Panchayat Raj Engineering Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Civil And Construction
Building Construction
Opening Date20 Apr 2022
Closing Date28 Apr 2022
Tender Amount₹ 17,19,162 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work APSS 402 & 403). For Pedastals

2.77

-

26181

... More
Building work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work APSS 402 & 403). For Columns GF

7.38

-

85205

... More
Building work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work APSS 402 & 403). For Plinth beams

9.96

-

113607

... More
Building work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work APSS 402 & 403). For Roof beams

8.17

-

90154

... More
Building work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work APSS 402 & 403). For Roof Slab

153.37

-

202698

... More
Building work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work APSS 402 & 403). ForLintels

0.48

-

5567

... More
Building work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work APSS 402 & 403). For Chejja

24.95

-

14672

... More
Building work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) Steel Fe 500 /500D / 550D from prime producers like TATA, SAIL, VSP, Jindal & shyam steel etc. of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding GST and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

5.5

-

447166

... More
Building work;Supply and filling of Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

161.24

-

35063

... More
Building work;Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes except GST on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504). Ground Floor

34.83

-

231081

... More
Building work;Supply and fixing of Sal wood Door Single shutter fully pannlled door of size 1.00 x 2.10mt with frame made of well seasoned Sal wood scantlings of size 125 x 100mm mm and shutter made of side rails 125mm X38, top rail 125mmX38mm, bottom rail 125mmX38mm and intermediate rails of 125 x 38 mm and panels - 3 no's are of 38mm thick as per approved design with fixtures of 3 nos of 9" ' z" holdfasts, 300 mm long Brass aldrop-2 no,125mm long Brass butt hinges 3 No's, Brass Door stoppers-1 no, 200mm long Tower bolts - 2no's ,Brass handles 150mm long 1no's, with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) including 13.615% over head charges and contractors profit but excluding VAT ans Seigniorage charges

2

-

27559

... More
Building work;Supply and fixing of Country wood /Sal wood window including C/C of all materials and laabour charges wrought and put up etc., complete For WINDOWS

10.8

-

17837

... More
Building work;Supply and fixing of Country wood /Sal wood Ventilators including C/C of all materials and laabour charges wrought and put up etc., complete For VENTILATOR- -1.20x0.45

2

-

4739

... More
Building work;Supply and fixing of Country wood /Sal wood Ventilators including C/C of all materials and laabour charges wrought and put up etc., complete For VENTILATOR- -1.50 x 0.45

6

-

17218

... More
Building work;Ceiling plastering of 12mm thick with CM (1:3) including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for CEILING PLASTERING.

174.84

-

31475

... More
Building work;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes except GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

385.7

-

150270

... More
Building work;Supply and fixing of MS Display board at site including fabrication, painting and erection charges etc complete

1

-

2500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.