Panchayat Raj Engineering Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 36,400Document Cost
Refer DocumentsTender Fee
₹ 5,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
584598Tender No
268/2024-25 Dated.11.03.2025 of the Regional Officer PR Region Nizamabad(1st call)Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Infrastructure;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, , sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
39.6
4734
187484
... More
Infrastructure;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
198
237
47084
... More
Infrastructure;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 230 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, but excluding seignorage charges and VAT etc., complete for finished item of work. (A.P.S.S. No. 1325).
13
8884
115501
... More
Infrastructure;Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, but excluding seignorage charges and VAT complete for finished item of work.
32
5437
174004
... More
Infrastructure;Providing & fixing UPVC SWR pipes TYPE-B (Double socket 4 Kg/sq.cm - Prince/Sudhakar or any ISI Brand ) conforming to IS 13592:1992 including necessary specials,jointing with adhesives ,fixing vertical pipes over wooden battens including cost and conveyance of all materials at site, all taxes etc., complete for finished item of work but excluding VAT.
50
333
16683
... More
Infrastructure;Manufacture, supply, delivery and Labour charges of un-plasticized Non-Pressure PolyvinylChloride(PVC-U) pipes of dark (any shade of Brown) for use in underground drainage& sewerage system conforming to IS 15328/2003) with Elastomeric Seal Ring Joints(Ringtite PVC Pipes)as per specification inclusive of transportation to the Sub-Divisional stores any where in T.G, excluding Taxes.160 D
451
623
281045
... More
Infrastructure;Manufacture, supply, delivery and Labour charges of un-plasticized Non-Pressure PolyvinylChloride(PVC-U) pipes of dark (any shade of Brown) for use in underground drainage& sewerage system conforming to IS 15328/2003) with Elastomeric Seal Ring Joints(Ringtite PVC Pipes)as per specification inclusive of transportation to the Sub-Divisional stores any where in T.G, excluding Taxes.- 200 D
131
896
117397
... More
Infrastructure;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including over heads & contractor profitcost and conveyance of all materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab but excluding other taxes and seignorage charges etc,, complete for finished item of work (50% Natural Sand+50% Manufactured Sand)
94.04
519
48809
... More
Infrastructure;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.
67.68
483
32715
... More
Infrastructure;Providing thermo mechanically treated (TMT) /HYSD reinforcement (Fe-500/550D grade as per IS 1786-2008of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding other taxes and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
2
65227
130781
... More
Infrastructure;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) (50% natural sand ans 50% manufactured sand) RCC Slab to Sump
43.46
1483
64452
... More
Infrastructure;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) (50% natural sand ans 50% manufactured sand) For Sump Walls
8.69
13318
115788
... More
Infrastructure;Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 using 40mm, 20mm & 10 mm metal wih concrete mixture including cost & conveyance of all materials like cement, sand, coarse aggreagate, water etc to site all operational, incidental and labour charges such as mixing, laying and ramming, curing including OH & contractors profit etc.., complete but excluding GST & seigniorage chrges, for finished item of work for bed blocks
8.25
5483
45235
... More
Infrastructure;Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding other taxes & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402).(50% Natural Sand+50% Manufactured Sand)
8.25
4701
38786
... More
Infrastructure;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and other taxes etc., complete, for Ordinary Soil-Manual Means-Upto 3 m depth.
225.2
237
53553
... More
Infrastructure;Supply and transportation of ......... LED Flood light Luminaire made of pressure die cast aluminum housing with powder coated, having toughened glass cover, Suitable lens on LEDs, IP 66 (Silicongasket ensures Optical & Electrical compartments are IP 66 )protected, wide operating voltage range , P.F > 0.90, System having efficacy >110 lumens/watt, with Ingress protection IP66, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70,Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the anufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GEVenture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA./ Capart / Fortune Arrt / FIEM / Arraystorm / GM / Goldmedal / Panasonic / Silicon / Leksa / Orient / HPL / Valmont / Transrail LED MAKE : PHILIPS LUMILEDS / CREE /
9
15340
138060
... More
Infrastructure;A1 Bulk Water Supply Connection as per Mission Bhageeratha
1
460990
460990
... More
Infrastructure;Manufacturing, Supply and delivery of 25 mm dia GI Bend
1
103
103
... More
Infrastructure;Supplying & fixing Bronze Horizontal Check (Non return) Valve as per IS-778 I-class heavy duty - 25 mm NB Size TBSP-G.III-11
1
1338
1338
... More
Infrastructure;Supply, Transportation and fixing of 150mm dia galvanised bore cover 450mm length, 12mm thickness and 75mm wide MS Clamp set with required nuts and bolts. ELEC-5.13.6 e
1
295
295
... More
Infrastructure;Manufacture, supply, & delivery of Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984- 2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.)
75
47
3579
... More
Infrastructure;Supply of 3 Core 2.5 Sqmm Flat Copper cable of ISI for Submersible Motors. Makes : Finolex / RR Kabel / Havells / KEI / L&T
85
140
11975
... More
Infrastructure;Supply and Transportation of control panel for single phase submersible motors up to 3 HP @ 220V 50Hz operating range between 80 to 240V including supply and fixing of Direct - on - Line LTLK / SIEMENS / CROMPTON make Volt meter and Ammeter with starting and running capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete. ELEC-5.10.1
1
11077
11077
... More
Infrastructure;Supply of 2.5 Sqmm WPSC (Weather Proof Single Core) ISI mark Alluminium Wire. Makes : Polycab / GM / Million / V-Guard / Gold Medal ELEC-1.6.1
80
10
873
... More
Infrastructure;Supply and Transportation of 2.00HP 25 Stage single phase ISI submersible motor pumpset suitable for 4" Bore well. Makes: Flowell / Waterman / Ellen / Kirlosker / Samudra ELEC-5.5.2
1
34766
34766
... More
Infrastructure;Geological Survey Charegs
1
1579
1579
... More
Infrastructure;Drilling of 6 1/2" dia ( 165mm ) submersible bore well in all strata of soils including cost and conveyance of all materials and labour charges etc., complete.
300
454
136338
... More
Infrastructure;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks
38500
11
445904
... More
Infrastructure;Supply and Fixing of CPVC Pipes ( 22.20mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges, and over heads but excuding VAT.
90
319
28759
... More
Infrastructure;Supply and Fixing of CPVC Pipes ( 34.90 mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges, and over heads but excuding VAT.
466
481
224485
... More
Infrastructure;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including over heads & contractor profitcost and conveyance of all materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab but excluding other taxes and seignorage charges etc,, complete for finished item of work (50% Natural Sand+50% Manufactured Sand)
54.78
519
28435
... More
Infrastructure;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.
51.6
483
24943
... More
Infrastructure;Providing thermo mechanically treated (TMT) /HYSD reinforcement (Fe-500/550D grade as per IS 1786-2008of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding other taxes and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
1.23
65227
80165
... More
Infrastructure;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) (50% natural sand ans 50% manufactured sand) RCC Slab to Sump
20.67
1483
30654
... More
Infrastructure;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) (50% natural sand ans 50% manufactured sand) For Sump Walls
5.89
13318
78451
... More
Infrastructure;Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 using 40mm, 20mm & 10 mm metal wih concrete mixture including cost & conveyance of all materials like cement, sand, coarse aggreagate, water etc to site all operational, incidental and labour charges such as mixing, laying and ramming, curing including OH & contractors profit etc.., complete but excluding GST & seigniorage chrges, for finished item of work for bed blocks
4.2
5483
23029
... More
Infrastructure;Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding other taxes & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402).(50% Natural Sand+50% Manufactured Sand)
4.2
4701
19746
... More
Infrastructure;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and other taxes etc., complete, for Ordinary Soil-Manual Means-Upto 3 m depth.
100
237
23780
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements