Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Opening Date30 Sep 2024
Closing Date8 Oct 2024
Tender Amount₹ 6,41,01,037 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Side Wall of Sump (20cm th.)

10.08

16149

162789

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Bottom Slab

4.6

10759

49493

... More
Sewerage Pipeline and STP;Laying PCC M20 mix using 40mm graded SS-5 HBG m/c metal, coarse and fine aggregates conforming to IS: 383 and OPC including cost and conveyance of all materials, machinery, labour charges, vibration, curing for 21 days, and all incidental & operational charges etc. complete conforming to standard specification for Bed - Unit 1 Cum (for Benching)

3.53

5384

18995

... More
Sewerage Pipeline and STP;Collection supply and filling with HBG stone chips 2.36 mm and below . ( in trenches of foundations & basement and the pipeline trenches with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work (APSS No.309&310)

5.29

1657

8774

... More
Sewerage Pipeline and STP;CONSTRUCTION OF RCC CHLORINATION TANK (2.5X2.5X2.5M) -Earth work excavation by Mechanical means for sumps and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious matter, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etccomplete for finished item of work as per SS 20 B (APSS 308)

8.82

123

1091

... More
Sewerage Pipeline and STP;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

94.24

48

4557

... More
Sewerage Pipeline and STP;Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

47.12

169

8002

... More
Sewerage Pipeline and STP;: Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Fe 415 / Fe 500 grade as per IS 1786-1979 of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes

2321

66

153488

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Side Wall of Sump (30cm th.)

15.5

16149

250384

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Bottom Slab

7.7

10759

82846

... More
Sewerage Pipeline and STP;Laying PCC M20 mix using 40mm graded SS-5 HBG m/c metal, coarse and fine aggregates conforming to IS: 383 and OPC including cost and conveyance of all materials, machinery, labour charges, vibration, curing for 21 days, and all incidental & operational charges etc. complete conforming to standard specification for Bed - Unit 1 Cum (for Benching)

4.93

5384

26533

... More
Sewerage Pipeline and STP;Collection supply and filling with HBG stone chips 2.36 mm and below . ( in trenches of foundations & basement and the pipeline trenches with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work (APSS No.309&310)

7.39

1657

12256

... More
Sewerage Pipeline and STP;CONSTRUCTION OF RCC LAMELLA SETTLER (3.7X2.5X3.5M) -Earth work excavation by Mechanical means for sumps and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious matter, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etccomplete for finished item of work as per SS 20 B (APSS 308)

12.32

123

1524

... More
Sewerage Pipeline and STP;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

314

48

15184

... More
Sewerage Pipeline and STP;Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

157

169

26662

... More
Sewerage Pipeline and STP;: Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Fe 415 / Fe 500 grade as per IS 1786-1979 of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes

11780

66

779011

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Bottom Side Wall of Sump (35cm th.)

42.7

16149

689590

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Bottom Bottom Slab

75.1

10759

808021

... More
Sewerage Pipeline and STP;Laying PCC M20 mix using 40mm graded SS-5 HBG m/c metal, coarse and fine aggregates conforming to IS: 383 and OPC including cost and conveyance of all materials, machinery, labour charges, vibration, curing for 21 days, and all incidental & operational charges etc. complete conforming to standard specification for Bed - Unit 1 Cum (for Benching)

44.67

5384

240517

... More
Sewerage Pipeline and STP;Collection supply and filling with HBG stone chips 2.36 mm and below . ( in trenches of foundations & basement and the pipeline trenches with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work (APSS No.309&310)

67.01

1657

111096

... More
Sewerage Pipeline and STP;CONSTRUCTION OF RCC ANOXIC TANK (1.7X2.5X3.5M), RCC MBBR TANKS (5.5 X 2.5 X 3.5M) & RCC RECYCLING TANK (1.7X2.5X3.5)-Earth work excavation by Mechanical means for sumps and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious matter, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etccomplete for finished item of work as per SS 20 B (APSS 308)

111.68

123

13815

... More
Sewerage Pipeline and STP;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

258.4

48

12495

... More
Sewerage Pipeline and STP;Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

129.2

169

21941

... More
Sewerage Pipeline and STP;: Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Fe 415 / Fe 500 grade as per IS 1786-1979 of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes

8936

66

590938

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Side Wall of Sump (30cm th.)

40.2

16149

649216

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Bottom Raft Slab

71.5

10759

769288

... More
Sewerage Pipeline and STP;Laying PCC M20 mix using 40mm graded SS-5 HBG m/c metal, coarse and fine aggregates conforming to IS: 383 and OPC including cost and conveyance of all materials, machinery, labour charges, vibration, curing for 21 days, and all incidental & operational charges etc. complete conforming to standard specification for Bed - Unit 1 Cum (for Benching)

21.63

5384

116468

... More
Sewerage Pipeline and STP;Collection supply and filling with HBG stone chips 2.36 mm and below . ( in trenches of foundations & basement and the pipeline trenches with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work (APSS No.309&310)

32.45

1657

53797

... More
Sewerage Pipeline and STP;CONSTRUCTION OF RCC Equilization Tank (8.5x8.5x3.0m)-Earth work excavation by Mechanical means for sumps and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious matter, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etccomplete for finished item of work as per SS 20 B (APSS 308)

54.08

123

6690

... More
Sewerage Pipeline and STP;: Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Fe 415 / Fe 500 grade as per IS 1786-1979 of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes

800

66

52904

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Side Walls Screen Chamber

5.1

16149

82363

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Columns

1

13413

13413

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Footing

1.2

10759

12911

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Beams

1.24

13650

16927

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Base slab

2.3

10759

24746

... More
Sewerage Pipeline and STP;Laying PCC M20 mix using 40mm graded SS-5 HBG m/c metal, coarse and fine aggregates conforming to IS: 383 and OPC including cost and conveyance of all materials, machinery, labour charges, vibration, curing for 21 days, and all incidental & operational charges etc. complete conforming to standard specification for Bed - Unit 1 Cum (for Benching)

0.9

5384

4846

... More
Sewerage Pipeline and STP;Collection supply and filling with HBG stone chips 2.36 mm and below . ( in trenches of foundations & basement and the pipeline trenches with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work (APSS No.309&310)

2.7

1657

4476

... More
Sewerage Pipeline and STP;CONSTRUCTION OF RCC SCREEEN CHAMBER OF SIZE 4.0 X 1.0 x 1.0M- Earth work excavation by Mechanical means for sumps and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious matter, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etccomplete for finished item of work as per SS 20 B (APSS 308)

4.5

123

557

... More
Sewerage Pipeline and STP;Filling with useful available excavated earth (excluding rock) in trenches with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit for finished item of work .(APSS NO.309&310)

3.92

33

132

... More
Sewerage Pipeline and STP;Providing impervious / weather proof coarse over RCC roof slabs with CM (1:3) with an average thickness of 20mm thick, premixed with water proofing compound like ACCO proof or any other ISI make at one KG per bag of cement as prescribed by the manufacturer and laid over the roof slab to required slopes as directed by the Engineer-in-charge when slab is in green including cost and conveyance of all materials to site, all labour charges for all operations, maintaining necessary slopes, finishing smooth and lininig, curing etc., complete as directed by Engineer-in-Charge for finished item of work, excluding GST & seigniorage charges.

20.25

512

10386

... More
Sewerage Pipeline and STP;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

137.8

48

6663

... More
Sewerage Pipeline and STP;Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

68.9

169

11701

... More
Sewerage Pipeline and STP;: Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Fe 415 / Fe 500 grade as per IS 1786-1979 of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes

3200

66

211616

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Roof Slab over Sump (15 cm th.) (0-4 m Above G.L)

3.81

11955

45518

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Roof beam (3-4 m Above G.L)

0.5

13650

6825

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Side Wall of Sump (30cm th.) (0-3 m Below G.L) - Delifting

16.36

16149

264241

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges Bottom Raft Slab (below ground level 0-3m depth)

11.2

10759

120504

... More
Sewerage Pipeline and STP;Laying PCC M20 mix using 40mm graded SS-5 HBG m/c metal, coarse and fine aggregates conforming to IS: 383 and OPC including cost and conveyance of all materials, machinery, labour charges, vibration, curing for 21 days, and all incidental & operational charges etc. complete conforming to standard specification for Bed - Unit 1 Cum (for Benching)

6.2

5384

33381

... More
Sewerage Pipeline and STP;Collection supply and filling with HBG stone chips 2.36 mm and below . ( in trenches of foundations & basement and the pipeline trenches with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work (APSS No.309&310)

6.14

1657

10186

... More
Sewerage Pipeline and STP;CONSTRUCTION OF RCC 30KL SUMP- Earth work excavation by Mechanical means for sumps and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious matter, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etccomplete for finished item of work as per SS 20 B (APSS 308)

121.65

123

15048

... More
Sewerage Pipeline and STP;: Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Fe 415 / Fe 500 grade as per IS 1786-1979 of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes

230

66

15210

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges. For side walls

1.29

16149

20785

... More
Sewerage Pipeline and STP;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30 grade Design Mix Concrete corresponding to IS 456 using weigh batcher with 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work, excluding GST & seigniorage charges. For Footing

1.01

10759

10845

... More
Sewerage Pipeline and STP;Laying PCC M20 mix using 40mm graded SS-5 HBG m/c metal, coarse and fine aggregates conforming to IS: 383 and OPC including cost and conveyance of all materials, machinery, labour charges, vibration, curing for 21 days, and all incidental & operational charges etc. complete conforming to standard specification for Bed - Unit 1 Cum (for Benching)

1.3

5384

6999

... More
Sewerage Pipeline and STP;Collection supply and filling with HBG stone chips 2.36 mm and below . ( in trenches of foundations & basement and the pipeline trenches with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work (APSS No.309&310)

2

1657

3316

... More
Sewerage Pipeline and STP;CONSTRUCTION OF RCC SCREEEN CHAMBER OF SIZE 1.5 X 0.5M-Earth work excavation by Mechanical means for sumps and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious matter, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etccomplete for finished item of work as per SS 20 B (APSS 308)

13.1

123

1620

... More
Sewerage Pipeline and STP;Cost of 100mm dia SWG pipe from house premises to Manhole including earthwork excavation, laying and jointing as per specifications and refilling with watering and tampering as per standards

3200

701

2243200

... More
Sewerage Pipeline and STP;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

800

9870

7896000

... More
Sewerage Pipeline and STP;Supply & Delivery of manhole covers and frames of H.D.-35/20 with 560mm dia clear opening with ISI marking anywhere in A.P., including, loading, un-loading & stacking at site including labour charges and all other incidental and operational and operational charges etc., complete

1200

3307

3968760

... More
Sewerage Pipeline and STP;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification

1200

16142

19370903

... More
Sewerage Pipeline and STP;Supply, Lowering, laying and jointing of 300 mm dia SWG SP1 pipe in ready made trench true to alignment and gradient,jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn including cost and conveyance of pipe. (Reference to specifications BIS No.6530/72) PHE-LJSW-13 including loading and unloading, Contractor's profit and overhead charges complete for finished item and as directed by the Engineer-in-charge

3393

2276

7725318

... More
Sewerage Pipeline and STP;Supply, Lowering, laying and jointing of 200 mm dia SWG SP1 pipe in ready made trench true to alignment and gradient,jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn including cost and conveyance of pipe. (Reference to specifications BIS No.6530/72) PHE-LJSW-13 including loading and unloading, Contractor's profit and overhead charges complete for finished item and as directed by the Engineer-in-charge

1733

1163

2016207

... More
Sewerage Pipeline and STP;Supply, Lowering, laying and jointing of 150mm dia SWG SP1 pipe in ready made trench true to alignment and gradient,jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn including cost and conveyance of pipe. (Reference to specifications BIS No.6530/72) PHE-LJSW-13 including loading and unloading, Contractor's profit and overhead charges complete for finished item and as directed by the Engineer-in-charge.

2488

1000

2490364

... More
Sewerage Pipeline and STP;Removal of Unsuitable /Unservicable soil excavation loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil , which shall be paid separately as per clause 303.5.2 as per technical specifications clause 302.3.11 MORD/301 MORTH

4603.92

90

417529

... More
Sewerage Pipeline and STP;(BLD-CSTN 2-8)- Reffling with usefull available excavated earth / soils in trenches ,sides of foundations & basement and the pipeline trenches after laid, jointed, executed, tested with intial lead in layors not exceeding 15 cm thick , consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost and conveyonce of water to work site and all operational ,incidental,labour charges,hire charges of T&P .,Complete for finished item of work and as directed by the Engineer-in-charge.

15396.08

33

520388

... More
Sewerage Pipeline and STP;Collection supply and filling with HBG stone chips 2.36 mm and below . ( in trenches of foundations & basement and the pipeline trenches with intial lead in layors not exceeding 15 cm thick, consolidating each deposited layer by watering consolidting each layer by watering and ramming including cost of collection of sand and otehr required materials conveyonce of water to work site and all operational, incidental, labour charges, hire charges of T&P., complete for finished item of work (APSS No.309&310)

2822.49

1657

4679547

... More
Sewerage Pipeline and STP;RBR -FNDN-1 Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,Conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for GLSR/ pipeline trenches for laying sewer/ Water supply lines including all incidental and operational charges etc., complete.

20000

123

2474000

... More
Sewerage Pipeline and STP;CutCutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the departmental officers.

1201.2

2664

3200357

... More
Sewerage Pipeline and STP;Pipeline Network-Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and stacking of excavated materials for pipe line trench work. as directed by the departmental officers.

232.5

1280

297693



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.