Public Health And Municipal Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Public Health And Municipal Engineering Department - PHMED Tender

Works
Civil And Construction
Civil Works Others
Opening Date6 Oct 2023
Closing Date30 Oct 2023
Tender Amount₹ 8,72,72,770 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;ELEC data -4-1-3: Supply and erection of Panel mounting cubical type ( 100 to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel. ( Fuse unit makes : L&T / SCHNEIDER / C&S / ABB / SIEMENS- Fuse Links : Makes : L & T / C & S / Standard / HPL / Havells / Siemens / Indo Asian.

2

15984

31969.13

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

1

6630

6630.57

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

50

169

8469

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

75

111

8361.75

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Earth Continuity including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

130

28

3758.3

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (2 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

5

305

1527

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

5

168

844.7

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

11

811

8927.59

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-1-3-2 : Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro.

39.38

117

4630.69

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Electrical items: BLD-ELEC-1-4-2C :Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro

78.75

105

8334.9

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

53.91

587

31665.12

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Providing and fixing of louvered Ventilators made of pre-painted steel as per IS 513 of 0.80 mm thickgalvanized as per IS 277 with a polyester paint with and fitted with 4 mm thick plain float glass including fixing the frames in concrete/masonry wall by means of self expanding screws, etc., complete for finished item of work for (i) Single fixed Louvers Ventilator size of 2? 0?x 2? 0? (609.6 x 609.6mm) outer frame box section sizeof 80 x 45mm and (ii) Double fixed Louvers ventilator Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame box section size of 80 x 45mm, vertical mullion section size of 80 x 60 mm and (iii) Double fixed Louvers

2.52

5590

14089.29

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and fixing of Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS with Pre-Painted Steel Sections fabricated from pre-painted Cold rolled formed sections made of galvanized steel color coated sections {Base steel as per 15-512 quality, galvanized as per IS-277 with Zinc of 120 gram/sqm) with total coated thickness of 0.58mm primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns and back coated with alkyd backer of 5-7 microns), the sections for outer frame and centre mullion (duly filled with PU form of 40 kg/Cum) should be of 60mm x 50mm, with provision for fixing glazed shutter. The section for glazed/paneled shutter should be of size 48mm x 25 mm and another section of size 60mm x 23mm should be provided for separating glazed and paneled portion 5 mm thick colour pin headed glass is to be provided for glazing and providing guard bars of 10mm square rods duly welded at 150mm pitch to MS flat section of size 18mm and 3mm thick. Windows are to be fixed to wall by means of self expansion nylon Cap (75) and electroplated wooden screws of size 100mm, including aluminum powder coated fittings, A)75mm long grip handles 1 no per shutter, B) 75 mm long tower bolts 2 nos. per shutter, C) Heavy duty 55 Pivot hinges 2 nos per shutter, D) MS Powder coated telescopic stay 1no per shutter.

10.08

9116

91894.02

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and Fixing of Main Door with Double leaf shutters, of size1.2x2.10m Door with Teak wood Frame of sections size 100mm x 125mm with Door Shutter 50mm thick teak wood including cost of fixtures such as Brass Tower Bolts 300mm long 4 Nos, ,Brass Handles 150mm long 4 Nos, 300mm long Brass Aldrops 2No, 150mm long Brass butt hinges 6Nos, Brass Door stopper 2 Nos, MS Hold fasts 8Nos 230mm long , including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

2.52

22717

57249.18

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Providing skirting to internal walls to 15 cm height/risers of steps with 15 mm thick polished Shahabad stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Cuddapah stone, cement, sand and water etc., complete including charges, etc., complete for finished item of work

3.86

888

3430.58

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-9-1-(99) : Flooring with Polished Shahabad/Tandur stones slab of all sizes between 15-18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones and labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

59.81

820

49050.78

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-12-1-(168) : Painting to new walls with 2 coats of acrylic based ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls

288.22

186

53735.74

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

288.22

78

22607.98

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-7-4-(75) : Providing raised / Cut Pointing on coursed or Ashlar stone Masonary or concrete block walling in White Cement Mortor (1:3) Prop, ( 1 cement : 3 Marble dust). including cost & conveyance of all materials to site and all labour charges etc., Complete for finished item of work

11.2

306

3428.77

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying and fixing of stainless steel ( grade 204 ) hand railing as per approved drawing with top rail of 50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 20mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges , overheads & contractors profit etc., complete for finished item of work.

91.02

718

65356.91

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-8-1-(76) : Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.(for Ceiling)

51.9

199

10373.25

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls).

81.02

520

42191.98

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Platering first floor

64.22

600

38558.97

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Ground floor

91.08

539

49156.79

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;First floor -Parapet wall

6.62

8847

58567.97

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Ground floor

14.87

7995

118899.18

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Filling gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

27.81

486

13532.35

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-Amendment Sl No. 5: Providing High Yield Strength Deformed (HYSD) (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all charges on all materials etc., complete for finished item of work in all floors.( APSS No.126)

2391.03

85

205054.73

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;For Sunshades

6.97

1019

7105.29

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;175 mm thick Stair case waist slab

0.91

11503

10467.93

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Roof slabs of 150 mm thick - 3.6m Lvl

9

12056

108504.56

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;For Roof Beams

4.99

13532

67525.73

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-14-(31) -B : Supply and Placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS.-Lintel

0.46

14721

6772

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-14-(31) -B : Supply and Placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS.-Columns

2.5

14746

36867.38

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;For Plinth Beams

2.31

14146

32678.99

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;For Pedastals

1.32

11836

15624.79

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;For Footings

6.78

11141

75537.2

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-6-6-(61) : Construction of Coursed Rubble Stone Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

2.24

5632

12616.87

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-6-12-(67) : Construction of Random Rubble stone Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

7.27

5174

37620.14

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 20 mm size Grded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

9.05

5794

52442.94

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-4 (12): Earth work excavation in Ordinary rock (not requiring blasting) by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

2.69

386

1039.36

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-2 (10): Earth work excavation in Ordinary Soil by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

37.58

127

4779.8

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

13.42

270

3629.71

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Construction of New Office Building in Place of Old Gram Panchayat Building :Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

44.14

98

4356.62

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Carting of surplus excavated rock/Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

64.48

98

6364.02

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying and fixing of 100mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge at 3 mts c/c.

3.2

205

658.05

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/ Fe 500D/ Fe 550 D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

3281

85

281378.56

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for top slab

7.28

7178

52261.15

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for side wall

9.6

9305

89336.54

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for Finisihed item of work

12.94

6787

87853

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm Graded HBG hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.

4.56

5558

25346.9

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.

120

68

8251.2

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-8 (16): Collection ,Supply and filling with HBG stone chips 2.36 mm & below from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

4.56

1629

7428.97

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

18.42

270

4982.06

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

73.69

127

9372.63

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

200

486

97320

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying and fixing of 100mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge at 3 mts c/c.

40.2

205

8266.73

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/ Fe 500D/ Fe 550 D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

23520

85

2017075.2

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for side wall

204

9305

1898401.56

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for Finisihed item of work

90

6787

610844.4

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm Graded HBG hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.

45

5558

250133.85

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-8 (16): Collection ,Supply and filling with HBG stone chips 2.36 mm & below from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

45

1629

73312.2

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

200

270

54094

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

800

127

101752

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;ELEC SoR -7.15.5 : Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C.Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

6630

6630.57

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-4-4-2A: Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete. 40A DP Isolator/ RCCB / ELCB - 1 No 6-32A SP MCBs - 4 Nos

1

6054

6054.54

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-6-1-3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

30

71

2148

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and Transportation of 18/20W CFL Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete.Makes : Bajaj / Crompton / Surya

6

490

2944.92

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.

40

28

1156.4

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

50

111

5574.5

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall.

2

305

610.8

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

4

168

675.76

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply, Transportation and fixing of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

4

1559

6239.72

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD- ELEC- 2-1-1 : Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

14

811

11362.39

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-1-3-2 : Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion /Austro.

38.5

117

4527.22

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.

55

105

5821.2

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

1500

11

17162.25

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply,fixing and testing of PVC SWR 4 KG/Sq.cm on wall surface pipe with necessary special like shoe and bends including providing holder clamps etc., complete as required by the engineer-in-charge for Rain Water Down Comer pipes - 110mm Dia.

20

215

4310.2

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

3

9959

29878.47

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying and fixing of PVC cowls of approved make of 110 mm dia complete etc.

3

26

78.39

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Boxing of Nahany traps in RCC floors including cost and conveyance of all material like Bricks, Cement, Sand etc., to site, all labour charges, , etc., complete.

19

301

5720.52

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and fixing of PVC Nahani trap 1st quality ISI marked conforming to IS:1729-1979 with C.P grating fixing with white cement as per site requirements with standard practice for 100mm dia inlet - 75mm (3") out let pippe 4kgs make with aluminium grating in cement concrete including cost and conveyance of all material to site, all labour charges, , etc., complete.

19

187

3562.4

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;75 mm dia - Door Bend 87.5 Degree

24

92

2208.68

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;110 mm dia - Door Bend 87.5 Degree

18

145

2617.69

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

60

368

22086.76

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

60

192

11566.01

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;50mm Dia

1

1934

1934.86

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;25mm Dia

5

529

2647.28

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;54 mm Dia

30

655

19667.36

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;28.60 mm Dia

20

267

5341.11

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;22.20 mm Dia

30

202

6069.74

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;15.90 mm Dia

20

176

3522.67

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;TBSP-F.I-01: S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded connection conforming to IS 8931,including cost and conveyance of all materials and labour charges complete for finished item of work.

10

307

3078.97

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter turn spindle with internal threaded conforming to IS 8931 with 7 years warranty: including cost and conveyance of all materials to the site, all labour charges, etc., complete for finished item of work and as directed by the Engineer/ In-Charge.

10

978

9783.15

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

6

2617

15706.14

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm (Parry/Nicer) including Waste Plug, 32mm dia PVC waste pipe etc, complete for finished item.

3

1565

4696.84

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and fixing 10 liters capacity PVC low level flushing tank white colour of SLIM LINE or equivalent from approved manufacturers with all internal components, necessary length of pipe with all accessories including etc., complete for finished item of work;

4

2117

8471.13

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556- Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm parryware/Nycer/Hindware etc., complete.

2

2474

4949.07

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying & fixing of white European type W.C pan 570mm x 340mm x 400mm of approved colour of parryware/Nycer/Hindware of approved make P trap etc., and heay duty PVC seat and cover of matching colour owith desired shade etc., complete.

2

3818

7637.2

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, charges etc complete BLD-CSTN-8-25

8.44

587

4957.4

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;TBSC-M.III-04-Providing and fixing of lowered Ventilators made of pre-painted steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with a polyester paint with and fitted with 4 mm thick plain float glass including fixing the frames in concrete/masonry wall by means of self expanding screws, etc., complete for finished item of work for (i) Single fixed Louvers Ventilator size of 2? 0? x 2? 0? (609.6 x 609.6mm) outer frame box section size of 80 x 45mm and (ii) Double fixed Louvers ventilator Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame box section size of 80 x 45mm, vertical mullion section size of 80 x 60 mm and (iii) Double fixed Louvers Ventilator size of 4?0? x 3?0? (1219.2mm x 914.4mm outer frame box section size of 80 x 45mm , Vertical mullion section size of 80 x 60 mm

5.4

5590

30191.35

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and fixing door shutter with frame made out of PVC section and panels conforming to IS:10151-1982 having panel sizes of 100 mm x 30 mm with self extruded grooves at 40 mm x 50 mm grooves on front face and the infill panel dimension is 610 mm x 20 mm seamless hallow multi chambered PVC single panel for finished item of work.

8

3303

26424.48

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and Fixing of single leaf shutter, Door Size 0.90x2.10 mtrs with Sal wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 150mm long 1 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 3Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 1 Nos, MS Hold fasts 3 Nos 230mm long , cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

3.78

5114

19332.32

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-12-17-9 : Painting to new internal walls with 2 coats of Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912.

213.56

121

25889.88

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Painting to new walls with 2 coats of water proof cement paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls

121.28

168

20474.49

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325 mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.

78.12

603

47117.3

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work,including the cost and conveyance of all materials.

49.97

949

47432.52

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc. to site, all operational charges , including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work. (For Internal walls).

213.56

520

111213.51

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational charges, including labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (For External walls).

121.28

539

65456.03

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, including conveyance charges of materials.BLD-CSTN-3-3

48.05

992

47683.38

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Brick Masonry in CM (1:6) with Bricks with traditional size 23 x 11 x 7 cms 2nd class including cost of all materials, labour and all operations charges for mixing cement mortar, curing etc., complete for finished item of work, including conveyance charges of materials.BLD-CSTN-3-3

18.44

7995

147444.58

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and filling with gravel from approved quarry including cost and conveyance, watering, tamping including all labour charges

17.62

486

8573.89

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded BLD-CSTN-2-18

1616.8

85

138656.77

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;slab 125mm th

8.44

12971

109476.67

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;for Roof beams 0.23*0.425mts

3.18

13532

43032.43

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;for Plinth Beam (0.23*0.30mts)(10*3)

3.18

14146

44986.67

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;for columns (1.5-0.15-0.3+0.45-0.3+2.67)

2.4

14746

35392.68

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;footings - 1.50x1.50m

6.08

11141

67738.37

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;CRS Masonry in CM (1:6) 2nd Sort including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc., including Cost of all Materials, Labour for cutting Stones to required size and shape mixing of Cement Mortor Construction, Scaffolding Charges curing Etc., Complete for Finished item of Work . (As per SS 611).P

13.41

5632

75532.23

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

11.03

5794

63916.64

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR - FNDN-1 - (i-B) - In ordinary soils, by Mechanical means: Earthwork excavation in all kinds of soil for foundation as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by mechanical means.

48.52

127

6171.26

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

84

587

49339.08

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

164.36

83

13789.8

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Flooring with 25mm thick polished Shabad /Tandoor stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including charges, labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost of conveyance of all materials.

42.48

820

34838.27

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)

89

199

17788.43

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Plastering to external walls in 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of on all materials, , all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)

114.36

539

61721.24

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply and filling with gravel from approved quarry including cost and conveyance of Material, labour charges, watering, tamping including all machinary charges etc. com

7.91

486

3849.01

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-5-4-(42): Brick Masonry 2nd Class Ground moulded or traditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

5.12

7995

40939.06

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying, fitting and placing HYSD(Fe 500) bar reinforcement in foundation complete as per drawings and technical specifications of Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979)(from Primary Producers like Tata, SAIL, VSP, Jindal & Shyam Steel etc.,) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc. ,for finished item of work.( APSS No.126)

2163.9

85

185576.06

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;slab 125mm th @ +2.95m Lvl

12.6

12971

163436.74

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Roof beams

6.52

13532

88230.01

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Plinth

2.25

14146

31830.19

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Columns

2.18

14746

32148.35

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;for footings

5.4

11141

60162.37

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

12.89

5632

72603.31

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete M10 using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

8.19

5794

47459.41

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;1) Funeral fire : RBR - FNDN-1 - (i-B) - In ordinary soils, by Mechanical means: Earthwork excavation in all kinds of soil for foundation as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by mechanical means.

45.19

127

5747.72

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Carting of surplus excavated Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

443.29

98

43752.62

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying and fixing of 110mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge at 3 mts c/c.

22

205

4524.08

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-7 : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work ( APSS No.126).for base slab, walls and top slab.

21262

85

1823429.12

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;top slab

50.05

7178

359295.44

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;side wall

66

9305

614188.74

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Base slab.

77.24

6787

524240.24

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

31.35

5558

174259.92

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.

120

68

8251.2

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

31.35

1629

51074.17

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-1: A i: Earthwork excavation in ordinary soil by manual means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH

126.65

270

34255.03

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-1: B i: Earthwork excavation in ordinary soil by mechanical means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH.

506.62

127

64437

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Carting of surplus excavated Soil within a lead of 5Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

359.55

98

35487.94

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying and fixing of 110mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge at 3 mts c/c.

22.2

205

4565.21

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-7 : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work ( APSS No.126).for base slab, walls and top slab.

16927.1

85

1451668.1

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Culvert top slab.

22.73

7178

163172.53

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;side wall

27

9861

266269.95

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;base slab

64.8

9305

603021.67

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Base slab.

99.9

6787

678037.28

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

61.56

5558

342183.11

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.

1200

68

82512

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

61.56

1629

100291.09

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-1: A i: Earthwork excavation in ordinary soil by manual means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH

154.09

270

41676.72

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-1: B i: Earthwork excavation in ordinary soil by mechanical means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH.

359.55

127

45731.16

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.

25.31

11269

285257.7

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-BASC-7 Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.

42.19

9997

421811.82

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.

1687.5

11

19777.5

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion (CSS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.

888.75

38

34216.88

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-SBBS-11 B: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

88.88

2741

243684.96

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

489

98

48264.3

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Saw cut joints for freshly laid concrete pavement including all material and labour charges (Grooves 2-3 mm)

2295

97

224244.45

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work.

2550

85

217285.5

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).

76.5

229

17569.76

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

370

7329

2711911.3

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4: Providing Plain Cement concrete nominal mix M10 grade using 20mm size Graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.

160.05

5558

889642.73

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)(R&B Data)

326.25

2415

787919.85

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MORTH specification No.301 and as directed by the Engineer-in-Charge.

489.38

76

37295.65

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately.

230.63

3046

702614.3

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per MORTH Section 803.4 and IRC: 35-2015, the material should satisfy the requirements as per MORTH specifications 803.4 and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel. In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-2015 and MORTH Section 803.4

147.15

663

97560.45

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).

94.5

229

21703.82

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-BASC-9: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. -GRADE II

113.4

11269

1277954.5

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-BASC-7: Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. - Grade - II

198.45

9997

1984085.24

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-BASC-2(V): Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Tech. specification No 503 MORTH.

7686

11

90079.92

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-BASC-1(b): Providing and applying primer coat with bitumen emulsion (CSS1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Tech. specification No 502 MORTH.

3906

38

150381

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-SBBS-11 B: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

976.5

2741

2677299.35

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-2-9 modification.; Filling with Gravel by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

254.83

486

124002.71

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Carting of surplus excavated rock/Soil within a lead of 6Km from the site to a distance suitable including loading charges, cost & conveyance, dumping, labour charges and other incidental and operational charges etc., complete.

4339.8

98

428338.26

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

9522

85

816606.72

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 E: Providing R.C.C. grade M 25 (Design Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Culvert slabs.

136.03

7178

976513.67

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. For Side walls

1304.58

6409

8362363.98

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 II (iii) : Providing P.C.C grade M 15 (MORD), Nominal mix (1:2.5:5) concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. For base slab

544.1

6060

3297454.62

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4 I(i) -Providing P.C.C grade M 10, Nominal mix concrete for in open foundations using 20 mm nominal size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

657.36

5558

3653971.96

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

657.36

1629

1070949.51

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete.

240

68

16502.4

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete by manual means.

1859.91

270

503049.86

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for drain work by mechanical means.

4339.8

127

551979.16

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar

135.91

589

80092.94

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision)

180

384

69197.4

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

1387

98

136896.9

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Saw cut joints for freshly laid concrete pavement including all material and labour charges (Grooves 2-3 mm)

10523.75

97

1028275.61

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work.

12753.75

85

1086747.04

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).

435.75

229

100078.7

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

2471.06

7329

18111609.56

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4: Providing Plain Cement concrete nominal mix M10 grade using 20mm size Graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.

1257.32

5558

6988843.99

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MORTH specification No.301 and as directed by the Engineer-in-Charge.

1981.61

2415

4785752.72

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)(R&B Data)

1981.61

76

151018.5

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision)

2282.5

384

877461.48

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-12-12-(193) : Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, , incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

164.16

81

13423.36

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.47mm thickness fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, Down Pipes, Gutter etc., with 0.50mm thick, Width: 0.585, Length: Maximum 2½ Meters (up to a pitch of 600) etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials

576

720

414984.96

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Supply & Fixing of Roof truss using MS tubes of different sizes including all scaffolding, hire and operational charges of machinary, all labour charges and Fabrication charges etc complete for finished item of work.

2352.01

146

344710.59

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-14-(31) - A : Supply and placing of M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For FOOTINGS, PLINTH and PEDESTALS. N

12.1

11836

143227.22

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;BLD-CSTN-3-5 (22) : Plain Cement concrete M10 using 20mm size graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.For foundation.

79.96

5794

463352.21

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-1: Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

8.96

270

2423.41

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's Specification including cost and conveyance of all material and all labour charges etc,. complete.

353

629

222178.2

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

550

359

197939.5

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

118

98

11646.6

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Saw cut joints for freshly laid concrete pavement including all material and labour charges (Grooves 2-3 mm)

821.25

97

80244.34

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work.

1068.75

85

91068.19

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).

42.75

229

9818.39

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

160.31

7329

1174990.54

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-FNDN-4: Providing Plain Cement concrete nominal mix M10 grade using 20mm size Graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.

82.29

5558

457432.28

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)(R&B Data)

168.86

2415

407816.45

... More
Infrastructure Developmental works in Bhupapally Mpty udner TUFDIC phase V Package I;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MORTH specification No.301 and as directed by the Engineer-in-Charge.

168.86

76

12868.82



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.