Professor Jayashankar Telangana State Agricultural University Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 3,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
199681Bid Award Id
ViewTender No
6-4/PJTSAU/EO/TPA/TA/2020-21, dated: 13-10-2020Tender Authority
Professor Jayashankar Telangana State Agricultural University ViewPurchaser Address
-Website
http://https://pjtsau.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Foot Over Bridge;Plastering 20 mm thick in single coat in CM (1:3) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904)-
65
-
15015
... More
Foot Over Bridge;Supplying, fitting and placing HYSD Fe 500 manufactured by Primary producers like TATA,SAIL,VSP, Jindal (as approved by Ministry of steel guidelines) of different diameters for RCC works complete, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)
4.4
-
229319
... More
Foot Over Bridge;Roof Slabs: Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for BEAMS & SLABS IN BUILDINGS Design Mix : M 25(Weigh Batch)
70
-
95060
... More
Foot Over Bridge;Roof Beams: Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for BEAMS & SLABS IN BUILDINGS Design Mix : M 25(Weigh Batch)
6
-
61092
... More
Foot Over Bridge;Columns: Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Design Mix : M 25 (Weigh Batch) Centering for Steel up to 3.66M above ground levels.
1.5
-
17145
... More
Foot Over Bridge;Columns: Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including Adjustable Jack screw Props and Acro span HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Design Mix : M 25 (Weigh Batch) Centering for Steel up to 3.66M below plinth levels.
3.5
-
40005
... More
Foot Over Bridge;Plinth Beams: Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for FOUNDATIONS, PLINTH, PEDESTALS, STEPS Design Mix : M 25(Weigh Batch) Centering with Steel
1.5
-
16449
... More
Foot Over Bridge;Footings: Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for FOUNDATIONS, PLINTH, PEDESTALS, STEPS Design Mix : M 25(Weigh Batch) Centering with Steel
9
-
78264
... More
Foot Over Bridge;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
100
-
4100
... More
Foot Over Bridge;Random Rubble Stone masonry in CM (1:8) prop: (cement : sand) using hard Granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., complete for finished item of work in foundation & basement. (APSS No. 615 & 601)
13
-
44629
... More
Foot Over Bridge;Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundation levelling courses and below flooring beds using 40mm size (SS5) hard Granite metal upto Plinth level from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402) for:-Machine Mix-PCC (1:4:8) NOMINAL MIX
3.5
-
12884
... More
Foot Over Bridge;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges in Ordinary Soil-Manual Means-Upto 3M depth etc as per SS 20B (ApSS 308).
120
-
42480
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements