Police Housing Corporation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 17,500Document Cost
Refer DocumentsTender Fee
₹ 9,440
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
367347Bid Award Id
ViewTender No
T95/2022-23Tender Authority
Police Housing Corporation Limited ViewPurchaser Address
-Website
http://http://www.tsphcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and fixing of 8 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for singile phase 8 Nos S.P out goings and for 1No Incommer including internal connection and labour charges for flush mounting etc., complete. Incommer: 40A DP Isolator-1No. Outgoing: 10kA-6-32A SP MCBs - 6 Nos DB Makes: Legrand / Schneider. Isolator Make: Legrand-DX3 / Schneider-Acti9. MCB Make: Legrand-DX3 / Schneider-Acti9.
1
-
5241.49
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges without bulb (for new installation). BH Make: Anchor / Gold Medal Olive / Million Zoom.
6
-
370.02
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Labour charges for fixing of Exhaust fan in wall with necessary connections etc., complete (for hole already made available).
2
-
653.76
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply of 12" (300mm) Light duty exhaust fan with wire guard etc., complete Makes: Crompton / Bajaj Bahar WG / Havells Ventilair-DB / Orient hill air.
2
-
3537.1
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Fixing of 20W LED tube light luminaire on wall / Ceiling with all accessories including giving connections and all labour charges etc., complete.
6
-
854.16
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and transportation of 20W +/-10%, >/ 2000 lumens ,1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete.with 5 years warranty with BIS Certification. LUMINAIRE MAKE: Crompton/Havells/Wipro. LED MAKE: CREE/ NICHIA/OSRAM.
6
-
4599.36
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Labour charges for fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.
4
-
679.76
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply of Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus.
4
-
2858.28
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Make : Atomberg (Efficio ) / Havells / Orient.
4
-
12499.48
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and run of 3 of 2.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable in existing pipe for 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Copper wire make: Finolex / RR kabel/ Havells.
200
-
26152
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete. [ Power plug ] Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus.
5
-
3760.9
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with suitable Module Hot Dip Galvanized Modular Metal Box covered with suitable Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus.
10
-
5575.5
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Wiring with 2 runs of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, is 17048 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with suitable Module Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, with 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. Copper wire make: Finolex / RR kabel/ Havells. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor /Schneider Zen celo / Honeywell Blenge Plus. Ceiling Rose Make: Anchor Penta Cherry / Gold Medal Olive / Million Zoom.
18
-
13944.06
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and Fixing of 25mm outer dia heavy grade FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) surface laying on false ceiling duly fixing with G.I. Wire on existing supported studs including all labour charges etc., complete for run of mains. Makes: Sudhakar/Modi /VIP.
60
-
4196.4
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and Fixing of 25mm outer dia heavy grade FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in underneeth the flooring with all required accessories including masonary work and labour charges etc., complete. Makes: Sudhakar / Modi /VIP.
15
-
1007.25
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and fixing of 25mm outer dia heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories [ like 'U' nails, Junction box, PVC Bends and Cement ] including masonary work for light, fan, common, separate plug point and switch/power boards etc., including all labour charges etc., complete. Makes: Sudhakar / Modi/VIP.
80
-
7711.2
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;Supply and Fixing of 25mm outer dia heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Modi/ VIP.
60
-
4791.6
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING, LAYING, JOINTING AND TESTING OF 152.40 MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 1.52M (5'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK.
30
-
27096
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;CONSTRUCTING 914.0 MM ( 3'-0") DIA BRICK MASONARY MAN HOLE AS PER IS-4111:PART-1:1986 WITH CM (1:6) PROP. USING 2ND CLASS BRICKS OF 225MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5N/SQ.MM INCLUDING PLASTERING WIH CM(1:3) PROP. 12 MM THICK BOTH INSIDE AND OUTSIDE, FITTED WITH 20'' DIA RCC COVERS AND FRAMES, INCLUDING EXCAVATING PITS UP TO A DEPTH OF 914.4 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, COST OF ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.
2
-
17783
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
20
-
3726
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
40
-
9860
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PROVIDING AND PLACING ON TERRACE POLYTHELENE WATER STORAGE TANKS (AT ALL FLOOR LEVELS) DOUBLE LAYER APPROVED BRAND AND MNUFACTURE WITH COVER AND SUITABLE LOCKING ARRANGEMENTS MAKING NECESSARY HOLES FOR INLET & OUTLETS AND OVERFLOW PIPES BUT WITHOUT FITTINGS & BASE SUPPORT FOR TANKS, MAKING GOOD THE SAME TO ENSURE LEAK PROOF WITH AN APPROPRIATE MASONARY PLATFORM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK AS DIRECTED BY THE ENGINEER -IN- CHARGE
1000
-
9100
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;CONSTRUCTING 1'-6" X 1'-6" BRICK MASONARY INSPECTION CHAMBER WITH CM (1:6) PROP. USING FLY ASH BRICKS OF 225MM THICK , AND FITTED WITH 457.2 X 457.2 MM (1'-6'' X 1'-6") RCC COVER UP TO A DEPTH OF 914.4 MM (3'-0") AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SAND, BRICKS, WATER ETC.,TO SITE ,COST OF LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTUCTING MASONARY, LIFT CHARGES, CURING ETC., COMPLETE INCLUDING COST OF STEEL AND ITS FABRICATION, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION
2
-
9460
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING OF 150MMX100MM SWG GULLY TRAP CONFIRMING TO ISI 651 & 4127 WITH CI GRATING AND CONSTRUCTION OF BRICK MASONRY INTERMEDIATE CHAMBER OF SIZE 20"X14"X12" IN CM (1:6) OVER CC (1:5:10) PROP. BED OF SIZE 20"X14"X4" AND PLASTERING WITH 12MM THICK IN CM (1:4) PROP. BOTH INSIDE AND OUTSIDE SURFACES AND FITTED WITH 9"X12" (230X305MM) RCC (1:11/2:3) 1 1/2" THICK COVER INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK COMPLETE.
4
-
2700.8
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING 19.04 MM DIA, 609.60 MM LONG ALUMINUM ANODISED TOWEL ROD WITH BRACKETS AND SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK .
2
-
334
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING NP SOAP DISH HEAVY TYPE WITH NP SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST,COMPLETE FOR FINISHED ITEM OF WORK.
2
-
552.2
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND LAYING 110 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK.
20
-
6596
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
3
-
1779.3
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING & FIXING INDIAN MAKE FLAT BACK WASH HAND BASIN 1ST QUALITY CONFORMING TO IS:2556-PART-4:1972 WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, 32 MM NOMINAL SIZE C.P. FITTING WITH PARALLEL PIPE THREAD CONFORMING TO IS:2963-1979 AND FITTED WITH 15 MM NOMINAL BORE CHROMIUM PLATED PILLAR TAP OF 1ST QUALITY INDIAN MAKE 400 GRAMS COMPLETE WITH STANDARD CI BRACKETS INCLUDING WOODEN BLOCK: 550 X 400 MM - SINGLE C.P. PILLAR COCK AS APPROVED BY EXECUTIVE ENGINEER WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, AND PAINTING TO ALL IRON FITTINGS WITH 2 COATS OF SYNTHETIC ENAMEL PAINT OF APPROVED COLOUR AND MAKE INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK. INCLUDING WOODEN BLOCK INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK, BUT EXCLUDING GST.
1
-
2426.8
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLY AND FIXING IN POSITION 584.2MM LONG ORRISA PAN WITH 100 MM 'P' OR 'S' TRAP INCLUDING PROVIDING BRICK MASONARY SEAT USING 2 ND CLASS BRICKS AS PER STANDARD PRACTICE, AND PROVIDING PVC LOW LEVEL FLUSHING SYSTEM OF 8 LITRES CAPACITYOF PARRYWARE SLIMLINE (WHITE) WITH INTERNAL COMPONENTS AND SHORT BEND, 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE
1
-
3808.4
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING APPROVED MAKE WASH DOWN EUROPEAN WATER CLOSET OF 1ST QUALITY CONFORMING TO IS:2556-PART-2-2004 OF WHITE GLAZED WITH 'P' TRAP, INCLUDING SUPPLYING AND FIXING BEST INDIAN MAKE PLASTIC SEAT AND LID FOR EUROPEAN WATER CLOSETS WITH RUBBER OR PLASTIC BUFFERS AS PER IS 2548-1996 AND SUPPLY & FIXING OF PVC LOW LEVEL SYSTEM WITH INTERNAL COMPONENTS & SHORT BEND: 8 LITERS CAPACITY SINGLE FLUSH & SUPPLYING & FIXING 15 MM NOMINAL SIZE PVC CONNECTION WITH BRASS UNION NUT C.P COATED INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
1
-
4557.1
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK.FOR GROUND FLOOR
40
-
9284
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANI TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
10
-
1272
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING GM GATE (PEET) VALVES - 20 MM NB SIZEINDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
2
-
1983.8
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING GM GATE (PEET) VALVES - 25 MM NB SIZE INDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
2
-
2849.4
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING OF CP LONG BODY BIB COCK FANCY TYPE DELUXE HEAVY DUTY TAP 12.70 MM DIA INDIAN KAKE SEIKO /SENIOR/NICE OR EQUIVALENT INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK (300 GRAMS)
4
-
2823.2
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
25
-
6562.5
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
20
-
4386
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLY AND FIXING OF 15.90MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
10
-
1806
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PAINTING TO NEW IRON WORK WITH ONE COAT OF RED OXIDE PRIMER COAT AND TWO COATS WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY, ALL INCIDENTAL, OPERATIONAL CHARGES ETC., COMPLETE (THE RATE INCLUDES TWO COATS OF PAINT AND ONE COAT PRIMER) BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK IN GROUND FLOOR. (APSS NO.1201, 1207, 1212)
30
-
3357
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PROVIDING, SUPPLYING & FIXING OF FIXED LOUVERED VENTILATOR MADE OUT OF MULTI CHAMBERED UPVC SECTIONS WITH GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. HAVING ISOLATED DRAINAGE AND REINFORCED WITH GALVANIZED IRON PROFILES THROUGHOUT THE WINDOW. THE OUTERFRAME HAVING AN OVERALL SIZE OF 60 MM X 55 MM X 2.40 WITH REINFORCEMENT OF 1 MM THICKNESS ANDMULLION WITH OVERALL SIZE OF 74 MM X 60 MM X 2.40 MM WITH REINFORCEMENT OF 1 MM THICKNESS. (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN).VENTILATOR SHALL BE PROVIDED WITH 4.5 MM PIN HEAD GLASS, STANDARD HARDWARE. WALL THICKNESS OF FRAME & MULLION SHALL BE 2.4 MM., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.
1.08
-
7861.64
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;TOILET DOOR: 0.85X2.10 M: SUPPLY, POSITIONING AND FIXING OF 35 MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH SEASONED SAL WOOD SCANTLING OF SIZE 100MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 250X50X8 MM,3 NOS. OF 125 MM BUTT HINGES, 2 NOS.75 MM LONG DOOR HANDLE, 1 NO. ALDROP OF SIZE 250 MM LONG, 1 NOS. OF 150 MM LONG TOWER BOLTS, INCLUDING PROVIDING KICK PLATE WITH 24 GUAGE ALUMINIUM SHEET UP TO 230 MM HEIGHT ON FRONT FACE & FULL HEIGHT ON REAR FACE INCLUDING BOTTOM EDGE OF THE SHUTTER WITH BOLTS, NUTS, NF SCREWS, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER, MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK ETC., COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSS NO: 1001&1002).
3.57
-
10995.6
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;EXTERNAL DOOR (DOUBLE SHITTER): 1.20X2.10M: SUPPLYING, POSITIONING AND FIXING OF ISI MARK, STANDARD MAKE, FLUSH DOOR SHUTTER OF 30 MM THICK BOND WOOD SOLID BLOCK BOARD TYPE WITH TEAK PLY ON ONE FACE AND COMMERCIAL PLY ON ANOTHER FACE, INCLUDING DOOR FRAME MADE WITH TEAK WOOD SCANTLING OF SIZE 75 MM X 100MM, 6 NOS. OF MS 'Z' HOLD FASTS OF SIZE 230 X 25 X 6 MM, 3 NOS. OF 125 MM BUTT HINGES, 2 NOS. 150 MM LONG DOOR HANDLES, 1 NO. ALDROP OF SIZE 250 MM LONG, 2 NOS. 150 MM LONG TOWER BOLTS, 1 NO. DOOR STOPPER WITH BOLTS, NUTS, NF SCREWS, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME, SHUTTER, MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALUMINIUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE). (APSS NO: 1001&1002).
5.04
-
19992.67
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING OF UNPLASTICISED POLY VINYL CHLORIDE (UPVC) 3 TRACK SLIDING WINDOWS WITH MESH SHUTTER ? (2-GLASS SHUTTERS AND 1- MESH SHUTTER) DULY MANUFACTURED USING UPVC REINFORCED PROFILES (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN)OF (94 MM X 45 MM)/(80 MM X 52 MM) X 2.20 MM FOR OUTER FRAMES, (58 MM X 39 MM)/(54 MM X 38 MM) X 2.20 MM FOR SLIDING SHUTTER FRAMES CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.0/1.2 MM PREFABRICATED & WELDED THROUGH FUSION WELDING. THE WINDOW SASH SHALL BE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE AND MESH SHUTTER FRAME SHALL BE (42 MM X 25 MM)/(52 MM X 21.5 MM) X 2.0 MM FITTED WITH VINYL COATED FIBRE MESH- ON ROLLERS/ PULLEY DULY FIXED WITH GREY COLOUR TPV GASKET FOR SASH & GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. SYSTEM SHALL HAVE SINGLE POINT LOCKING WITH TOUCH LOCK AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/ DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE, BUT EXCLUDING GST, AND SEIGNIORAGE CHARGES COMPLETE FOR FINISHED ITEM OF WORK
5.76
-
55914.05
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND LAYING RAIN WATER DOWN TAKE PIPES WITH 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST - COMPLETE FOR FINISHED ITEM OF WORK. GROUND FLOOR
20
-
4642
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLY AND FIXING GYP BOARD SUSPENDED REGULAR SINGLE LAYER FALSE CEILING (GS-MFSC-4.1 AS PER INDIA GYPSUM) USING 12.50 MM THICK GYP BOARD CONFORMING TO IS 2095-1982 FIXING TO GYP STEEL GI PERIMETER CHANNELS OF SIZE 20 X 27 X 30 MM (WEB) OF 0.55 MM THICK ALONG THE PERIMETER OF CEILING SCREW FIXED TO BRICK WORK / PARTITION AT 610 MM C/C AND SUSPENDING THE FRAME WORK USING INTERMEDIATE CHANNELS (45 X 15 X 15 X 0.90 MM) FROM SOFFIT AT 1220 MM C/C WITH CEILING ANGLE (25 X 10 X 0.55 MM) FIXED WITH GI CLEAT AND STEEL EXPANSION FASTENERS & CONNECTING CLIP TO THE CEILING CHANNELS (WITH KNURLED WEB OF 51.50 X 26 X 10.50 X 0.55 MM) FIXED IN DIECTION PERPENDICULAR TO THE INTERMEDIATE CHANNEL AT 457 MM C/C AND FIXING THE 12.50 MM DRYWALL SCEWS AT 230 MM C/C & JOINTING, FIXING USING JOINT COMPOUND AND PAPER TAPE TO HAVE A FLUSH LOOK INCLUDING FILLING THE TAPPERED & SQUARE EDGES WITH JOINTING COMPOUND, TWO COATS OF DRYWALL TOPCOAT, BUT EXCLUDING GST. COMPLETE FOR FINISHED ITEM OF WORK AS PER INDIA GYPSUM LTD., SPECIFICATION. FOR GROUND FLOOR.
60
-
64236
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING BUT EXCLUDING GST ON ALL MATERIALS ETC . COMPLETE FOR THE FINISHED ITEM OF WORK M.S. SQUARE BARS of ALL SIZES
150
-
17655
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;DADOOING WITH DIGITAL / POLISHED GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS AS APPROVED BY EXECUTIVE ENGINEER, SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LIFTING (MANNUAL), ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE ETC., INCLUDING ALL LABOUR CHARGES, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR.
15
-
13329
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;FLOORING WITH SUPPLY OF NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK, FOR GROUND FLOOR (APSS.NO:701&707).
10
-
8196
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR
5
-
5723
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;FLOORING WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 3711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR.
50
-
57705
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PAINTING TO NEW WALLS WITH THREE (3) COATS OF PLASTIC EMULSION PAINT OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIRECTED 2 COATS BY DILUTING 1 LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING LIFTING(MANUAL) AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO. 911) GROUND FLOOR.
150
-
25500
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR EQUIVALENT PUTTY SUCH AS BIRLA WALL CARE PUTTY OF AVERAGE 1 TO 2 MM THICK OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING, KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2-3 HRS., SAND WITH 180 AND 320 NO. EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK FOR INTERNAL WALLS- FOR GROUND FLOOR
150
-
30900
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PAINTING TO EXTERIOR FACES OF WALLS WITH EMULSION PAINT OF APPROVED MAKE (ACE FROM ASIAN PAINT) AND COLOUR 2 COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 ML OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1 COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, BRUSHES, ALL INCIDENTAL, OPERATIONAL & LABOUR CHARGES, CURING, SCAFFOLDING ETC., COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING GST FOR COMPOUND WALL (APSS NO:908)
175
-
41772.5
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC, COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS .GROUND FLOOR (APSS.NO: 901&903)
60
-
28056
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904) GROUND FLOOR
60
-
25590
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PLASTERING TO SUPERSTRUCTURE 20MM THICK WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, Lifting ( Mannual),CURING CHARGES, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK GROUND FLOOR (APSS NO: 901&904)
175
-
75372.5
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. (APSS NO: 901&904) GROUND FLOOR
150
-
61230
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;RCC M-20 GRADE NOMINAL MIX CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS FOR FINISHED ITEM OF WORK. SUNSHADES OF 50MM (2") AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP -GROUND FLOOR (APSS NO.403)
20
-
17954
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR LINTELS
1.5
-
15804.15
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT UPTO 3.66M, BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS 125 MM THICK (APSS NO.403)
10
-
95888
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT UPTO 3.66M, BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR BEAMS (APSS NO.403)
5
-
49597
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS Reinforcement Steel (HYSD/TMT) from steel manufacturers like TATA, SAIL, VSP, Jindal Panther., AF Star TMT/MS Life TMT, Radha TMT and Suguna TMT FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
3.5
-
309755.25
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT UPTO 3.66M, BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR COLUMNS (APSS NO.403)
4
-
43155.6
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL CENTERING PLATES ETC., BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR PLINTH BEAMS. (APSS NO. 403)
10
-
113297
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL CENTERING PLATES ETC., BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR PEDESTALS . (APSS NO. 403)
1.5
-
14080.35
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 400 KGS PER CUM OF CONCRETE, COMPLETE AND PROVIDING CENTERING USING STEEL CENTERING PLATES ETC., BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR FOOTINGS. (APSS NO. 403)
7
-
62010.2
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS IN GROUND FLOOR (APSS NO: 402).
1
-
5392.3
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;BRICK MASONRY IN CM (1:4 WITH 2ND CLASS BRICKS TRADITIONAL SIZE 23 X 11 X 7 CMS HAVING A CRUSHING STRENGTH OF NOT LESS THAN 35.00KG/CM2 INCLUDING COST AND SEIGNORAGE CHARGES AND CONVEYANCE OF ALL MATERIALS AND WATER FROM APPROVED SOURCES TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES SUCH AS SCAFFOLDING MIXING MORTOR CONSTRUCTING MASONARY LIFT CHARGES(MANNUAL), CURING ETC. COMPLETE BUT EXCLUDING THE COST OF STEEL AND ITS FABRICATION CHARGES FOR SUPERSTRUCTURE WALLS OF 110 MM THICK FIRST FLOOR FOR FINISHED ITEM OF WORK AS PER SS 509
4
-
34970.8
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;BRICK MASONRY IN CM (1:6) WITH 2ND CLASS BRICKS TRADITIONAL SIZE 23 X 11 X 7 CMS HAVING A CRUSHING STRENGTH OF NOT LESS THAN 35.00KG/CM2 INCLUDING COST AND SEIGNORAGE CHARGES AND CONVEYANCE OF ALL MATERIALS AND WATER FROM APPROVED SOURCES TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES SUCH AS SCAFFOLDING MIXING MORTOR CONSTRUCTING MASONARY LIFT CHARGES(MANNUAL), CURING ETC. COMPLETE BUT EXCLUDING THE COST OF STEEL AND ITS FABRICATION CHARGES FOR SUPERSTRUCTURE WALLS OF 230MM THICK GROUND FLOOR FOR FINISHED ITEM OF WORK AS PER SS 509
10
-
75011
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;BRICK MASONRY IN CM (1:6) WITH 2ND CLASS BRICKS TRADITIONAL SIZE 23 X 11 X 7 CMS HAVING A CRUSHING STRENGTH OF NOT LESS THAN 35.00KG/CM2 INCLUDING COST AND SEIGNORAGE CHARGES AND CONVEYANCE OF ALL MATERIALS AND WATER FROM APPROVED SOURCES TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES SUCH AS SCAFFOLDING MIXING MORTOR CONSTRUCTING MASONARY LIFT CHARGES(MANNUAL), CURING ETC. COMPLETE BUT EXCLUDING THE COST OF STEEL AND ITS FABRICATION CHARGES FOR BASEMENT SUPERSTRUCTURE WALLS OF 230MM THICK FOR FINISHED ITEM OF WORK AS PER SS 509
4
-
28039.03
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., BUT EXCLUDING GST - COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
50
-
2105
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;FILLING WITH CARTED GRAVEL IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES, HIRE CHARGES OF T & P ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST, COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
80
-
20840
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATIONS .(APSS NO: 402).
10
-
42381
... More
CONSTRUCTION OF KIT ROOM AT FIRE STATION MADNOOR OF KAMAREDDY DISTRIC;EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).
50
-
17730
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements