Police Housing Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Police Housing Corporation Limited Tender

Works
Civil And Construction
Building Construction
Opening Date19 Aug 2024
Closing Date2 Sep 2024
Tender Amount₹ 29,77,014 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Prohibition and Excise Station Building at Husnabad;Supply and Run of 25mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete.

25

157

3941.75

... More
Prohibition and Excise Station Building at Husnabad;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

2

6630

13261.14

... More
Prohibition and Excise Station Building at Husnabad;Supply and fixing of 12 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for singile phase 12 Nos S.P out goings and for 1No Incommer including internal connection and labour charges for flush mounting etc., complete. Incommer: 40A DP Isolator-1No. Outgoing: 10kA-6-32A SP MCBs - 10 Nos DB Makes: Legrand / Schneider. Isolator Make: Legrand-DX3 / Schneider-Acti9. MCB Make: Legrand-DX3 / Schneider-Acti9.

1

8139

8139.38

... More
Prohibition and Excise Station Building at Husnabad;Supply and run of 2 Pair, 0.5mm telephone copper wire in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: Finolex / Delton / Polycab

40

25

1000

... More
Prohibition and Excise Station Building at Husnabad;Supply and fixing of Modular socket type Telephone jack with Connector on 2 moduler hot dip galvanized metal box and 2 modular cover frame including giving connections, cost of all accessories and labour charges etc. Complete. Telephone jack with Connector, cover frame & metal box Makes: Legrand Myrius /Havells Fabio/Gold Medal Curve.

2

365

730.06

... More
Prohibition and Excise Station Building at Husnabad;Supply and run of LAN Cable cat - 6 UTP cable in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete. Makes: D Link / AMP / Molex / Legrand / Krone.

40

40

1622

... More
Prohibition and Excise Station Building at Husnabad;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate on 2 moduler hot dip galvanized metal box including giving connections, cost of all accessories and labour charges etc. Complete. I/O & duel face plate Makes: D Link / AMP / Molex / Legrand / Krone. Metal box make: Legrand Myrius /Havells Fabio/Gold Medal Curve.

2

589

1179.96

... More
Prohibition and Excise Station Building at Husnabad;Labour charges for fixing of Exhaust fan in wall with necessary connections etc., complete (for hole already made available).

2

426

852.12

... More
Prohibition and Excise Station Building at Husnabad;Supply of 9" (225mm) Light duty exhaust fan with wire guard etc., complete Makes: Crompton / Havells Ventilair-DB / Orient hill air.

2

1665

3330.08

... More
Prohibition and Excise Station Building at Husnabad;Labour charges for fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

4

219

879.4

... More
Prohibition and Excise Station Building at Husnabad;Supply of Modular type Electronic step type Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete. Makes:Legrand Myrius /Havells Fabio/Gold Medal Curve.

4

705

2822.2

... More
Prohibition and Excise Station Building at Husnabad;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient

4

3274

13097.52

... More
Prohibition and Excise Station Building at Husnabad;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges without bulb (for new installation). BH Make: Anchor / Gold Medal Olive / Million Zoom.

2

81

162.7

... More
Prohibition and Excise Station Building at Husnabad;Fixing of 20W LED tube light luminaire on wall / Ceiling with all accessories including giving connections and all labour charges etc., complete.

13

182

2377.7

... More
Prohibition and Excise Station Building at Husnabad;Supply and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE: Crompton / Havells /Jaquar LED MAKE : CREE / NICHIA / OSRAM /

13

669

8699.47

... More
Prohibition and Excise Station Building at Husnabad;Supply and run of 3 of 6.0 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Copper cable Makes: Power Flex/Gloster/RPG.

10

301

3015.5

... More
Prohibition and Excise Station Building at Husnabad;Supply and run of 3 of 4.0 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Copper cable Makes: Power Flex/Gloster/RPG.

40

221

8855.2

... More
Prohibition and Excise Station Building at Husnabad;Supply and run of 3 of 2.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete. Copper cable Makes: Power Flex/Gloster/RPG.

100

144

14465

... More
Prohibition and Excise Station Building at Husnabad;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch controls-2Nos duly recessed in wall with 6 Module Hot Dip Galvanized Modular Metal Box size covered with 6 Modular Cover Frame including earth connections and all labour charges etc., complete. {For 2 socket board - For Raw Power]. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius /Havells Fabio/Gold Medal Curve.

4

1030

4122.88

... More
Prohibition and Excise Station Building at Husnabad;Supply and Fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete. [ Power plug ] Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius /Havells Fabio/Gold Medal Curve.

2

768

1536.52

... More
Prohibition and Excise Station Building at Husnabad;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with suitable Module Hot Dip Galvanized Modular Metal Box covered with suitable Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius /Havells Fabio/Gold Medal Curve.

2

545

1091.34

... More
Prohibition and Excise Station Building at Husnabad;Wiring with 2 runs of 1.5Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with suitable size Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, with 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. [For stair case point] Copper wire make: Power Flex/Gloster/RPG. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius /Havells Fabio/Gold Medal Curve. Ceiling Rose Make: Anchor Penta Cherry / Gold Medal Olive / Million Zoom.

2

1275

2550.2

... More
Prohibition and Excise Station Building at Husnabad;Wiring with 2 runs of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with suitable Module Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, with 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. Copper wire make: Power Flex/Gloster/RPG. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Myrius /Havells Fabio/Gold Medal Curve. Ceiling Rose Make: Anchor Penta Cherry / Gold Medal Olive / Million Zoom.

23

850

19551.61

... More
Prohibition and Excise Station Building at Husnabad;Supply and Fixing of 25mm outer dia heavy grade FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in underneeth the flooring with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Modi/ VIP/Precision.

20

85

1701.4

... More
Prohibition and Excise Station Building at Husnabad;Supply and fixing of 25mm outer dia heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in wall with all required accessories [ like 'U' nails, Junction box, PVC Bends and Cement ] including masonary work for light, fan, common, separate plug point and switch/power boards etc., including all labour charges etc., complete. Makes: Sudhakar / Modi/ VIP/Precision.

150

122

18354

... More
Prohibition and Excise Station Building at Husnabad;Supply and Fixing of 25mm outer dia heavy grade, FRLS with IS: 9537 part 3 regid PVC pipe (ISI mark) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Modi/ VIP/Precision.

100

101

10144

... More
Prohibition and Excise Station Building at Husnabad;CONSTRUCTION OF SLUDGE PITS USING LOCALLY AVAILABLE RCM PRECAST WELL STEINING RINGS 6 NOS. 1.2M DIA AND 30 CM HEIGHT TO FORM ABOUT 1.5M DEEP SLUDGE PIT USING 30mm THICK SHAHABAD / CUDDAPAH TILE SPACERS IN BETWEEN RINGS INCLUDING EARTH WORK EXCAVATIONS IN ALL SOILS EXCEPT ROCK REQUIRING BLASTING COST AND CONVEYANCE OF RCM RINGS TO SITE, LAYING THEM IN GROUND OVER PCC ANGULAR BED OF (1:6:10) 230mmX100mm THICK FOR CIRCULAR RING PORTION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS AND LABOUR CHARGES AND SEALING THE TOP OF PIT WITH RCM PRECAST COVER 50mm THICK 1.2M DIA INCLUDING FIXING CHARGES WITH CM (1:3) LEAK PROOF AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES SUCH AS REFILLING SIDE WITH EXCAVATED EARTH ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS AS DIRECTED BY THE ENGINEER-IN-CHARGE FOR FINISHED ITEM OF WORK.

1

7072

7072.2

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING, LAYING, JOINTING AND TESTING OF 101.60 MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 1.52M (5'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK.

20

743

14860

... More
Prohibition and Excise Station Building at Husnabad;CONSTRUCTING 914.0 MM ( 3'-0") DIA BRICK MASONARY MAN HOLE AS PER IS-4111:PART-1:1986 WITH CM (1:6) PROP. USING FLY ASH BRICKS OF 225MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5N/SQ.MM INCLUDING PLASTERING WIH CM(1:3) PROP. 12 MM THICK BOTH INSIDE AND OUTSIDE, FITTED WITH 20'' DIA RCC COVERS AND FRAMES, INCLUDING EXCAVATING PITS UP TO A DEPTH OF 914.4 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, COST OF ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.

2

9783

19566.8

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING GM GATE (PEET) VALVES - 32 MM NB SIZE INDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

3

2265

6795.9

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING GM GATE (PEET) VALVES - 25 MM NB SIZE INDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

3

1493

4481.4

... More
Prohibition and Excise Station Building at Husnabad;SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

15

194

2914.5

... More
Prohibition and Excise Station Building at Husnabad;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

15

256

3852

... More
Prohibition and Excise Station Building at Husnabad;SUPPLY AND FIXING OF 34.90MM OD PIPE - SDR 13.5ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

15

349

5248.5

... More
Prohibition and Excise Station Building at Husnabad;PROVIDING AND PLACING ON TERRACE POLYTHELENE WATER STORAGE TANKS (AT ALL FLOOR LEVELS) DOUBLE LAYER APPROVED BRAND AND MNUFACTURE WITH COVER AND SUITABLE LOCKING ARRANGEMENTS MAKING NECESSARY HOLES FOR INLET & OUTLETS AND OVERFLOW PIPES BUT WITHOUT FITTINGS & BASE SUPPORT FOR TANKS, MAKING GOOD THE SAME TO ENSURE LEAK PROOF WITH AN APPROPRIATE MASONARY PLATFORM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK AS DIRECTED BY THE ENGINEER -IN- CHARGE

1000

10

10200

... More
Prohibition and Excise Station Building at Husnabad;CONSTRUCTING 1'-6" X 1'-6" BRICK MASONARY INSPECTION CHAMBER WITH CM (1:6) PROP. USING FLY ASH BRICKS OF 225MM THICK , AND FITTED WITH 457.2 X 457.2 MM (1'-6'' X 1'-6") RCC COVER UP TO A DEPTH OF 914.4 MM (3'-0") AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SAND, BRICKS, WATER ETC.,TO SITE ,COST OF LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTUCTING MASONARY, LIFT CHARGES, CURING ETC., COMPLETE INCLUDING COST OF STEEL AND ITS FABRICATION, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION

2

4926

9853.6

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING OF 150MMX100MM SWG GULLY TRAP CONFIRMING TO ISI 651 & 4127 WITH CI GRATING AND CONSTRUCTION OF BRICK MASONRY INTERMEDIATE CHAMBER OF SIZE 20"X14"X12" IN CM (1:6) OVER CC (1:5:10) PROP. BED OF SIZE 20"X14"X4" AND PLASTERING WITH 12MM THICK IN CM (1:4) PROP. BOTH INSIDE AND OUTSIDE SURFACES AND FITTED WITH 9"X12" (230X305MM) RCC (1:11/2:3) 1 1/2" THICK COVER INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK COMPLETE.

2

701

1402

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 19.04 MM DIA, 609.60 MM LONG ALUMINUM ANODISED TOWEL ROD WITH BRACKETS AND SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK .

3

173

521.4

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING NP SOAP DISH HEAVY TYPE WITH NP SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST,COMPLETE FOR FINISHED ITEM OF WORK.

3

711

2135.7

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING, LAYING, JOINTING AND TESTING OF 101.60 MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 1.52M (5'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK.

15

743

11145

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING, LAYING, JOINTING AND TESTING OF 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, AND JOINTING WITH SOLVENT CEMENT INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.

9

549

4949.1

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND LAYING 110 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK.

15

374

5619

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

2

618

1236.2

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANI TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

132

265.8

... More
Prohibition and Excise Station Building at Husnabad;SUPPLY & FIXING 40 MM NOMINAL SIZE DIA PVC SOLID WASTE PIPE OUTLET INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

2

118

236.4

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 15MM BRASS BIB TAP CP FINISH - INDIAN MAKE HEAVY DUTY QUARTER TURN 300GMS AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

2

734

1469.8

... More
Prohibition and Excise Station Building at Husnabad;S&F OF CHROMIUM PLATED FINISH BRASS BODY QUARTER TURN BIBCOCK CUM HEALTH FAUCET WITH 1M LONG TUBE AND WALL HOOK WITH 10 YEARS WARRANTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

2

3914

7828

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING & FIXING INDIAN MAKE FLAT BACK WASH HAND BASIN 1ST QUALITY CONFORMING TO IS:2556-PART-4:1972 WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, 32 MM NOMINAL SIZE C.P. FITTING WITH PARALLEL PIPE THREAD CONFORMING TO IS:2963-1979 AND FITTED WITH 15 MM NOMINAL BORE CHROMIUM PLATED PILLAR TAP OF 1ST QUALITY INDIAN MAKE 400 GRAMS COMPLETE WITH STANDARD CI BRACKETS INCLUDING WOODEN BLOCK: 550 X 400 MM - SINGLE C.P. PILLAR COCK AS APPROVED BY EXECUTIVE ENGINEER WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, AND PAINTING TO ALL IRON FITTINGS WITH 2 COATS OF SYNTHETIC ENAMEL PAINT OF APPROVED COLOUR AND MAKE INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK. INCLUDING WOODEN BLOCK INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.

2

2645

5290.8

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING APPROVED MAKE WASH DOWN EUROPEAN WATER CLOSET OF 1ST QUALITY CONFORMING TO IS:2556-PART-2-2004 OF WHITE GLAZED WITH 'P' TRAP, INCLUDING SUPPLYING AND FIXING BEST INDIAN MAKE PLASTIC SEAT AND LID FOR EUROPEAN WATER CLOSETS WITH RUBBER OR PLASTIC BUFFERS AS PER IS 2548-1996 AND SUPPLY & FIXING OF PVC LOW LEVEL SYSTEM WITH INTERNAL COMPONENTS & SHORT BEND: 8 LITERS CAPACITY SINGLE FLUSH & SUPPLYING & FIXING 15 MM NOMINAL SIZE PVC CONNECTION WITH BRASS UNION NUT C.P COATED INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

2

4854

9708.6

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR SINGLE TEE (WITH DOOR) AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

3

95

286.2

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR SINGLE TEE (WITH DOOR) AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

6

168

1009.2

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

3

19

57.9

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

3

25

75

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR DOOR BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

3

88

265.8

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR DOOR BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

6

139

838.2

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

6

65

395.4

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

6

109

654.6

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK.FOR GROUND FLOOR

15

273

4096.5

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING 15MM BRASS BIB TAP CP FINISH - INDIAN MAKE HEAVY DUTY FULL TURN 300GMS AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

4

311

1244.4

... More
Prohibition and Excise Station Building at Husnabad;SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

25

228

5710

... More
Prohibition and Excise Station Building at Husnabad;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.

7.6

77753

590927.36

... More
Prohibition and Excise Station Building at Husnabad;TOILET DOOR : 0.84X2.10 SUPPLY AND FIXING OF 30 MM THICK FLUSH DOOR OF SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH WELL SEASONED MEDIUM TEAK WOOD SCANTLINGS OF SIZE 100 MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 250X50X8 MM, 3NOS. OF 125 MM BUTT HINGES, 2NOS. 75MM LONG DOOR HANDLE, 1NO. ALDROP OF SIZE 250 MM LONG , 1NOS. OF 150 MM LONG TOWER BOLTS, OF THE SHUTTER INCLUDING PROVIDING KICK PLATE WITH 24 GAUGE ALLUMINIUM SHEET TO THE FULL LENGTH OF SHUTTER INSIDE AND 0.23MT OTHER SIDE OF THE SHUTTER COVERING BOTTOM EDGE WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER AND FIXING ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).

3.53

5589

19730.93

... More
Prohibition and Excise Station Building at Husnabad;CELL DOOR: MANUFACTURING, SUPPLYING AND FIXING OF IRON GRATED DOOR OF SIZE 0.75 X 2.00 M (TO LOCK UP ROOM) MADE WITH I.S.M.C. CHANNEL 150X50X10mm SECTION OF CHANNEL AT TOP AND BOTTOM WITH VERTICAL MS ROUNDS OF 20 mm DIA @ 100 mm C/C HORIZONTAL FLAT OF SIZE 75mmX10mm FOR SHUTTER @ 0.30 MM C/C AND SIDE SUPPORTS WITH MS PLATE OF SIZE 150mmX10mm WHICH WILL BE WELDED TO THE CHANNEL AT TOP AND BOTTOM AND ALSO LOCKING ARRANGEMENTS WITH ALDROP MADE WITH 20 mm DIA MS ROUNDS INCLUDING COST, LABOUR CHARGES FOR CUTTING, BENDING, WELDING CHARGES, MAKING HOLES AND HOLD FAST OF SIZE 50X8mm FLAT OF 300mm LONG AND INCLUDING THE COST OF MISCELLANEOUS ACCESSORIES, TRANSPORTATION TO SITE AND PAINTING ONE COAT WITH RED OXIDE ETC., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK AS PER DRAWING.

3

18256

54770.7

... More
Prohibition and Excise Station Building at Husnabad;INTERNAL DOOR: 1.05 X2.1 SUPPLY AND FIXING OF 30 MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF SIZE 100 MM X 75 MM, INCLUDING 3 NOS. OF MS HOLD FASTS OF SIZE 250X50X8 MM, 3 NOS. OF 125 MM BUTT HINGES, 1 NO. DOOR STOPER, 2 NOS. 150 MM LONG DOOR HANDLES, 1 NOS ALDROP OF SIZE 300 MM LONG, 1 NO. OF 250 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER AND FIXING ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK . BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).

6.62

4873

32262.57

... More
Prohibition and Excise Station Building at Husnabad;EXTERNAL DOOR(DOUBLE SHUTTER): 1.50X2.1 SUPPLY AND FIXING OF 30 MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF SIZE 100 MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 250X50X8 MM, 6 NOS. OF 125 MM BUTT HINGES, 2 NOS. DOOR STOPER, 4 NOS. 150 MM LONG DOOR HANDLES, 2 NOS ALDROP OF SIZE 300 MM LONG, 2 NOS. OF 250 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER AND FIXING ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK . BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).

6.3

4328

27266.4

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND FIXING OF UNPLASTICISED POLY VINYL CHLORIDE (UPVC) 3 TRACK SLIDING WINDOWS WITH MESH SHUTTER PROVISION ? (ONLY 2-GLASS SHUTTERS) DULY MANUFACTURED USING UPVC REINFORCED PROFILES (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN) OF (80 MM X 52 MM)/ (94 MM X 45 MM) X 2.20MM FOR OUTER FRAMES,(54MMX38MM)/(39 MM X 58 MM) X 2.20 MM FOR SLIDING SHUTTER FRAMES CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM, STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.0/1.2 MM PREFABRICATED & WELDED THROUGH FUSION WELDING. THE WINDOW SASH SHALL BE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE DULY FIXED WITH GREY COLOUR TPV GASKET FOR SASH & GLAZING BEAD SHALL BE CO- EXTRUDED WITH GREY COLOUR SOFT PVC. SYSTEM SHALL HAVE SINGLE POINT LOCKING WITH TOUCH LOCK AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/ DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK

12.15

7266

88291.62

... More
Prohibition and Excise Station Building at Husnabad;SUPPLYING AND LAYING RAIN WATER DOWN TAKE PIPES WITH 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST - COMPLETE FOR FINISHED ITEM OF WORK. GROUND FLOOR

10

374

3746

... More
Prohibition and Excise Station Building at Husnabad;DADOOING WITH DIGITAL / POLISHED GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS AS APPROVED BY EXECUTIVE ENGINEER, SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LIFTING (MANNUAL), ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE ETC., INCLUDING ALL LABOUR CHARGES, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR.

23

913

20999

... More
Prohibition and Excise Station Building at Husnabad;FLOORING WITH SUPPLY OF NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK, FOR GROUND FLOOR (APSS.NO:701&707).

4.7

923

4339.51

... More
Prohibition and Excise Station Building at Husnabad;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH 15 TO 18 MM THICK POLISHED SHAHABAD STONE LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE SHAHABAD STONE, CEMENT, SAND AND WATER ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR

15.5

888

13768.65

... More
Prohibition and Excise Station Building at Husnabad;FLOORING WITH POLISHED SHAHABAD STONES 15 TO 18 MM THICK SET OVER BASE COAT OF CM (1:8) OVER ALREADY LAID CC BED / RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3 KGS PER SQM. & JOINTED WITH NEAT CEMENT TO FULL DEPTH INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND, AND WATER AND FLOORING STONES ETC., COMPLETE, INCLUDING CHARGES, LABOUR CHARGES FOR DRESSING OF FLOORING STONES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR

88

803

70672.8

... More
Prohibition and Excise Station Building at Husnabad;PAINTING TO NEW IRON WORK WITH ONE COAT OF RED OXIDE PRIMER COAT AND TWO COATS WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY, ALL INCIDENTAL, OPERATIONAL CHARGES ETC., (THE RATE INCLUDES TWO COATS OF PAINT AND ONE COAT PRIMER) BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO.1201, 1207, 1212)

7.5

212

1596

... More
Prohibition and Excise Station Building at Husnabad;PAINTING TO NEW WOOD WORK TWO COATS WITH SYNTHETIC ENAMEL PAINT OVER ONE COAT OF WOOD PRIMER OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY AND ALL INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING GST., (THE RATE INCLUDES ONE COAT OF WOOD PRIMER AND TWO COATS OF PAINT ) (APSS NO.1201, 1207, 1212).COMPLETE FOR FINISHED ITEM OF WORK

45

226

10201.5

... More
Prohibition and Excise Station Building at Husnabad;PAINTING TO EXTERIOR FACES OF WALLS WITH EMULSION PAINT OF APPROVED MAKE (ACE FROM ASIAN PAINT) AND COLOUR 2 COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 ML OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1 COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, BRUSHES, ALL INCIDENTAL, OPERATIONAL & LABOUR CHARGES, CURING, SCAFFOLDING ETC., COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING GST FOR EXTERNAL WALLS GROUND FLOORS(APSS NO:908)

300

289

86910

... More
Prohibition and Excise Station Building at Husnabad;PAINTING TO NEW WALLS WITH 2 COATS OF READY MIXED OIL BOUND WAHSABLE DISTEMPER OF APPROVED BRAND AND SHADE OVER A BASE COAT OF APPROPRIATE PRIMER OF APPROVED BRAND, MAKING 3 COATS IN ALL TO GIVE AN EVEN SHADE AFTER THOURUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES ETC. BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR (APSS NO. 911)

400

140

56120

... More
Prohibition and Excise Station Building at Husnabad;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901&904)

400

505

202280

... More
Prohibition and Excise Station Building at Husnabad;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC, COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS . GROUND FLOOR (APSS.NO: 901&903)

100

560

56040

... More
Prohibition and Excise Station Building at Husnabad;ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904) GROUND FLOOR

120

526

63168

... More
Prohibition and Excise Station Building at Husnabad;PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, SEIGNIORAGE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS IN GROUND FLOOR (APSS NO: 402).

1

5666

5666.8

... More
Prohibition and Excise Station Building at Husnabad;PROVIDING MASONRY WORK WITH AERATED (CELLULAR) AUTOCLAVED CONCRETE BLOCKS OF APPROVED BRANDS XTRALITE FROM ULTRATECH, AEROCON FROM HIL, CONFORMING TO IS:2185 (PART-3) - 1984 AND IS:6441-1972 OF COMPRESSIVE STRENGTH 3 N/MM2 600 X 200 X 100 MM - AND CHEMICAL JOINTING COMPOUND OF SAME BRAND, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK -FOR SUPERSTRUCTURE WALLS OF 100MM THICK (APSS NO. 501&504) FOR GROUND FLOOR (APSS NO. 501&504)

4.5

9136

41112.9

... More
Prohibition and Excise Station Building at Husnabad;PROVIDING MASONRY WORK WITH AERATED (CELLULAR) AUTOCLAVED CONCRETE BLOCKS OF APPROVED BRANDS XTRALITE FROM ULTRATECH, AEROCON FROM HIL, CONFORMING TO IS:2185 (PART-3) - 1984 AND IS:6441-1972 OF COMPRESSIVE STRENGTH 3 N/MM2 600 X 200 X 230 MM - AND CHEMICAL JOINTING COMPOUND OF SAME BRAND, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK - FOR SUPERSTRUCTURE WALLS OF 230MM THICK (APSS NO. 501&504) FOR GROUND FLOOR.

33

8429

278186.7

... More
Prohibition and Excise Station Building at Husnabad;RCC M-20 GRADE NOMINAL MIX CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS FOR FINISHED ITEM OF WORK. SUNSHADES OF 50MM (2") AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP -GROUND FLOOR (APSS NO.403)

5

1008

5044

... More
Prohibition and Excise Station Building at Husnabad;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR LINTELS

0.58

11655

6759.9

... More
Prohibition and Excise Station Building at Husnabad;VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, VIBRATING , CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES. FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR SLABS OF 175MM THICK

1.2

9358

11230.2

... More
Prohibition and Excise Station Building at Husnabad;VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, VIBRATING , CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES. FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR SLABS OF 125MM THICK

14.3

10360

148153.72

... More
Prohibition and Excise Station Building at Husnabad;VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, VIBRATING , CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES. FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR BEAMS

6.5

10750

69877.6

... More
Prohibition and Excise Station Building at Husnabad;VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES. FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR COLUMNS

4.5

12111

54500.4

... More
Prohibition and Excise Station Building at Husnabad;VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES. FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GRADE WALL OF 230MM THICK

15

13183

197752.5

... More
Prohibition and Excise Station Building at Husnabad;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. . COMPLETE AND PROVIDING CENTERING USING STEEL CENTERING PLATES ETC., BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR PLINTH BEAM (APSS NO. 403)

5.2

12503

65018.72

... More
Prohibition and Excise Station Building at Husnabad;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE AND PROVIDING CENTERING USING STEEL CENTERING PLATES ETC., BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR PEDASTALS. (APSS NO. 403)

3.1

10292

31907.99

... More
Prohibition and Excise Station Building at Husnabad;VRCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL),LAYING CONCRETE, VIBRATING, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE AND PROVIDING CENTERING USING STEEL CENTERING PLATES ETC., BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK.FOR FOOTINGS. (APSS NO. 403)

7.2

9630

69341.04

... More
Prohibition and Excise Station Building at Husnabad;RANDAM RUBBLE MASONRY USING HARD GRANITE STONE IN CM(1:6) PROP. INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE,LABOUR CHARGES, CURING, ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE FOR FOUNDATIONS AND BASEMENTS FOR FINISHED ITEM OF WORK. APSS NO: 615.

20

4536

90720

... More
Prohibition and Excise Station Building at Husnabad;RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., BUT EXCLUDING GST - COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)

150

51

7710

... More
Prohibition and Excise Station Building at Husnabad;FILLING WITH CARTED GRAVEL IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES, HIRE CHARGES OF T & P ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST, COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)

100

372

37200

... More
Prohibition and Excise Station Building at Husnabad;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATIONS AND UNDER STONE SLAB FLOORING .(APSS NO: 402).

17

4615

78460.1

... More
Prohibition and Excise Station Building at Husnabad;EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).

150

451

67740



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.