Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date29 Feb 2024
Closing Date11 Mar 2024
Tender Amount₹ 16,30,009 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Sub Health Centre at Rompally;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) FRLS PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable of makes Ploycab / Havells / Sun Cab / Gold Medal / Million /Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /Anchor / Bonton. with Run 1 of 14/0.3mm(1.0Sqmm) FRLS PVC insulated 1100Vgrade as perIS:694/1990 specification for Copper cable of makes Ploycab / Havells / Sun Cab / Gold Medal / Million /Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /Anchor / Bonton make including cost and conveyance of all material and labour chages but excluding VAT.

14

144

2028

... More
Construction of Sub Health Centre at Rompally;Supply and fixing of 6A ISI mark Flush type switch of makes Anchor / Gold Medal Olive / Million Zoom with 6A 3/2 pin wall plug socket of Anchor / Gold Medal Olive / Million Zoom make on a common switch board with earth connections in surface / consealed wiring including cost and conveyance of all materialsa and labour charges but excluding VAT.

6

153

923

... More
Construction of Sub Health Centre at Rompally;Wiring with run of 2 of 22/0.3mm (1.50 Sq.mm) FR / FRLS PVC insulated flexible ISI mark copper cable of GM / L&T / RPG / Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard / Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including cost and conveyance of all material and all labour charges but excluding VAT etc., complete for light, bell, fan and exhaust fan points including cost and conveyance of all material and labour charges but excluding VAT.

45

775

34902

... More
Construction of Sub Health Centre at Rompally;Supply and laying of 25mm dia 1.8mm thick P.V.C.pipe ISI mark of Sudhakar / Maco Plast / Modi make concealed in wall with PVC / Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size Metallic deep box including all labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding VAT.

40

115

4609

... More
Construction of Sub Health Centre at Rompally;Electrification-Supply and Laying of 25mm outer dia heavy (2.20mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi. make concealed in Roof Slabs with all required PVC / Metallic Deep Boxes including masonary work and labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding VAT.

50

97

4871

... More
Construction of Sub Health Centre at Rompally;Painting to new walls with 2 coats of Plastic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 912 for external walls.

145.1

218

31670

... More
Construction of Sub Health Centre at Rompally;Painting to new walls with 2 coats of Plastic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 911 for internal walls

311.46

208

65024

... More
Construction of Sub Health Centre at Rompally;Providing and fixing of two Shuttter Sliding windows Made of Galvanized Steel as per IS 513 D Quality, galvanized as per IS 277 with powder coated with pure Polyester Powder up to 50-60 microns thick with total coated thickness of 0.8mm for outer frame and 0.58 mm thickness for sliding shutter section, the outer frame for two tracks with grill provision size of 90mmx50mm and the Window Shutter section of 58mm x 36mm and the outer frame with two intergrated guide tracks of 12mm width and 24mm deep for provsision tos lide the shutter/sash frame and facilities with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of aaluminimum 1 No. per each shutter including installation of Window System at site using anchor fasteners, Silicon Sealant applied at the Outer Frame corners inclusive of conveyance of all materials accessories, labour charges and erection at site with complete finished item of work for Window tih Two Sliding shutters and with Grill.

7.2

7127

51315

... More
Construction of Sub Health Centre at Rompally;Supply and fixing of Bath room / Toilet door shutter with 16mm BISON Lam (IS 15786) door shutter with all round ?U? lipping of PPS section of size 12mm X 18mmX 12mmX0.6mm thickness with a hardware of 12mm dia X200mm long aluminium aldrops ? 2 nos(Jyothi make)2 No of 125mm long handles(Jyothi make) and also 3 no Of IS304 grade Patee Hinges 3mmX12mmX180mm long with pole receiver of 10mm dia pole X40mm long welded on 2mm X40mm(ss304) plates works as receiver for RT patte hinges. The price inclusive of all material at site.

3.15

3795

11957

... More
Construction of Sub Health Centre at Rompally;Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butt hinges and SS screws shall be paid separately)

11.66

2429

28311

... More
Construction of Sub Health Centre at Rompally;Providing and fixing factory made extruded WPC (Wood Polymer Composite) solid white colour board for cupboards and bathroom/kitchen cabinet/partitioning/wall panelling/ wall cladding of required size comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butt hinges and SS screws shall be paid separately) - 12mm Thick

11.66

2106

24550

... More
Construction of Sub Health Centre at Rompally;Providing dadooing to walls with 5 to 7mm thick ceramic wall tiles 1st quality of 7.30mm and of size approved by Engineer-in-Charge, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit, cost of all materials like tiles, cement, sand and water etc., complete including complete for finished item of work, but excluding VAT and seignorage charges.

15.16

981

14880

... More
Construction of Sub Health Centre at Rompally;Flooring with Double charged / multi charged vitrified tiles of 1st quality and of size not less than 600 x 600 mm x 8 mm thickness glossy finish permium colours, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, and water and flooring tiles etc., complete, including over heads & contractor profit, labour charges etc., complete for finished item of work, but excluding GST and seignorage charges.

3.59

1146

4118

... More
Construction of Sub Health Centre at Rompally;Providing dadooing to walls with 5 to 7mm thick ceramic wall tiles 1st quality of 7.30mm and of size approved by Engineer-in-Charge, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit, cost of all materials like tiles, cement, sand and water etc., complete including complete for finished item of work, but excluding VAT and seignorage charges.

8.38

981

8225

... More
Construction of Sub Health Centre at Rompally;Flooring with Double charged / multi charged vitrified tiles of 1st quality and of size not less than 600 x 600 mm x 8 mm thickness glossy finish permium colours, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, and water and flooring tiles etc., complete, including over heads & contractor profit, labour charges etc., complete for finished item of work, but excluding GST and seignorage charges.

72.18

1146

82787

... More
Construction of Sub Health Centre at Rompally;Plastering in CM (1:4) mix proportion using 12mm thick including cost and conveyance of all materials, mixing, curing and labour charges etc., complete.

403.52

155

62734

... More
Construction of Sub Health Centre at Rompally;Ceiling plastering of 12mm thick with CM (1:3) including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for CEILING PLASTERING.

96.11

189

18190

... More
Construction of Sub Health Centre at Rompally;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding GST and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

3700

75

278616

... More
Construction of Sub Health Centre at Rompally;Brick masonry in superstructure with CM (1:6) prop mix using Sand Cement Bricks of size 29x20x14 cms from approved source having minimum crusheing strength of 75 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)

24.3

7618

185124

... More
Construction of Sub Health Centre at Rompally;Filling with carted gravel by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for fnished item of work. (APSS NO. 309 & 310)

33.27

471

15678

... More
Construction of Sub Health Centre at Rompally;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Over First Floor

97.68

498

48722

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For RCC Slabs Stair Case steps

0.5

8687

4344

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For Stair Case Slab175mm thick

9.84

1950

19188

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For Roof Slab 125mm thick

97.68

1761

172014

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For Roof Beams

4.64

14411

66868

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For 0.60x0.0375 Mts wide Sunshade

7.5

791

5933

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For Lintels

0.85

14974

12728

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For Plinth Beams

5.01

14012

70203

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For Columns

4.04

13552

54753

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For Pedestals

1.83

11038

20200

... More
Construction of Sub Health Centre at Rompally;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For Footings

5.55

10420

57832

... More
Construction of Sub Health Centre at Rompally;Brick masonry in superstructure with CM (1:6) prop mix using Sand Cement Bricks of size 29x20x14 cms from approved source having minimum crusheing strength of 75 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)

9.13

7618

69555

... More
Construction of Sub Health Centre at Rompally;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402).

5.58

5792

32323

... More
Construction of Sub Health Centre at Rompally;Construction of Sub-Health Centre at Rompally ( Rompally PHC) of Tiryani Mandal in KB Asifabad District. Est.Cost of Rs.20.00 Lakhs-Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

54.36

394

21441



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.