Public Health And Municipal Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 1,04,559Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
537360Bid Award Id
ViewTender No
828/TUFIDC/Khammam/2024-25 Dt: 14-8-2024 (Recall)Tender Authority
Public Health And Municipal Engineering Department ViewPurchaser Address
-Website
http://http://www.appublichealth.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;Excavation in ordinary soils, up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Storm water drains as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for construction of drains including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by mechanical means.
1892.16
129
244769.82
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.
810.93
297
241048.94
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.
720
70
50652
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
207.93
1346
279996.46
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
138.62
5798
803727.08
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For base slab
277.24
7036
1950732.72
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.for Benching
47.8
6097
291459.07
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Side walls
358.5
10337
3706061.87
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Culvert slabs.
3.84
7442
28578.05
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
32133
81
2623016.79
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;Carting of surplus excavated rock/Soil within a lead of 6Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.
1892.16
99
187324.14
... More
Construction of Storm Water Construction ( from Ganapati Circle Board to Existing Railway Culvert) i;Supplying and fixing of 100mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge
79.5
215
17161.67