Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date29 Sep 2023
Closing Date5 Oct 2023
Tender Amount₹ 1,25,07,433 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building;Supply and filling of earth (ordinary soil) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges,and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

388.12

212

82289

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work footings

55.66

9620

535469

... More
Building;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615)

22

3783

83241

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work Plinth beams

9.81

12249

120167

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work columns

8.61

12497

107605

... More
Building;Supply and filling of gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

220

366

80608

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For Beams

15.83

11741

185871

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For 150mm slabs

210.91

1568

330730

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For 175mm slabs

9.72

1746

16980

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For 50mm RCC Slabs

17.1

911

15591

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For 25mm RCC Slabs

22.8

754

17207

... More
Building;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure and others but excluding GST and seignorage chages.

53.33

8267

440896

... More
Building;Reinforced Brick Masonry 115mm thick in superstructure with CM (1:4) prop: using 2nd class Bricks from approved source having minimum crushing strength of 50 kg/cm2 and placing 2 No.s of 6mm dia MS bars in every 3rd layer with free ends keyed into mortar joints including all operational & incidental, scaffolding, lift & labour charges, and Cost and Conveyance of all materials etc., complete for finished item of work but excluding seigniorage charges. (APSS No. 501 & 504)

36.83

9618

354230

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work in lintels

2.78

12660

35195

... More
Building;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work. for sunshades

12.96

1036

13439

... More
Building;Supply and fixing of Medum teak wood Door single shutter fully paneled door of size 1.50 x 2.10 mts with frame of sal Wood scantlings of size 100 x 75mm and bottom reeper of size 75x38mm and shutter of side rails 125mm x38, top rail 125mmx38mm, bottom rail 175mmx38mm and intermediate rails of 125 x 38 mm and panels - 4 nos 25mm thick with all fixtures complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS No.1001 & 1002) (CSSR).

10

27035

270353

... More
Building;Supply and fixing of Medum teak wood Door single shutter fully paneled door of size 2.40 x 2.40 mts with frame of Medum teak scantlings of size 100 x 75mm and bottom reeper of size 75x38mm and shutter of side rails 125mm x38, top rail 125mmx38mm, bottom rail 175mmx38mm and intermediate rails of 125 x 38 mm and panels - 4 nos 25mm thick with all fixtures complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS No.1001 & 1002) (CSSR).

2

33949

67899

... More
Building;Supply and fixing of Medum teak wood Door single shutter fully paneled door of size 0.90x1.80 mts with frame of Medum teak scantlings of size 100 x 75mm and bottom reeper of size 75x38mm and shutter of side rails 125mm x38, top rail 125mmx38mm, bottom rail 175mmx38mm and intermediate rails of 125 x 38 mm and panels - 4 nos 25mm thick with all fixtures complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS No.1001 & 1002) (CSSR).

4

15449

61797

... More
Building;Providing and fixing 2 Track 2 glass shutter sliding Windows fabricated from roll formed sections made of Galvanized Steel Colour Coated/ Powder Coated (Base Steel as per IS 513 ?D? quality, Galvanized as per IS 277 with Zinc of 120 GM/Sq.mtr) with total coated thickness of 0.58 mm. Primer coat with epoxy primer of 5?7 micron thick, finish painted with polyester paint of 12-16 microns thick and back coated with alkyd backer of 5-7 microns or Powder Coated with pure Polyester Powder up to 50-60 microns thick. Section for external frame should be of 44 x 59mm, Section for glass shutter should be of 35 x 49 mm Section for euro groove should be 25 x 24mm( Aluminium/Plastic)and Lap Strip should be of 30 x 41mm(Aluminium/Plastic).shutter should be provided with a glass of 5mm Plain Float Glass. Corner bracket for External frame made of Steel/Polypropylene, Corner Bracket for Internal frame made of Steel/Polypropylene, Touch Lock, Rollers, wool pile for lap strip & euro groove, Bump Stop Base & Rubber for shutter stopper. Ethyl Propylene Diamine Monomer (EPDM) Gasket should be used all around glass in shutter. The Frame Section should be cut to length and mitre joined with Corner brackets & Shutter Sections should be cut to length and mitre joined with Corner Bracket. Window Frame should be fixed to brick/ concrete masonry by using Nylon self-expanding caps and driving MS electroplated 80mm long screws into the caps through frames.10mm square guard bars with 6? pitch (152.4mm) max to be fixed wall to wall and all taxes complete for finished item of work

44

9644

424370

... More
Building;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls.

399

423

169144

... More
Building;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Ceiling.

192

423

81393

... More
Building;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.

168

435

73189

... More
Building;Flooring with vitrified tiles of 1st quality and of size not less than 600 x 600 mm x 8 mm thickness glossy finish permium colours, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, and water and flooring tiles etc., complete, including over heads & contractor profit, labour charges etc., complete for finished item of work, but excluding VAT and seignorage charges.

184.49

1150

212165

... More
Building;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit cost and conveyrance of all materials like tiles, cement, sand and water etc., complete but excluding VAT and seigniorage charges, etc., complete for finished item of work.

17.19

1212

20852

... More
Building;Flooring with Ceramic non skid tiles of not less than 7.3mm thick 1st quality laid over floor bed /VRCC slab set over 12.0 mm th.in CM (1:8 ) prop. base coat and neat grey cement slurry of honey like consistence spread at the rate of 3.3 kg of cement per Sqm and jointed with neat white cement paste mixed with pigment of matching shade including cost and conveyance of all materials to site, including cost of mixing of mortar and watering, leveling to proper slope and curing including over heads & contractor profit, all labour charges etc., and excluding VAT and seignorage charges for finished item of work but excluding cost of CC bed and dadoing to walls

7

1061

7430

... More
Building;Providing dadooing to walls with 5 to 7mm thick ceramic wall tiles 1st quality of 7.30mm and of size approved by Engineer-in-Charge, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit, cost of all materials like tiles, cement, sand and water etc., complete including complete for finished item of work, but excluding VAT and seignorage charges.

12.13

880

10681

... More
Building;Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 911 for internal walls

591

173

102273

... More
Building;Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 912 for external walls.

168

234

39470

... More
Building;Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal walls.

995

221

220226

... More
Building;Providing and applying synthetic plaster putty or equivalent putty such as birla wall care putty or texture paint or equivalent such as NCL/ Saicoat texture paint of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls - excluding cost of access scaffolding for external walls

470

389

182875

... More
Building;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding GST and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

21144

88

1865112

... More
Building;FIRST FLOOR.Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work columns

5.36

12849

68876

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For Beams

15.83

11936

188951

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For 150mm slabs

210.91

1597

336884

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For 175mm slabs

9.72

1780

17311

... More
Building;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

213.88

508

108672

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For 50mm RCC Slabs

3.8

921

3502

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work For 25mm RCC Slabs

7.6

759

5773

... More
Building;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure and others but excluding GST and seignorage chages.

66

8430

556385

... More
Building;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for lintels

1.57

13012

20430

... More
Building;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work. for sunshades

8.64

1049

9065

... More
Building;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls.

238

460

109551

... More
Building;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Ceiling .

165.87

460

76348

... More
Building;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.

236

472

111397

... More
Building;Flooring with vitrified tiles of 1st quality and of size not less than 600 x 600 mm x 8 mm thickness glossy finish permium colours, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, and water and flooring tiles etc., complete, including over heads & contractor profit, labour charges etc., complete for finished item of work, but excluding VAT and seignorage charges.

165.87

1189

197353

... More
Building;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit cost and conveyrance of all materials like tiles, cement, sand and water etc., complete but excluding VAT and seigniorage charges, etc., complete for finished item of work.

14

1252

17536

... More
Building;Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 911 for internal walls

403.87

173

69889

... More
Building;Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 912 for external walls.

236

234

55446

... More
Building;SECOND FLOOR.Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure and others but excluding GST and seignorage chages.

13.44

8796

118189

... More
Building;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.

65.13

513

33420

... More
Building;Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 912 for external walls.

65.13

234

15303

... More
Building;COMPOUND Wall.Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

202.5

215

43548

... More
Building;Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402).

28.13

4365

122796

... More
Building;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615)

112.5

3783

425665

... More
Building;Construction of CR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615)

67.5

4151

280257

... More
Building;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure and others but excluding GST and seignorage chages.

139.1

8267

1150058

... More
Building;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.

1204.1

435

524566

... More
Building;Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 912 for external walls.

1204.1

234

282891

... More
Building;INTERNAL ELECTRIFICATION.CONDUIT PIPE Supply and Laying of ISI 25mm outer dia heavy grade, FRLS with IS:9537 part 3 regid PVC pipe Makes : Sudhakar / GM / Modi / Million Plast concealed in Roof Slabs with all required PVC / Metallic Deep Boxes including masonary work and labour charges etc., complete.

400

103

41590

... More
Building;Supply and Fixing of ISI 25mm outer dia 2mm mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

120

110

13283

... More
Building;Supply and fixing of MS hook for fan while laying the slab.

24

362

8688

... More
Building;WIRING: Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated flexible ISI mark copper cable,Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard. (HFFR).in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6/10A ISI Mark 1way Modular switch Makes : Legrand Arteor / Schneider Zencelo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze with hylam sheet covering to switch control box in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in N.R.B.

120

848

101844

... More
Building;Supply and Fixing of 6A 3/2 pin flush type Socket with wooden deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth connections and all labour charges etc., complete.

20

334

6686

... More
Building;Supply and Fixing of 16A ISI mark Modular switch socket of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega with wooden deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth connections and all labour charges etc., complete.

52

428

22273

... More
Building;RUN of MAINS Supply and Run of 2 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper Makes : Finolex/ RR Cable/ Havells/ Polycab/ HPL/ RPG/ Power flex / GM / Million / Gold Medal cable in existing pipe for earth continuity inlcuding all labour charges etc., complete.

100

71

7135

... More
Building;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable Makes : Finolex/ RR Cable/ Havells/ Polycab/ HPL/ RPG/ Power flex / GM / Million / Gold Medal in existing pipe for run of mains inlcuding all labour charges etc., complete.

220

102

22448

... More
Building;Supply and Run of 2 of 56/0.3mm (4.00 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable Makes : Finolex/ RR Cable/ Havells/ Polycab/ HPL/ RPG/ Power flex / GM / Million / Gold Medal in existing pipe for run of mains inlcuding all labour charges etc., complete.

150

155

23263

... More
Building;Supply and Run of 2 of 84/0.3mm (6.0 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable Makes : Finolex/ RR Cable/ Havells/ Polycab/ HPL/ RPG/ Power flex / GM / Million / Gold Medal in existing pipe for run of mains inlcuding all labour charges etc., complete.

250

213

53399

... More
Building;FIXTURES: Supply, Transportation and fixing of 20W, 2000 lumens, T8,1200mm length LED tube light with batten, input voltage AC 220 - 260Volts with PF=0.9, Surge protection: 2KV,THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI=80,.etc., complete Manufacture has to submit LM79,LM80 & Photobiological Safety Report. Luminaire Performance Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 ISO certified company Including fixing on wall / ceiling with fixing arragements including with inter connections etc complete. LUMINAIRE MAKE: Phillips / OSRAM / GE / Crompton / VIN / Bajaj / Havells / HPL/ Surya / Syska, LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

40

923

36948

... More
Building;Supply, Transportation and Fixing of 1200mm (48") Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings but without Regulator of makes Crompton / Bajaj Kassels 50 / Usha atom make with all standard accessories but without regulator including all labour charges etc., complete including cost and conveyance of all material and labour charges but excluding other taxes.

24

3442

82608

... More
Building;INTERNAL SANITARY & WATERSUPPLY.Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318). 101.60mm dia upto 914.40mm (3') depth

16

622

9962

... More
Building;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318). 152.40mm dia upto 1524.0mm (5') depth

42

1021

42899

... More
Building;Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 & 4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as approved including cost and conveyance of all materials to site, labour charges, overheads & contractors profit etc., complete for finished item of work.

6

1177

7062

... More
Building;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

6

5244

31467

... More
Building;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

10

9969

99697

... More
Building;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

3

16004

48015

... More
Building;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

20

187

3749

... More
Building;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, 15 mm nominal size CP finish brass angled stop valve screw type with internal /external threaded conforming to IS 8931, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

3

5592

16776

... More
Building;Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make heavy duty complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty, 30mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work.

3

2560

7683

... More
Building;Supplying and fixing of stainless steel sink of size (914.4x457.2mm), 1mm thick of Indian make fixed on cantilever brackets including supply and fixing 31.75mm C.P. waste coupling, 30mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality ncluding chiselling brick masonry wall and making good & restoring to original surfaces, overheads & contractors profit complete for finished item of work in all floors

2

7898

15798

... More
Building;Supplying and fixing CP finish brass soap dish of approved make ISI quality including cost and conveyance of all materials, labour charges for fixing, overheads & contractors profit for finished item of work in all floors.

10

828

8283

... More
Building;Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work in all floors.

3

618

1854

... More
Building;Supplying and fixing of 20mm dia , 600mm long CP finish steel towel rods with brackets including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work.

3

478

1435

... More
Building;Supplying and fixing 15 mm brass body CP finish self closing tap push type conforming to IS 1711 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work in all floors.

3

398

1196

... More
Building;Supplying and fixing 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work in all floors.

3

369

1108

... More
Building;Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 7 - 10 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges, overheads & contractor profit complete for finished item of work in all floors.

3

4118

12356

... More
Building;Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 4' 0" x 2' 0" for urinals including full rounding the edges, fixing in position, polishing, including cost and conveyance of all materials and labour charges, overheads & contractors profit complete for finished item of work for all floors.

3

1167

3503

... More
Building;Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality fixed in brick masonry to the required slopes , white cement pointing including cost and conveyance of all materials and labour charges, overheads & contractors profit complete for finished item of work for all floors.

2

595

1191

... More
Building;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 22.20mm OD pipe

32

279

8944

... More
Building;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 28.60mm OD pipe

22

324

7149

... More
Building;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 34.90mm OD pipe

55

423

23308

... More
Building;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 41.30mm OD pipe

48

547

26286

... More
Building;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels. 54.00mm OD pipe

10

758

7589

... More
Building;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work. 25mm Nominal bore

9

1483

13354

... More
Building;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work. 32mm Nominal bore

1

2255

2255

... More
Building;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work. 40mm Nominal bore

3

3041

9124

... More
Building;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work. 50mm Nominal bore

1

4460

4461

... More
Building;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar/ Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326). 75mm dia

150

304

45673

... More
Building;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar/ Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326). 110mm dia

80

451

36084



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.