Police Housing Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Police Housing Corporation Limited Tender

Opening Date18 Aug 2021
Closing Date25 Aug 2021
Tender Amount₹ 2,85,57,988 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Installation of response indicators for above false ceiling detectors.

227

-

33527.9

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Installation of UL approved intellegent analogue addressable fault isolator modules including the cost of mounting accessories complete as per specifications and complete as required. Makes: Notifier / Edwards / Honeywell / Morley IAS / Bosch.

8

-

34538.96

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and installation of UL approved intellegent analogue addressable rate of rise cum fixed temparature heat detectors including the cost of base plate. 75mm dia MS outlet box for fixing of the detector base, mounting accessories etc., complete as per specifications and as required. Makes: Notifier / Edwards / Honeywell / Morley IAS / Bosch

18

-

69123.42

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and instllation of intallegent analogue addressable photo electric smoke detector including cost of base plate etc., complete as per specification with required fittings and accessories. Makes: Notifier / Edwards / Honeywell / Morley IAS / Bosch (below False Ceiling)

239

-

980258.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and instllation of intallegent analogue addressable photo electric smoke detector including cost of base plate etc., complete as per specification with required fittings and accessories. Makes: Notifier / Edwards / Honeywell / Morley IAS / Bosch (above False Ceiling)

227

-

931040.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and installation of addressable analogue manual call point with resetable flexible element to initiate alaram including the cost of mounting accessories etc. complete. Makes: Notifier / Edwards / Honeywell / Morley IAS / Bosch / Honeywell / Morley IAS / Bosch.

11

-

55739.53

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of addressable wall mounting strobes cum hooters including the cost of mounting accessories complete as per specifications and as required including testing and commissioning. Makes: Notifier / Edwards / Honeywell / Morley IAS / Bosch / Honeywell / Morley IAS / Bosch.

11

-

58114.1

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply, Installation, testing and commissioning of UL Listed 2 loop micro processor based analog addressable fire control panel expandable by minimum 2 additional loops with minimum 160 character LCD display 4 access levels 1000 events, historical logging, flash E-PROM, 240 volts A C Power supply, automatic battery charger, 24V SLA batteries suitable for operating the entire system including tack back units and the hooters/strobes for a minimum of 4 hours in battery condition the panel shall have suitable power amplifiers for hooter / strobes the panel shall be capable beeing integrated with the BMS system and shall include cost of supply, installation of any additional modules or interfaces required for the same. The panel shall be completed as per the specification and as required for fixing of above Micro processor based Fire Alarm control panel with zonal indictions and battery back up as per detailed specifications. Makes: Notifier / Edwards / Honeywell / Morley IAS / Bosch / Honeywell / Morley IAS / Bosch/ Morley IAS.

6

-

1431549

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Engineer charges towards configuration, Programming and liasoining to execute the solution as directed by the Engineer-in-charge.

1

-

2600

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply, Installation, Testing and Commissioning of Desktop computer with i5 Processor, 2 GB Graphic card, 16 GB RAM, DVD R/W, HDMI and VGA output, 7th generation, original windows 10 professional operating system, 1 TB Hard disk drive, 2 years onsite warranty, Keyboard, Speakers, Mouse etc., complete as directed by the Engineer-in-charge. Make: DELL/HP/LENOVA

1

-

98900

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 2X2 Junction box whether proof to close the RJ 45 connector for preventing the water ingress at camera location as directed by the Engineer-in-charge.

48

-

13200

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 9U floor mounting net work rack with power spike including all accessories and giving all connections, labour charges etc., complete. Makes: HCL / Vall.

2

-

12301.3

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and run of LAN Cable cat - 6 UTP cable in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: D Link / AMP / Molex / Legrand / Krone.

2000

-

70120

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of 24 port 10/100/1000 + 2 SFP combo port L2 smart managed POE switch as directed by the Engineer-in-charge. Make: D-Link / Net Gear / HP.

2

-

77400

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of Electro magnetic Lock to fix on door to control the access by Biometric or card including the cost of brackets as directed by the Engineer-in-charge.

4

-

26000

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of Application software with USB Dongle for access control Software for 500 users as directed by the Engineer-in-charge. Make: D-Link / Netgear / AMP.

2

-

55490

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of Exit switch for exit on the door, will open the door by push the button as directed by the Engineer-in-charge.

5

-

2850

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of Finger print and EM proxy card based door controller with 50000 events and 9600 finger print templates storage, Built in POE ethernet, Built in door lock port, door sense port, exit reader port, exit switch, RS 485 and Ethernet interfaces (For Entry or Exit) as directed by the Engineer-in-charge. Make: Matrix / Honeywell / Tyco.

5

-

98000

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing of 25mm outer dia Heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) surface laying on false ceiling duly fixing with G.I. Wire on existing supported studs including all labour charges etc., complete for run of mains. Makes : Sudhakar / Modi / Precision ( ISI mark).

500

-

36100

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and run of 4 of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex / RR kabel / Polycab (HR_FR-LF).

150

-

35394

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 12 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for singile phase 12 Nos S.P out goings and for 1No Incommer including internal connection and labour charges for flush mounting etc., complete (For Lift). Incommer: 63A FP Isolator-1No. Outgoing: 32A DP Isolator - 2 Nos DB Makes: Legrand / Schneider. Isolator Make: Legrand-DX3 / Schneider-Acti9. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

-

5089.95

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing of 25mm outer dia heavy grade, FRLS with IS:9537 part 3 regid PVC pipe (ISI mark) surface with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Modi ( ISI mark).

100

-

9014

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Run of No. 8 SWG copper wire including cost of all accessories and labour charges etc., complete.

150

-

14691

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 40mm dia 'B' Class G.I Pipe of 2.5Mtr length as per National Electric Code and earth connection from electrode GI strip of 25mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mm X 450mm X 400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II).

2

-

27267.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Design, Supply, Installation, Testing and Commissioning of Passenger Elevator in the available shaft for not less than 8 Persons capacity with a travelling speed of 1m/scc for a total travel of Four floors to operate on 440V, 3 Phase, 50 cycles/sec AC suply etc., including errection of lift etc., complete as as per detail specification. Brand Names : SCHINDLER Lifts. (LQR) CAPACITY (kgs) : 544 Kg, 8 persons. SPEED (mps) : 1 mps RISE (m) : 16 m STOPS : 4 Stops With (all opening on the same side) CONTROLLER TYPE : ACD3-MRL DRIVE : VF Regenerative (Closed Loop) POWER SUPPLY : 400/415 Volts (3 Phase AC) OPERATION : Full collective operation CAR GROUP : One car (simplex) MACHINE : PM Gearless (Located above shaft) TRACTION MEDIA : Flat Coated Steel Belt CAR FINISH : *Rear Mid Panel = Stainless Steel #4(Hairline) *Rear Corner Panels = Stainless Steel #4(Hairline) * Side Panels = Stainless Steel #4(Hairline) *Front Panels = Stainless Steel #4(Hairline) FALSE CEILING TYPE: CD-41 FLASE CEILING FINISH : Stainless Steel #4(Hairline) VENTILLATION : Cross flow fan HAND RAILS : Stainless Steel Mirror Finish Handrails on rear car panels FLOORING : Vinyl Tiles CAR DOOR FINISH : Stainless Steel #4(Hairline) with Vision Panel LANDING DOORS FINISH : Stainless Steel #4(Hairline) with Vision Panel PIT DEPTH : 1350 OVERHEAD 4500 HOISTWAY DIMENSIONS (W x D ? mm) : 1850 mm W x 1650 mm D CAR DIMENSIONS (W x D x H - mm) : 1100 mm W x 1300 mm D x 2200 mm D CAR & HOISTWAY DOOR TYPE : Central opening (CO) doors DOOR OPENING (W x H - : 800 mm W x 2000 mm Hmm) DOOR OPERATOR : DC Door Operator COP : Gien Buttons in Stainless Steel #4(Hairline) CAR POSITION INDICATOR:Dot matrix(RED LED) Scrolling Display HALL FIXTURES : O2000 HALL FIXTURE FACE PLATE:Stainless Steel #4(Hairline) HALL BUTTON ARRANGEMENT:Hall Button with HPI STANDARD FEATURES : Anti-nuisance Car Call Protection, Independent Service (for Duplex only), Overload Device, Nudging, Emergency Firemen?s Service, Emergency Car Light Unit, Infrared Curtain Door Protection, Door Time Protection, Emergency Alarm Button, Extra Door Time of Lobby & Parking, Door Open/Close Button, Manual Rescue Operation, Belt Inspection Drive, Auto Fan Cut Off OPTIONS INCLUDED : Automatic Rescue operation etc., complete.

1

-

1700000

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 9U floor mounting net work rack with power spike including all accessories and giving all connections, labour charges etc., complete. Makes: HCL / Vall.

1

-

6150.65

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and run of LAN Cable cat - 6 UTP cable in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: D Link / AMP / Molex / Legrand / Krone.

3000

-

105180

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing of 25mm outer dia Heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) surface laying on false ceiling duly fixing with G.I. Wire on existing supported studs including all labour charges etc., complete for run of mains. Makes : Sudhakar / Modi / Precision ( ISI mark).

1000

-

72200

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply, Installation, Testing and Commissioning of IP Based digtal Telephone (EPABX) system complied with following specifications: > IP @ Core, PCM/TDM switching, Non blocking, > Must Support PRI, E1, Analog Junctions > Must Support PC Console, > Must support Mobile SIP (Android and IOs) > Must support Voice Mail > Must support Card based GSM > Inbuilt Call Details Software with search engine software > 8 Analog Trunks > 1 PRI Trunk module > 16 Digital Extensions > 224 Analog Extensions > 1 Digital Key Phone with minimum 16 Keys (Must work only on 2 wires) > Inbuilt hotstandby for CPU and PSU. > Compatibility to run on DC -48v source. > Expandable to 400 Ports wired or more at extra cost. Approved Brands: NEC/ Alcatel/ Karel/ Unify.

1

-

655728.97

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 100mm x 25mm G I Raceways of 2mm thick with top cover and required hard ware etc., complete.

110

-

56844.7

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 150mm x 25mm G I Raceways of 2mm thick with top cover and required hard ware etc., complete.

100

-

65310

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 300mm x 25mm G I Raceways of 2mm thick with top cover and required hard ware etc., complete.

10

-

11530

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply, Transportation and Installation of 150mm x 50mm x 2mm thick hot dip GI perforated cable tray without cover along with coupler plates, T's, Bends, Reducers, Anchor bolts, nuts, washers and slotted channels / Angle Iron Channels etc complete and the tray should be fitted on the wall / Ceiling etc., complete for finished item of work.

30

-

13974.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply, Transportation and Installation of 300mm x 50mm x 2mm thick hot dip GI perforated cable tray without cover along with coupler plates, T's, Bends, Reducers, Anchor bolts, nuts, washers and slotted channels / Angle Iron Channels etc complete and the tray should be fitted on the wall / Ceiling etc., complete for finished item of work.

90

-

75156.3

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply, Transportation and Installation of 600mm x 50mm x 2mm thick hot dip GI perforated cable tray without cover along with coupler plates, T's, Bends, Reducers, Anchor bolts, nuts, washers and slotted channels / Angle Iron Channels etc complete and the tray should be fitted on the wall / Ceiling etc., complete for finished item of work.

20

-

22495.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing Distribution board with 20A SP Plug and Socket with SS enclosure with 10/16/20A 10KA SP MCB, C/D Curve ISI Mark including internal connection and labour charges for surface / flush mounting etc., complete . Makes: Legrand / Schneider. MCB Make: Legrand-DX3 / Schneider-Acti9.

45

-

86736.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Labour charges for run of U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official) etc., complete.

600

-

35664

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of 50 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes: Torrent / Universal / Polycab / Havells / Gloster / Finolex.

300

-

111114

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I). Makes: Torrent / Universal / Polycab / Havells / Gloster / Finolex.

300

-

50100

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Run of 40mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete.

100

-

16706

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Run of 25mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete.

250

-

28840

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II).

10

-

47718.3

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 4 Way VTPN DB with IP 43 Protection as per IS:13032 and suitable for accommodating T.P. / S.P. as out goings and 125A 4 pole MCCB as Incommerincluding internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 125A, 4P, MCCB - 1No. Outgoing: 63A, 10KA, TP MCB's - 4 Nos DB Makes : Legrand / Schneider. MCCB Make: L&T / Schneider / Siemens / Legrand. MCB Make: Legrand-DX3 / Schneider-Acti9.

4

-

116973.44

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 12 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for single phase 8 Nos S.P out goings and for 1No Incommer including internal connection and labour charges for flush mounting etc., complete. [for Lift] Incommer: 63A FP Isolator-1No. Outgoing: 10kA-6-32A SP MCBs - 4 Nos 63A FP MCBs - 1 No. DB Makes: Legrand / Schneider. Isolator Make: Legrand-DX3 / Schneider-Acti9. MCB Make: Legrand-DX3 / Schneider-Acti9.

4

-

29585.36

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 6 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 18 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 63A FP Isolator-1No. Outgoing: 10kA-6-32A SP MCBs - 18 Nos DB Makes: Legrand / Schneider. Isolator Make: Legrand-DX3 / Schneider-Acti9. MCB Make: Legrand-DX3 / Schneider-Acti9.

3

-

35386.53

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 8 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 24 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 63A FP Isolator-1No. Outgoing: 10kA-6-32A SP MCBs - 24 Nos DB Makes: Legrand / Schneider. Isolator Make: Legrand-DX3 / Schneider-Acti9. MCB Make: Legrand-DX3 / Schneider-Acti9.

4

-

55135.08

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 12 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete including internal connection and labour charges for surface / flush mounting etc., complete. Incommer: 40A FP Isolator-1No. Outgoing: 10kA-6-32A SP MCBs - 12 Nos DB Makes: Legrand / Schneider. Isolator Make: Legrand-DX3 / Schneider-Acti9. MCB Make: Legrand-DX3 / Schneider-Acti9.

9

-

78755.67

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 6U floor mounting net work rack with power spike including all accessories and giving all connections, labour charges etc., complete. Makes: HCL / Vall.

4

-

20966.92

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 24 Port manageble switch including giving connections cost of all accessories and all labour charges etc., complete. Makes: CISCO / Net Gear / HP / D link.

8

-

55235.12

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of Modular co-Axial socket type TV Antenna outlet on 2 moduler hot dip galvanized metal box and 2 modular cover frame including giving connections, cost of all accessories and labour charges etc. Complete. co-Axial socket type TV Antenna outlet, cover frame & metal box makes: Legrand Myrius.

15

-

4400.55

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and run of 2 Pair, 0.5mm telephone copper wire in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: Finolex / Delton / Surabi / Polycab

3500

-

75390

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of Modular socket type Telephone jack with Connector on 2 moduler hot dip galvanized metal box and 2 modular cover frame including giving connections, cost of all accessories and labour charges etc. Complete. Telephone jack with Connector, cover frame & metal box Makes: Legrand Myrius.

91

-

26800.41

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and run of LAN Cable cat - 6 UTP cable in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: D Link / AMP / Molex / Legrand / Krone.

5000

-

175300

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate on 2 moduler hot dip galvanized metal box including giving connections, cost of all accessories and labour charges etc. Complete. I/O & duel face plate Makes: D Link / AMP / Molex / Legrand / Krone. Metal box make: Legrand Myrius.

160

-

80932.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Fixing of 36W LED luminaire in false ceiling / pop with necessary arrangment including giving connections and all labour charges etc., complete.

145

-

41770.15

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Transportation of 36W Back lit, 2' x2' (600mm x 600mm) Recessed / Surface mounted LED luminaire made of CRCA sheet housing with powder coated with high efficiency acrylic wide diffuser, with wide operating voltage range, Power factor > 0.9, Surge protection >2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Crompton / Havells / Phillips. LED MAKE : CREE / NICHIA / OSRAM.

145

-

611192.4

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Fixing of LED luminaire 18W Down lights with all necessary accessories in false ceiling / on wall including giving connections and all labour charges etc., complete.

120

-

12512.4

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and transportation of 18W back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Crompton / Havells / Phillips. LED MAKE : CREE / NICHIA / OSRAM.

120

-

267222

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Fixing of 20W LED tube light luminaire on wall / Ceiling with all accessories including giving connections and all labour charges etc., complete.

21

-

3267.81

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and transportation of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE: Crompton / Havells. LED MAKE : CREE / NICHIA / OSRAM.

21

-

17417.19

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Labour charges for fixing of Exhaust Fan in wall with necessary connections etc., complete (for hole already made available).

22

-

8006.02

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of 12" (300mm) Light duty exhaust fan with wire guard etc., complete. Makes: Crompton / Havells Ventilair-DB / Orient hill air.

22

-

36227.84

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Labour charges for fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

115

-

21564.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes: Legrand Myrius.

115

-

62454.2

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of 48" (1200mm) 5 star rated Sweep Ceiling Fan with all accessories etc., complete. Makes : Crompton HS Plus / Havells ES NEO / Orient Energy Star.

115

-

276464.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and run of 5 of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for 4 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Makes: Finolex / RR kabel / Polycab (HR_FR-LF).

400

-

162856

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and run of 3 of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Makes: Finolex / RR kabel / Polycab (HR_FR-LF).

2500

-

442425

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and run of 3 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Makes: Finolex / RR kabel / Polycab (HR_FR-LF).

6000

-

699000

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch controls-2Nos duly recessed in wall with 6 Module Hot Dip Galvanized Modular Metal Box size covered with 6 Modular Cover Frame including earth connections and all labour charges etc., complete. [For Computer Board - For UPS Power]. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus.

162

-

132998.76

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch controls-2Nos duly recessed in wall with 6 Module Hot Dip Galvanized Modular Metal Box size covered with 6 Modular Cover Frame including earth connections and all labour charges etc., complete. [For 2 No Socket Board - For Raw Power]. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius.

67

-

55005.66

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete. [ Power plug ] Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius.

60

-

36715.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with suitable Module Hot Dip Galvanized Modular Metal Box covered with suitable Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius.

65

-

28226.25

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Wiring with 2 runs of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control and 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter fixing on Separate board with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame including all labour charges etc., complete. Copper wire make: Finolex / RR kabel / Polycab (HR_FR-LF). Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius.

25

-

13703.75

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Wiring with 2 runs of 22/0.3mm (1.5 Sqmm) FRLS/HFFR PVC insulated 1100V grade as per IS: 694/1990 specification for Copper cable in existing pipe without Ceiling Rose including all labour charges etc., complete for light points in Non-Residential Buildings. [For secondary light points i.e., from existing light point to extended light point ] Copper wire make: Finolex / RR kabel / Polycab (HR_FR-LF).

60

-

16656

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Wiring with 2 runs of 22/0.3mm (1.5 Sqmm) FRLS/HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 2 Way 1 Module Modular Switch control with suitable size Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, with 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for Stair case / Double height points in Non-Residential Buildings. Copper wire make: Finolex / RR kabel / Polycab (HR_FR-LF). Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius. Ceiling Rose Make: Anchor / Gold Medal Olive / Million Zoom.

4

-

3951.08

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Wiring with 2 runs of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with suitable Module Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, without 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. Copper wire make: Finolex / RR kabel / Polycab (HR_FR-LF). Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius.

320

-

214384

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Wiring with 2 runs of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with suitable Module Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, with 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. Copper wire make: Finolex / RR kabel / Polycab (HR_FR-LF). Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius. Ceiling Rose Make: Gold Medal Olive / Million Zoom / Anchor Penta Cherry.

43

-

29736.22

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing of 25mm FRPP Flexible Pipe including all labour charges etc., complete. Make: Precision or its equivalet

300

-

8190

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing of 25mm outer dia Heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in underneeth the floor with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Modi / Precision ( ISI mark).

2500

-

199050

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing of 25mm outer dia Heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) surface laying on false ceiling duly fixing with G.I. Wire on existing supported studs including all labour charges etc., complete for run of mains. Makes : Sudhakar / Modi / Precision ( ISI mark).

3000

-

216600

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and fixing of 25mm outer dia Heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories [like 'U' nails, Junction box, PVC Bends and Cement] including masonary work for Light, Fan, Common, Separate plug point and Switch/Power boards etc., including all labour charges etc., complete. Makes: Sudhakar / Modi / Precision (ISI mark).

3000

-

303750

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing of 25mm outer dia Heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Modi/ precision (ISI mark).

500

-

41585

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING, LAYING, JOINTING AND TESTING OF 154.2MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 1.52M (5'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

50

-

44185

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING, LAYING, JOINTING AND TESTING OF 101.60MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M (3'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

10

-

5431

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;CONSTRUCTING 904.0 MM (3?0?) DIA BRICK MASONRY INSPECTION CHAMBER AS PER IS - 4111: PART-1:1986 WITH CEMENT MORTAR (1:6) PROP USING 2ND CLASS CLAY BRICKS OF 225 MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5 N/SQ.MM INCLUDING PLASTERING WITH CEMENT MORTAR 1:3 ROP; ½? THICK BOTH INSIDE AND OUTSIDE FITTED WITH 20? DIA RCC MANHOLE COVERS AND FRAMES INCLUDING EXCAVATING PITS UP TO A DEPTH OF 1524 MM (5'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND P.C.C. 1:2:4 BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SAND, BRICKS, WATER ETC., TO SITE, AND ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, LIFT CHARGES, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION

2

-

26601.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;CONSTRUCTING 904.0 MM (3?0?) DIA BRICK MASONRY INSPECTION CHAMBER AS PER IS - 4111: PART-1:1986 WITH CEMENT MORTAR (1:6) PROP USING 2ND CLASS CLAY BRICKS OF 225 MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5 N/SQ.MM INCLUDING PLASTERING WITH CEMENT MORTAR 1:3 ROP; ½? THICK BOTH INSIDE AND OUTSIDE FITTED WITH 20? DIA RCC MANHOLE COVERS AND FRAMES INCLUDING EXCAVATING PITS UP TO A DEPTH OF 904.0 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND P.C.C. 1:2:4 BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SAND, BRICKS, WATER ETC., TO SITE, AND ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, LIFT CHARGES, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION

3

-

25076.1

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING AND PLACING OF TERRACE POLYTHELENE WATER STORAGE TANKS (AT ALL FLOOR LEVELS) DOUBLE LAYER APPROVED BRAND AND MNUFACTURE WITH COVER AND SUITABLE LOCKING ARRANGEMENTS MAKING NECESSARY HOLES FOR INLET & OUTLETS AND OVERFLOW PIPES BUT WITHOUT FITTINGS & BASE SUPPORT FOR TANKS, MAKING GOOD THE SAME TO ENSURE LEAK PROOF WITH AN APPROPRIATE MASONARY PLATFORM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK AS DIRECTED BY THE ENGINEER -IN- CHARGE

1000

-

8000

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY OF 32MM PPR BALL VALVE CONFORMING TO DIN STANDARDS 8077/8092 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

-

529.4

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 13.5 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

50

-

11020

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

1

-

15.9

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

1

-

21.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

2

-

1063.4

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANI TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

-

229.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock AS APPROVED BY EXECUTIVE ENGINEER WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, AND PAINTING TO ALL IRON FITTINGS WITH 2 COATS OF SYNTHETIC ENAMEL PAINT OF APPROVED COLOUR AND MAKE INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK. INCLUDING WOODEN BLOCK INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK, BUT EXCLUDING GST

2

-

3548.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'P' trap, including Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 AND Supply & fixing of PVC low level system with internal components & short bend: 8 Liters capacity single Flush & Supplying & Fixing 15 mm nominal size PVC connection with brass union nut C.P coated INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

1

-

3723.9

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK.FOR GROUND FLOOR

12

-

2724

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND LAYING 110 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK.

20

-

6328

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING OF 150MMX100MM SWG GULLY TRAP CONFIRMING TO ISI 651 & 4127 WITH CI GRATING AND CONSTRUCTION OF BRICK MASONRY INTERMEDIATE CHAMBER OF SIZE 20"X14"X12" IN CM (1:6) OVER CC (1:5:10) PROP. BED OF SIZE 20"X14"X4" AND PLASTERING WITH 12MM THICK IN CM (1:4) PROP. BOTH INSIDE AND OUTSIDE SURFACES AND FITTED WITH 9"X12" (230X305MM) RCC (1:11/2:3) 1 1/2" THICK COVER INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK

2

-

1219.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S&F NP soap dish AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

-

557.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING OF 19.04mm dia, 609.60MM LONG ALUMINIUM ANODISED TOWEL ROD AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

-

295.4

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S&F of CP finish brass wall mounted towel ring AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

-

1279.4

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 40mm dia PVC Solid waste pipe outlet AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

1

-

101.1

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

1

-

3339.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing GI Union - 25mm NB Size - Indian make AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

-

168.2

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing GI Union - 15mm NB Size - Indian make AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

-

93.2

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply and Fixing of 15mm brass Bib Tap cp finish - Indian make heavy duty full turn 300gms AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

-

533

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;CONSTRUCTING 457.2 X 457.2 MM (1'-6" X 1'-6") BRICK MASONARY INSPECTION CHAMBER WITH CM (1:6) PROP. USING 2ND CLASS CLAY BRICKS OF 225MM THICK, AND FITTED WITH 457.2 X 457.2 MM (1'-6" X 1'-6") RCC COVER UP TO A DEPTH OF 914.4 MM (3'-0") AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION, BUT EXCLUDING SEIGNIORAGE CHARGES & GST, FOR FINISHED ITEM OF WORK.

1

-

4223.2

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 13.5 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

50

-

11020

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 13.5 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 13.5 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

30

-

5010

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING OF 15.90MM OD PIPE - SDR 13.5 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 13.5 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

10

-

1466

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING OF UNPLASTICISED POLY VINYL CHLORIDE (UPVC) 3 TRACK SLIDING WINDOWS WITH MESH SHUTTER ? (2-GLASS SHUTTERS AND 1-MESH SHUTTER) DULY MANUFACTURED USING UPVC REINFORCED PROFILES (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN) OF (94MMX45MM)/(80MMX52MM) X 2.20 MM FOR OUTER FRAMES, (58 MM X 39 MM)/(54 MM X 38 MM) X 2.20 MM FOR SLIDING SHUTTER FRAMES CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.0/1.2MM PREFABRICATED & WELDED THROUGH FUSION WELDING. THE WINDOW SASH SHALL BE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE AND MESH SHUTTER FRAME SHALL BE (42MMX25MM) / (52MMX21.5MM)X2.0MM FITTED WITH VINYL COATED FIBRE MESH-ON ROLLERS/PULLEY DULY FIXED WITH GREY COLOUR TPV GASKET FOR SASH & GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. SYSTEM SHALL HAVE SINGLE POINT LOCKING WITH TOUCH LOCK AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE COMPLETE FOR FINISHED ITEM OFWORK. BUT EXCLUDING GST

8.4

-

63846.72

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DOOR: 0.75X2.10 SUPPLING POSITIONING AND FIXING OF BIS MARK, STANDARD MAKE PRE POLISHED FLUSH DOOR SHUTTER OF 35MM MADE UP OF THICK SOLID WOOD INFILL CORE WITH NATURAL TEAK VENEER ON ONE SIDE AND COMMERCIAL PLY ON OTHER SIDE OF SPECIFIED COLOUR, SHADE, FINISH AS APPROVED BY ENGINEER - IN - CHARGE AND INTERNAL TEAK LIPPING ALROUND, INCLUDING SUPPLYING AND FIXING OF PRE POLISHED MEDIUM QUALITY KILN SEASONED SOLID RED MERANTI HARD WOOD FRAME (WITH OUT THRESHOLD) OF SECTION 100MMX62MM, WHICH SHOULD BE FIXED TO WALL ON BOTH SIDES WITH ANCHOR FASTENRS OF SIZE 10X100MM. 3NOS ON EITHER SIDE OF WALL AND GAP BETWEEN WALL AND FRAME SHOULD BE FILLED WITH Poly-Urethane (PU) Foam (GAP, SHOULD NOT MORE THAN 10MM) AND ARCHITRAVES OF 40X10MM AND 20X10MM WILL BE NAILED ON THE FRAME, INCLUDING 3NOS OF SSPC HINGES OF SIZE 125MM LONG, 1NO 200MM LONG SS TOWER BOLT. 2NOS SS DOOR HANDLES OF 125MM LONG & 1NO SS ALROP OF 250MM LONG. POLISHING SHALL BE DONE WITH Poly-Urethane (PU) ON ONE SIDE AND PIGMENTED Poly-Urethane (PU) GLOSSY/MATT FINISH TO THE WOOD WORKS DULY CLEANING THE SURFACE AND APPLYING EMERY PAPER, SAND THE WOOD WITH 180 NOS, EMERY PAPER AND THEN WITH 320NO., EMERY PAPER, CLEAN & WIPE OFF LOOSE DUST, APPLYING SUITABLE KNIFING PASTE FILLER/WOOD FILLER BY PUTTY KNIFE/MUSLIN PAD, AIR DRY FOR 2-3 HOURS, SAND WITH 180 AND 320NO., EMERY PAPER, APPLY TWO COMPONENT WOOD SEALER, AIR DRY FOR 24HOURS, SAND WITH 320NO., EMERY PAPER, APPLY ONE COAT OF APPROVED SPRAYING THINNER (FOR SPRAYING)/APPLYING ONE COAT OF APPROVED BRUSHING THINNER OR GENERAL PURPOSE THINNER (FOR BRUSHING) AND APPLY (EITHER WITH SPRAY OR BRUSH) TWO COATS OF APPROVED BRAND MELAMINE OF SHADE AS APPROVED BY THE ENGINEER IN CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EMERY PAPERS, COST OF THINNER & MELAMINE POLISH OF APPROVED BRANDS SUCH AS JENSON & NICHOLSON, ASAIN PAINTS, BERGER PAINTS OR EQUIVALENT ETC AS APPROVED BY THE ENGINEER IN CHARGE. FIXING SHALL BE DONE WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIAL TO SITE, LABOUR CHARGES FOR FIXING FRAME AND SHUTTER ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER - IN - CHARGE OF THE WORK, BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF DOORSET SC OR SS, BIS MARK & GOT APPROVED BY THE ENGINEER - IN - CHARGE) NOTE: NECESSARY REUSABLE TEMPLATES OF STEEL SHALL BE FIXED TO THE OPENING BEFORE PROCEEDING TO BRICK WORK, SO AS TO MAINTAIN CORRECT SIZES.

1.79

-

14640.23

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DOOR: 0.90X2.10 SUPPLING POSITIONING AND FIXING OF BIS MARK, STANDARD MAKE PRE POLISHED FLUSH DOOR SHUTTER OF 35MM MADE UP OF THICK SOLID WOOD INFILL CORE WITH NATURAL TEAK VENEER ON ONE SIDE AND COMMERCIAL PLY ON OTHER SIDE OF SPECIFIED COLOUR, SHADE, FINISH AS APPROVED BY ENGINEER - IN - CHARGE AND INTERNAL TEAK LIPPING ALROUND, INCLUDING SUPPLYING AND FIXING OF PRE POLISHED MEDIUM QUALITY KILN SEASONED SOLID AFRICAN TEAK WOOD FRAME (WITH OUT THRESHOLD) OF SECTION 100MMX62MM, WHICH SHOULD BE FIXED TO WALL ON BOTH SIDES WITH ANCHOR FASTENRS OF SIZE 10X100MM. 3NOS ON EITHER SIDE OF WALL AND GAP BETWEEN WALL AND FRAME SHOULD BE FILLED WITH Poly-Urethane (PU) Foam (GAP, SHOULD NOT MORE THAN 10MM) AND ARCHITRAVES OF 40X10MM AND 20X10MM WILL BE NAILED ON THE FRAME, INCLUDING 3NOS OF SSPC HINGES OF SIZE 125MM LONG, 2NO 200MM LONG SS TOWER BOLT. 1NO OF DOORSET MORTICE LEVER LOCK (KY) SC FINISH & 1NO.DOOR STOPPER. POLISHING SHALL BE DONE WITH Poly-Urethane (PU) ON ONE SIDE AND PIGMENTED Poly-Urethane (PU) GLOSSY/MATT FINISH TO THE WOOD WORKS DULY CLEANING THE SURFACE AND APPLYING EMERY PAPER, SAND THE WOOD WITH 180 NOS, EMERY PAPER AND THEN WITH 320NO., EMERY PAPER, CLEAN & WIPE OFF LOOSE DUST, APPLYING SUITABLE KNIFING PASTE FILLER/WOOD FILLER BY PUTTY KNIFE/MUSLIN PAD, AIR DRY FOR 2-3 HOURS, SAND WITH 180 AND 320NO., EMERY PAPER, APPLY TWO COMPONENT WOOD SEALER, AIR DRY FOR 24HOURS, SAND WITH 320NO., EMERY PAPER, APPLY ONE COAT OF APPROVED SPRAYING THINNER (FOR SPRAYING)/APPLYING ONE COAT OF APPROVED BRUSHING THINNER OR GENERAL PURPOSE THINNER (FOR BRUSHING) AND APPLY (EITHER WITH SPRAY OR BRUSH) TWO COATS OF APPROVED BRAND MELAMINE OF SHADE AS APPROVED BY THE ENGINEER IN CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EMERY PAPERS, COST OF THINNER & MELAMINE POLISH OF APPROVED BRANDS SUCH AS JENSON & NICHOLSON, ASAIN PAINTS, BERGER PAINTS OR EQUIVALENT ETC AS APPROVED BY THE ENGINEER IN CHARGE. FIXING SHALL BE DONE WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIAL TO SITE, LABOUR CHARGES FOR FIXING FRAME AND SHUTTER ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER - IN - CHARGE OF THE WORK, BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF DOORSET SC OR SS, BIS MARK & GOT APPROVED BY THE ENGINEER - IN - CHARGE) NOTE: NECESSARY REUSABLE TEMPLATES OF STEEL SHALL BE FIXED TO THE OPENING BEFORE PROCEEDING TO BRICK WORK, SO AS TO MAINTAIN CORRECT SIZES.

2.21

-

19681.15

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DOOR 1.20 X 2.10 M: SUPPLING POSITIONING AND FIXING OF BIS MARK, STANDARD MAKE PRE POLISHED FLUSH DOOR SHUTTER OF 35MM MADE UP OF THICK SOLID WOOD INFILL CORE WITH NATURAL TEAK VENEER ON ONE SIDE AND COMMERCIAL PLY ON OTHER SIDE OF SPECIFIED COLOUR, SHADE, FINISH AS APPROVED BY ENGINEER - IN - CHARGE AND INTERNAL TEAK LIPPING ALROUND, INCLUDING SUPPLYING AND FIXING OF PRE POLISHED MEDIUM QUALITY KILN SEASONED SOLID AFRICAN TEAK WOOD FRAME (WITH OUT THRESHOLD) OF SECTION 125MMX62MM, WHICK SHOULD BE FIXED TO WALL ON BOTH SIDES WITH ANCHOR FASTENRS OF SIZE 10X100MM. 3NOS ON EITHER SIDE OF WALL AND GAP BETWEEN WALL AND FRAME SHOULD BE FILLED WITH Poly-Urethane (PU) Foam (GAP, SHOULD NOT MORE THAN 10MM) AND ARCHITRAVES OF 40X10MM AND 20X10MM WILL BE NAILED ON THE FRAME, INCLUDING 6NOS OF SSPC HINGES OF SIZE 125MM LONG, 2NO 200MM LONG SS TOWER BOLT. 1NO OF DOORSET MORTICE LEVER LOCK (KY) SC FINISH & 2NO.DOOR STOPPER. POLISHING SHALL BE DONE WITH Poly-Urethane (PU) ON ONE SIDE AND PIGMENTED Poly-Urethane (PU) GLOSSY/MATT FINISH TO THE WOOD WORKS DULY CLEANING THE SURFACE AND APPLYING EMERY PAPER, SAND THE WOOD WITH 180 NOS, EMERY PAPER AND THEN WITH 320NO., EMERY PAPER, CLEAN & WIPE OFF LOOSE DUST, APPLYING SUITABLE KNIFING PASTE FILLER/WOOD FILLER BY PUTTY KNIFE/MUSLIN PAD, AIR DRY FOR 2-3 HOURS, SAND WITH 180 AND 320NO., EMERY PAPER, APPLY TWO COMPONENT WOOD SEALER, AIRE DRY FOR 24HOURS, SAND WITH 320NO., EMERY PAPER, APPLY ONE COAT OF APPROVED SPRAYING THINNER (FOR SPRAYING)/APPLYING ONE COAT OF APPROVED BRUSHING THINNER OR GENERAL PURPOSE THINNER (FOR BRUSHING) AND APPLY (EITHER WITH SPRAY OR BRUSH) TWO COATS OF APPROVED BRAND MELAMINE OF SHADE AS APPROVED BY THE ENGINEER IN CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EMERY PAPERS, COST OF THINNER & MELAMINE POLISH OF APPROVED BRANDS SUCH AS JENSON & NICHOLSON, ASAIN PAINTS, BERGER PAINTS OR EQUIVALENT ETC AS APPROVED BY THE ENGINEER IN CHARGE. FIXING SHALL BE DONE WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIAL TO SITE, LABOUR CHARGES FOR FIXING FRAME AND SHUTTER,BUT EXCLUDING GST ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER - IN - CHARGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF DOORSET SC OR SS, BIS MARK & GOT APPROVED BY THE ENGINEER - IN - CHARGE) NOTE: NECESSARY REUSABLE TEMPLATES OF STEEL SHALL BE FIXED TO THE OPENING BEFORE PROCEEDING TO BRICK WORK, SO AS TO MAINTAIN CORRECT SIZES.

2.52

-

22360.46

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING, SUPPLYING & FIXING OF TOP HUNG VENTILATOR WITH EXHAUST FAN PROVISION MADE OUT OF MULTI CHAMBERED UPVC SECTIONS WITH TPV GASKET FOR SASH & GLAZING BEAD SHALL BE COEXTRUDED WITH GREY COLOUR SOFT PVC AND REINFORCED WITH GALVANIZED IRON PROFILES THROUGHOUT THE WINDOW. THE OUTER FRAME HAVING A OVERALL SIZE OF 60MM X 55 MM X 2.40 MM WITH REINFORCEMENT OF 1 MM THICKNESS, MULLION WITH OVERALL SIZE OF 74 MM X 60 MM X 2.40 MM WITH REINFORCEMENT OF 1 MM THICKNESS AND SASH WITH OVERALL SIZE OF 75 MM X 60 MM X 2.40 MM WITH REINFORCEMENT OF 1.0/1.2 MM THICKNESS. (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN).GLAZING BEAD FOR FIXING OF GLASS SHALL BE OF SIZE 34 X 20 MM COEXTRUDED WITH SOFT PVC GASKET. VENTILATOR SHALL BE PROVIDED WITH 4.5 MM PIN HEAD GLASS, STANDARD HARDWARE, SINGLE POINT LOCKING USING COCKSPUR HANDLE AND FRICTION STAYS. WALL THICKNESS OF FRAME, MULLION AND SASH SHALL BE 2.4 MM., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE COMPLETE FOR FINISHED ITEM OF WORK, BUT EXCLUDING GST

0.54

-

5196.53

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PAINTING TO NEW WOOD WORK TWO COATS WITH SYNTHETIC ENAMEL PAINT OVER ONE COAT OF WOOD PRIMER OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY AND ALL INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE (THE RATE INCLUDES ONE COAT OF WOOD PRIMER AND TWO COATS OF PAINT ) (APSS NO.1201, 1207, 1212).FOR FINISHED ITEM OF WORK EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

6.51

-

1268.15

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PAINTING TO NEW IRON WORK TWO COATS WITH SYNTHETIC ENAMEL PAINT OVER ONE COAT OF PRIMER OF APPROVED BRAND AND SHADE TOTAL 3 COATS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, ALL INCIDENTAL, OPERATIONAL & LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES, INCLUDING PUTTY, ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST. (APSS NO.1201, 1207, 1212).

10

-

1829

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING GYP BOARD SUSPENDED REGULAR SINGLE LAYER FALSE CEILING (GS-MFSC-4.1 AS PER INDIA GYPSUM) USING 12.50 MM THICK GYP BOARD CONFORMING TO IS 2095-1982 FIXING TO GYP STEEL GI PERIMETER CHANNELS OF SIZE 20 X 27 X 30 MM (WEB) OF 0.55 MM THICK ALONG THE PERIMETER OF CEILING SCREW FIXED TO BRICK WORK / PARTITION AT 610 MM C/C AND SUSPENDING THE FRAME WORK USING INTERMEDIATE CHANNELS (45 X 15 X 15 X 0.90 MM) FROM SOFFIT AT 1220 MM C/C WITH CEILING ANGLE (25 X 10 X 0.55 MM) FIXED WITH GI CLEAT AND STEEL EXPANSION FASTENERS & CONNECTING CLIP TO THE CEILING CHANNELS (WITH KNURLED WEB OF 51.50 X 26 X 10.50 X 0.55 MM) FIXED IN DIECTION PERPENDICULAR TO THE INTERMEDIATE CHANNEL AT 457 MM C/C AND FIXING THE 12.50 MM DRYWALL SCEWS AT 230 MM C/C & JOINTING, FIXING USING JOINT COMPOUND AND PAPER TAPE TO HAVE A FLUSH LOOK INCLUDING FILLING THE TAPPERED & SQUARE EDGES WITH JOINTING COMPOUND, TWO COATS OF DRYWALL TOPCOAT, BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK AS PER INDIA GYPSUM LTD., SPECIFICATION.

55

-

56771

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PAINTING WITH Acrylic Emulsion paint Exterior grade silicon additives having (VOC < 50 Gms/Lit) OF APPROVED MAKE AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 Ml OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION Etc., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO:908).

700

-

158130

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR PLASTER OF PARIS PUTTY OR BIRLA WALL CARE PUTTY OF AVERAGE 1 TO 2 MM THICKNESS OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2 - 3 HRS, SAND WITH 180 AND 320 NO., EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LIFTING(MANUAL), LABOUR CHARGES ETC. BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

210

-

44268

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PAINTING TO NEW WALLS WITH THREE (3) COATS OF Synthetic Polymer luxury Plastic emulsion /solvent based lustre paint of superior grade having (VOC < 50 Gms./Lit) OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING LIFTING(MANUAL) AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

210

-

37569

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND STONES ETC., COMPLETE, INCLUDING LABOUR CHARGES FOR DRESSING OF STONES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR STAIRCASE LANDING & STEPS GROUND FLOOR

12

-

49377.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DADOOING WITH DIGITAL / POLISHED GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNSAS APPROVED BY EXECUTIVE ENGINEER APPROVED BY EXECUTIVE ENGINEER, SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LIFTING (MANNUAL), ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR.

15

-

12868.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FLOORING WITH NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, LIFTING ( MANNUAL). BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK,GROUND FLOOR (APSS.NO:701&707).

2.7

-

2245.05

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FLOORING WITH Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. GROUND FLOOR

55

-

63167.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;ORNAMENTAL PLASTERING TO CEILING 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:3) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901&904)

180

-

81810

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901&904)

1300

-

565500

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA,SAIL,VSP,JSW,Shyam steel and GOEL Steel, Jindal Panther, X-Vega & Balaji Shakti FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.

4.5

-

360443.7

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING MASONRY WORK WITH AERATED (CELLULAR) AUTOCLAVED CONCRETE BLOCKS OF APPROVED BRANDS XTRALITE FROM ULTRATECH, AEROCON FROM HIL, CONFORMING TO IS:2185 (PART-3) - 1984 AND IS:6441-1972 OF COMPRESSIVE STRENGTH 3 N/MM2 600 X 200 X 100 MM - AND CHEMICAL JOINTING COMPOUND OF SAME BRAND, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK 100MM THICK WALLS GROUND FLOOR (APSS NO. 501&504)

2

-

14969.4

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING MASONRY WORK WITH AERATED (CELLULAR) AUTOCLAVED CONCRETE BLOCKS OF APPROVED BRANDS XTRALITE FROM ULTRATECH, AEROCON FROM HIL, CONFORMING TO IS:2185 (PART-3) - 1984 AND IS:6441-1972 OF COMPRESSIVE STRENGTH 3 N/MM2 600 X 200 X 230 MM - AND CHEMICAL JOINTING COMPOUND OF SAME BRAND, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK 230MM THICK WALLS GROUND FLOOR (APSS NO. 501&504)

130

-

892606

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;RCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR SUNSHADES OF 50MM AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP FOR GROUND FLOOR (APSS NO. 403)

10

-

10884

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR LINTELS

1

-

11720.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC., FOR UNSUPPORTED HEIGHT 3.66 M ,VIBRATING,CURING , LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS OF 150MM THICK (APSS NO.403)

25

-

254347.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC., FOR UNSUPPORTED HEIGHT 3.66 M ,VIBRATING,CURING , LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR BEAMS (APSS NO.403)

8

-

91400.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES, ETC., FOR UNSUPPORTED HEIGHT 3.66 M ,VIBRATING,CURING , LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR COLUMNS (APSS NO.403)

12

-

144028.8

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR FLOORING BED (APSS NO: 402).

8

-

32777.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;CEMENT CONCRETE (1:3:6) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS GROUND FLOOR. (APSS NO: 402).

0.5

-

2649.55

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA,SAIL,VSP,JSW,Shyam steel and GOEL Steel, Jindal Panther, X-Vega & Balaji Shakti FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.

3.3

-

264325.38

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PLASTERING TO SUPERSTRUCTURE 20MM THICK IN TWO COATS, WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. BASEMENT (APSS NO: 901&904)

450

-

198855

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;RANDAM RUBBLE MASONRY USING HARD GRANITE STONE IN CM(1:6) PROP. INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, CURING, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST COMPLETE FOR FOUNDATIONS AND BASEMENTS FOR FINISHED ITEM OF WORK. APSS NO: 615).

20

-

79804

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC., FOR UNSUPPORTED HEIGHT UPTO 3.66 M ,VIBRATING,CURING , LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS UPTO PLINTH LEVEL (APSS NO.403)

4

-

48009.6

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL CENTERING PLATES ETC., BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR PLINTH BEAMS. (APSS NO. 403)

6

-

68898

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL CENTERING PLATES ETC., BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR PEDESTALS. (APSS NO. 403)

3

-

28608.3

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL CENTERING PLATES ETC., BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR FOOTINGS. (APSS NO. 403)

20

-

179152

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., BUT EXCLUDING GST ON ALL MATERIALS COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)

350

-

15645

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATION BED AND UNDER STONE SLAB FLOORING. (APSS NO: 402).

45

-

184374

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308). BUT EXCLUDING GST

350

-

135275

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

318

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

432

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR DOOR BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

1522

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR DOOR BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

2432

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

1136

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

1886

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

20

-

10634

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S&F of 15 mm brass body Premium variety Chromium plated finish long neck pillar cock with aerator of not less than 500 grams weight quarter turn spindle conforming to IS 8931 and with a warranty of 7-10 years INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

15

-

17257.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S&F CP finish brass soap dish INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

20

-

11748

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply & Fixing Double coat hook with 10years warranty INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

20

-

15520

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S&F of Chromium plated finish stainless steel body Toilet paper holder with 10 years warranty INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

20

-

18088

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S & F 19.04 mm dia& 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

20

-

2954

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANI TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

50

-

5740

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 yearswarranty INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

20

-

66796

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING & FIXING WHITE GLAZED FALT BACK HALF STAL URINALS 1ST QUALITY CONFORMIMG TO IS-2556-1995 WITH STANDARD CP. SPREADER FIXED WITH SREWS COMPLETE INDIAN MAKE SIZE 590 x 375 x 390 mm FIXED WITH SREWS COMPLETE INDIAN MAKE INCLUDING 15MM PVC CONNECTION WITH BRASS UNION NUTS CP COATED, 32MM CP WASTE COUPLING, 40MM PVC SOLID WASTE PIPE OUT LET, COST IN CONVEYANCE ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE.

10

-

34389

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming to IS:2556-Part-5-1994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 600 x 400 x 250 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

12

-

57163.2

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply, Installation and commissioning approved make wash down wall mounted EWC conforming to IS:2556 (Part 16)-2002 with 'P' or 'S' trap with concealed flush cistern fixed in wall with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap all of approvedmakeetc.completeforfinisheditem of work in all respects:SpecialColouredGrade-III INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

305828

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.FOR GROUND FLOOR

250

-

56750

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND LAYING 110 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

250

-

79100

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

50

-

32640

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;S&F of 15 mm brass body CP finish long body bib tap of not less than 400 grams weight with quarter turn spindle internal / external threaded connection conforming to IS 8931 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES FOR FIXING, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

50

-

40195

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of 20mm PPR Ball Valve conforming to DIN Standards 8077/8092 INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

3840

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of 20mm PPR Union conforming to DIN Standards 8077/8092 INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

2114

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of 25mm PPR Ball Valve conforming to DIN Standards 8077/8092 INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

5068

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;Supply of 25mm PPR Union conforming to DIN Standards 8077/8092 INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

-

2454

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIER CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

150

-

35280

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIER CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GSTETC., COMPLETE FOR FINISHED ITEM OF WORK.

150

-

29490

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., BUT EXCLUDING GST ON ALL MATERIALS COMPLETE FOR THE FINISHED ITEM OF WORK MS SQUARE BARS OF ALL SIZES

1000

-

106900

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;MANUFACTURING, SUPPLYING AND FIXING IN POSITION OF STAIRCASE RAILING AS PER DRAWING USING STAINLESS STEEL TUBES, SECTIONS, PLATES SHEETS & PIPES OF ALL DIAMETERS OF 304 GRADE INCLUDING LABOUR CHARGES FOR FABRICATION OF STAINLESS STEEL RAILING WORKS USING STAINLESS STEEL WELDING RODS INCLUDING BUFFING, POLISHING, LACQUER FINISHING, TO PRESENT SEAMLESS FINISH, BUT EXCLUDING GST ETC., COMPLETE AS DIERCTED BY THE ENGINEER-IN-CHARGE FOR FINISHED ITEM OF WORK.

1400

-

907620

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING & FIXING OF OUTLET PIPE A) MAKING 3" HOLE WITH BREAKER B) FIXING OF 11/4" PVC PIPE C) FIXING OF PIPE WITH MORTAR BY MIXING WITH POLYMER MODIFIED REINSTATEMENT CONCRETE SCOTTPROOF HI-POWER OR ITS EQUIVALENT (PIDILITE ROOF/POLYGEL/FOSROC MAKES) @ 100ML PER OF 50KG CEMENT ETC., INCULDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE ETC., COMPLETE FOR FINSIHED ITEM OF WORK.

16

-

8400

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;ACRYLIC POLYMER SCREED CONCRETE/MORTAR TREATMENT TO THE TOILETS/BATHROOM A) APPLICATION OF ONE COAT OF ACRYLIC POLYMER BONDING AGENT ROFF BOND REPAIR OR ITS EQUIVALENT (PIDILITE ROFF/POLYGEL/ FOSROC MAKE) MIXING WITH CEMENT AS PER MANUFACTURES SPECIFICATIONS (1) LITER SHOULD BE USED FOR 4 SQM/COAT) B) AFTER THE BOND COAT APPLICATION LAYING OF SPECIALIZED POLYMER MODIFIED REINSTATEMENT CONCRETE 1:2:4 RATIO BY USING 6MM METAL MIXING WITH SCOTTPROOF HI-POWER OR ITS EQULIVALENT (PIDLITE ROFF/POLYGEL/FOSROC MAKES) (PART-I POLYMER LIQUID) AT 100ML PER BAG OF 50 KGS CEMENT AT AN AVERAGE THICKNESS OF 50MM C) LAYING OF POLYMER CEMENT MORTAR PLASTERING AT 1:4 RATIO BY MIXING WITH ACRYLIC POLYMER MODIFIED REINSTATEMENT MORTAR SCOTTPROOF HI-POWER OR ITS EQUIVALENT (PIDLITE ROFF/POLYGEL/FORSROC MAKES) AT 100ML PER BAG OF 50 KGS CEMENT AT AN AVERAGE THICKNESS OF 20MM WITH NEAT FINISH ETC., INCULDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE ETC., COMPLETE FOR FINISHED ITEM OF WORK.

24.2

-

13552

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING FRAME WORK FOR GLASS PARTION USING 19 MM THICK 9PLY BWR/BWP GRADE PLY WOOD IS 303 GRADE FRAME SIZE 150MMX40MM &TOP BEADING 12MM PLY WOOD &LIPPING WITH 1.5MM THICK MAT FINISH LAMINATION SHEET,GUM TAPE,NAILS INCLUDING COST & CONVEYANCE OF ALL MATERIALS TO SITE & ALL OTHER INCEDENTAL,OPERATIONAL ,LABOUR CHARGES ETC COMPETE FOR FINISHED ITEM OF WORK.

18

-

14575.68

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;GLASS PARTIONS;SUPPLYING AND FIXING TOUGHENED GLASS (IN PLY WOOD FRAME) FIXED IN POSITION FOR PARTION USING 12MM THICK TOUGHENED GLASS OF REPUTED MAKE AS APPROVED BY THE ENGINEER IN CHARGE &NECESSARY FIXTURES,TRANPORTATION AND LIFTING OF GLASS ETC INCLUDING COST & CONVEYANCE OF ALL MATERIALS TO SITE &ALL OTHER INCEDENTAL,OPERATIONAL ,LABOUR CHARGES ETC COMPETE FOR FINISHED ITEM OF WORK .

8.1

-

36260.86

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DOOR: 1.8X2.85 (DOUBLE SHUTTER) : SUPPLING POSITIONING AND FIXING OF BIS MARK, STANDARD MAKE PRE POLISHED DOUBLE CORE FLUSH DOOR SHUTTER(DOUBLE) OF 40MM MADE UP OF THICK SOLID WOOD INFILL CORE WITH NATURAL TEAK VENEER ON BOTH SIDES AND PU POLISHED AND INTERNAL TEAK LIPPING ALL AROUND FOR A HEIGHT OF 2.40M OF SPECIFIED COLOUR, SHADE, FINISH AS APPROVED BY ENGINEER - IN - CHARGE , INCLUDING SUPPLYING AND FIXING OF PRE POLISHED MEDIUM QUALITY KILN SEASONED SOLID AFRICAN TEAK WOOD FRAME (WITH OUT THRESHOLD) OF SECTION 125MMX75MM, WHICK SHOULD BE FIXED TO WALL ON BOTH SIDES WITH ANCHOR FASTENRS OF SIZE 10X100MM. 3NOS ON EITHER SIDE OF WALL AND GAP BETWEEN WALL AND FRAME SHOULD BE FILLED WITH Poly-Urethane (PU) Foam (GAP, SHOULD NOT MORE THAN 10MM) AND ARCHITRAVES OF 65X10MM AND 30X10MM WILL BE NAILED ON THE FRAME PU POLISH ,AND PROVISION OF 6MM THICK CLEAR FLOAT GLASS FIXED VENTILATOR ON TOP OF SHUTTER OF 0.45M HEIGHT RUBBER BEADING ALROUND GLASS INCLUDING 6NOS OF SSPC HINGES OF SIZE 125MM LONG, 4NOS OF 200MM LONG SS TOWER BOLT, 1NO OF DOORSET MORTICE LEVER LOCK (KY) SC FINISH & 2NO.DOOR STOPPER. POLISHING SHALL BE DONE WITH Poly-Urethane (PU) ON ONE SIDE AND PIGMENTED Poly-Urethane (PU) GLOSSY/MATT FINISH TO THE WOOD WORKS DULY CLEANING THE SURFACE AND APPLYING EMERY PAPER, SAND THE WOOD WITH 180 NOS, EMERY PAPER AND THEN WITH 320NO., EMERY PAPER, CLEAN & WIPE OFF LOOSE DUST, APPLYING SUITABLE KNIFING PASTE FILLER/WOOD FILLER BY PUTTY KNIFE/MUSLIN PAD, AIR DRY FOR 2-3 HOURS, SAND WITH 180 AND 320NO., EMERY PAPER, APPLY TWO COMPONENT WOOD SEALER, AIRE DRY FOR 24HOURS, SAND WITH 320NO., EMERY PAPER, APPLY ONE COAT OF APPROVED SPRAYING THINNER (FOR SPRAYING)/APPLYING ONE COAT OF APPROVED BRUSHING THINNER OR GENERAL PURPOSE THINNER (FOR BRUSHING) AND APPLY (EITHER WITH SPRAY OR BRUSH) TWO COATS OF APPROVED BRAND MELAMINE OF SHADE AS APPROVED BY THE ENGINEER IN CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EMERY PAPERS, COST OF THINNER & MELAMINE POLISH OF APPROVED BRANDS SUCH AS JENSON & NICHOLSON, ASAIN PAINTS, BERGER PAINTS OR EQUIVALENT ETC AS APPROVED BY THE ENGINEER IN CHARGE. FIXING SHALL BE DONE WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIAL TO SITE, LABOUR CHARGES FOR FIXING FRAME AND SHUTTER ETC.,BUT EXCLUDING GST ON ALL MATERIALS INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER - IN - CHARGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF DOORSET SC OR SS, BIS MARK & GOT APPROVED BY THE ENGINEER - IN - CHARGE) NOTE: NECESSARY REUSABLE TEMPLATES OF STEEL SHALL BE FIXED TO THE OPENING BEFORE PROCEEDING TO BRICK WORK, SO AS TO MAINTAIN CORRECT SIZES.

20.52

-

197090.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DOOR: 1.05X2.55 SUPPLING POSITIONING AND FIXING OF BIS MARK, STANDARD MAKE PRE POLISHED FLUSH DOOR SHUTTER OF 35MM MADE UP OF THICK SOLID WOOD INFILL CORE WITH NATURAL TEAK VENEER PU POLISHED ON ONE SIDE AND PIGMENTED PU ON ANOTHER SIDE OF SPECIFIED COLOUR, SHADE, FINISH AS APPROVED BY ENGINEER - IN - CHARGE AND INTERNAL TEAK LIPPING ALROUND FOR A HEIGHT OF 2.10M , INCLUDING SUPPLYING AND FIXING OF PRE POLISHED MEDIUM QUALITY KILN SEASONED SOLID AFRICAN TEAK WOOD FRAME (WITH OUT THRESHOLD) OF SECTION 125MMX62MM, WHICK SHOULD BE FIXED TO WALL ON BOTH SIDES WITH ANCHOR FASTENRS OF SIZE 10X100MM. 3NOS ON EITHER SIDE OF WALL AND GAP BETWEEN WALL AND FRAME SHOULD BE FILLED WITH Poly-Urethane (PU) Foam (GAP, SHOULD NOT MORE THAN 10MM) AND ARCHITRAVES OF 40X10MM AND 20X10MM WILL BE NAILED ON THE FRAME,WITH PU POLISH AND PROVISION OF 6MM THICK CLEAR FLOAT GLASS FIXED VENTILATOR ON TOP OF SHUTTER OF 0.45M HEIGHT RUBBER BEADING ALROUND GLASS INCLUDING 6NOS OF SSPC HINGES OF SIZE 125MM LONG, 2NO 200MM LONG SS TOWER BOLT. 1NO OF DOORSET MORTICE LEVER LOCK (KY) SC FINISH & 2NO.DOOR STOPPER. POLISHING SHALL BE DONE WITH Poly-Urethane (PU) ON ONE SIDE AND PIGMENTED Poly-Urethane (PU) GLOSSY/MATT FINISH TO THE WOOD WORKS DULY CLEANING THE SURFACE AND APPLYING EMERY PAPER, SAND THE WOOD WITH 180 NOS, EMERY PAPER AND THEN WITH 320NO., EMERY PAPER, CLEAN & WIPE OFF LOOSE DUST, APPLYING SUITABLE KNIFING PASTE FILLER/WOOD FILLER BY PUTTY KNIFE/MUSLIN PAD, AIR DRY FOR 2-3 HOURS, SAND WITH 180 AND 320NO., EMERY PAPER, APPLY TWO COMPONENT WOOD SEALER, AIRE DRY FOR 24HOURS, SAND WITH 320NO., EMERY PAPER, APPLY ONE COAT OF APPROVED SPRAYING THINNER (FOR SPRAYING)/APPLYING ONE COAT OF APPROVED BRUSHING THINNER OR GENERAL PURPOSE THINNER (FOR BRUSHING) AND APPLY (EITHER WITH SPRAY OR BRUSH) TWO COATS OF APPROVED BRAND MELAMINE OF SHADE AS APPROVED BY THE ENGINEER IN CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EMERY PAPERS, COST OF THINNER & MELAMINE POLISH OF APPROVED BRANDS SUCH AS JENSON & NICHOLSON, ASAIN PAINTS, BERGER PAINTS OR EQUIVALENT ETC AS APPROVED BY THE ENGINEER IN CHARGE. FIXING SHALL BE DONE WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIAL TO SITE, LABOUR CHARGES FOR FIXING FRAME AND SHUTTER ETC., BUT EXCLUDING GST ON ALL MATERIALS ,INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER - IN - CHARGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF DOORSET SC OR SS, BIS MARK & GOT APPROVED BY THE ENGINEER - IN - CHARGE) NOTE: NECESSARY REUSABLE TEMPLATES OF STEEL SHALL BE FIXED TO THE OPENING BEFORE PROCEEDING TO BRICK WORK, SO AS TO MAINTAIN CORRECT SIZES.

58.91

-

543728.49

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DOOR: 0.825X2.10 SUPPLING POSITIONING AND FIXING OF BIS MARK, STANDARD MAKE PRE POLISHED FLUSH DOOR SHUTTER OF 35MM MADE UP OF THICK SOLID WOOD INFILL CORE WITH NATURAL TEAK VENEER PU POLISHED ON ONE SIDE AND PHENOLIC FILM WITH PIGMENTED PU ON OTHER SIDE OF SPECIFIED COLOUR, SHADE, FINISH AS APPROVED BY ENGINEER - IN - CHARGE AND INTERNAL TEAK LIPPING ALROUND, INCLUDING SUPPLYING AND FIXING OF PRE POLISHED MEDIUM QUALITY KILN SEASONED SOLID RED MERANTI HARD WOOD FRAME (WITH OUT THRESHOLD) OF SECTION 100MMX62MM, WHICK SHOULD BE FIXED TO WALL ON BOTH SIDES WITH ANCHOR FASTENRS OF SIZE 10X100MM. 3NOS ON EITHER SIDE OF WALL AND GAP BETWEEN WALL AND FRAME SHOULD BE FILLED WITH Poly-Urethane (PU) Foam (GAP, SHOULD NOT MORE THAN 10MM) AND ARCHITRAVES OF 40X10MM AND 20X10MM WILL BE NAILED ON THE FRAME WITH PU POLISH , INCLUDING 3NOS OF SSPC HINGES OF SIZE 125MM LONG, 1NO 200MM LONG SS TOWER BOLT. 2NOS SS DOOR HANDLES OF 125MM LONG & 1NO SS ALROP OF 250MM LONG. POLISHING SHALL BE DONE WITH Poly-Urethane (PU) ON ONE SIDE AND PIGMENTED Poly-Urethane (PU) GLOSSY/MATT FINISH TO THE WOOD WORKS DULY CLEANING THE SURFACE AND APPLYING EMERY PAPER, SAND THE WOOD WITH 180 NOS, EMERY PAPER AND THEN WITH 320NO., EMERY PAPER, CLEAN & WIPE OFF LOOSE DUST, APPLYING SUITABLE KNIFING PASTE FILLER/WOOD FILLER BY PUTTY KNIFE/MUSLIN PAD, AIR DRY FOR 2-3 HOURS, SAND WITH 180 AND 320NO., EMERY PAPER, APPLY TWO COMPONENT WOOD SEALER, AIRE DRY FOR 24HOURS, SAND WITH 320NO., EMERY PAPER, APPLY ONE COAT OF APPROVED SPRAYING THINNER (FOR SPRAYING)/APPLYING ONE COAT OF APPROVED BRUSHING THINNER OR GENERAL PURPOSE THINNER (FOR BRUSHING) AND APPLY (EITHER WITH SPRAY OR BRUSH) TWO COATS OF APPROVED BRAND MELAMINE OF SHADE AS APPROVED BY THE ENGINEER IN CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EMERY PAPERS, COST OF THINNER & MELAMINE POLISH OF APPROVED BRANDS SUCH AS JENSON & NICHOLSON, ASAIN PAINTS, BERGER PAINTS OR EQUIVALENT ETC AS APPROVED BY THE ENGINEER IN CHARGE. FIXING SHALL BE DONE WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIAL TO SITE, LABOUR CHARGES FOR FIXING FRAME AND SHUTTER ETC.,BUT EXCLUDING GST ON ALL MATERIALS INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER - IN - CHARGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF DOORSET SC OR SS, BIS MARK & GOT APPROVED BY THE ENGINEER - IN - CHARGE) NOTE: NECESSARY REUSABLE TEMPLATES OF STEEL SHALL BE FIXED TO THE OPENING BEFORE PROCEEDING TO BRICK WORK, SO AS TO MAINTAIN CORRECT SIZES.

31.19

-

242728.45

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DOOR:( DOUBLE SHUTTE) 1.2X2.55 SUPPLING POSITIONING AND FIXING OF BIS MARK, STANDARD MAKE PRE POLISHED FLUSH DOOR SHUTTER (DOUBLE )OF 35MM MADE UP OF THICK SOLID WOOD INFILL CORE WITH NATURAL TEAK VENEER PU POLISHED ON ONE SIDE AND PIGMENTED PU ON OTHER SIDE OF SPECIFIED COLOUR, SHADE, FINISH AS APPROVED BY ENGINEER - IN - CHARGE AND INTERNAL TEAK LIPPING ALROUND FOR A HEIGHT OF 2.10M, INCLUDING SUPPLYING AND FIXING OF PRE POLISHED MEDIUM QUALITY KILN SEASONED SOLID AFRICAN TEAK WOOD FRAME (WITH OUT THRESHOLD) OF SECTION 125MMX62MM, WHICK SHOULD BE FIXED TO WALL ON BOTH SIDES WITH ANCHOR FASTENRS OF SIZE 10X100MM. 3NOS ON EITHER SIDE OF WALL AND GAP BETWEEN WALL AND FRAME SHOULD BE FILLED WITH Poly-Urethane (PU) Foam (GAP, SHOULD NOT MORE THAN 10MM) AND ARCHITRAVES OF 40X10MM AND 20X10MM WILL BE NAILED ON THE FRAME WITH PU POLISH ,AND PROVISION OF 6MM THICK CLEAR FLOAT GLASS FIXED VENTILATOR ON TOP OF SHUTTER OF 0.45M HEIGHT RUBBER BEADING ALROUND GLASS INCLUDING 6NOS OF SSPC HINGES OF SIZE 125MM LONG, 2NO 200MM LONG SS TOWER BOLT. 1NO OF DOORSET MORTICE LEVER LOCK (KY) SC FINISH & 2NO.DOOR STOPPER. POLISHING SHALL BE DONE WITH Poly-Urethane (PU) ON ONE SIDE AND PIGMENTED Poly-Urethane (PU) GLOSSY/MATT FINISH TO THE WOOD WORKS DULY CLEANING THE SURFACE AND APPLYING EMERY PAPER, SAND THE WOOD WITH 180 NOS, EMERY PAPER AND THEN WITH 320NO., EMERY PAPER, CLEAN & WIPE OFF LOOSE DUST, APPLYING SUITABLE KNIFING PASTE FILLER/WOOD FILLER BY PUTTY KNIFE/MUSLIN PAD, AIR DRY FOR 2-3 HOURS, SAND WITH 180 AND 320NO., EMERY PAPER, APPLY TWO COMPONENT WOOD SEALER, AIRE DRY FOR 24HOURS, SAND WITH 320NO., EMERY PAPER, APPLY ONE COAT OF APPROVED SPRAYING THINNER (FOR SPRAYING)/APPLYING ONE COAT OF APPROVED BRUSHING THINNER OR GENERAL PURPOSE THINNER (FOR BRUSHING) AND APPLY (EITHER WITH SPRAY OR BRUSH) TWO COATS OF APPROVED BRAND MELAMINE OF SHADE AS APPROVED BY THE ENGINEER IN CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EMERY PAPERS, COST OF THINNER & MELAMINE POLISH OF APPROVED BRANDS SUCH AS JENSON & NICHOLSON, ASAIN PAINTS, BERGER PAINTS OR EQUIVALENT ETC AS APPROVED BY THE ENGINEER IN CHARGE. FIXING SHALL BE DONE WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIAL TO SITE, LABOUR CHARGES FOR FIXING FRAME AND SHUTTER ETC.,BUT EXCLUDING GST ON ALL MATERIALS INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER - IN - CHARGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF DOORSET SC OR SS, BIS MARK & GOT APPROVED BY THE ENGINEER - IN - CHARGE) NOTE: NECESSARY REUSABLE TEMPLATES OF STEEL SHALL BE FIXED TO THE OPENING BEFORE PROCEEDING TO BRICK WORK, SO AS TO MAINTAIN CORRECT SIZES. SIZES.

30.6

-

277306.38

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DOOR: 0.90X2.10 SUPPLING POSITIONING AND FIXING OF BIS MARK, STANDARD MAKE PRE POLISHED FLUSH DOOR SHUTTER OF 35MM MADE UP OF THICK SOLID WOOD INFILL CORE WITH NATURAL TEAK VENEER PU POLISH ON ONE SIDE AND PIGMENTED PU ON OTHER SIDE OF SPECIFIED COLOUR, SHADE, FINISH AS APPROVED BY ENGINEER - IN - CHARGE AND INTERNAL TEAK LIPPING ALROUND, INCLUDING SUPPLYING AND FIXING OF PRE POLISHED MEDIUM QUALITY KILN SEASONED SOLID AFRICAN TEAK WOOD FRAME (WITH OUT THRESHOLD) OF SECTION 100MMX62MM, WHICK SHOULD BE FIXED TO WALL ON BOTH SIDES WITH ANCHOR FASTENRS OF SIZE 10X100MM. 3NOS ON EITHER SIDE OF WALL AND GAP BETWEEN WALL AND FRAME SHOULD BE FILLED WITH Poly-Urethane (PU) Foam (GAP, SHOULD NOT MORE THAN 10MM) AND ARCHITRAVES OF 40X10MM AND 20X10MM WILL BE NAILED ON THE FRAME WITH PU POLISH , INCLUDING 3NOS OF SSPC HINGES OF SIZE 125MM LONG, 1NO 200MM LONG SS TOWER BOLT. 1NO OF DOORSET MORTICE LEVER LOCK (KY) SC FINISH & 1NO.DOOR STOPPER. POLISHING SHALL BE DONE WITH Poly-Urethane (PU) ON ONE SIDE AND PIGMENTED Poly-Urethane (PU) GLOSSY/MATT FINISH TO THE WOOD WORKS DULY CLEANING THE SURFACE AND APPLYING EMERY PAPER, SAND THE WOOD WITH 180 NOS, EMERY PAPER AND THEN WITH 320NO., EMERY PAPER, CLEAN & WIPE OFF LOOSE DUST, APPLYING SUITABLE KNIFING PASTE FILLER/WOOD FILLER BY PUTTY KNIFE/MUSLIN PAD, AIR DRY FOR 2-3 HOURS, SAND WITH 180 AND 320NO., EMERY PAPER, APPLY TWO COMPONENT WOOD SEALER, AIRE DRY FOR 24HOURS, SAND WITH 320NO., EMERY PAPER, APPLY ONE COAT OF APPROVED SPRAYING THINNER (FOR SPRAYING)/APPLYING ONE COAT OF APPROVED BRUSHING THINNER OR GENERAL PURPOSE THINNER (FOR BRUSHING) AND APPLY (EITHER WITH SPRAY OR BRUSH) TWO COATS OF APPROVED BRAND MELAMINE OF SHADE AS APPROVED BY THE ENGINEER IN CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, EMERY PAPERS, COST OF THINNER & MELAMINE POLISH OF APPROVED BRANDS SUCH AS JENSON & NICHOLSON, ASAIN PAINTS, BERGER PAINTS OR EQUIVALENT ETC AS APPROVED BY THE ENGINEER IN CHARGE. FIXING SHALL BE DONE WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIAL TO SITE, LABOUR CHARGES FOR FIXING FRAME AND SHUTTER ETC.,BUT EXCLUDING GST ON ALL MATERIALS INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER - IN - CHARGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF DOORSET SC OR SS, BIS MARK & GOT APPROVED BY THE ENGINEER - IN - CHARGE) NOTE: NECESSARY REUSABLE TEMPLATES OF STEEL SHALL BE FIXED TO THE OPENING BEFORE PROCEEDING TO BRICK WORK, SO AS TO MAINTAIN CORRECT SIZES.

17.01

-

151482.56

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING AND FIXING IN TRUE HORIZONTAL LEVEL 600 MM X 600 MM 15 MM THICK ARM STRONG FALSE CEILING SYSTEM MANUFACTURED BY M/S ARM STRONG WORLD INDUSTRIES USING HOT DIPPED GALVANIZED STEEL SECTION EXPOSED SURFACE WITH PRE-COATED CAPPING, MAIN TEE OF SIZE 24 X 32 MM AT EVERY 1200 MM C/C MAXIMUM AND ROTARY STITCHED CROSS TEE OF SIZE 24 X 27 MM AT EVERY 600 MM C/C AND SUB-CROSS TEE OF SIZE 24 MM X 25 MM AT 1200 MM C/C AND WALL ANGLE OF SIZE 19 X 19 MM FIXED TO PERIPHERY OF THE WALL AND THE ABOVE GRID IS SUSPENDED AT EVERY 1200 MM C/C IN BOTH DIRECTIONS USING 2.0 MM THICK PRE-STRAIGHTENED GI WIRE LAYING FINE FISSURED BUTT EDGE CEILING TILES OF 15 MM THICK MINERAL FIBER BOARD MANUFACTURED BY M/S ARM STRONG WORLD INDUSTRIES LTD., HAVING RH 99% AND FOR FINISHED OF SIZE 600 X 600 MM INCLUDING COST &CONVEYANCE OF ALL MATERIALS AND LABOUR CHARGES SUCH AS CUTTING , FIXING OF STANDING OF FRAME WORK EXPOSING ROOF MAKING COMPLETE, BUT EXCLUDING GST FOR FINISHED ITEM OF WORK THIRD FLOOR

480

-

609648

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING GYP BOARD SUSPENDED REGULAR SINGLE LAYER FALSE CEILING (GS-MFSC-4.1 AS PER INDIA GYPSUM) USING 12.50 MM THICK GYP BOARD CONFORMING TO IS 2095-1982 FIXING TO GYP STEEL GI PERIMETER CHANNELS OF SIZE 20 X 27 X 30 MM (WEB) OF 0.55 MM THICK ALONG THE PERIMETER OF CEILING SCREW FIXED TO BRICK WORK / PARTITION AT 610 MM C/C AND SUSPENDING THE FRAME WORK USING INTERMEDIATE CHANNELS (45 X 15 X 15 X 0.90 MM) FROM SOFFIT AT 1220 MM C/C WITH CEILING ANGLE (25 X 10 X 0.55 MM) FIXED WITH GI CLEAT AND STEEL EXPANSION FASTENERS & CONNECTING CLIP TO THE CEILING CHANNELS (WITH KNURLED WEB OF 51.50 X 26 X 10.50 X 0.55 MM) FIXED IN DIECTION PERPENDICULAR TO THE INTERMEDIATE CHANNEL AT 457 MM C/C AND FIXING THE 12.50 MM DRYWALL SCEWS AT 230 MM C/C & JOINTING, FIXING USING JOINT COMPOUND AND PAPER TAPE TO HAVE A FLUSH LOOK INCLUDING FILLING THE TAPPERED & SQUARE EDGES WITH JOINTING COMPOUND, TWO COATS OF DRYWALL TOPCOAT, BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK AS PER INDIA GYPSUM LTD., SPECIFICATION.THIRD FLOOR

440

-

454168

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;HALF ROUNDING THE EDGES OF GRANITE/MARBLE STONE OF ALL THICKNESS INCLUDING POLISHING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST ON ALL MATERIALS ,COMPLETE FOR FINISHED ITEM OF WORK. IN THIRD FLOOR

75

-

31530

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FULL ROUNDING THE EDGES OF GRANITE/MARBLE STONE OF ALL THICKNESS INCLUDING POLISHING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST ON ALL MATERIALS ,COMPLETE FOR FINISHED ITEM OF WORK. IN THIRD FLOOR

100

-

54540

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PAINTING TO NEW WALLS WITH THREE (3) COATS OF Synthetic Polymer luxury Plastic emulsion /solvent based lustre paint of superior grade having (VOC < 50 Gms./Lit) OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING LIFTING(MANUAL) AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK IN THIRD FLOOR

1050

-

187845

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR PLASTER OF PARIS PUTTY OR BIRLA WALL CARE PUTTY OF AVERAGE 1 TO 2 MM THICKNESS OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2 - 3 HRS, SAND WITH 180 AND 320 NO., EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES, BUT EXCLUDING GST ETC. COMPLETE FOR FINISHED ITEM OF WORK FOR THIRD FLOOR

450

-

94860

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT / RISERS OF STEPS WITH HIGH POLISHED GRANITE SLAB16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:3) 20MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER BUT EXCLUDING SEIGNIORAGE CHARGES & GST ETC., COMPLETE , FOR FINISHED ITEM OF WORK, THIRD FLOOR

15

-

57861

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING CLADDING WITH HIGH POLISHED GRANITE SLAB 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR SET OVER BASE COAT OF CM (1:3) 20 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE STONES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING LIFTING (MANUAL) ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK FOR LIFT WALLS THIRD FLOOR

25

-

96435

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DADOOING WITH DIGITAL / POLISHED GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNSAS APPROVED BY EXECUTIVE ENGINEER APPROVED BY EXECUTIVE ENGINEER, SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LIFTING (MANNUAL), ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE, BUT EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK. FOR THIRD FLOOR.

150

-

133230

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FLOORING WITH NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, LIFTING ( MANNUAL). BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK, THIRD FLOOR (APSS.NO:701&707).

40

-

38168

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND STONES ETC., COMPLETE, LABOUR CHARGES FOR DRESSING OF STONES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. THIRD FLOOR

50

-

217050

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1ST QUALITY CONFORMING TO 13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR THIRD FLOOR

100

-

126380

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FLOORING WITH DIGITAL/POLISHED GLAZED (GVT) FULL BODY PORCELAIN VITRIFIED TILES of size 600 x 600 mm and thickness between 8-10 mm 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. THIRD FLOOR

400

-

590440

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING MASONRY WORK WITH AERATED (CELLULAR) AUTOCLAVED CONCRETE BLOCKS OF APPROVED BRANDS XTRALITE FROM ULTRATECH, AEROCON FROM HIL, CONFORMING TO IS:2185 (PART-3) - 1984 AND IS:6441-1972 OF COMPRESSIVE STRENGTH 3 N/MM2 600 X 200 X 230 MM - AND CHEMICAL JOINTING COMPOUND OF SAME BRAND, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, LIFTING (MANUAL) CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK 230MM THICK WALLS THIRD FLOOR (APSS NO. 501&504)

70

-

560539

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING AND FIXING IN TRUE HORIZONTAL LEVEL 600 MM X 600 MM 15 MM THICK ARM STRONG FALSE CEILING SYSTEM MANUFACTURED BY M/S ARM STRONG WORLD INDUSTRIES USING HOT DIPPED GALVANIZED STEEL SECTION EXPOSED SURFACE WITH PRE-COATED CAPPING, MAIN TEE OF SIZE 24 X 32 MM AT EVERY 1200 MM C/C MAXIMUM AND ROTARY STITCHED CROSS TEE OF SIZE 24 X 27 MM AT EVERY 600 MM C/C AND SUB-CROSS TEE OF SIZE 24 MM X 25 MM AT 1200 MM C/C AND WALL ANGLE OF SIZE 19 X 19 MM FIXED TO PERIPHERY OF THE WALL AND THE ABOVE GRID IS SUSPENDED AT EVERY 1200 MM C/C IN BOTH DIRECTIONS USING 2.0 MM THICK PRE-STRAIGHTENED GI WIRE LAYING FINE FISSURED BUTT EDGE CEILING TILES OF 15 MM THICK MINERAL FIBER BOARD MANUFACTURED BY M/S ARM STRONG WORLD INDUSTRIES LTD., HAVING RH 99% AND FOR FINISHED OF SIZE 600 X 600 MM INCLUDING COST &CONVEYANCE OF ALL MATERIALS AND LABOUR CHARGES SUCH AS CUTTING , FIXING OF STANDING OF FRAME WORK EXPOSING ROOF MAKING, BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK SECOND FLOOR

720

-

914472

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;SUPPLY AND FIXING GYP BOARD SUSPENDED REGULAR SINGLE LAYER FALSE CEILING (GS-MFSC-4.1 AS PER INDIA GYPSUM) USING 12.50 MM THICK GYP BOARD CONFORMING TO IS 2095-1982 FIXING TO GYP STEEL GI PERIMETER CHANNELS OF SIZE 20 X 27 X 30 MM (WEB) OF 0.55 MM THICK ALONG THE PERIMETER OF CEILING SCREW FIXED TO BRICK WORK / PARTITION AT 610 MM C/C AND SUSPENDING THE FRAME WORK USING INTERMEDIATE CHANNELS (45 X 15 X 15 X 0.90 MM) FROM SOFFIT AT 1220 MM C/C WITH CEILING ANGLE (25 X 10 X 0.55 MM) FIXED WITH GI CLEAT AND STEEL EXPANSION FASTENERS & CONNECTING CLIP TO THE CEILING CHANNELS (WITH KNURLED WEB OF 51.50 X 26 X 10.50 X 0.55 MM) FIXED IN DIECTION PERPENDICULAR TO THE INTERMEDIATE CHANNEL AT 457 MM C/C AND FIXING THE 12.50 MM DRYWALL SCEWS AT 230 MM C/C & JOINTING, FIXING USING JOINT COMPOUND AND PAPER TAPE TO HAVE A FLUSH LOOK INCLUDING FILLING THE TAPPERED & SQUARE EDGES WITH JOINTING COMPOUND, TWO COATS OF DRYWALL TOPCOAT, BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK AS PER INDIA GYPSUM LTD., SPECIFICATION.SECOND FLOOR

660

-

681252

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;HALF ROUNDING THE EDGES OF GRANITE/MARBLE STONE OF ALL THICKNESS INCLUDING POLISHING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST ON ALL MATERIALS COMPLETE FOR FINISHED ITEM OF WORK. IN SECOND FLOOR

75

-

31530

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FULL ROUNDING THE EDGES OF GRANITE/MARBLE STONE OF ALL THICKNESS INCLUDING POLISHING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST ON ALL MATERIALS COMPLETE FOR FINISHED ITEM OF WORK. IN SECOND FLOOR

100

-

54540

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PAINTING TO NEW WALLS WITH THREE (3) COATS OF Synthetic Polymer luxury Plastic emulsion /solvent based lustre paint of superior grade having (VOC < 50 Gms./Lit) OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING LIFTING(MANUAL) AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK IN SECOND FLOOR

2450

-

438305

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR PLASTER OF PARIS PUTTY OR BIRLA WALL CARE PUTTY OF AVERAGE 1 TO 2 MM THICKNESS OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2 - 3 HRS, SAND WITH 180 AND 320 NO., EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES, BUT EXCLUDING GST ETC. COMPLETE FOR FINISHED ITEM OF WORK FOR SECOND FLOOR

1050

-

221340

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING CLADDING WITH HIGH POLISHED GRANITE SLAB 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR SET OVER BASE COAT OF CM (1:3) 20 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE STONES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING LIFTING (MANUAL) ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK FOR LIFT WALLS SECOND FLOOR

25

-

95442.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT / RISERS OF STEPS WITH HIGH POLISHED GRANITE SLAB16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:3) 20 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER BUT EXCLUDING SEIGNIORAGE CHARGES & GST ETC., COMPLETE , FOR FINISHED ITEM OF WORK, SECOND FLOOR

25

-

95442.5

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;DADOOING WITH DIGITAL / POLISHED GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNSAS APPROVED BY EXECUTIVE ENGINEER APPROVED BY EXECUTIVE ENGINEER, SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LIFTING (MANNUAL), ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE, BUT EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK. FOR SECOND FLOOR.

250

-

219525

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FLOORING WITH NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, LIFTING ( MANNUAL). BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK,SECOND FLOOR (APSS.NO:701&707).

60

-

54798

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND STONES ETC., COMPLETE, LABOUR CHARGES FOR DRESSING OF STONES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. SECOND FLOOR

65

-

277264

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1ST QUALITY CONFORMING TO 13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR SECOND FLOOR

150

-

183435

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;FLOORING WITH DIGITAL/POLISHED GLAZED (GVT) FULL BODY PORCELAIN VITRIFIED TILES of size 600 x 600 mm and thickness between 8-10 mm 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. SECOND FLOOR

1100

-

1578720

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING CLADDING WITH HIGH POLISHED GRANITE SLAB 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR SET OVER BASE COAT OF CM (1:3) 20 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE STONES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING LIFTING (MANUAL) ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK FOR LIFT WALLS FIRST FLOOR

25

-

94450

... More
CONSTRUCTION OF DPO WANAPARTHY (BALANCE WORK), MAIN GATE, SECURITY ROOM, COMPOUND WALL;PROVIDING CLADDING WITH HIGH POLISHED GRANITE SLAB 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR SET OVER BASE COAT OF CM (1:3) 20 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE STONES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING LIFTING (MANUAL) ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK FOR LIFT WALLS GROUND FLOOR

25

-

93457.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.