Panchayat Raj Engineering Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 9,801Document Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
585259Tender No
387/SE/Tenders/2024-25,Dated.17.03.2025 of SE PR Circle, Peddapally(2nd Call)Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Building;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402).With Concrete Mixture
3.24
4904
15892.14
... More
Building;Vibrated reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:2:4) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work For Plinth Beams
8.62
12512
107857.49
... More
Building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, finishing, including cutting of Grooves wherever necessary as directed by Engineer in charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)
478.75
457
218961.1
... More
Building;Plain Cement Concrete (1:5:10) prop nominal mix (cement: fine aggregate: coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including Cost and Conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402) including overhead charges & Contractors profit etc but excluding GST, Seigniorage charges complete.for finished item of work
3.38
4720
15956.71
... More
Building;Manufacture, Supply and fixing of Iron Gate with Structural steel/Mild Steel including fabrication charges welding Joints all taxes and loading unloading and transportaion to site etc., complete
200
124
24996
... More
Building;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding GST and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
1800
74
133650
... More
Building;Vibrated reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:2:4) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work For Footings
6.75
9539
64389.33
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements