Professor Jayashankar Telangana State Agricultural University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Professor Jayashankar Telangana State Agricultural University - PJTSAU Tender

Opening Date9 Apr 2021
Closing Date23 Apr 2021
Tender Amount₹ 2,07,54,978 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of First floor;Supply and fixing of Automatic Street Light Control System with Optical Sensor, Low volatage / High voltage trip and reset operating voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs of Legrand / Schneider /L&T / Siemens of 10KA C/D curve and Contactor suitable to control the load of 5 KW Single phase load with necessary clamping arrangements.Makes : Swadeep Nature Switch / Light Mate / L&T / Siemens / Bajaj

1

-

11800

... More
Construction of First floor;Fabrication, Transportation and supply of 1.5 Mtr Length single Arm standard Bracket made with MS galvanized 50mm dia Pipe.Makes: BAJAJ / VALMONT / TRANSRAIL/ SKIPPER / UTKARSH / LAASMA / CONSOUL

10

-

17200

... More
Construction of First floor;Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal /Conical pole duly erecting on base plate duly provided 4 Nos foundation bolts with nuts with providing of 0.45Mtrx0.45Mtrsx1.20 Mtr size M20 cc work vibrated concreting mixing with necessary steel (10kgs) reinforcement as directed by the field engineers during execution including centering, decentering, water curing as required, soil exacavation, back filling, muffing removal and coil earthing including all labour charges and cost and conveyance of materials etc. complete.

10

-

47300

... More
Construction of First floor;Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including chain for anti theft mechanism, supply of suitable boards with bakelite sheet, din channel for MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for7.50 Mtrs height Pole having dimensions Bottom 130mm, Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700mm long 'J' bolts along with template or equivalent. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL

10

-

120000

... More
Construction of First floor;Supply ,transportation and fixing of 90W +/-10% LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro /Jaquar / Eveready / Halonix / Keselec /HAVELLS / POLYCAB / SURYA / SYSKA /Capart / Fortune Art / FIEM / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs.including all connections and all labour charges etc.,complete.

16

-

159776

... More
Construction of First floor;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate. including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B

20

-

10140

... More
Construction of First floor;Supply and fixing of LAN Cable cat - 6 UTP cable of Makes : D Link / AMP / Molex / Legrand / Krone. including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B

450

-

16200

... More
Construction of First floor;Supply and run of 25mmx3mm copper strip including cost of all accessories and labour charges etc.,complete

60

-

34020

... More
Construction of First floor;Supply, Transportation and Fixing of 9" (225mm) light duty exhaust fan with wire guard etc complete of makes Crompton / Havells Ventilair-DB /Orient hill air Make exhaust / Fresh Air fan with metallic body and blades including making hole in wall and masonary work and all labour charges etc., complete.

12

-

29076

... More
Construction of First floor;Supply of 7.0W LED Lamp with input voltage 90 to 300V, Colour temparature 3000k - 6500k, Beam angle 170 - 220 degrees, B22 base, 490 Lumens.Makes: Phillips / OSRAM / GE / Crompton / VIN /Bajaj / Havells / Pharox / Halonix / Green lites.

52

-

6656

... More
Construction of First floor;Supply and fixing of Anchor/Gold Medal Olive/million Zoom make ISI mark batten holder / angle holder on existing block, but without bulb including all connections etc., complete (For replacement)

52

-

4888

... More
Construction of First floor;Providing independent earthing for Important equipment with 100mm dia Heavy gauge C.I ( Cast iron ) pipe with Flange 2.5m long enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with salt and charcoal from the bottom of the pipe giving earth connection from electrode through flange with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

4

-

33076

... More
Construction of First floor;Supply and fixing of 4 Way VTPN DB accomodating 125A 4 Pole MCCB as incomer and 4 Nos(40-63)A TP MCBs as outgoing and with IP 43 Protection of makes Legrand / Schneider. , including internal connections and labour charges for Flush Mounting etc., complete

4

-

118588

... More
Construction of First floor;Supply and fixing of (8+12) 4 way TPN DB Harizontal with IP-43 Protection makes Legrand/Schneider suitable for with 1No 100A FP isolator and 12Nos 6-32A 10KA SP MCB,C/D Curve ISI Mark of make Legrand/Schneider , including internal connections and labour charges for Flush Mounting etc., complete.

16

-

151968

... More
Construction of First floor;Supply,fixing and transportation of 18 W +/-10% back lit LED Down Light Recessed /Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro/ Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska /Eveready / Surya / Keselec / FIEM.LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs...including all accessrioes and all labour charges etc.,complete.

35

-

81865

... More
Construction of First floor;Supply,fixing and Transportation of 10W,1000 lumens, 600mm length LED batten tube light, housing made with PC body, wide operating voltage with Single /double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K -6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj /Havells / Jaquar / IB LED / Panasonic /Halonix / HPL / Syska / Eveready / Surya /Keselec.LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs. including all accessories and labour charges etc complete

15

-

11625

... More
Construction of First floor;Supply,fixing and Transportation of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: >2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS certification with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj /Havells / Jaquar / IB LED / Panasonic /Halonix / HPL / Syska / Eveready / Surya /Keselec/ FIEM.LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs including all accessories and labour charges etc complete

130

-

145080

... More
Construction of First floor;Supply & Fixing of Electronic step type Fan Regulator.Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL including 2 way module box and Cover frame including all accessories and labour charges etc complete

60

-

25620

... More
Construction of First floor;Supply, Transportation and Fixing of energy efficient decorative fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90,Service Value (CMM/W) greater than 8.5,Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%, remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C (max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., complete.Makes :Atomberg (Efficio + ) / Havells / Orient including all labour charges etc., complete.

60

-

218280

... More
Construction of First floor;Supply and fixing of 16A/6A 1 way Combi Socket Modular Socket ( Sockets combined 2 in one) with 20A 1 Way Modular Switch with indicator of Legrand Myrius / Million mway/Goldmedal Curve/ Anchor Roma viola /Havells Fabio / Panasonic Vision / Hager Insista / Benlo Vesta / C&S Primo / CPL Vysma / Polycab Levana. make make with suitable cover frame and Modular box and earth connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B

190

-

110390

... More
Construction of First floor;Supply and fixing of 10A 3/2 pin 2 module modular Socket with 10A 1 Way 1 module Modular Switch of Legrand Myrius / Million mway /Goldmedal Curve/ Anchor Roma viola /Havells Fabio / Panasonic Vision / Hager Insista / Benlo Vesta / C&S Primo / CPL Vysma / Polycab Levana make make with suitable cover frame and Modular box and earth connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B

125

-

60500

... More
Construction of First floor;Supply and Run of 5 of 140/0.3mm (10.00 Sq.mm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR). make in existing pipe for run of mains inlcuding all labour charges etc., com

120

-

66000

... More
Construction of First floor;Supply and Run of 5 of 86/0.3mm (6.00 Sq.mm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR). make in existing pipe for run of mains inlcuding all labour charges etc., com

120

-

44640

... More
Construction of First floor;Supply and Run of 3 of 56/0.3mm (4.00 Sq.mm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR)t. make in existing pipe for run of mains inlcuding all labour charges etc., com

1450

-

242150

... More
Construction of First floor;Supply and Run of 3 of 36/0.3mm (2.50 Sq.mm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR).. make in existing pipe for run of mains inlcuding all labour charges etc., com

1150

-

126500

... More
Construction of First floor;Wiring with run of 2 of 22/0.3mm (1.50 Sq.mm) FRLS/HFFR PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR) make in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with cover frame of ISI Mark Legrand Myrius / Million Tap-Wood/ Anchor Roma viola / Havells Fabio / C&S Prime / CPL Vysma / Benlo Vesta / Polycab Levana makes with required cover frame to be fixed with Modular box in existing surface / consealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete including cost and conveyance of all materials and all labour charges etc., complete for light and bell points in N.R.B

330

-

221100

... More
Construction of First floor;Supply and fixing of 25mm outer dia Heavy(1.50mm thickness) grade with IS:9537 part 3 regid PVC pipe makes Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / along with reinforcement is concealed in wall with all required accessories including chiseling the wall whenever necessary including masonry work including all labour charges etc., complete and as directed by the department for fan point, light point and plug point including all labour charges.

850

-

79050

... More
Construction of First floor;Supply and fixing of 25mm outer dia Heavy(2.20mm thickness) grade with IS:9537 part 3 regid PVC pipe makes Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion. along with reinforcement is concealed in Roof Slabs with all required accessories including chiseling the wall whenever necessary including masonry work including all labour charges etc., complete and as directed by the department for fan point, light point and plug point including all labour charges.(for Slabs)

950

-

96900

... More
Construction of First floor;Supplying & fixing Bronze Vertical Check (Non return) Valve as per IS-778 I-class heavy duty as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 50mm

2

-

4826

... More
Construction of First floor;Supplying & fixing Bronze Horizontal Check (Non return) Valve as per IS-778 I-class heavy duty as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 40mm

2

-

4586

... More
Construction of First floor;Supplying & fixing Bronze Horizontal Check (Non return) Valve as per IS-778 I-class heavy duty as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 32mm

2

-

3306

... More
Construction of First floor;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including overheads and contractor's profit complete for finished item of work.

20475

-

163800

... More
Construction of First floor;Cutting holes in Brick masonry & repairs Labour charges only including overheads & contractors profit complete for finished item of work.

32

-

2272

... More
Construction of First floor;Cutting holes in stone masonry & basement and repairs Labour charges only including overheads & contractors profit complete for finished item of work.

16

-

1696

... More
Construction of First floor;Cutting holes in C.C; basement & repairs Labour charges only including overheads & contractors profit complete for finished item of work.

16

-

2560

... More
Construction of First floor;S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 50mm

4

-

6516

... More
Construction of First floor;S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 40mm

4

-

4340

... More
Construction of First floor;S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 32mm

12

-

9444

... More
Construction of First floor;S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 25mm

4

-

1776

... More
Construction of First floor;S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 20mm

10

-

3160

... More
Construction of First floor;Supplying, laying and jointing 65mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete, with necessary excavation in all types of soils (except rock requiring blasting) refilling, chiseling masonry walls and making good the walls and floors to the original surface, fixing M.S. clamps and T.W. block on walls wherever required, Brick support pillars on terraces etc including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work as directed by Engineer-in-charge.

65

-

60320

... More
Construction of First floor;Supplying, laying and jointing 50mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete, with necessary excavation in all types of soils (except rock requiring blasting) refilling, chiseling masonry walls and making good the walls and floors to the original surface, fixing M.S. clamps and T.W. block on walls wherever required, Brick support pillars on terraces etc including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work as directed by Engineer-in-charge.

135

-

70605

... More
Construction of First floor;Supplying, laying and jointing 40mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete, with necessary excavation in all types of soils (except rock requiring blasting) refilling, chiseling masonry walls and making good the walls and floors to the original surface, fixing M.S. clamps and T.W. block on walls wherever required, Brick support pillars on terraces etc including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work as directed by Engineer-in-charge.

20

-

9740

... More
Construction of First floor;Supplying, laying and jointing 32mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete, with necessary excavation in all types of soils (except rock requiring blasting) refilling, chiseling masonry walls and making good the walls and floors to the original surface, fixing M.S. clamps and T.W. block on walls wherever required, Brick support pillars on terraces etc including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work as directed by Engineer-in-charge.

100

-

43400

... More
Construction of First floor;Supplying, laying and jointing 25mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete, with necessary excavation in all types of soils (except rock requiring blasting) refilling, chiseling masonry walls and making good the walls and floors to the original surface, fixing M.S. clamps and T.W. block on walls wherever required, Brick support pillars on terraces etc including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work as directed by Engineer-in-charge.

318

-

98580

... More
Construction of First floor;Supplying, laying and jointing 20mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete, with necessary excavation in all types of soils (except rock requiring blasting) refilling, chiseling masonry walls and making good the walls and floors to the original surface, fixing M.S. clamps and T.W. block on walls wherever required, Brick support pillars on terraces etc including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work as directed by Engineer-in-charge.

496

-

117552

... More
Construction of First floor;Supplying, laying and jointing 15mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete, with necessary excavation in all types of soils (except rock requiring blasting) refilling, chiseling masonry walls and making good the walls and floors to the original surface, fixing M.S. clamps and T.W. block on walls wherever required, Brick support pillars on terraces etc including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work as directed by Engineer-in-charge.

172

-

36464

... More
Construction of First floor;S&F of 15 mm premium variety Chromium plated finish brass body wall mixer with hand shower with a provision for over head shower with 115 mm long bend pipe on upper side, connecting legs & wall flanges conforming to IS 8931 with 10 years warranty overhead & contractor's profit complete for finished item of work in all floors as directed by Engineer-in-charge.

32

-

124032

... More
Construction of First floor;S&F of 15 mm premium variety Chromium plated finish brass body wall mixer with hand shower with a provision for over head shower with 115 mm long bend pipe on upper side, connecting legs & wall flanges conforming to IS 8931 with 10 years warranty overhead & contractor's profit complete for finished item of work in all floors as directed by Engineer-in-charge.

32

-

5536

... More
Construction of First floor;Supplying and fixingTV shape mirror with plastic frame size 609.6 mm x 457 .2 mm best quality glass mirror with approved make 1st quality including cost & conveyance of all materials, labour charges, etc. overhead & contractor's profit complete for finished item of work in all floors as directed by Engineer-in-charge.

10

-

5390

... More
Construction of First floor;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 660 x 460 mm - Single C.P. Pillar cock

20

-

93360

... More
Construction of First floor;S&F of 15 mm brass body CP finish long body bib tap of not less than 400 grams weight with quarter turn spindle internal / external threaded connection conforming to IS 8931, including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

28

-

22820

... More
Construction of First floor;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty, including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

24

-

80952

... More
Construction of First floor;Supplying & Fixing Orissa Pan White glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm duly providing constructing Brick masonry seat using 2nd class bricks, CC Squatting plate in P.C.C 1:2:4, S&F PVC Low level system with internal components & short bend: 10 Litres capacity Single Flush, S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and S&F 15 mm nominal size PVC connection with brass union nut C.P coated including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

8

-

36792

... More
Construction of First floor;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2- 2004 of white glazed with 'S' trap with CI short Connector & 4" dia CP thimble pipe: 150 mm long, best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and 15 mm nominal size PVC connection with brass union nut C.P coated all of approved make, including cost and conveyance of all materials and labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

24

-

138048

... More
Construction of First floor;Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work.

124

-

20088

... More
Construction of First floor;Supplying & fixing of 3" (75 mm nominal size ) Nahany Trap with Jali - UPVC/SWR Pipe fittings including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work.

12

-

1380

... More
Construction of First floor;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc with solvent jointing as per standard practice including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) 75MM DIA

534

-

158064

... More
Construction of First floor;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc with solvent jointing as per standard practice including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) 110MM DIA

157

-

69237

... More
Construction of First floor;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

200

-

131600

... More
Construction of First floor;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives of NCL/ Saicoat texture paint or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding for:-External Colouring - Providing / Texture to External walls.

558

-

227664

... More
Construction of First floor;Providing 16 to 18mm thick high polished granite stone slabs of premium colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special) TREADS

40

-

258680

... More
Construction of First floor;Providing 16 to 18mm thick high polished granite stone slabs of premium colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special) RISERS

20

-

90360

... More
Construction of First floor;Roofing: - Roofing will be provided with 0.5mm thickgalvanized/ pre painted G.I. profiledsheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anticapillary grove.

40

-

32960

... More
Construction of First floor;Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including providing 4" coving with cement concrete in (1:2:4) prop. rounding off the wall and slab junction etc., complete for finished item of work. (APSS No. 901 & 903) For IMPERVIOUS COAT TERRACE FLOOR

1205.71

-

708957.48

... More
Construction of First floor;Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 3 Coats (All Floors)

558.1

-

131153.5

... More
Construction of First floor;Painting to new walls with 2 coats of ready mixed oil bound washable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls for:-Internal Colouring - Oil Bound Distemper paint - 2 Coats + 1 coat primer (Terrace Floors)

1215.2

-

149469.6

... More
Construction of First floor;Painting to new walls with 2 coats of ready mixed oil bound washable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls for:-Internal Colouring - Oil Bound Distemper paint - 2 Coats + 1 coat primer (First Floor)

1873.4

-

230428.2

... More
Construction of First floor;Providing and applying Synthetic plaster putty or plaster of paris putty or lime punning of average 1.0 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal walls (Terrace floor)

1215.2

-

534688

... More
Construction of First floor;Providing and applying Synthetic plaster putty or plaster of paris putty or lime punning of average 1.0 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal walls (First floors)

1873.4

-

788701.4

... More
Construction of First floor;Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawing to be supplied at the time of execution of work, including cost and conveyance of all Mild steel Tubes & Pipes sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental, Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, excluding cost of fixing in position, including cost of Labour charges for erecting & fixing all structural steel works like heavy iron grills, Trusses, Stanchions, Heavy Beams and Girders erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position etc. complete for finished item of work.

1327.8

-

182970.84

... More
Construction of First floor;Providing, supplying & fixing of Top hung Ventilator with Exhaust Fan Provision made out of multi chambered UPVC sections with TPV gaskets having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having a overall size of 60x55 mm with reinforcement of 1mm thickness, Mullion with overall size of 75x60mm with reinforcement of 1.5mm thickness. Glazing bead for fixing of glass shall be size 34x20mm coextruded with gasket, Ventilator shall be provided with 4.5mm Pin Head glass, standard hardware, single point locking and friction stays, Wall thickness of frame, mullion and sash shall be 2.0 mm For VENTILATORS FIRST FLOOR

41

-

399873

... More
Construction of First floor;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.20mmforouterframes,(54mmx38mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co- extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete forfinished item of work

212

-

1467040

... More
Construction of First floor;S/F of 30mm thick WPC (wood plastic composite) solid door shutter factory made including made including fixing of MS powder coating alum coating alum fixture such as 3nos. Butt hinges, 150mm ht, 1no, tower bolts 10mm long, 2nos alum long handles, 125mm long 1no aldrop 200mm long, including fixing the door shutter to frame for finished item of work (Rate as per Quotation approved by the Executive Engineer).

88.2

-

308700

... More
Construction of First floor;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast. For FIRST FLOOR

277.2

-

210672

... More
Construction of First floor;Supply and fixing of Doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm fixed with ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 3 Nos. butt hinges (IS:205) 150mm long , 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm) FIRST FLOOR

113.4

-

605215.8

... More
Construction of First floor;Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutter of 30mm thick double shutters with bond wood solid block board type core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides, including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm) For TERRACE FLOORS

10.08

-

53776.8

... More
Construction of First floor;Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutter of 30mm thick double shutters with bond wood solid block board type core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides, including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm) For FIRST FLOORS

10.08

-

53776.8

... More
Construction of First floor;Ornamental plastering to ceiling 12 mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) For CEILING TERRACE FLOOR

146.5

-

84530.5

... More
Construction of First floor;Ornamental plastering to ceiling 12 mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) For CEILING FIRST FLOOR

547.1

-

288868.8

... More
Construction of First floor;Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) For Internal walls TERRACE FLOOR

1068.7

-

585647.6

... More
Construction of First floor;Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) For Internal walls FIRST FLOOR

547.1

-

275738.4

... More
Construction of First floor;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) For EXTERNAL WALLS FIRST FLOOR

558.1

-

334301.9

... More
Construction of First floor;Skirting with Vitrified tiles of Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs to internal walls 12.5cm height with length equal to flooring stones and matching the flooring joint lines and set over a base coat of CM (1:5) prop. 12mm thick and filling the joints with laticrete epoxy grout of approved shade pigment match the lines of tiles slab, including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed)cost of excluding seigniorage on all materials cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701)

61.8

-

64704.6

... More
Construction of First floor;Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement etc., to site, cost of excluding seigniorage on materials and all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

1366.7

-

1072859.5

... More
Construction of First floor;Flooring with Vitrified tiles of Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick and filling the joints with laticrete epoxy grout of pigment of approved shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed)cost of excluding seigniorage on all materials cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701)

711.6

-

748603.2

... More
Construction of First floor;Providing Clading/Skirting with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black/ REGULAR colours set over base coat of CM (1:3) 12mm thick with Grey cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with cement to full depth (joints of stone should be flushed)including cost and conveyance of all materials like cement, sand, water, etc., to site includingcost of excluding seigniorage on all materials cost of base coat all labour charges like dressing to the required size, mixing of mortar, curing and lift charges including cutting the brick wall to place the stones and redoing the surface smooth complete for finished item of works (APSS No.707 & 701). The skirting should flush online with plastering.

65.4

-

297700.8

... More
Construction of First floor;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black/ REGULAR colours set over a base coat of CM (1:8) prop. 12mm thick and filling the joints with white cement mixed with pigment of matching shade to match the shade of granite over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, granite slabs, white cement etc., to site (excluding cost of C.C. bed)cost of excluding seigniorage on all materials cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701)

459.7

-

1944990.7

... More
Construction of First floor;Supplying, fitting and placing HYSD (Fe 500/ tmt grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes, on cost of all materials complete for finished item of work for TERRACE FLOOR

3.8

-

311809

... More
Construction of First floor;Supplying, fitting and placing HYSD (Fe 500/ tmt grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes, on cost of all materials complete for finished item of work for FIRST FLOOR

38.5

-

3107681.5

... More
Construction of First floor;Reinforced Brick Masonry for partition walls (115 mm thick) in CM (1:4) prop.(Cement:Sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, excluding cost of seigniorage charges on all materials, scaffolding charges and all labour charges like mixing cement mortar, lift charges, curing, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) for:-Reinforced Brick Masonry in CM 1:4 (Country)

411.6

-

359326.8

... More
Construction of First floor;Brick masonry 230 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Brick Masonry in CM 1:6 (Country). FOR WALLS IN TERRACE FLOOR

106

-

809946

... More
Construction of First floor;Brick masonry 230 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Brick Masonry in CM 1:6 (Country). FOR WALLS IN FIRST FLOOR

286.7

-

2075134.6

... More
Construction of First floor;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402)

9.1

-

51970.1

... More
Construction of First floor;Supply and placing of M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20 mm size graded machin crushed hard granite metel (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc. to site and including Seigniorage charges, Sales and other taxes on all materials including all oprational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.402) with minimum cement content as per IS code from standerd suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finish item of work. for SUNSHADES FIRST FLOOR

105.84

-

115365.6

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work. for M25 abv ground level FOR WAIST SLAB 175MM THK FIRST FLOOR

37.3

-

67363.8

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work. for M25 abv ground level FOR ROOF SLAB 125MM THK TERRACE FLOOR

133.2

-

201798

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work. for M25 abv ground level FOR ROOF SLAB 125MM THK FIRST FLOOR

1205.7

-

1753087.8

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work. for M25 abv ground level FOR ROOF BEAMS TERRACE FLOOR

6.07

-

76866.34

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work. for M25 abv ground level FOR ROOF BEAMS FIRST FLOOR

77.75

-

944973.5

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work. for M25 abv ground level FOR LINTELS TERRACE FLOOR

0.2

-

2896.4

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work. for M25 abv ground level FOR LINTELS FIRST FLOOR

9.8

-

134789.2

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work. for M25 abv ground level FOR COLUMNS TERRACE FLOOR

5.8

-

85358.6

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work. for M25 abv ground level FOR COLUMNS FIRST FLOOR.

40.6

-

563974.6

... More
Construction of First floor;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work . below ground level for STEPS FIRST FLOOR

3

-

21177



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.