Professor Jayashankar Telangana State Agricultural University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Professor Jayashankar Telangana State Agricultural University - PJTSAU Tender

Opening Date27 May 2021
Closing Date10 Jun 2021
Tender Amount₹ 2,44,29,417 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Girls Hostel;Fabrication, Transportation and supply of 1.5 Mtr Length single Arm standard Bracket made with MS galvanized 50mm dia Pipe.Makes: BAJAJ / VALMONT / TRANSRAIL/ SKIPPER / UTKARSH / LAASMA / CONSOUL

8

-

13760

... More
Girls Hostel;Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal /Conical pole duly erecting on base plate duly provided 4 Nos foundation bolts with nuts with providing of 0.45Mtrx0.45Mtrsx1.20 Mtr size M20 cc work vibrated concreting mixing with necessary steel (10kgs) reinforcement as directed by the field engineers during execution including centering, decentering, water curing as required, soil exacavation, back filling, muffing removal and coil earthing including all labour charges and cost and conveyance of materials etc. complete.

8

-

37840

... More
Girls Hostel;Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including chain for anti theft mechanism, supply of suitable boards with bakelite sheet, din channel for MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for7.50 Mtrs height Pole having dimensions Bottom 130mm, Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700mm long 'J' bolts along with template or equivalent. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL

8

-

96000

... More
Girls Hostel;Supply ,transportation and fixing of 90W +/-10% LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro /Jaquar / Eveready / Halonix / Keselec /HAVELLS / POLYCAB / SURYA / SYSKA /Capart / Fortune Art / FIEM / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs.including all connections and all labour charges etc.,complete.

10

-

99400

... More
Girls Hostel;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate. including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B

25

-

12675

... More
Girls Hostel;Supply and fixing of LAN Cable cat - 6 UTP cable of Makes : D Link / AMP / Molex / Legrand / Krone. including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B

825

-

29700

... More
Girls Hostel;Supply and run of 25mmx3mm copper strip including cost of all accessories and labour charges etc.,complete

80

-

45360

... More
Girls Hostel;Supply, Transportation and Fixing of 9" (225mm) light duty exhaust fan with wire guard etc complete of makes Crompton / Havells Ventilair-DB /Orient hill air Make exhaust / Fresh Air fan with metallic body and blades including making hole in wall and masonary work and all labour charges etc., complete.

14

-

33922

... More
Girls Hostel;Supply of 7.0W LED Lamp with input voltage 90 to 300V, Colour temparature 3000k - 6500k, Beam angle 170 - 220 degrees, B22 base, 490 Lumens.Makes: Phillips / OSRAM / GE / Crompton / VIN /Bajaj / Havells / Pharox / Halonix / Green lites.

25

-

3200

... More
Girls Hostel;Supply and fixing of Anchor/Gold Medal Olive/million Zoom make ISI mark batten holder / angle holder on existing block, but without bulb including all connections etc., complete (For replacement)

25

-

2350

... More
Girls Hostel;Providing earth electrode of low carbon steel rod, UL listed of 17.2 mm dia, 3 Mtr long, coated with copper of 254 microns thickness, CPRI tested for short time current withstand test of 25 kA, coating thickness, environmental test (Salt Mist Test), Bend test, Tensile strength, Yield /tensile ratio, Electrical Resistivity test,complete with clamps and 2 bags of Earthplus ULTRA high grade earthing compound IEC 62561-7 complaint Ecofriendly,Maintenance free, anti corrosive, lead-free, super conductive, mineral based high-grade earthing compound, to enhance soil conductivity. With resistance <0.20 ohms-meter, should be leach proof & sulphur free complete with earth inspection chamber of dimensions : Width :320 mm x 320 mm, Height : 192 mm, Weight : 30 Kgs, Load bearing capacity :5000 Kgs including drilling of bore in any kind of soil.

2

-

29664

... More
Girls Hostel;Providing independent earthing for Important equipment with 100mm dia Heavy gauge C.I ( Cast iron ) pipe with Flange 2.5m long enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with salt and charcoal from the bottom of the pipe giving earth connection from electrode through flange with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

2

-

16538

... More
Girls Hostel;Supply and fixing of 8 Way VTPN DB accomodating 125A 4 Pole MCCB as incomer and 8 Nos(40-63)A TP MCBs as outgoing and with IP 43 Protection of makes Legrand / Schneider. , including internal connections and labour charges for Flush Mounting etc., complete

2

-

79310

... More
Girls Hostel;Supply and fixing of (8+12) 4 way TPN DB Harizontal with IP-43 Protection makes Legrand/Schneider suitable for with 1No 100A FP isolator and 12Nos 6-32A 10KA SP MCB,C/D Curve ISI Mark of make Legrand/Schneider , including internal connections and labour charges for Flush Mounting etc., complete.

8

-

75984

... More
Girls Hostel;Supply,fixing and transportation of 18 W +/-10% back lit LED Down Light Recessed /Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro/ Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska /Eveready / Surya / Keselec / FIEM.LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs...including all accessrioes and all labour charges etc.,complete.

45

-

105255

... More
Girls Hostel;Supply,fixing and Transportation of 10W,1000 lumens, 600mm length LED batten tube light, housing made with PC body, wide operating voltage with Single /double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K -6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj /Havells / Jaquar / IB LED / Panasonic /Halonix / HPL / Syska / Eveready / Surya /Keselec.LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs. including all accessories and labour charges etc complete

18

-

13950

... More
Girls Hostel;Supply,fixing and Transportation of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: >2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS certification with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj /Havells / Jaquar / IB LED / Panasonic /Halonix / HPL / Syska / Eveready / Surya /Keselec/ FIEM.LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs including all accessories and labour charges etc complete

60

-

66960

... More
Girls Hostel;Supply & Fixing of Electronic step type Fan Regulator.Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL including 2 way module box and Cover frame including all accessories and labour charges etc complete

30

-

12810

... More
Girls Hostel;Supply, Transportation and Fixing of energy efficient decorative fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90,Service Value (CMM/W) greater than 8.5,Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%, remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C (max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., complete.Makes :Atomberg (Efficio + ) / Havells / Orient including all labour charges etc., complete.

30

-

109140

... More
Girls Hostel;Supply and fixing of 16A/6A 1 way Combi Socket Modular Socket ( Sockets combined 2 in one) with 20A 1 Way Modular Switch with indicator of Legrand Myrius / Million mway/Goldmedal Curve/ Anchor Roma viola /Havells Fabio / Panasonic Vision / Hager Insista / Benlo Vesta / C&S Primo / CPL Vysma / Polycab Levana. make make with suitable cover frame and Modular box and earth connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B

55

-

31955

... More
Girls Hostel;Supply and fixing of 10A 3/2 pin 2 module modular Socket with 10A 1 Way 1 module Modular Switch of Legrand Myrius / Million mway /Goldmedal Curve/ Anchor Roma viola /Havells Fabio / Panasonic Vision / Hager Insista / Benlo Vesta / C&S Primo / CPL Vysma / Polycab Levana make make with suitable cover frame and Modular box and earth connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B

45

-

21780

... More
Girls Hostel;Supply and Run of 5 of 140/0.3mm (10.00 Sq.mm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR). make in existing pipe for run of mains inlcuding all labour charges etc., com

100

-

55000

... More
Girls Hostel;Supply and Run of 5 of 86/0.3mm (6.00 Sq.mm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR). make in existing pipe for run of mains inlcuding all labour charges etc., com

120

-

44640

... More
Girls Hostel;Supply and Run of 3 of 56/0.3mm (4.00 Sq.mm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR)t. make in existing pipe for run of mains inlcuding all labour charges etc., com

950

-

158650

... More
Girls Hostel;Supply and Run of 3 of 36/0.3mm (2.50 Sq.mm) + Run of 2 of 22/0.3mm(1.50sqmm) FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR).. make in existing pipe for run of mains inlcuding all labour charges etc., com

650

-

94250

... More
Girls Hostel;Wiring with run of 3 of 22/0.3mm (1.50 Sq.mm) FRLS/HFFR PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR) make in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with cover frame of ISI Mark Legrand Myrius / Million Tap-Wood/ Anchor Roma viola / Havells Fabio / C&S Prime / CPL Vysma / Benlo Vesta / Polycab Levana makes with required cover frame to be fixed with Modular box in existing surface / consealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete including cost and conveyance of all materials and all labour charges etc., complete for light and bell points in N.R.B

30

-

23910

... More
Girls Hostel;Wiring with run of 2 of 22/0.3mm (1.50 Sq.mm) FRLS/HFFR PVC insulated 1100V grade as per IS:694/1990 specification for copper cable of makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) /L&T / V-Guard (HFFR) make in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with cover frame of ISI Mark Legrand Myrius / Million Tap-Wood/ Anchor Roma viola / Havells Fabio / C&S Prime / CPL Vysma / Benlo Vesta / Polycab Levana makes with required cover frame to be fixed with Modular box in existing surface / consealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete including cost and conveyance of all materials and all labour charges etc., complete for light and bell points in N.R.B

130

-

87100

... More
Girls Hostel;Supply and fixing of 25mm outer dia Heavy(1.50mm thickness) grade with IS:9537 part 3 regid PVC pipe makes Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / along with reinforcement is concealed in wall with all required accessories including chiseling the wall whenever necessary including masonry work including all labour charges etc., complete and as directed by the department for fan point, light point and plug point including all labour charges.

1150

-

106950

... More
Girls Hostel;Supply and fixing of 25mm outer dia Heavy(2.20mm thickness) grade with IS:9537 part 3 regid PVC pipe makes Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold/ Polycab / DEC / Beljin / Champion. along with reinforcement is concealed in Roof Slabs with all required accessories including chiseling the wall whenever necessary including masonry work including all labour charges etc., complete and as directed by the department for fan point, light point and plug point including all labour charges.(for Slabs)

850

-

86700

... More
Girls Hostel;ELECTRICAL WORKS

-

-

-

... More
Girls Hostel;Providing 110 mm Dia ISI marked PVC (Sudhakar / Nandhini) down water take pipes with socket , 2.5mm thick 2.5kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)

24

-

8472

... More
Girls Hostel;Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work.

10000

-

80000

... More
Girls Hostel;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.-For 50mm dia

4

-

15584

... More
Girls Hostel;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.-For 40mm dia

8

-

21248

... More
Girls Hostel;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.-For 32mm dia

8

-

15752

... More
Girls Hostel;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.-For 20mm dia

8

-

7208

... More
Girls Hostel;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost & conveyance of all materials, labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.-For 15mm dia

8

-

5352

... More
Girls Hostel;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost of overheads & contractor profit etc. for finished item of work as directed by Engineer-in-charge. -'54.00mm OD pipe11

70

-

38570

... More
Girls Hostel;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost of overheads & contractor profit etc. for finished item of work as directed by Engineer-in-charge. -41.30 mm OD Pipe SDR 11

70

-

26460

... More
Girls Hostel;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost of overheads & contractor profit etc. for finished item of work as directed by Engineer-in-charge.-34.90mm OD Pipe SDR 11: Terrace

246

-

74784

... More
Girls Hostel;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost of overheads & contractor profit etc. for finished item of work as directed by Engineer-in-charge.-22.20 mm OD Pipe SDR 11:

410

-

69290

... More
Girls Hostel;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost of overheads & contractor profit etc. for finished item of work as directed by Engineer-in-charge.-15.90mm OD Pipe SDR 11

231

-

34188

... More
Girls Hostel;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) -For 110mm dia

100

-

44100

... More
Girls Hostel;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

70

-

20720

... More
Girls Hostel;Supply and fixing tested Chromium plated Short Body Bib Cock of fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/Senior/ Nice or equivalent approved make chromium plated 400 grams with CP Wall flanges complete for all floors, including cost & conveyance of all materials, labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.

8

-

5128

... More
Girls Hostel;Supply and fixing tested Chromium plated Long Body Bib Cock of fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/Senior/ Nice or equivalent approved make chromium plated 400 grams with CP Wall flanges complete for all floors, including cost & conveyance of all materials, labour charges, etc. complete for finished item of work as directed by Engineer-in-charge.

16

-

13040

... More
Girls Hostel;Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with brackets and aluminium screws including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work.

10

-

1730

... More
Girls Hostel;S&F CP finish brass wall mounted towel ring, including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

8

-

5184

... More
Girls Hostel;Supplying and fixing Glass frameless mirror and plywood back with CP screws of size 609.6 mm x 457 .2 mm (24" x 18") Indian make best quality glass mirror with approved make 1st quality including cost & conveyance of all materials, labour charges, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

8

-

4312

... More
Girls Hostel;Supplying and fixing CP soap dish heavy type of approved make ISI quality with CP screws etc., complete including cost and conveyance of all materials, labour charges for fixing , overheads & contractors profit for finished item of work in all floors

15

-

8925

... More
Girls Hostel;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice/ Esso or equivalent complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 400 gms Seiko or equivalent , 31.75mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work

8

-

20536

... More
Girls Hostel;Supplying and fixing Chrome plated bib cock cum health faucet with 1m long flexible tube and wall hook of Jaquar make queen series/Jupiter Aqua Lines-JAL-make Nira as approved by Engineer-In-Charge with 7 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges , overheads & contractor profit complete for finished item of work in all floors.

6

-

20238

... More
Girls Hostel;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components and fixed using required size of nails and screws, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

6

-

34512

... More
Girls Hostel;Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick - ISI mark and providing masonry seat, CC squatting plate and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge, 12.70mm PVC connection with brass union nuts CP coated , 31.75mm brass plumber union, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges, overheads & contractors profit etc., complete for finished item of work.

3

-

13797

... More
Girls Hostel;Supplying and fixing CI Nahani traps 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

20

-

5520

... More
Girls Hostel;Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 & 4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as approved including cost and conveyance of all materials to site, labour charges, overheads & contractors profit etc., complete for finished item of work.

8

-

5728

... More
Girls Hostel;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

4

-

54136

... More
Girls Hostel;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

6

-

50958

... More
Girls Hostel;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318) 152.40mm dia upto 914.40mm (3') depth

170

-

134640

... More
Girls Hostel;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318) 101.60mm dia upto 914.40mm (3') depth

150

-

79350

... More
Girls Hostel;SANITARY WORKS

-

-

-

... More
Girls Hostel;Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 & 4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as approved including cost and conveyance of all materials to site, labour charges, overheads & contractors profit etc., complete for finished item of work.

20

-

14320

... More
Girls Hostel;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc with solvent jointing as per standard practice including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326)

205

-

139605

... More
Girls Hostel;Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including providing 4" coving with cement concrete in (1:2:4) prop. rounding off the wall and slab junction etc., complete for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3) 20mm.

72

-

38304

... More
Girls Hostel;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:6) & (1:4): 20 mm -EXTERNAL PLASTERING

75

-

16800

... More
Girls Hostel;Supplying, fitting and placing HYSD (Fe 500/ tmt grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position,tying etc., and sales & other taxes, on cost of all materials complete for finished item of work (Obtained from primary producers such as TATA/VSKP/JSW/SHYAM )

2.7

-

214334

... More
Girls Hostel;Brick masonry 230 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Brick Masonry in CM 1:6 (Country) .

3

-

20217

... More
Girls Hostel;Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for BEAMS & SLABS IN BUILDINGS Design Mix : M 25(Weigh Batch) Roof Slabs-(150mm thk)

52

-

80808

... More
Girls Hostel;Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Design Mix : M 25 (Weigh Batch) Centering for Steel up to 3.66M .-Side walls-SUMP &

96

-

251808

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR SUMP

6

-

59754

... More
Girls Hostel;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 402) (BLD-CSTN-3-5)

14

-

55034

... More
Girls Hostel;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and Overheads & Contractors profit complete for fnished item of work (APSS NO.309&310) (BLD-CSTN-2-9)

139

-

6394

... More
Girls Hostel;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental,labour charges,hire charges of T&P etc., and Overheads & Contractors profit complete for fnished item of work(APSS NO.309&310)

42

-

9114

... More
Girls Hostel;Filling with 20mm Nominal aggregate in trenches, sides of foundations & basement from approved quarry consolidating deposited layer by watering and ramming, including all operational, incidental, labour charges, complete including cost and conveyance of sand / gravel for finished item of work. (APSS No 309 & 310).

53

-

92644

... More
Girls Hostel;Filling with 40mm Nominal aggregate in trenches, sides of foundations & basement from approved quarry consolidating deposited layer by watering and ramming, including all operational, incidental, labour charges, complete including cost and conveyance of sand / gravel for finished item of work. (APSS No 309 & 310).

42

-

43932

... More
Girls Hostel;Filling with 60mm Nominal aggregate in trenches, sides of foundations & basement from approved quarry consolidating deposited layer by watering and ramming, including all operational, incidental, labour charges, complete including cost and conveyance of sand / gravel for finished item of work. (APSS No 309 & 310).

42

-

37548

... More
Girls Hostel;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges in Ordinary Soil-Manual Means-Upto 3M depth etc as per SS 20B (ApSS 308).

352

-

142208

... More
Girls Hostel;RAIN WATER HARVESTING PIT

-

-

-

... More
Girls Hostel;Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including providing 4" coving with cement concrete in (1:2:4) prop. rounding off the wall and slab junction etc., complete for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3) 20mm.

83

-

44156

... More
Girls Hostel;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:6) & (1:4): 20 mm -EXTERNAL PLASTERING

147

-

68502

... More
Girls Hostel;Supplying, fitting and placing HYSD (Fe 500/ tmt grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position,tying etc., and sales & other taxes, on cost of all materials complete for finished item of work (Obtained from primary producers such as TATA/VSKP/JSW/SHYAM )

3

-

238149

... More
Girls Hostel;Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for BEAMS & SLABS IN BUILDINGS Design Mix : M 25(Weigh Batch) Roof Slabs-(150mm thk)

20

-

31080

... More
Girls Hostel;Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for BEAMS & SLABS IN BUILDINGS Design Mix : M 25(Weigh Batch) Roof Slabs-(125mm thk)

12

-

16728

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS.

2

-

23290

... More
Girls Hostel;Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Design Mix : M 25 (Weigh Batch) Centering for Steel up to 3.66M .-Side walls-SUMP & Side walls-Septic tank

92

-

241316

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR SUMP AND SEPTIC TANK BASE SLAB

4

-

39836

... More
Girls Hostel;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 402) (BLD-CSTN-3-5)

3

-

11793

... More
Girls Hostel;Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means.

112

-

25872

... More
Girls Hostel;SUMP AND SEPTIC TANK:

-

-

-

... More
Girls Hostel;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.

22

-

3740

... More
Girls Hostel;Supplying and fixing of MS doors, grill to windows / in open court yards using MS angles, flat, square bars including cost and conveyance of all materials, cutting, bending, welding, all operational charges, labour charges, overheads and contractor profit etc., complete for finished item of work. for GATE

2000

-

220000

... More
Girls Hostel;Painting to walls with two coats of water proof cement paint of snowcem or equivalent of approved brand and shade over a base coat of water based Cement Primer of Exterior Grade- 2of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Water proof cement paint - 3 Coats.

903

-

136353

... More
Girls Hostel;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:6) & (1:4): 20 mm -EXTERNAL PLASTERING

903

-

420798

... More
Girls Hostel;Supplying, fitting and placing HYSD (Fe 500/ tmt grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position,tying etc., and sales & other taxes, on cost of all materials complete for finished item of work (Obtained from primary producers such as TATA/VSKP/JSW/SHYAM )

9

-

714447

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS in compound wall

9

-

117657

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Pedastals

25

-

264000

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS

29

-

288811

... More
Girls Hostel;Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work, for:-Machine Mix-PCC : M-20 NOMINAL MIX Centering with Steel up to 3.66M. FOR STEPS./ coping

15

-

99495

... More
Girls Hostel;Brick masonry 230 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Brick Masonry in CM 1:6 (Country) .

85

-

572815

... More
Girls Hostel;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING

31

-

205313

... More
Girls Hostel;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 402) (BLD-CSTN-3-5)

29

-

113999

... More
Girls Hostel;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means.

256

-

103424

... More
Girls Hostel;COMPOUND WALL:

-

-

-

... More
Girls Hostel;Supply and fixing jallies ( cement concrete ) of 50mm thick as per the design approved by the Engineer-in-Charge including cost and conveyance of materials to site and labour charges etc., complete for finished item of work in all floors.

15

-

11625

... More
Girls Hostel;Supplying and fixing ornamental MS Grills including fabrication and erection in position using alround frame of 25mm X 6mm MS flat welded with 10mm X 10mm square bar rods placed at 4" and 2" c/c (alternate spacing) fixed in both horizontal and vertical directions including cost and conveyance of all materials to work site, all operational, incidental labour charges, power charges, overheads & contractors profit etc., complete for finished item of work.

72

-

166824

... More
Girls Hostel;Providing 10 mm thick poly carbonate multi wall sheet including alum. Flats with rubber beeding, necessary screws etc., complete as directed by the department.

225

-

672975

... More
Girls Hostel;Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand water and tiles etc., overheads and contractors profit, complete for finished item of work.

20

-

16020

... More
Girls Hostel;Supplying and fixing stainless steel hand railing. Balustrade etc using 304 grade stainless steel pipes of 50 mm dia nominal bore for hand railing at 3'0" high form ground leveland 40 mm dia nominal bore for vertical supportes placed at 5'0" C/C and three numbers 25 mm nominal bore for horizontal pipes placed below hand railing pipes as per the approved drawing including cost and conveyance of all materials buffing charges polishing charges etc complete for finished item of work. (50mm dia @1.91 kg/Rmt, 40mm dia @1.41 kg/Rmt and 25mm dia @0.88kg/Rmt Ground floor

13

-

98826

... More
Girls Hostel;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR ofCaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

6

-

41592

... More
Girls Hostel;Supplying and fixing of UnplasticisedPolyVinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94mmx45mm) / (80mmx52mm) x 2.20 mm for outer frames, (58 mm x 39mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of1.0/1.2mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42mmx25mm)/(52mmx21.5mm)x2.0mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing /deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractor's profit, etc. complete for finished item of work.

56

-

431368

... More
Girls Hostel;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Flush door shutters of 30 mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 and providing and fixing PVC door cladding to the flush doors shutter it shall be pasted with synthetic glue 1 mm thick including cost of Aluminium fixtures 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1 No. Latch - 300 mm long, 2 Nos. handles of 150 mm size and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work.(800mmx2100mm)

24

-

122160

... More
Girls Hostel;S/F in position teak wood flush door of approved design with single shutter using medium grade T.W scantling of rize 100mm x 75mm for door frame and 35mm thick flush shutter using solid bond wood black bound type (ISF) with teak veneer on both sides conforming to IS 2202 including cost of 6nos x MS Z-hold faster of rize 300 x 40 x 5mm C.C bed blocks of rize 300x230x150mm 3Nosx125 rizeSSbult hinges (IS 205) 1No x 300 long SS aldrop (IS 2681) 1No 300 x long (10mm) SS tower bolt IS(204) 2 Nos x 150mm SS handler (IS 208) 1Nos x aluminium door stopper cost of necessary screws nuts & bolts labour charges for rought put up for making door frame fixing flush door shutter with fixtures to the door frame cost and conveyance of all materials to the etc., complete for finished item of work as directed by the dept. (1050mmx2100mm)

18

-

105012

... More
Girls Hostel;S/F in position teak wood partly panelled and partly glazed using scantling at size 150x75mm for door frame alround as per design and drawing and providing teak wood panelled design shutters using the medium teak wood scantling 125x45mm for vertical styles of 150x45mm size for bottom rail and lock rail 100x45mm top rail & middle rail and fixed with 25mm x6mm size teak wood design beeding for planks for alround the planks as per design including painting with bitumen paint for door frame on masonary side. Cost of 8 No's x 300mmx40mmx5mm size Brass butt hinges as per IS (205) 1x350x16mm dia brass aldrop (IS-2681) 1 NOx350x16 dia brass 3 Nos x 300x10mm brass tower bolts (IS 204) 4 Nos x 200 long heavy latch (IS 26) door stopper cost of necessary screws as per design screws nuts labour charges for wrought & put up for making partly glazed teak wood as per design and drawing including fixing the shutters glass and fixing to the doors cost & coveyance of all materials, labour charges etc.

4

-

46692

... More
Girls Hostel;Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402)

18

-

209790

... More
Girls Hostel;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with synthetic enamel paint 1st grade of approved brand and shade having VOC (Volatile organic compound) content less than 50 grams/liter over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors.

11

-

2662

... More
Girls Hostel;Painting to walls with 2 coats water proof cement paint or snowcem or equivalent of approved brand and shade over existing paint surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Water proof cement paint - 2 Coats

835

-

126085

... More
Girls Hostel;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.

2017

-

264227

... More
Girls Hostel;White washing three coats with paint grade white lime to ceiling and basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work .

768

-

43008

... More
Girls Hostel;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding for:-External Putty -First Floor

594

-

237600

... More
Girls Hostel;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding for:-External Putty -Ground Floor

835

-

329825

... More
Girls Hostel;Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including providing 4" coving with cement concrete in (1:2:4) prop. rounding off the wall and slab junction etc., complete for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3) 20mm. GROUND FLOOR

808

-

429856

... More
Girls Hostel;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand, water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) GROUND FLOOR

31

-

122140

... More
Girls Hostel;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand, water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707) GROUND FLOOR

17

-

70856

... More
Girls Hostel;Providing 16 to 18mm thick high polished granite stone slabs of premium colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special) Ground Floor :

12

-

75996

... More
Girls Hostel;Providing 16 to 18mm thick high polished granite stone slabs of premium colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special) Ground Floor :

8

-

35872

... More
Girls Hostel;Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement etc., to site, cost of excluding seigniorage on materials and all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. Ground Floor :

260

-

199940

... More
Girls Hostel;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701) Ground Floor :

113

-

95485

... More
Girls Hostel;Skirting with Vitrified tiles of Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs to internal walls 12.5cm height with length equal to flooring stones and matching the flooring joint lines and set over a base coat of CM (1:5) prop. 12mm thick and filling the joints with laticrete epoxy grout of approved shade pigment match the lines of tiles slab, including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed)cost of excluding seigniorage on all materials cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701) Ground Floor :

77

-

76923

... More
Girls Hostel;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) Ground Floor :

602

-

604408

... More
Girls Hostel;Plastering 20mm thick using screened sand with CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, curing, cutting grooves as directed by Engineer - in - charge and cost of overheads & contractors profit etc., complete for finished item of work for basement. (SS 901,903 & 904) EXTERNAL PLASTERING GF

122.8

-

27507

... More
Girls Hostel;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:6) & (1:4): 20 mm -EXTERNAL PLASTERING FF

593.3

-

306736

... More
Girls Hostel;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:5) & (1:3): 20 mm -EXTERNAL PLASTERING GF

835

-

389110

... More
Girls Hostel;Ornamental plastering to ceiling 12 mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Ceiling Plastering 2/c in CM (1:3) & (1:5): 12 mm FIRST FLOOR

24

-

12384

... More
Girls Hostel;Ornamental plastering to ceiling 12 mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Ceiling Plastering 2/c in CM (1:3) & (1:5): 12 mm GROUND FLOOR

744

-

347448

... More
Girls Hostel;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) FIRST FLOOR

47

-

23077

... More
Girls Hostel;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) GROUND FLOOR

1970

-

880590

... More
Girls Hostel;Reinforced Brick Masonry for partition walls (115 mm thick) in CM (1:4) prop.(Cement:Sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, excluding cost of seigniorage charges on all materials, scaffolding charges and all labour charges like mixing cement mortar, lift charges, curing, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) for:-Reinforced Brick Masonry in CM 1:4 (Country) . GROUND FLOOR

196

-

160524

... More
Girls Hostel;Brick masonry 230 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Brick Masonry in CM 1:6 (Country) . FIRST FLOOR

66

-

471042

... More
Girls Hostel;Brick masonry 230 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Brick Masonry in CM 1:6 (Country) . GROUND FLOOR

247

-

1664533

... More
Girls Hostel;Supplying, fitting and placing HYSD (Fe 500/ tmt grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position,tying etc., and sales & other taxes, on cost of all materials complete for finished item of work (Obtained from primary producers such as TATA/VSKP/JSW/SHYAM ) FIRST FLOOR

2

-

161438

... More
Girls Hostel;Supplying, fitting and placing HYSD (Fe 500/ tmt grade as per IS 1786-1985) bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of bars from approved sources to site of work, binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position,tying etc., and sales & other taxes, on cost of all materials complete for finished item of work (Obtained from primary producers such as TATA/VSKP/JSW/SHYAM ) GROUND FLOOR

66.7

-

5294846

... More
Girls Hostel;Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HGG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials including cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., & lift charges for finished item of work. (APSS No. 402)

214

-

229408

... More
Girls Hostel;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) Ground Floor

44

-

45628

... More
Girls Hostel;Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for BEAMS & SLABS IN BUILDINGS Design Mix : M 25(Weigh Batch) Roof Slabs-First Floor (150mm thk)

24

-

38928

... More
Girls Hostel;Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for BEAMS & SLABS IN BUILDINGS Design Mix : M 25(Weigh Batch) Roof Slabs-Ground Floor (175mm thk)

70

-

121310

... More
Girls Hostel;Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for BEAMS & SLABS IN BUILDINGS Design Mix : M 25(Weigh Batch) Roof Slabs-Ground Floor (150mm thk)

411

-

638694

... More
Girls Hostel;Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for BEAMS & SLABS IN BUILDINGS Design Mix : M 25(Weigh Batch) Roof Slabs-Ground Floor (125mm thk)

335

-

466990

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS. FIRST floor :

3

-

36492

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS. Ground floor :

49

-

570605

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS, in BUILDINGS. FIRST floor :

0.3

-

4129

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS, in BUILDINGS. Ground floor :

4.2

-

54743

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS in BUILDINGS. First floor :

2.5

-

34753

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS in BUILDINGS. Ground floor :

30.7

-

401341

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS in BUILDINGS. upto plinth level

21.1

-

275840

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR PLINTH BEAMS.

42

-

526722

... More
Girls Hostel;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS

300

-

2987700

... More
Girls Hostel;Pre construction Anti termite is a process in which chemical toxic to sub terrain termites is apply/ inject into soil during early stage of building Construction Treatment of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the columns , plinth beams (Back filling) walls and floor junction, external perimeters, along retaining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for spraying, rodding, cost of overheads and contractors profit, etc. complete for furnished item of work as per the approval of the Engineer-in-charge (Plinth area measurements will be taken for payment)

808

-

139784

... More
Girls Hostel;Providing Plinth protection with a bed of 100mm thick PCC(1:5:10) using 40mm size HB Granite metal and on top of PCC, 20mm thick granolithic concrete flooring with CC(1:1:2) prop.using 6mm to 12mm size graded hard granite machine crushed metal laid monolithically already laid, in alternate panels of size not exceeding 1.5 x 1.5 Mts. and providing 5mm thick glass strips between the pannels and finishing the top surface to required smoothness and slopes including grooves, thread lining as directed by the Engineer - in - charge including cost and conveyance of all materials to site including seigniorage charges, sales & other taxes on all materials and operational & incidental and labour charges like mixing of cement concrete, laying, curing, lift charges etc.,and Overheads & Contractors profit complete including cost of CC bed for finished item of work. (APSS No.701 & 710)

328

-

465104

... More
Girls Hostel;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental,labour charges,hire charges of T&P etc., and Overheads & Contractors profit complete for fnished item of work(APSS NO.309&310)

441

-

95697

... More
Girls Hostel;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and Overheads & Contractors profit complete for fnished item of work (APSS NO.309&310) (BLD-CSTN-2-9)

674

-

31004

... More
Girls Hostel;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING

76

-

503348

... More
Girls Hostel;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) HAND MIXING

74

-

275946

... More
Girls Hostel;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 402) (BLD-CSTN-3-5)

75

-

294825

... More
Girls Hostel;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mannual Means.

1065

-

430260



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.