Professor Jayashankar Telangana State Agricultural University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Professor Jayashankar Telangana State Agricultural University - PJTSAU Tender

Works
Civil And Construction
Building Construction
Opening Date11 Oct 2023
Closing Date18 Oct 2023
Tender Amount₹ 4,99,520 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Granolithic Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, excluding seigniorage charges, etc., complete for finished item of work,

155.12

345

53516

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Painting with 2 coats of approved synthetic enamel paint over a coat of primer of approved brand and shade to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for:-Painting to wood work - Synthetic enamel paint over a coat of primer to New Iron Work - 2 coats + 1 coat primer

125

149

18625

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Painting to walls with 2 coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound) content less than 50 grams/ liter. of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for Internal walls for:-External Colouring - acrylic emulsion paint - 2 Coats

350

146

51100

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Painting to walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for Internal walls for:-Internal Colouring - Plastic emulsion paint - 2 Coats

300

91

27300

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Supplying and fixing the SS fly proof mesh for the windows and ventilators with alround frame made up of sal wood reepers of size 50mmx25mm alround including cutting the mesh to the required size, nailing the mesh to the wooden windows/ ventilators including fixing of the frame over the mesh including cost and conveyance of all the materials nails fixing charges etc., complete as directed by the department.

52.71

784

41325

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Supply and fixing of pre-painted steel casement/ open able windows base steel as per IS 513 of - 0.58 mm thick 'D quality, galvanized as per IS 277, finish painted with a polyester paint, section for outer frame of 46 x 52 mm section for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading 18 x 25 mm panelled with 5 mm thick plain float glass fitted with EPDM gaskets, handle made of high grade aluminium powder coated frames fixed to the concrete /masonry wall by means of self-expanding screws including 10 mm square guard bars @ 150 mm pitch for Windows: Double shutter for sizes 2'0 x 4'0 (609.6 x 1219.2 mm ) 3'-0 x 4'-0 (914.4mm x 1219.2 mm) without mullion section

5.76

6417

36962

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Plastering 20 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for finished item of work.

60

197

11820

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).

2.1

5864

12314

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Repairs for existing rolling shutters including all necessary fixtures and labour charges etc., complete for finished item of work..

3

2000

6000

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Removal windows stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead.

8

200

1600

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Removal Asbestos sheets stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead.

1

5000

5000

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead for RCC Flooring work

1

5000

5000

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead for Brick work

0.83

228

189

... More
Repairs and Renovation for storage godown units (implements and farms input) at ARS, Adilabad;Item Detailed Specification Description

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.