mm for Medium traffic areas including sand bed conforming to IS 15658:2006 and IRC : SP63:2004 in all shapes and designs as per the manufacturer's Specification including cost and conveyance of all material and all labour charges etc,. complete.

482

-

376239.56

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

96.4

-

389348.03

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16): Collection ,Supply and filling of Crushed stone sand / Rock sand 4.75mm to 2.36 mm from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

96.4

-

90061.7

... More
Development of Hindu Vaikuntadhamam at Hindpur;Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).05% of EWE Qty

9.88

-

20443

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-EECD-8(c): Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge- 95% of EWE Qty

187.64

-

8944.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;Carting of surplus excavated rock/ earth/ dismanteled CC road material from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

255

-

17187

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSC-T.I-15 : Saw cut joints for freshly laid concrete pavement including all material and labour charges

2254

-

184377.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;Providing Curing compound, including Spraying at 0.25 ltr/sqm including cost and conveyance of all material and all labour charges etc, complete.

1277

-

47874.73

... More
Development of Hindu Vaikuntadhamam at Hindpur;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work. (As per Quotation)

1277

-

114930

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-CCPV-5: Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

191.55

-

1179172.22

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-CCPV-4 : Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing etc. complete as per Technical Specification 601 MORTH.

127.7

-

390166.92

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-SBBS-11 B: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

127.7

-

239033.97

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-SBBS-1 Construction of granular sub-base by providing well graded material / Close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH. For Grading I Material (CBR Value minimum 30)

191.55

-

304219.71

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-EECD-5 : Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3 MORD / 301 MORTH.

510.8

-

24349.84

... More
Development of Hindu Vaikuntadhamam at Hindpur;Lowering 300 mm dia RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with Cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead upto 500 metres as per BIS No.783/85.

40

-

14270

... More
Development of Hindu Vaikuntadhamam at Hindpur;Manufacture, Supply and Delivery of 300 mm dia NP2 class R.C.C. Spun / Vibrated Cast (Reinforced) Plain ended pipes conforming to B.I.S 458/2003,(Rate per Meter of effective length) including transportation for 5kms.300mm dia RCC NP2 class pipe for pathway crossing

40

-

21359.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

249

-

10567.56

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

249

-

40753.83

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non traffic areas including Sand bed onforming to IS 15658:2006 and IRC : SP63:2004 in all shapes and designs as per the manufacturer's Specification including cost and conveyance of all materials and all labour chrges etc, complete.

1400

-

791784

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH.

600

-

180798

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

82.5

-

333207.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16): Collection ,Supply and filling of Crushed stone sand / Rock sand 4.75mm to 2.36 mm from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

110

-

102767.5

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-SBBS-1 Construction of granular sub-base by providing well graded material / Close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.

165

-

262053

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-EECD-8(c): Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge-Total Qty

257.5

-

12275.03

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-STCL-15 ; Dismantling of Existing cement concrete pavement by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials seperately including all hire & operational charges of T&P, labour charges, complete for finished item of work as directed by Engineer-in-charge as per Technical Specification Clause 202 MORD/MORTH. Existing CC Roads

3.72

-

10267.53

... More
Development of Hindu Vaikuntadhamam at Hindpur;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete,as per IS specifications 732/1982 (Part II).Earthing

1

-

5525.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;ELEC-3.5.1.b : Supply and fixing of Automatic Street Light Control System with Optical Sensor, Low volatage / High voltage trip and reset,operating voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs of Legrand / Schneider / L&T / Siemens of 10KA C/D curve and Contactor suitable to control the load of 3 KW Single phase load with necessary clamping arrangements. Makes : Swadeep Nature Switch / Light Mate / L&T / Siemens / Bajaj3KW

1

-

13480.42

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 3 Pole, 25kA, MCCB with thermal magnetic setting / Microprocessor based release arrangement with all connections etc., complete on existing panel.

1

-

10681.24

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type 125A TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel.

1

-

6808.11

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-14-1-2 :Supply, Transportation, fabrication and erection of following guage CRCA sheet steel enclosure for power control cubicle panel / boxes etc., including cutting, bending drilling, welding and reveting etc., complete with cleaning with 7 tank process and painting with powder coating including cost and conveyance of all materials and labour charges.1 No of 0.9m x 1.20m size Box

1

-

5282.93

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-15-6-1 :Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.for under ground Cabling

100

-

23351

... More
Development of Hindu Vaikuntadhamam at Hindpur;ELEC- 1.5.7.q : Supply of 10 Sqmm 4 core PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable as per IS 7098 / Part-I / 1988 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells / Polycab / RPG / KEI / Gloster / V-Guardfrom Panel to incomming

120

-

67078.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : RPG / V-Guard / Fortune Art /Suncab / Finecab / Gemscab / Payal /Orbit / RR Kabel / Beljin.Under ground Cable connecting all poles and extra for pole to panel

440

-

61987.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-3-1-2 Supply and run of 1 of 22/0.3mm (1 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / V-Guard.

110

-

2717

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-3-1-4 :Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

110

-

10276.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply and transportation of 120W LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA / Capart / Fortune Art / FIEM / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.Along the Path ways and other places as per requirement

22

-

47491.18

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-2: Using Concrete mixture: Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for Lamp post above GL

1.24

-

5930.41

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply of 6-32A DP MCB 10KA, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-Acti9 /Siemens / L&T Exora / Cabtree.

22

-

18946.4

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-4-1-1 :Supply and erection of Panel mounting cubical type 30 / 32A TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel. Fuse links Makes : L & T / C & S / Standard / HPL /Havells / Siemens / Indo Asian. Switch Makes : L&T / SCHNEIDER / C&S / ABB /SIEMENS

22

-

44373.12

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-13-5-2 ; Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet box with hinged door and locking arrangements and din channel for fixing 2Nos MCBs duly powder coated with matching colour of poles including fixing with necessary arrangments etc., complete.

22

-

33705.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-13.4.6- Erection charges for 6Mtrs. Long MS / GI Garden post including excavation of pit, concreting 1:3:6 and painting including cost and conveyance of all materials including fixing of luminaire and labour charges etc., complete.Along the Path ways as per requirement

22

-

36610.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-13.3.1: Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with sleeve and fasteners with necessary angle including painting etc., complete on existing pole including fixing of luminaire.

22

-

20122.52

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap including cost and conveyance of all material including fixing of luminaire and labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with base plate and suitable pole capAlong the Path ways as per requirement

22

-

62298.28

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved make with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of Bombay nails etc., complete for 6" dia (152.4mm) SingleSocket (TBSP-C.I-03)from Soakpit to existing drain or stream

6

-

12065.94

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)filling with brick bats and Granular material

3.18

-

109.77

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate: coarse aggregate ) using 12mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level, curing etc., complete for finished item of work with nomonal reinforcementSupply & fixing CC (1:2:4) cover 1.60m dia with nominal reinforcement 100mm thick and hooks for lifting

1

-

2040.23

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate: coarse aggregate ) using 12mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level, curing etc., complete for finished item of work with nomonal reinforcementCCC (1:2:4) for 1.50m dia, 50mm thick ring of 0.30m height

6

-

4039.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. for Spakpit of 1.50m dia

0.2

-

807.78

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).for Spakpit of 1.50m dia

4.02

-

977.54

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved make with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of Bombay nails etc., complete for 6" dia (152.4mm) SingleSocket (TBSP-C.I-03)

6

-

12065.94

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix M 20 (Cement : fine aggregate: coarse aggregate ) using 12mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

8

-

43759.68

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-10-25-(148): Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

12.58

-

6547.14

... More
Development of Hindu Vaikuntadhamam at Hindpur;Manufacture as per company?s standard specification supply and delivery of encapsulated plastic steps for man holes anywhere in T.G. including cost of materials packing as per company?s standards, loading, transportation, unloading and stacking at site of work etc, complete but excluding taxes and others etc., as applicable.

22

-

4874.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126 )

2130.15

-

181318.37

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply, delivery and fixing of 110mm dia PVC vent pipe including vent cowl, cost of material and labour charges etc., complete for fixing it to the septic tank for 15m height above GL

10

-

1056.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames anywhere in T.G., F.O.R. destination including, loading, un-loading & stacking at site but excluding central exise duty, sales tax, octroi and other Govt levies etc., as applicable

2

-

5878.5

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-1-(76): Plastering with 12mm thick in single coat in CM (1:3) using Sulphate Resistant Cementm finished smooth including cost and conveyance of all materials to site, charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

74.53

-

13036.79

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-1 (39) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:3 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

1.08

-

6965.91

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including ,all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vicbrating,curing etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. , 402)with minimum cement content as per IS code for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.

1.51

-

17270.23

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.

19.12

-

174071.73

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted

3.29

-

27902.69

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

3.92

-

15832.41

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-7 - (15) : Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH - Mechanical Means (with all lifts)10% of the Total Qty

5.9

-

12207.87

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-2(9):Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).90% of EWE Qty

52.7

-

12815.06

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-11-8-(164): Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

257.15

-

16367.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

1990.01

-

54187.97

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

2247.16

-

367792.68

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including cost & conveyance of all materials to site , labour charges on all materials, curing etc., Complete for finished item of work

571.5

-

55549.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-21 ( 33 ) Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)ring etc., complete for finished item of work with nomonal reinforcement

490.35

-

136385.95

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

241.81

-

1559655.16

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

128.59

-

549157.74

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

158.75

-

592408.96

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

31.75

-

128234.44

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

190.5

-

46323.89

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSC-R.I-22; Supply, delivery and fixing of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibro- compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation & erection etc.,complete.

1.08

-

738.68

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-7-4-(75) : Providing raised / Cut Pointing on coursed or Ashlar stone Masonary or cocrete block walling in White Cement Mortor (1:3) Prop, ( 1 cement : 3 Marble dust). including cost & conveyance of all materials to site and all labour charges etc., Complete for finished item of work

549.45

-

148499.85

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - Two Coats - for New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

91.8

-

9851.06

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-7-(174): Painting One Priming Coat on New Iron Work- with Red oxide primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

91.8

-

5794.42

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying and fixing of MS Grill for Compound wall using 20mm MS Square Bars alround and 12mm MS square bars Vertically at 100mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick/ CRS masonry, fixing and making to original surface neatly excluding painting including cost and conveyance of all materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work as per drawing and as directed by the Engineer-in-charge..

3600

-

380376

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nominal reinforcement

0.65

-

3555.47

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-21 ( 33 ) Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

71.45

-

19873.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

66.88

-

285618.4

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

83.2

-

310478.27

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

12.8

-

51697.66

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

96

-

23344.32

... More
Development of Hindu Vaikuntadhamam at Hindpur;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks.

2000

-

18180

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm including cost and conveyance of all materials, labour charges etc complete for finished item of work.

6

-

3558.42

... More
Development of Hindu Vaikuntadhamam at Hindpur;S&F CP finish brass soap dish with NP screws etc., including cost and conveyance of all materials, labour charges, etc complete for finished item of work in all floors

1

-

655.56

... More
Development of Hindu Vaikuntadhamam at Hindpur;Constructing Brick masonry support for G.I pipe with C.M 304.8 x 228.6 x228.6 mm size including plastering and finishing etc. complete.including all labour charges, cost and conveyance of all materials etc. complete for finished item of work.

3

-

293.13

... More
Development of Hindu Vaikuntadhamam at Hindpur;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type 25mm NB Size including cost and conveyance of all materials etc complete for finished item of work.

1

-

1424.73

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work. 25 mm dia nominal bore

15

-

5129.7

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work. 20 mm dia nominal bore

20

-

5226.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work. 15 mm dia nominal bore

25

-

5851.25

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply and fixing of 90 mm dia 3 M single Socket PVC pipe - 4 Kg/sq.cm, supply and fixing of 90 mm dia 609.6mm (2'-0") Double Socket PVC pipe - 4 Kg/sq.cm, supply and fixing 90 mm dia - Door Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Plain Bend 87.5 Degree - UPVC Pipe fittings, supply and fixing of 90 mm dia - Single 'Y' with Door - UPVC Pipe fittings, supply anf fixing of 90 mm dia - Vent Cowl - UPVC Pipe fittings,S & F of 3 nos of 40 mm nominal size holder bat clamps including cost and conveyance of all materials etc complete for finished item of work.

8

-

2411.68

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping.

30

-

18746.4

... More
Development of Hindu Vaikuntadhamam at Hindpur;S&F 15 mm nominal size 152.0 mm CP finish iron body showerrose 1st quality of approved make including cost and conveyance of all materials to work site all labour chages for fixing etc. Complete

12

-

2617.68

... More
Development of Hindu Vaikuntadhamam at Hindpur;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 including cost and conveyance of all materials etc complete for finished item of work.

4

-

2767.68

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying & fixing CI floor traps 1st quality ISImarked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for nominal dia 75 mm (3") and grating size 100 mm dia of weight not less than 4.0 Kgs including cost and conveyance of all materials etc complete for finished item of work.

12

-

4989.96

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover including cost and conveyance of all materials etc complete for finished item of work.

4

-

3149.4

... More
Development of Hindu Vaikuntadhamam at Hindpur;S&F CP finish brass body 32 mm dia nominal size waste coupling with half/full thread & brass check nut conforming to IS 2963: 1979 and Supply & fixing 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials and labour charges for finished item of work etc. complete.

7

-

2123.45

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Double C.P. Pillar cock and Supplying and Fixing Pedestal for Wash Hand Basin.

4

-

17987.52

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSP-E.VII-03:Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm, Supplying & Fixing 15 mm nominal size PVC connection with brass union nut C.P coated, S&F of 15 mm brass body CP finish self closing tap push type conforming to IS 1711, Supply & Fixing 40 mm nominal size dia PVC solid waste pipe outlet, S & F of 2 nos of 76.2 x 101.6 mm teak wood block complete as directed by th eEngineer-in-charge and conveyance of all materials to site, labour charges etc., complete for finished item of work for all floors.

3

-

14318.91

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap,Supplying and Fixing best Indian make plastic seatand lid for European water closets with rubber or plastic Buffers as per IS2548-1996 and low down porcelain flushing tank with lid 10 Lit Capacity with internal components, Supplying & Fixing 15 mm nominal size PVC connection with brass union nut C.P coated, S & F 15 mm nominal size brass concealed stop valve screw type with internal /external threaded conforming to IS 8931, S&F CP short bend, S & F 76.2 x 101.6 mm teak wood block complete including cost and conveyance of all materials to site, for finished item of work for all floors.

4

-

30094.36

... More
Development of Hindu Vaikuntadhamam at Hindpur;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II).

1

-

5525.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-4-4-2A: Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.SPN 4 way D.B with IP-43 Protection, 40A D.P.Isolator / ECCB / RCCB.10 kA - 6-32A range SP MCBs.

1

-

4562.78

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-6-1-3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. Makes : Polycab / GM / Million / VGuard/ Gold Medal / Kundancab / HPL /RPG / Nandicab / Nakoda / Payal / Finecab/ Gemini / Vimal / Suncab / Stanjo /Rajnigandha / Orbit / Airson / Beljin /Savera Champion / Rhino

20

-

1478

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-8.6.6: Supply fixing and Transportation of Ceiling / Wall mounted Circular 1x13W luminaire with decorative acrylic diffuser and 1 No. 13W CFL lamp (circular type) etc., complete. Retrofit CFL Makes : Phillips / Crompton / Bajaj / Surya/ Havells / HPL / Halonix. CFL fitting- Makes : Phillips / Crompton / Bajaj / Surya.

10

-

1363.4

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-8.6.6B: Supply fixing and Transportation of 18/20W Retrofit CFL with Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Retrofit CFL Makes :Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix. Bulk head fitting makes: Bajaj / Crompton / Surya

6

-

2944.92

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for earth continuity including all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

60

-

1482

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-3-1-3: Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

30

-

2010.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

30

-

2802.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet (8"x6") covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

2

-

523.08

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

2

-

302.78

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2.1.7 : Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges etc. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

6

-

597.18

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-1: Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

16

-

11099.84

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-1.4.1 (a)Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

110.9

-

9979.89

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

102.6

-

9158.08

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSC-R.I-22 :S&F of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibro-compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation & erection etc.

4.86

-

3324.05

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

114.48

-

59579.97

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-3-(170) ; Painting to walls with One coat of water proof cement paint of approved brand and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 2 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Water proof cement paint

228.24

-

30787.29

... More
Development of Hindu Vaikuntadhamam at Hindpur;Building amendment Sl.No 15 : Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

502.28

-

54391.9

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

502.28

-

35285.17

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

228.24

-

17149.95

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

352.97

-

9611.37

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSC-L.III-02: Providing and fixing 30mm thick FACTORY MADE BOTHSIDE PRELAM SOLID PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, top and bottom rails. MS. Frame shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5mm thick heat molded Prelam Pac ?C? channel of size 30mm thickness, 70mm width out of which 50mm shall be flat and 20mm shall be tapered in 450 angle on either side forming stiles; and 5mm thick, 95mm wide Prelam Pac sheet out of which 75mm shall be flat and 20mm shall be tapered in 450 on the inner side to form top and bottom rail 115mm wide Prelam Pac sheet out of which 75mm shall be flat and 20mm shall be tapered on both sides to form lock rail. Top, bottom and lock rail shall be provided either side of the panel. 10mm (5mmX2) thick, 20mmwide cross Pac sheet shall be provided as gap insert for top and bottom rail. Paneling of 5mm thick both side Prelam Pac sheet to be fitted in the MS. Frame welded/ sealed to the stiles & rails with 7mm (5mm+2mm) thick X 15mm wide Pac sheet beading on inner side, and joined together with solvent cement adhesive etc. an additional 5mm thick Pac strip of 20mm width is to be stuck on the interior side of the ?C? channel using Pac solvent cement adhesive etc. complete as per direction of Engineer ? in- charge, manufacture specification and drawing

30.45

-

90571.7

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

2980.45

-

253695.9

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with plain white glazed wall tiles of 200 x 300 mm / 245 mm x 325 mm size and of 5 to 7 mm thick set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work (for toilets)

149.31

-

86423.61

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, etc., complete for finished item of work,including the cost and conveyance of all materials.

90.03

-

79621.63

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal Walls)

412.25

-

189911.21

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)

90.03

-

15748.05

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

228.24

-

40140.57

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

38.66

-

11376.09

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, including conveyance charges of materials.

105.53

-

85779.01

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

36.24

-

233745.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

0.48

-

2625.58

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Base ment.

4.21

-

17979.27

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Foundations.

6.32

-

23584.41

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -C : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Roof Beams

5.24

-

62618.47

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -C : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Roof Slab 100mm thick-

11.45

-

145083.98

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -B : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Lintels

0.4

-

5209.19

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -B : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.

4.16

-

54267.28

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Plinth Beams

5.53

-

69160.61

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Pedastals

1.34

-

13975.92

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted Footings

5.08

-

49811.23

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

10.13

-

40913.85

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).70% of the Total Qty

7.96

-

16470.27

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).in all types of soils for footings

71.64

-

17420.7

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-11-8-(165): Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, including conveyance charges of materials

241.2

-

15352.38

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSC-E.I.01: Supply & fixing of Rolling shutter made of 80 x1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec:1108

5.04

-

23826.7

... More
Development of Hindu Vaikuntadhamam at Hindpur;Truss 6m span -4 NosBLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1068.35

-

90937.95

... More
Development of Hindu Vaikuntadhamam at Hindpur;TrussesBLD-CSTN-10-1-(124); Supply and Fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixing with G.I ?J? bolts & nuts 8 mm dia G.I plain washers complete for finished item of work, excluding the cost of purlins, rafters, trusses including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work in all floors. ? upto 600 pitch.

97.57

-

75418.68

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply, fabrication and fixing in position of MS tubular trusses including cost and conveyance of all material, Synthetic enamil painting, nuts and bolts and transportation and all labour chages etc complete.Purlins

216

-

27486

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply, fabrication and fixing in position of MS tubular trusses including cost and conveyance of all material, Synthetic enamil painting, nuts and bolts and transportation and all labour chages etc complete.Trusses

319.82

-

40697.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply and fixing of base plate of 10 mm thick 200x200 mm M.s. plates for base plates, 250 mm long 12mm F anchor bolts with plate washer and nuts complete with one coat of Asian or equivalent red oxide paint.

8

-

6407.92

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

63.93

-

41416.41

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903)

241.2

-

42419.84

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

28.8

-

8474.69

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

18.72

-

120742.5

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Base ment.

4.62

-

19730.22

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Foundations.

6.16

-

22987.33

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -C : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.

1.73

-

20673.66

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deductedLintels

0.12

-

1562.76

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site . on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted

2.84

-

37047.86

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site . on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted for Plinth Beams

2.4

-

30015.46

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site . on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted for Pedastals

0.97

-

10116.9

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site . on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted for Footings

4.5

-

44124.12

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

11.05

-

44629.62

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).10% of the Total Qty

5.39

-

11152.61

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).in all types of soils for footings

48.55

-

11805.9

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-7.15.5 : Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

8

-

44200.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-4-4-2A: Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.SPN 4 way D.B with IP-43 Protection, 40A D.P.Isolator / ECCB / RCCB.10 kA - 6-32A range SP MCBs.

4

-

18251.12

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-6-1-3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. Makes : Polycab / GM / Million / VGuard/ Gold Medal / Kundancab / HPL /RPG / Nandicab / Nakoda / Payal / Finecab/ Gemini / Vimal / Suncab / Stanjo /Rajnigandha / Orbit / Airson / Beljin /Savera Champion / Rhino

120

-

8868

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-9.7.2A : Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete. Fan Makes : Atomberg (Efficio ) / Havells /Orient

24

-

95188.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-8.6.6B : Supply fixing and Transportation of 18/20W Retrofit CFL with Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Retrofit CFL Makes :Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix. Bulk head fitting makes: Bajaj / Crompton / Surya

44

-

21596.08

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-8.5-1 : Supply and fixing and transportation of recessed mounting 1x18W CFL down light with all standard accessories with 1No. 18W CFL lamp etc., complete

28

-

3976.56

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for earth continuity including all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

240

-

5928

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-3-1-3: Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

240

-

16084.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

200

-

18684

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet (8"x6") covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

8

-

2092.32

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

16

-

2422.24

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2.1.7 : Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges etc. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

52

-

5175.56

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-1: Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.

80

-

55499.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-1.4.1 (a)Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

243.2

-

21885.57

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austrofor Circuite wiring for Switch board to all rooms in GF

117.2

-

10461.27

... More
Development of Hindu Vaikuntadhamam at Hindpur;Providing and instalation of Stainless Steel Waiting Bench 3 Seat overall minimum length: 1750 mm, Height: 760 mm and Back Height: 460 mm etc, complete for finished item of work as directed engineer incharge.

16

-

153600

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-3-(170) ; Painting to walls with One coat of water proof cement paint of approved brand and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 2 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Water proof cement paint

274.16

-

36981.44

... More
Development of Hindu Vaikuntadhamam at Hindpur;Building amendment Sl.No 15 : Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over existing base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

361.64

-

39162

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

361.64

-

25405.21

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.Qty as per external wall plastering

274.16

-

20600.38

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

4672

-

397680.64

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.SITTING DHYAN AREA

148.36

-

96113.54

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)Ceiling of SITTING DHYAN AREA

151.28

-

26461.9

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

210.36

-

34429.62

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

274.16

-

68490.65

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)SITTING DHYAN AREA

44.52

-

13100.46

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of workBrick Masonry in GF

21.28

-

137254.3

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -B : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.

18.72

-

187473.12

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Base ment.

4.44

-

18961.51

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Foundations.

18.2

-

67917.12

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -C : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. for Roof Beams

10.48

-

125236.94

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -C : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. for Roof Slab 150mm thick

26.2

-

278104.09

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) -B : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering with steel scaffolding, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted.

6.12

-

79835.52

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted for Plinth Beams

8.44

-

105554.35

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted for Pedastals

1.4

-

14601.71

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted for Footings

6.92

-

67853.09

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

22.52

-

90955.58

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).10% of the Total Qty

8.56

-

17711.75

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).in all types of soils for footings

76.92

-

18704.64

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply fixing and Transportation of 18/20W Retrofit CFL with Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Retrofit CFL Makes :Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix. Bulk head fitting makes: Bajaj / Crompton / Surya

4

-

1963.28

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-1: Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.CFL Light points

4

-

2774.96

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-1.4.1 (a)Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

13.9

-

1240.71

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-9-21-(119) : Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707)

7.8

-

15339.25

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-9-13-(111) : Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, etc., complete for finished item of work.

9.57

-

3860.73

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-Amendment Sl No. 19 : Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls.

43.07

-

17677.22

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

38.27

-

2875.61

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

38.27

-

9560.61

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

7.58

-

48890.39

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcementFlooring of Dimpudu Kallem 4m dia (A = p r²)

1.26

-

6892.15

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)Gravel Filling in the basement of outer platform - Circuler 4m dia (A = p r²)

3.77

-

1109.36

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Foundations.for outer Platform foundation

2.26

-

8433.66

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

1.53

-

6179.49

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).10% of the Total Qty

0.28

-

579.36

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).90% of the Total Qty

2.55

-

620.08

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supply fixing and Transportation of 18/20W Retrofit CFL with Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Retrofit CFL Makes :Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix. Bulk head fitting makes: Bajaj / Crompton / Surya

24

-

11779.68

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-2-1-1: Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings.CFL Light points

24

-

16649.76

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-1.4.1 (a)Supply and Fixing of 20mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

46.4

-

4175.54

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austrofor Circuite wiring for Switch board to all rooms in GF

48

-

4284.48

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying and fixing of MS Grill for Burining Platform using 20mm MS Square Bars Horizantally and Vertically at 100mm centre to centre including fixing with 8 Nos of MS angle (3 on each side and 2 at center) duly making cutting concrete / brick/ CRS masonry, fixing and making to original surface neatly including cost and conveyance of all materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work as per drawing and as directed by the Engineer-in-charge.

2454.76

-

259369.94

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work.

116.56

-

60662.49

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSC-G.VI-01 : Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls

256.24

-

105168.58

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Interior Gr-1 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

120

-

8430

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

136.24

-

10237.07

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126 )

5733.8

-

488061.06

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

136.24

-

34035.48

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.RCC Wall

20.32

-

203496.47

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)FUNERAL PYRE

43.88

-

12912.13

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work . Basement

15.8

-

67475.64

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

23.56

-

87919.09

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted. for Roof Beams

12.12

-

144835.09

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted. for Roof Slab 150mm thick

17.48

-

185544.26

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.Lintels

1.92

-

25004.12

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.Columns

6.4

-

83488.13

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted for Plinth Beams

7.16

-

89546.11

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted for Pedastals

1.52

-

15853.28

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted for Footings

3.88

-

38044.8

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

20.44

-

82554.71

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).10% of the Total Qty

5.8

-

12000.95

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).in all types of soils for footings

52.36

-

12732.38

... More
Development of Hindu Vaikuntadhamam at Hindpur;Providing and fixing 1.80 metre height natural stone/ fencing posts as per design including excavation and cost of conveyance of all materials charges, labour charges, etc., complete for finished item of work.

8

-

4640

... More
Development of Hindu Vaikuntadhamam at Hindpur;Item No.2.a (i) of HMDA (FSR-2019-20), Pg.39 -CARPET GRASS-KOREAN / MEXICAN : Making lawns by Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4" thckness after rolling), Laying carpet grass and ramming and regular watering and removal of weeds , Protection etc for 45 days for initial establishment including the cost of red earth, sand and labour charges and the cost of fertlizers, chemical but excluding the cost of Grass etc,. complete as per standard practice.

61

-

38822.84

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) : Collection, Supply and Filling with red earth in central divider portion with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

5

-

6142.5

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-Amendment Sl No. 19 : Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls.

64

-

26267.52

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

64

-

4808.96

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

64

-

10474.88

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

7.36

-

47471.41

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)Gravel Filling in the basement of outer platform

7.5

-

2206.95

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Foundations.R.R. Masonry for outer Platform foundation

3.6

-

13434.16

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

1.25

-

5048.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).10% of the Total Qty

1.45

-

3000.24

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).90% of the Total Qty

13.05

-

3173.37

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-Amendment Sl No. 19 : Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls.

414

-

169918.02

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

414

-

31107.96

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

414

-

67759.38

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126 )

2442

-

207863.04

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for Walls Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted

26.25

-

262882.99

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for Walls Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deductedFor Plinth Beam

4.05

-

50651.08

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. For Base Slab including Toe & Heel

11.7

-

114722.71

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. For Pavilion Wall

4.8

-

19386.62

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-EECD-9 -ii : Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH - Mechanical Means (with all lifts)10% of the Total Qty

1.8

-

3724.43

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).90% of the Total Qty

15.8

-

3842.09

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-Amendment Sl No. 19 : Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls.For Pavilion Wall

82.8

-

33983.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

82.8

-

6221.59

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

82.8

-

13551.88

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126 )

976.8

-

83145.22

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for Walls Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted

10.5

-

105153.2

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for Walls Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deductedFor Plinth Beam

1.62

-

20260.43

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deductedFor Base Slab including Toe & Heel

4.68

-

45889.08

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. For Pavilion Wall

1.92

-

7754.65

... More
Development of Hindu Vaikuntadhamam at Hindpur;RBR-EECD-9 -ii : Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH - Mechanical Means (with all lifts)10% of the Total Qty

0.71

-

1469.08

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).90% of the Total Qty

6.32

-

1536.83

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-Amendment Sl No. 19 : Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls.

89.98

-

36930.49

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

89.98

-

6761.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

76.14

-

12461.83

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-9-21-(119) : Cladding to External walls with Granite stone tiles 8 mm thick (mirror polished of all shades) using cement compatible bonding agent having acrylic emulsion base set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kg.s per sq.mt including fixing with MS clits with anticorrosive coating hold fasts and using Janatha paste and jointed with white cement paste mixed with pigment of matching shade to match the shade of granite slabs including cost and conveyance of all materials and water to work site, including all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing, including cutting the brick masonry walls and redoing the same such that the top surface of tiles is to be flushed with plastered surface etc., complete for finished item of work.(APSS No.701 & 707)

13.84

-

27217.33

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-21 ( 33 ) Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, excluding conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)ring etc., complete for finished item of work with nominal reinforcement

8.16

-

2269.62

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortar 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortar, scaffolding charges lift charges , curing charges etc., complete for finished item of work

9.52

-

61403.24

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-6-13-(68) : Construction of RR Masonry in Cement Mortar ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortar ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

2.16

-

8060.49

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

0.72

-

2907.99

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

4.32

-

1050.49

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Mild steel (MS) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

273.25

-

23259.04

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-12-(197): Painting with Synthetic Enamel paints - Two Coats - for New Iron with Work Grade - II including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

30

-

3219.3

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-12-7-(174): Painting One Priming Coat on New Iron Work- with Red oxide primer Grade -1 including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

30

-

1893.6

... More
Development of Hindu Vaikuntadhamam at Hindpur;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. 2 Wings of 175.00 Kg Each ( 3.5m x2.0m ) 2Nos

700

-

73962

... More
Development of Hindu Vaikuntadhamam at Hindpur;TBSC-G.VI-01 : Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls

7.61

-

3123.37

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

7.61

-

322.97

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.

7.61

-

1245.53

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site , including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.

1.22

-

15914.92

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deductedPedastals for F1

0.43

-

4484.81

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate , coarse aggregate, water etc., to site . including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding , cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deductedFootings-F1

0.6

-

5883.22

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. For Footings -F1

0.29

-

1171.28

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).10 % of Total Qty

0.58

-

1200.1

... More
Development of Hindu Vaikuntadhamam at Hindpur;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). 90% of Total Qty

5.19

-

1262.05



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.