Police Housing Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Police Housing Corporation Limited Tender

Civil And Construction
Building Construction
Opening Date13 May 2022
Closing Date27 May 2022
Tender Amount₹ 12,40,80,750 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and fixing of 24 Port manageble switch including giving connections cost of all accessories and all labour charges etc., complete. Makes: CISCO / Net Gear / HP / D link.

4

-

27632.76

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and fixing of Modular co-Axial socket type TV Antenna outlet on 2 moduler hot dip galvanized metal box and 2 modular cover frame including giving connections, cost of all accessories and labour charges etc. Complete. Co-Axial socket type TV Antenna outlet, cover frame & metal box makes: Legrand Myrius / Havells Fabio.

10

-

3043

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and run of 2 Pair, 0.5mm telephone copper wire in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: Finolex / Delton / Surabi / Polycab.

1500

-

33045

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and fixing of Modular socket type Telephone jack with Connector on 2 moduler hot dip galvanized metal box and 2 modular cover frame including giving connections, cost of all accessories and labour charges etc. Complete. Telephone jack with Connector, cover frame & metal box Makes: Legrand Myrius / Havells Fabio.

50

-

15271.5

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and run of LAN Cable cat - 6 UTP cable in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: D Link / AMP / Molex / Legrand / Krone.

2000

-

71100

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate on 2 moduler hot dip galvanized metal box including giving connections, cost of all accessories and labour charges etc., complete. I/O & duel face plate Makes: D Link / AMP / Molex / Legrand / Krone. Metal box make: Legrand Myrius/ Havells Fabio.

75

-

38415.75

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Fixing of 36W LED luminaire in false ceiling / pop with necessary arrangment including giving connections and all labour charges etc., complete.

120

-

36000

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and Transportation of 36W Back lit, 2' x2' (600mm x 600mm) Recessed / Surface mounted LED luminaire made of CRCA sheet housing with powder coated with high efficiency acrylic wide diffuser, with wide operating voltage range, Power factor > 0.9, Surge protection >2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Crompton / Havells / Wipro. LED MAKE : CREE / NICHIA / OSRAM.

120

-

505814.4

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Fixing of LED luminaire 18W Down lights with all necessary accessories in false ceiling / on wall including giving connections and all labour charges etc., complete.

450

-

48744

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and transportation of 18W back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 50,000 burning hours with BIS Certification. LUMINAIRE MAKE : Crompton / Havells / Wipro. LED MAKE : CREE / NICHIA / OSRAM.

450

-

1002082.5

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Labour charges for fixing of Exhaust Fan in wall with necessary connections etc., complete (for hole already made available).

45

-

17066.25

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply of 12" (300mm) Light duty exhaust fan with metal blades etc complete. Makes: Crompton / Havells Ventilair-DB / Orient hill air.

45

-

81745.2

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Labour charges for fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

100

-

19519

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply of Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes: Legrand Myrius / Havells Fabio.

100

-

56353

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC) motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient.

100

-

320962

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and run of 5 of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for 4 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Makes: RR kabel / Polycab (HR_FR-LF) / Havells / KEI (HFFR).

500

-

211890

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and run of 3 of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Makes: RR kabel / Polycab (HR_FR-LF) / Havells / KEI (HFFR).

1000

-

184290

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and run of 3 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Makes: RR kabel / Polycab (HR_FR-LF) / Havells / KEI (HFFR).

7000

-

849170

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch controls-2Nos duly recessed in wall with 6 Module Hot Dip Galvanized Modular Metal Box size covered with 6 Modular Cover Frame including earth connections and all labour charges etc., complete. [For Computer board]. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius / Havells Fabio.

75

-

64113

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch controls-2Nos duly recessed in wall with 6 Module Hot Dip Galvanized Modular Metal Box size covered with 6 Modular Cover Frame including earth connections and all labour charges etc., complete. [For 2 socket board] Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius / Havells Fabio.

75

-

64113

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete. [ Power plug ] Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius / Havells Fabio.

150

-

95845.5

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with suitable Module Hot Dip Galvanized Modular Metal Box covered with suitable Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius / Havells Fabio.

100

-

45200

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Wiring with 2 runs of 22/0.3mm (1.5 Sqmm) FRLS/HFFR PVC insulated 1100V grade as per IS: 694/1990 specification for Copper cable in existing pipe without Ceiling Rose including all labour charges etc., complete for light points in Non-Residential Buildings. [For secondary light points i.e., from existing light point to extended light point ] Copper wire make: RR kabel / Polycab (HR_FR-LF) / Havells / KEI (HFFR).

100

-

28917

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Wiring with 2 runs of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with suitable Module Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, without 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. Copper wire make: RR kabel / Polycab (HR_FR-LF) / Havells / KEI (HFFR). Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius / Havells Fabio.

320

-

223123.2

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Wiring with 2 runs of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with suitable Module Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, with 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. Copper wire make: RR kabel / Polycab (HR_FR-LF) / Havells / KEI (HFFR). Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius / Havells Fabio. Ceiling Rose Make: Gold Medal Olive / Million Zoom / Anchor Penta Cherry.

295

-

212057.8

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and Fixing of 25mm outer dia Heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) surface laying on false ceiling duly fixing with G.I. Wire on existing supported studs including all labour charges etc., complete for run of mains. Makes : Sudhakar / Modi / VIP.

5000

-

367650

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and Fixing of 25mm outer dia HEAVY GRADE, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in underneeth the floor with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Modi / VIP.

1500

-

110130

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and fixing of 25mm outer dia Heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories [like 'U' nails, Junction box, PVC Bends and Cement] including masonary work for light, fan, common, separate plug point and switch/power boards etc., including all labour charges etc., complete. Makes: Sudhakar / Modi / VIP.

3000

-

310980

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;Supply and Fixing of 25mm outer dia HEAVY GRADE, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes: Sudhakar / Modi / VIP.

4000

-

339760

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.

10

-

926758

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PLASTERING TO BASEMENT 20MM THICK WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, Lifting (Mannual), CURING CHARGES, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK FOR BASEMENT (APSS NO: 901&904)

150

-

69015

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS.NO: 901&903)

250

-

126650

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS , MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING, LIFTING (MANUAL) ETC., WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS OF 125 MM THICK (APSS NO.403)

8

-

78172.8

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 GRADE NOMINAL MIX CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, SHUTTERING, WITH STEEL PLATES, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. BOTTOM SLAB(APSS NO.403)

25

-

226447.5

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 GRADE NOMINAL MIX CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, SHUTTERING, CENTERING WITH STEEL PLATES, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. RCC SIDE WALLS OF 250 MM THICK (APSS NO.403)

38

-

467080.8

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR FOUNDATIONS .(APSS NO: 402).

20

-

81544

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;EARTH WORK EXCAVATION AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH FOR OPEN EXCAVATION -EXCLUDING GST. (APSS 308).

300

-

69240

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING, LAYING, JOINTING AND TESTING OF 101.60 MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M (3'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK.

450

-

237960

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING, LAYING, JOINTING AND TESTING OF 152.40 MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M (3'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK.

450

-

356580

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;CONSTRUCTING 914.0 MM ( 3'-0") DIA BRICK MASONARY MAN HOLE AS PER IS-4111:PART-1:1986 WITH CM (1:6) PROP. USING 2ND CLASS BRICKS OF 225MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5N/SQ.MM INCLUDING PLASTERING WIH CM(1:3) PROP. 12 MM THICK BOTH INSIDE AND OUTSIDE, FITTED WITH 20'' DIA RCC COVERS AND FRAMES, INCLUDING EXCAVATING PITS UP TO A DEPTH OF 914.4 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, COST OF ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.

12

-

161764.8

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;CONSTRUCTING 914.0 MM ( 3'-0") DIA BRICK MASONARY MAN HOLE AS PER IS-4111:PART-1:1986 WITH CM (1:6) PROP. USING 2ND CLASS BRICKS OF 225MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5N/SQ.MM INCLUDING PLASTERING WIH CM(1:3) PROP. 12 MM THICK BOTH INSIDE AND OUTSIDE, FITTED WITH 20'' DIA RCC COVERS AND FRAMES, INCLUDING EXCAVATING PITS UP TO A DEPTH OF 914.4 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, COST OF ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.

18

-

152479.8

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING PPR BALL VALVES - 40 MM SIZE INDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK

4

-

2172.4

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING PPR BALL VALVES - 32 MM SIZE INDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK

10

-

2647

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING PPR BALL VALVES - 25 MM SIZE INDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK

20

-

5068

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXING OF 54.00MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

200

-

110200

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXING OF 41.30MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

400

-

151320

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXING OF 34.90MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

400

-

121800

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

500

-

111900

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING AND PLACING ON TERRACE POLYTHELENE WATER STORAGE TANKS (AT ALL FLOOR LEVELS) DOUBLE LAYER APPROVED BRAND AND MNUFACTURE WITH COVER AND SUITABLE LOCKING ARRANGEMENTS MAKING NECESSARY HOLES FOR INLET & OUTLETS AND OVERFLOW PIPES BUT WITHOUT FITTINGS & BASE SUPPORT FOR TANKS, MAKING GOOD THE SAME TO ENSURE LEAK PROOF WITH AN APPROPRIATE MASONARY PLATFORM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK AS DIRECTED BY THE ENGINEER -IN- CHARGE

25000

-

200000

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING OF BOTTLE TRAP INCLUDING ALL ACCESERIES ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., FOR FINISHED ITEM OF WORK COMPLETE.

90

-

103500

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warrant

72

-

239601.6

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING 19.04 MM DIA, 609.60 MM LONG ALUMINUM ANODISED TOWEL ROD WITH BRACKETS AND SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., FOR FINISHED ITEM OF WORK COMPLETE.

29

-

4381.9

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING NP SOAP DISH HEAVY TYPE WITH NP SCREWSINCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.

73

-

20352.4

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.

72

-

1144.8

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.

72

-

1555.2

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR SINGLE 'Y" WITH DOOR AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.

40

-

5952

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR SINGLE 'Y" WITH DOOR AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.

40

-

10408

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., FOR FINISHED ITEM OF WORK COMPLETE.

29

-

15616.5

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR SINGLE TEE WITH DOOR AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.

72

-

5889.6

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR SINGLE TEE WITH DOOR AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.

72

-

10555.2

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXINGWHITE GLAZED FLAT BACK HALF STALL URINALS OF 1 ST QUALITY CONFORMING TO IS2556-1995 WITH STANDARD CP SPREADER OF OVERALL SIZE 95X95X57 MM CONFORMING TO IS 2556-PART 6 ,SEC-6-1974 FIXED WITH SCREWS COMPLETRE INDIAN MAKE OF SIZE 410 x265 x 305 mm INCLUDING 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, 38.10 MM C.P WASTE COUPLING, 38.10 MM PVC SOLID WASTE PIPE OUTLET, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE.

30

-

104619

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING & FIXING INDIAN MAKE FLAT BACK WASH HAND BASIN 1ST QUALITY CONFORMING TO IS:2556-PART-4:1972 WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, 32 MM NOMINAL SIZE C.P. FITTING WITH PARALLEL PIPE THREADCONFORMING TO IS:2963-1979 AND FITTED WITH 15 MM NOMINAL BORE CHROMIUM PLATED PILLAR TAP OF 1ST QUALITY INDIAN MAKE 400 GRAMS SEIKO/ SENIOR/ NICE/ ESSO OR EQUIVALENT COMPLETE WITH STANDARD CI BRACKETS INCLUDING WOODEN BLOCK: 550 X 400 MM - SINGLE C.P. PILLAR COCK INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE.

60

-

108090

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXING IN POSITION EUROPEAN TYPE WATER CLOSET OF BEST INDIAN MAKE WHITE GLAZED WITH 100 MM 'P' TRAP, PLASTIC SEAT AND LID FOR EUROPEAN WATER CLOSET AND BUFFERS AS PER IS 2548-1963 AND PROVIDING PVC LOW LEVEL FLUSHING SYSTEM OF 8 LITRES CAPACITYOF PARRYWARE SLIMLINE (WHITE) WITH INTERNAL COMPONENTS AND SHORT BEND, 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE.

72

-

271994.4

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING, LAYING, JOINTING AND TESTING OF 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, AND JOINTING WITH SOLVENT CEMENT INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.

190

-

91162

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND LAYING 75 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.

250

-

58125

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND LAYING 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.

270

-

86886

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXING IN POSITION 584.2MM LONG ORRISA PAN WITH 100 MM 'P' OR 'S' TRAP INCLUDING PROVIDING BRICK MASONARY SEAT USING 2 ND CLASS BRICKS AS PER STANDARD PRACTICE, AND PROVIDING PVC LOW LEVEL FLUSHING SYSTEM OF 8 LITRES CAPACITYOF PARRYWARE SLIMLINE (WHITE) WITH INTERNAL COMPONENTS AND SHORT BEND, 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE

10

-

29910

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;CONSTRUCTING 457.2 X 457.2 MM ( 1'-6" X 1'-6") BRICK MASONARY INSPECTION CHAMBER WITH CM (1:6) PROP. USING 2ND CLASS CLAY BRICKS OF 225MM THICK , AND FITTED WITH 457.2 X 457.2 MM (1'-6" X 1'-6") RCC COVER UP TO A DEPTH OF 914.4 MM (3'-0") AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SAND, BRICKS, WATER ETC.,TO SITE ,COST OF SEIGNORAGE, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTUCTING MASONARY, LIFT CHARGES, CURING ETC., COMPLETE INCLUDING COST OF STEEL AND ITS FABRICATION FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.

18

-

77277.6

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING OF 150MMX100MM SWG GULLY TRAP CONFIRMING TO ISI 651 & 4127 WITH CI GRATING AND CONSTRUCTION OF BRICK MASONRY INTERMEDIATE CHAMBER OF SIZE 20"X14"X12" IN CM (1:6) OVER CC (1:5:10) PROP. BED OF SIZE 20"X14"X4" AND PLASTERING WITH 12MM THICK IN CM (1:4) PROP. BOTH INSIDE AND OUTSIDE SURFACES AND FITTED WITH 9"X12" (230X305MM) RCC (1:11/2:3) 1 1/2" THICK COVER INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., FOR FINISHED ITEM OF WORK COMPLETE.

18

-

11160

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANI TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.

114

-

13087.2

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING 12.70MM DIA BRASS STOP COCK INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., COMPLETE

60

-

17082

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING S&F 15 MM BRASS BIB TAP INDIAN MAKE 300 GRAMS SEIKO OR EQUIVALENT INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., COMPLETE (300 GRAMS).

120

-

84504

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING C.P LONG BODY 12.70MM DIA BIB COCK FANCY TYPE DELUX BEST INDIAN MAKE (1SI QUALITY) INDIAN MAKE SEIKO OR EQUIVALENT INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., COMPLETE (400 GRAMS).

120

-

97752

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM MAKE CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.

280

-

66808

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM MAKE CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.

280

-

55664

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLY AND FIXING OF 15.90 MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM MAKE CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.

765

-

125154

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND LAYING RAIN WATER DOWN TAKE PIPES WITH 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.

100

-

32180

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., COMPLETE FOR THE FINISHED ITEM OF WORK

10000

-

1211000

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING IN POSITION OF STAIRCASE RAILING AS PER DRAWING USING STAINLESS STEEL TUBES, SECTIONS, PLATES SHEETS & PIPES OF ALL DIAMETERS OF 304 GRADE INCLUDING LABOUR CHARGES FOR FABRICATION OF STAINLESS STEEL RAILING WORKS USING STAINLESS STEEL WELDING RODS INCLUDING BUFFING, POLISHING, LACQUER FINISHING, TO PRESENT SEAMLESS FINISH ETC., COMPLETE AS DIERCTED BY THE ENGINEER-IN-CHARGE FOR FINISHED ITEM OF WORK.

500

-

328900

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING "HYSD" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER (Fe500GRADE AS PER IS 1786 - 1979)FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.

350

-

32436530

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING GYP BOARD SUSPENDED REGULAR SINGLE LAYER FALSE CEILING (GS-MFSC-4.1 AS PER INDIA GYPSUM) USING 12.5 MM THICK GYP BOARD CONFORMING TO IS 2095 - 1982 FIXING TO GYP STEEL GI PERIMETER CHANNELS OF SIZE 20 MM X 27 MM X 30 MM(WEB) OF 0.55 MM THICK ALONG THE PERIMETER OF CEILING SCREW FIXED TO BRICK WORK/ PARTITION AT 610 MM C/C AND SUSPENDING THE FRAME WORK USING INTERMEDIATE CHANNELS (45 MM X 15MM X 15MM X 0.9 MM) FROM SOFFIT AT 1220 MM C/C WITH CEILING ANGLE (25 MM X 10 MM X 0.55 MM) FIXED WITH GI CLEAT AND STEEL EXPANSION FASTENERS & CONNECTING CLIP TO THE CEILING CHANNELS (WITH KNURLED WEB OF 51.5 MM X 26 MM X 10.5 MM X 0.55 MM) FIXED IN DIRECTION PERPENDICULAR TO THE INTERMEDIATE CHANNEL AT 457 MM C/C AND FIXING THE 12.5 MM TAPERED EDGE GYPBOARD WITH 25 MM DRYWALL SCREWS AT 230 MM C/C & JOINTING AND FINISHING USING JOINT COMPOUND AND PAPER TAPE TO HAVE A FLUSH LOOK INCLUDING FILLING THE TAPERED & SQUARE EDGES WITH JOINTING COMPOUND, TWO COATS OF DRYWALL TOPCOAT COMPLETE FOR FINISHED ITEM OF WORK AS PER IDIA GYPSUM LTD SPECIFICATION. (APSS NO: 901 & 904)

480

-

501263.79

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;DOOR: 1.80X2.10 SUPPLY AND FIXING OF 30 MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF SIZE 100 MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 230X40X5 MM, 3 NOS. OF 125 MM BUTT HINGES, 1 NO. DOOR STOPER, 2 NOS. 100 MM LONG DOOR HANDLES, 1 NOS ALDROP OF SIZE 250 MM LONG, 1NOS. OF 200 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER AND FIXING ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).

135

-

377254.79

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;TOILET DOOR: 0.85X2.10 M: SUPPLY, POSITIONING AND FIXING OF 35 MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH SEASONED SAL WOOD SCANTLING OF SIZE 100MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 250X50X8 MM,3 NOS. OF 125 MM BUTT HINGES, 2 NOS.75 MM LONG DOOR HANDLE, 1 NO. ALDROP OF SIZE 250 MM LONG, 1 NOS. OF 150 MM LONG TOWER BOLTS, INCLUDING PROVIDING KICK PLATE WITH 24 GUAGE ALUMINIUM SHEET UP TO 230 MM HEIGHT ON FRONT FACE & FULL HEIGHT ON REAR FACE INCLUDING BOTTOM EDGE OF THE SHUTTER WITH BOLTS, NUTS, NF SCREWS, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER, MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK ETC., COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSS NO: 1001&1002).

130

-

520678.14

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;INTERNAL DOOR: 1.05X2.1 SUPPLY AND FIXING OF 35 MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF SIZE 125 MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 230X40X8 MM, 3 NOS. OF 125 MM BUTT HINGES, 1 NO. DOOR STOPER, 2 NOS. 100 MM LONG DOOR HANDLES, 1 NOS ALDROP OF SIZE 250 MM LONG, 1NOS. OF 150 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER AND FIXING ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).

250

-

1002060.6

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;EXTERNAL DOOR: 1.50X2.10 SUPPLY AND FIXING OF 35 MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF SIZE 125 MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 230X40X8 MM, 3 NOS. OF 125 MM BUTT HINGES, 1 NO. DOOR STOPER, 2 NOS. 100 MM LONG DOOR HANDLES, 1 NOS ALDROP OF SIZE 250 MM LONG, 1NOS. OF 200 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING PROVIDING KICK PLATE WITH 24GUAGE ALLUMINIUM SHEET TO THE EXTERNAL FACE OF THE SHUTTER UPTO 0.23m HT. COVERING BOTTOM EDGE WITH BOLTS,NUTS,NCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER AND FIXING ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).

135

-

668593.29

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;GRONOLITHIC CONCRETE FLOORING 20 MM THICK WITH (1:1:2), USING 6MM TO 12 MM SIZE HARD GRANITE MACHINE CRUSHED METAL LAID OVER CC BED ALREADY LAID OR RCC ROOF SLAB, IN ALTERNATE PANELS OF SIZE NOT EXCEEDING 1.50 M X 1.50 M AND FINISHING THE TOP SURFACE TO REQUIRED SMOOTHNESS AND SLOPES AND THREAD LINING INCLUDING COST OF ALL MATERIALS LIKE CEMENT, METAL, SAND AND WATER ETC., COMPLETE, INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK,

1225

-

481915.28

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;DADOOING WITH DIGITAL / POLISHED GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNSAS APPROVED BY EXECUTIVE ENGINEER SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LIFTING (MANNUAL), ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE ETC., COMPLETE FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR.

415

-

362582.01

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;DADOOING WITH DIGITAL / POLISHED GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNSAS APPROVED BY EXECUTIVE ENGINEER SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LIFTING (MANNUAL), ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE ETC., COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR.

505

-

435862.05

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH CERAMIC TILES OF SIZE 300 MM X600 MM OF 7.30MM THICKNESSIS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK. FIRST FLOOR)

5

-

4366.4

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH CERAMIC TILES OF SIZE 300 MM X600 MM OF 7.30MM THICKNESSIS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK(GROUND FLOOR)

8

-

6902.59

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;FLOORING WITH SUPPLY OF NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, LIFTING ( MANNUAL), INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK,FIRST FLOOR (APSS.NO:701&707).

155

-

138418.93

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;FLOORING WITH SUPPLY OF NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, LIFTING ( MANNUAL), INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK GROUND FLOOR (APSS.NO:701&707).

275

-

233830.12

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH SOLUBLE SALT PORCELAIN VITRIFIED TILES SCREEN PRINTED AND POLISHED OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO1 3711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR FIRST FLOOR

390

-

408368.75

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH SOLUBLE SALT PORCELAIN VITRIFIED TILES SCREEN PRINTED AND POLISHED OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO1 3711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR

455

-

457001.7

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;FLOORING WITH SOLUBLE SALT PORCELAIN VITRIFIED TILES SCREEN PRINTED AND POLISHED OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 3711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK FIRST FLOOR

2570

-

2710577.31

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;FLOORING WITH SOLUBLE SALT PORCELAIN VITRIFIED TILES SCREEN PRINTED AND POLISHED OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 3711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK GROUND FLOOR

3015

-

3051479.48

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;FULL ROUNDING THE EDGES OF GRANITE/MARBLE OF ALL THICKNESS INCLUDING POLISHING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE LABOUR CHARGES ETC., COMPLETE.

440

-

250955.09

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK AND REGULAR COLOURS SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILESETC., COMPLETE, INCLUDING SEIGNIORAGE CHARGES, LABOUR CHARGES FOR DRESSING OF TILES ETC., COMPLETE FOR FINISHED ITEM OF WORK, FIRST FLOOR (APSS.NO:701&703)

90

-

380509.97

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK AND REGULAR COLOURS SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILESETC., COMPLETE, INCLUDING SEIGNIORAGE CHARGES, LABOUR CHARGES FOR DRESSING OF TILES ETC., COMPLETE FOR FINISHED ITEM OF WORK, GROUND FLOOR (APSS.NO:701&703)

270

-

1120350.45

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PAINTING TO NEW IRON WORK TWO COATS WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND SHADE 2 COATS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, ALL INCIDENTAL, OPERATIONAL & LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES, INCLUDING PUTTY, ETC., COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO.1201, 1207, 1212).

790

-

95985

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PAINTING TO NEW WOOD WORK TWO COATS WITH SYNTHETIC ENAMEL PAINT OVER ONE COAT OF WOOD PRIMER OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY AND ALL INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE (THE RATE INCLUDES ONE COAT OF WOOD PRIMER AND TWO COATS OF PAINT ) (APSS NO.1201, 1207, 1212).FOR FINISHED ITEM OF WORK

955

-

192241.11

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PAINTING TO EXTERIOR FACES OF WALLS WITH EMULSION PAINT OF APPROVED MAKE (ACE FROM ASIAN PAINT) AND COLOUR 2 COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 ML OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1 COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, BRUSHES, ALL INCIDENTAL, OPERATIONAL & LABOUR CHARGES, CURING, SCAFFOLDING ETC., COMPLETE FOR FINISHED ITEM OF WORK. ALL FLOORS (APSS NO:908)

10500

-

2449650.2

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PAINTING TO NEW WALLS & CEILING WITH THREE (3) COATS OF PLASTIC EMULSION PAINT OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,COMPLETE FOR FINISHED ITEM OF WORK IN ALL FLOORS FOR INTERNAL WALLS

12225

-

2255513.03

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR EQUIVQLENT PUTTY SUCH AS BIRLA WALL CARE PUTTY OR TEXTURE PAINT OR EQUIVQLENT SUCH AS NCL / SAICOAT TEXTURE PAINT OF AVERAGE 2 TO 3 MM THICKNESS OVER PLASTERED SURFACE TO PREPARE THE SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER TOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS APPLYING EMERY PAPER , SAND THE SURFACE , CLEAN &WIPE OFF LOOSE DUST, APPLYING KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD , AIR DRY FOR 2-3 HOURS, SAND WITH 180 & 320 No., EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO WORK SITE AND ALL OPERATIONAL ,INCIDENTAL,LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR EXTERNAL WALLS - INCLUDING COST OF ACCESS SCAFFOLDING AND ALL OTHER NECESSARY SAFETY PRECAUTIONS SUCH AS SAFETY BELTS , SAFETY NETS ETC.,COMPLETE FOR EXTERNAL WALLS(APSS NO:908

4500

-

1777950

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR EQUIVALENT PUTTY SUCH AS BIRLA WALL CARE PUTTY OF AVERAGE 1 TO 2 MM THICK OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING, KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2-3 HRS., SAND WITH 180 AND 320 NO. EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR INTERNAL WALLS.

12225

-

2640600.62

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK. SECOND FLOOR (APSS NO: 901&904)

1400

-

758100

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK. FIRST FLOOR (APSS NO: 901&904)

7000

-

3481101.39

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901&904)

9600

-

4350722.15

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PLASTERING TO BASEMENT 20MM THICK WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, Lifting (Mannual), CURING CHARGES, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK FOR BASEMENT (APSS NO: 901&904)

260

-

119626

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, SEIGNIORAGE CHARGES, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, COMPLETE FOR FINISHED ITEM OF WORK. SECOND FLOOR (APSS.NO: 901&903)

175

-

102094.3

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, SEIGNIORAGE CHARGES, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, COMPLETE FOR FINISHED ITEM OF WORK. FIRST FLOOR (APSS.NO: 901&903)

180

-

98098.8

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, SEIGNIORAGE CHARGES, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, COMPLETE FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS.NO: 901&903)

100

-

50661.37

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;ORNAMENTAL PLASTERING TO CEILING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK. SECOND FLOOR (APSS NO: 901 & 904)

150

-

85665

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;ORNAMENTAL PLASTERING TO CEILING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK. FIRST FLOOR (APSS NO: 901 & 904)

3300

-

1723259.69

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;ORNAMENTAL PLASTERING TO CEILING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901 & 904)

3350

-

1585219.72

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING, SUPPLYING & FIXING OF FIXED LOUVERED VENTILATOR MADE OUT OF MULTI CHAMBERED UPVC SECTIONS WITH GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. HAVING ISOLATED DRAINAGE AND REINFORCED WITH GALVANIZED IRON PROFILES THROUGHOUT THE WINDOW. THE OUTERFRAME HAVING AN OVERALL SIZE OF 60 MM X 55 MM X 2.40 WITH REINFORCEMENT OF 1 MM THICKNESS AND MULLION WITH OVERALL SIZE OF 74 MM X 60 MM X 2.40 MM WITH REINFORCEMENT OF 1 MM THICKNESS. (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN).VENTILATOR SHALL BE PROVIDED WITH 4.5 MM PIN HEAD GLASS, STANDARD HARDWARE. WALL THICKNESS OF FRAME & MULLION SHALL BE 2.4 MM., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE COMPLETE FOR FINISHED ITEM OF WORK.

60

-

415902

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;SUPPLYING AND FIXING OF UNPLASTICISED POLY VINYL CHLORIDE (UPVC) 3 TRACK SLIDING WINDOWS WITH MESH SHUTTER ? (2-GLASS SHUTTERS AND 1- MESH SHUTTER) DULY MANUFACTURED USING UPVC REINFORCED PROFILES (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN)OF (94 MM X 45 MM)/(80 MM X 52 MM) X 2.20 MM FOR OUTER FRAMES, (58 MM X 39 MM)/(54 MM X 38 MM) X 2.20 MM FOR SLIDING SHUTTER FRAMES CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.0/1.2 MM PREFABRICATED & WELDED THROUGH FUSION WELDING. THE WINDOW SASH SHALL BE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE AND MESH SHUTTER FRAME SHALL BE (42 MM X 25 MM)/(52 MM X 21.5 MM) X 2.0 MM FITTED WITH VINYL COATED FIBRE MESH- ON ROLLERS/ PULLEY DULY FIXED WITH GREY COLOUR TPV GASKET FOR SASH & GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. SYSTEM SHALL HAVE SINGLE POINT LOCKING WITH TOUCH LOCK AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/ DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE COMPLETE FOR FINISHED ITEM OF WORK

550

-

4236705

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RCC M20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE DOWN GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR RACKS 38 MM THICK - FIRST FLOOR (APSS NO.403)

195

-

66864.81

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RCC M20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR RACKS 38 MM THICK - GROUND FLOOR (APSS NO.403)

125

-

41338.82

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR SUNSHADES OF 50MM AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP FOR SECOND FLOOR (APSS NO. 402)

10

-

10289

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR SUNSHADES OF 50MM AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP FOR FIRST FLOOR (APSS NO. 402)

170

-

167089.07

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR SUNSHADES OF 50MM AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP FOR GROUND FLOOR (APSS NO. 402)

140

-

131344.25

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING SEIGNIORAGE CHARGES, SALES & OTHER TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR SECOND FLOOR LINTELS

1

-

11927.9

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING SEIGNIORAGE CHARGES, SALES & OTHER TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR FIRST FLOOR LINTELS

20

-

228484.65

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING SEIGNIORAGE CHARGES, SALES & OTHER TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR LINTELS

20

-

218253.26

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR SLABS OF 175 MM THICK (APSS NO.403)

22

-

201987.22

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR SLABS OF 175 MM THICK (APSS NO.403)

22

-

195117.57

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR SLABS OF 150 MM THICK (APSS NO.403)

10

-

91975.3

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR SECOND FLOOR SLABS OF 125MM THICK (APSS NO.403)

10

-

105194

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR SLABS OF 125MM THICK (APSS NO.403)

395

-

4009594.59

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR SLABS OF 125MM THICK (APSS NO.403)

395

-

3859771.5

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR SECOND FLOOR BEAMS (APSS NO.403)

15

-

163704

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR BEAMS (APSS NO.403)

110

-

1157266

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR BEAMS (APSS NO.403)

135

-

1367415

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR SECOND FLOOR COLUMNS (APSS NO.403)

10

-

125064

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR COLUMNS (APSS NO.403)

120

-

1430732.51

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, SEIGNIORAGE, SALES & OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR COLUMNS (APSS NO.403)

275

-

3118369.67

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING SEIGNIORAGE CHARGES, SALES & OTHER TAXES ON ALL MATERIALS, SHUTTERING, CENTERING WITH STEEL PLATES, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR PLINTH BEAMS (APSS NO.403)

40

-

465661.25

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING SEIGNIORAGE CHARGES, SALES & OTHER TAXES ON ALL MATERIALS, SHUTTERING, CENTERING WITH STEEL PLATES, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR GRADE WALL (APSS NO.403)

150

-

1843740

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING SEIGNIORAGE CHARGES, SALES & OTHER TAXES ON ALL MATERIALS, SHUTTERING, CENTERING WITH STEEL PLATES, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR PEDESTALS (APSS NO.403)

5

-

48298.5

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING SEIGNIORAGE CHARGES, SALES & OTHER TAXES ON ALL MATERIALS, SHUTTERING, CENTERING WITH STEEL PLATES, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. FOR FOOTINGS (APSS NO.403)

10

-

90579

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PLAIN CEMENT CONCRETE (1:4:8) USING 20MM METAL WITH HAND MIXING INCLUDING CENTRING CHARGES FOR DUMMY COLUMNS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, SEIGNIORAGE CHARGES ACCESSORIES AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE BUT EXCLUDING COST OF STEEL, BINDING WIRE AND ITS FABRICATION FOR FINISHED ITEM OF WORK, FOR DUMY COLUMNS IN SECOND FLOOR .(APSS NO: 403)

30

-

223885.36

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, Lifting ( Mannual),LAYING, ,CURING, FINISHING, INCLUDING ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., COMPLETE FOR BED BLOCKS IN SECOND FLOOR FOR FINISHED ITEM OF WORK.(APSS NO: 402).

1

-

5490

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, Lifting ( Mannual),LAYING, ,CURING, FINISHING, INCLUDING ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., COMPLETE FOR BED BLOCKS IN FIRST FLOOR FOR FINISHED ITEM OF WORK.(APSS NO: 402).

10

-

53948

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, Lifting ( Mannual),LAYING, ,CURING, FINISHING, INCLUDING ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., COMPLETE FOR BED BLOCKS IN GROUND FLOOR FOR FINISHED ITEM OF WORK.(APSS NO: 402).

10

-

52996

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING MASONRY WORK IN CM (1:4) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 100 X 140 MM(CLASS 5) CONFIRMING TO IS : 12894 : 2002 (FIRST REVISION) FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SEINIORAGE CHARGES, SCAFFOLDING, LIFTING ( MANNUAL), CURING ETC., COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 100MM THICK - SECOND FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)

5

-

50819.5

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING MASONRY WORK IN CM (1:4) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 100 X 140 MM(CLASS 5) CONFIRMING TO IS : 12894 : 2002 (FIRST REVISION) FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SEINIORAGE CHARGES, SCAFFOLDING, LIFTING ( MANNUAL), CURING ETC., COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 100MM THICK - FIRST FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)

40

-

375315.4

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING MASONRY WORK IN CM (1:4) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 100 X 140 MM(CLASS 5) CONFIRMING TO IS : 12894 : 2002 (FIRST REVISION) FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SEINIORAGE CHARGES, SCAFFOLDING, LIFTING ( MANNUAL), CURING ETC., COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 100MM THICK - GROUND FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)

50

-

429955.28

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM(CLASS 5) CONFIRMING TO IS : 12894 : 2002 (FIRST REVISION) FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, SCAFFOLDING CHARGES,LIFTING(MANUAL) , LABOUR CHARGES, SEINIORAGE CHARGES, , CURING ETC., COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR WALLS OF 225MM THICK FOR SECOND FLOOR FOR FINISHED ITEM OF WORK AS PER (SS 504 )

100

-

868770

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM(CLASS 5) CONFIRMING TO IS : 12894 : 2002 (FIRST REVISION) FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, SCAFFOLDING CHARGES, LIFTING(MANUAL) , LABOUR CHARGES, SEINIORAGE CHARGES, , CURING ETC., COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR WALLS OF 225MM THICK - FIRST FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)

400

-

3276360

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;PROVIDING MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM(CLASS 5) CONFIRMING TO IS : 12894 : 2002 (FIRST REVISION) FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, SCAFFOLDING CHARGES, LIFTING(MANUAL) , LABOUR CHARGES, SEINIORAGE CHARGES, , CURING ETC., COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR WALLS OF 225MM THICK - GROUND FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)

800

-

6155120

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RANDAM RUBBLE MASONRY USING HARD GRANITE STONE IN CM(1:6) PROP. INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, SEIGNORAGE CHARGES,LABOUR CHARGES, CURING, ETC., COMPLETE FOR FOUNDATIONS AND BASEMENTS FOR FINISHED ITEM OF WORK. APSS NO: 615).

50

-

200495

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)

1500

-

69150

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;FILLING WITH GRAVEL IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES, HIRE CHARGES OF T & P ETC., COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)

4500

-

1142100

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, SEIGNIORAGE ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATION BED AND UNDER STONE SLAB FLOORING. (APSS NO: 402).

500

-

2038600

... More
CONSTRUCTION OF ADMINSTRATOIVE BUILDING (BALANCE WORK) FOR COLLEGE OF FISHERIES SCIENCE AT PEBBAIR O;EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).

1500

-

605700



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.