Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Opening Date8 Sep 2023
Closing Date19 Sep 2023
Tender Amount₹ 80,82,448 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building;Providing and fixing factory made solid wood polymer composite (WPC) single extruded door frame section of 100*65mm with encapsulation of 6mm rigid layer on all external surfaces.The door frame will have a rebate of 32mm/37mm.The two vertical memebers are to be joined together with the horizontal memeber using 8x75mm long MS star full thread screws to be used with reverse forward speed control hand drilling machine.The ready/ assemblled door frame is fixed to wall using Z hand fast 300mm long hold fast.

125.44

882

110737

... More
Building;supply and fixing of best teak wood door fully panelled door frame made of well seasoned medium teak scantlings of bottom reeper and shutter made of side rails bottom rails and intermediate rails , panels4nos are of 25mm thick as per approved design with fixtures of 9z holdfasts, aldrop butt hinges, door stoppers tower bolts handles with necessary screws complete including cost and conveyance of all materials and labour charges etc., complet as per specifications(APSS NO.1001 and 1002)

1

47618

47619

... More
Building;Supplying and filling gravel in trenches ,sides of the foundations and basement with initial lead in layers not exceeding 15 cm thick consolidatiing each depposited layer by watering and rampping including cost and conveyance of water to work site and all operational incidental ,labour charges hire charges and T & O Complete for finished item APSS 309 &310)

228.2

355

81077

... More
Building;Plain cement concrete (M20) nominal mix using 20mm HBG crusher metal including cost and conveyance of all the materials and labour charges etc..,

2.87

6046

17352

... More
Building;Ground floor.Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,,excluding seignarage charges as per the message no 03/RD/TA/2020dt 13.02.20 of Technical adviser RD TS ,Including,and all taxes Cement as per GO MS 5 dt16.06.20& other taxes on all materials, other taxes on all materials, complete for finished item of work

463.29

518

240443

... More
Building;ornemental plastering of 12mm thick with CM (1:3) including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for CEILING PLASTERING.

456.99

204

93409

... More
Building;plastering of 12mm thick with CM (1:3) including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for CEILING PLASTERING.

697.33

475

331887

... More
Building;Plastering 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand, water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves, finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904) (CSSR) Internal Walls

39.56

164

6500

... More
Building;Filling with Selected Earth in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labor charges, hire charges of T & P etc., complete,excluding seignarage charges all operational, incidental, and labor charges , for finished item of work. (APSS NO. 309 & 310)

296.07

321

95332

... More
Building;Reinforced Brick Masonry 115mm thick in superstructure with CM (1:4) prop: using 2nd class Bricks from approved source having minimum crushing strength of 50 kg/cm2 and placing 2 No.s of 6mm dia MS bars in every 3rd layer with free ends keyed into mortar joints including all operational & incidental, scaffolding, lift & labour charges, and Cost and Conveyance of all materials etc., complete for finished item of work but excluding seigniorage charges. (APSS No. 501 & 504)

11.37

9901

112584

... More
Building;Brick Masonry in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, Including, Countryes & other taxes on all materials, all operational, incidental,Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing,excluding seignarage charges as per the message no 03/RD/TA/2020dt 13.02.20 of Technical adviser RD TS ,etc., complete for finished item of work. (APSS No. 501 & 504).

205.58

8074

1659927

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

23.19

614

14243

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

2.78

12230

34001

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

12.8

1689

21621

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

147.8

1518

224449

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

463.29

1365

632442

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

26.35

11411

300698

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

28.58

11957

341749

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

26.35

11622

306245

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

9.11

9553

87030

... More
Building;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site, excluding seignarage charges & other taxes on all materials, Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403)

54.45

9103

495689

... More
Building;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site, excluding seignarage charges & other taxes on all materials, all operational, incidental,Including GST on steel,and all taxes Cement as per GO MS 5 dt16.06.20and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)

49.42

3948

195121

... More
Building;Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture.All work upto plinth level. nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

22.44

4739

106352

... More
Building;Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402) All work upto plinth level.

51.86

4547

235859

... More
Building;C/o Tahsildar Office (Govt) Building at Peddavangara(V&M) of Mahabubabad district -Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labor charges etc., complete for finished item of work for Foundation of Building. (APSS No. 308)

370.09

225

83414



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.