Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Civil Works Roads
Opening Date6 May 2021
Closing Date25 May 2021
Tender Amount₹ 10,84,87,861 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road Work;Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C chips) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotaor at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

2376.75

-

3479633

... More
Road Work;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1751.62

-

3377421

... More
Road Work;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

2382.37

-

650911

... More
Road Work;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc,. Complete. for Prime Coat

11677.5

-

378234

... More
Road Work;Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc,. Complete. for Tack Coat

11677.5

-

108951

... More
Road Work;Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using penetration grade bitumen 60/70 grade at the rate of 14.6 kg/10 sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hot Mix plant of 30-40TPH, laying & levelling with mechanical paver and rolling with a three wheel 0-100 kN static roller capacity, finished to required level and grades to be followed by seal coat including cost and conveyance of all materials from approved sources, , labour charges and hire and operational charges of power road roller and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per clause 508 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

11677.5

-

1453849

... More
Road Work;Providing and laying bituminous premixed Seal coat (Type B) comprising of a thin application of fine aggregate premixed with bituminous binder of grading as defined in table 500.16 of MOST Crushed sand defined as passing through 2.36 mm sieve and retained on 180 micron seive applied @ 0.06 cum per 10 sqm.to be laid simultaneously along with the bitumunous course using 6.80 kgs of bitumen 60/70 grade for 10 sqm and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to rquired level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, seigniorage, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specification clause 510 of MORD Using Hot mix plant including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

11677.5

-

460094

... More
Road Work;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

636.5

-

3892758

... More
Road Work;Construction of HP Culvert 1V of 1000mm Dia.NP3 Pipes 5 Nos at 0/020, 0/506, 0/650, 1/940,6/200 KM --------- Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

104.49

-

10515

... More
Road Work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

20.14

-

15902

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

69.37

-

306167

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

71.14

-

332098

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

37.5

-

337598

... More
Road Work;Construction of 3 v 1000mm Dia NP3 Class Pipes Culvert 3 Nos at 0/200,1/265, 2/300 Km -Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

115.18

-

11591

... More
Road Work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

32.93

-

25995

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

69.24

-

305611

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

63.9

-

298294

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

67.5

-

607677

... More
Road Work;Construction of Retaining wall of 25.00m Length 1 Nos at KM 1/620 ----- Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

94.5

-

9510

... More
Road Work;Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

15.75

-

62144

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

28.12

-

124135

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

17.55

-

81929

... More
Road Work;Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -Ordinary KM Stones

3.96

-

8201

... More
Road Work;Reinforced cement concrete M15 grade HM stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -200M H.M Stones

15.82

-

9552

... More
Road Work;Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges,But excluding GST

2

-

19309

... More
Road Work;Providing and fixing of typical PMGSY Citizen informatory sign board as per MORD specifications and drawing. Two MS Plates of 900x750x1.6 mm thick, top and lower plate duly welded with MS flat iron 40mm x 5m size on back on edges.The top & Lower plates will be welded to 2 nos. 75 mm x 75 mm or 75mm dia of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level.All M.s. will be stove enameled on both sides. Lettering and printing arrows, border etc., will be pointed with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 MORD including contractors profit & Over head charges,But excluding GST

4

-

66345

... More
Road Work;Providing and erecting direction and place identifications of semi reflective sign boards up to 0.90 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, But Excluding GST.

12

-

26702

... More
Road Work;Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.60mm thick MS sheet, with 600X 600 mm size MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, But Excluding GST

16

-

26715

... More
Road Work;Cost, supply and fixing on road of Reflective Studs - RMP (Twin Moulded Shanks) including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

184

-

66424

... More
Road Work;Cost, supply and Painting on road of Thermoplastic Paint including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

29

-

19227

... More
Road Work;Providing and erecting a "W" metal beam crash barrier comprising of 3mm thick corrugated sheet metal beam rail 70 cm above road/ground level, fixed on ISMC series chennel verical post 150x75x5mm spaced 2.00m cente-to-centre, 1.80m high, 1.10m below ground/road level, all steel parts and fitiings to be galvanized by hot dip process, all fittings to confirm to IS:1367 and IS: 1364, metal beam rail to be fixed on vertical post with a spacer of chennel section 150x75x5mm, 330mm longs complete as per clause 810, including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

50

-

142850

... More
Road Work;Rountine maintanance for 1 st year

3.96

-

204406

... More
Road Work;Rountine maintanance for 2 nd year

3.96

-

241756

... More
Road Work;Rountine maintanance for 3 rd year

3.96

-

255095

... More
Road Work;Rountine maintanance for 4 th year

3.96

-

292993

... More
Road Work;Rountine maintanance for 5 th year

3.96

-

305237

... More
Road Work;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST etc,. Complete. .

19050

-

42863

... More
Road Work;Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

15920

-

3214566

... More
Road Work;Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C chips) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotaor at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

2994

-

5304709

... More
Road Work;Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, but excluding GST etc,. Complete.

4631.25

-

137131

... More
Road Work;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

2804.07

-

6363164

... More
Road Work;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

3127.51

-

1072861

... More
Road Work;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc,. Complete. for Prime Coat

18693.75

-

604556

... More
Road Work;Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc,. Complete. for Tack Coat

18693.75

-

174226

... More
Road Work;Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using penetration grade bitumen 60/70 grade at the rate of 14.6 kg/10 sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hot Mix plant of 30-40TPH, laying & levelling with mechanical paver and rolling with a three wheel 0-100 kN static roller capacity, finished to required level and grades to be followed by seal coat including cost and conveyance of all materials from approved sources, , labour charges and hire and operational charges of power road roller and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per clause 508 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

18693.75

-

2455424

... More
Road Work;Providing and laying bituminous premixed seal coat (Type C) comprising of stone chipping of grading as defined in table 500.16 of MOST with Crushed stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by mechanical means .with the bitumunous binder using 6.50 kgs of bitumen VG 30 grade for 10 sqm and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to required level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specification clause 510 of MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. for seal coat.

18693.75

-

788876

... More
Road Work;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

431.25

-

2822868

... More
Road Work;Construction of HP Culvert 1V of 1000mm Dia.NP3 Pipes 8 Nos at 0/490 Km, 2/200 Km, 2/850 Km, 3/400 Km, 3/700 Km, 4/200 Km, 5/850 Km, 6/100 Km ------ Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

167.18

-

16824

... More
Road Work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

32.23

-

38806

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

110.99

-

536520

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

113.82

-

581961

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

60

-

555559

... More
Road Work;Construction of 2 v 1000mm Dia NP3 Class Pipes Culvert 1 Nos at 4/825 Km, 5/725 Km ------------------ Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

59.29

-

5967

... More
Road Work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

14.02

-

16875

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

36.95

-

178637

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

35.53

-

181646

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

30

-

277779

... More
Road Work;Construction of 3 v 1000mm Dia NP3 Class Pipes Culvert 1 Nos at 5/300 Km-----------------------Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

38.39

-

3864

... More
Road Work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

10.98

-

13216

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

23.08

-

111572

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

21.3

-

108901

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

22.5

-

208334

... More
Road Work;Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -Ordinary KM Stones

1

-

3734

... More
Road Work;Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -Ordinary KM Stones

5

-

10933

... More
Road Work;Reinforced cement concrete M15 grade HM stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -200M H.M Stones

18

-

11231

... More
Road Work;Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges,But excluding GST

2

-

19521

... More
Road Work;Providing and fixing of typical PMGSY Citizen informatory sign board as per MORD specifications and drawing. Two MS Plates of 900x750x1.6 mm thick, top and lower plate duly welded with MS flat iron 40mm x 5m size on back on edges.The top & Lower plates will be welded to 2 nos. 75 mm x 75 mm or 75mm dia of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level.All M.s. will be stove enameled on both sides. Lettering and printing arrows, border etc., will be pointed with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 MORD including contractors profit & Over head charges,But excluding GST

2

-

33196

... More
Road Work;Providing and erecting direction and place identifications of semi reflective sign boards up to 0.90 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, But Excluding GST.

16

-

36451

... More
Road Work;Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.60mm thick MS sheet, with 600X 600 mm size MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, But Excluding GST

25

-

43066

... More
Road Work;Cost, supply and fixing on road of Reflective Studs - RMP (Twin Moulded Shanks) including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

540

-

194940

... More
Road Work;Cost, supply and Painting on road of Thermoplastic Paint including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

215

-

142545

... More
Road Work;Rountine maintanance for 1 st year

5.56

-

276563

... More
Road Work;Rountine maintanance for 2 nd year

5.56

-

333473

... More
Road Work;Rountine maintanance for 3 rd year

5.56

-

357315

... More
Road Work;Rountine maintanance for 4 th year

5.56

-

415224

... More
Road Work;Rountine maintanance for 5 th year

5.56

-

437069

... More
Road Work;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST etc,. Complete. .

26700

-

60075

... More
Road Work;Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

24047

-

4855570

... More
Road Work;Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C chips) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotaor at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

4362

-

7300374

... More
Road Work;Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, but excluding GST etc,. Complete.

5156.25

-

152677

... More
Road Work;Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lifts and lead upto 1000 m as per Technical Specification Clause 305.4.3 MORTH including contractors profit & Over head charges, but excluding GST etc,. Complete.

3487.5

-

30027

... More
Road Work;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

3746.25

-

8093698

... More
Road Work;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

4348.13

-

1187996

... More
Road Work;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc,. Complete. for Prime Coat

24975

-

807692

... More
Road Work;Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc,. Complete. for Tack Coat

28462.5

-

265271

... More
Road Work;Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using penetration grade bitumen 60/70 grade at the rate of 14.6 kg/10 sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hot Mix plant of 30-40TPH, laying & levelling with mechanical paver and rolling with a three wheel 0-100 kN static roller capacity, finished to required level and grades to be followed by seal coat including cost and conveyance of all materials from approved sources, , labour charges and hire and operational charges of power road roller and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per clause 508 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

28462.5

-

3675647

... More
Road Work;Providing and laying bituminous premixed seal coat (Type C) comprising of stone chipping of grading as defined in table 500.16 of MOST with Crushed stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by mechanical means .with the bitumunous binder using 6.50 kgs of bitumen VG 30 grade for 10 sqm and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to required level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specification clause 510 of MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. for seal coat.

28462.5

-

1180340

... More
Road Work;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

300

-

1918287

... More
Road Work;Construction of HP Culvert 1V of 1000mm Dia.NP3 Pipes 15Nos at 0/825 Km, 1/100 Km, 1/750 Km, 2/200 Km, 2/450 Km, 3/500 Km, 4/450 Km, 5/0 Km, 5/350 Km, 5/750 Km, 6/150 Km, 6/620 Km, 8/300 Km, 8/875 Km ----------- Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

334.37

-

33647

... More
Road Work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

64.46

-

67087

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

221.98

-

1039840

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

227.64

-

1127912

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

120

-

1080475

... More
Road Work;Construction of 2 v 1000mm Dia NP3 Class Pipes Culvert 2 Nos at KM 2/850, 8/080 Km -------------------------------- Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

59.29

-

5967

... More
Road Work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

14.02

-

14586

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

36.95

-

173110

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

35.53

-

176026

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

30

-

270119

... More
Road Work;Const. of 60 m Road Dam with 3 vents of 1000mm Dia NP3 Class pipes 1 No at 1/425 Km ------------------- Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

220.44

-

22183

... More
Road Work;Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

57.83

-

243786

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

229.59

-

1075520

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

22.5

-

202589

... More
Road Work;Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

309.65

-

225356

... More
Road Work;Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For Protection Work

73.99

-

111241

... More
Road Work;Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

53.89

-

227176

... More
Road Work;Providing and laying cement concrete Wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

45

-

285646

... More
Road Work;Construction of Retaining wall of 20.00m Length 2 Nos 2/500, 2/525 Km at KM ---------------------- Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

92.16

-

9274

... More
Road Work;Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

23.04

-

97135

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

45.36

-

212488

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

40.5

-

200667

... More
Road Work;Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -Ordinary KM Stones

1

-

3675

... More
Road Work;Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -Ordinary KM Stones

7

-

15025

... More
Road Work;Reinforced cement concrete M15 grade HM stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -200M H.M Stones

28

-

17270

... More
Road Work;Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges,But excluding GST

2

-

19445

... More
Road Work;Providing and fixing of typical PMGSY Citizen informatory sign board as per MORD specifications and drawing. Two MS Plates of 900x750x1.6 mm thick, top and lower plate duly welded with MS flat iron 40mm x 5m size on back on edges.The top & Lower plates will be welded to 2 nos. 75 mm x 75 mm or 75mm dia of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level.All M.s. will be stove enameled on both sides. Lettering and printing arrows, border etc., will be pointed with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 MORD including contractors profit & Over head charges,But excluding GST

2

-

33187

... More
Road Work;Providing and erecting direction and place identifications of semi reflective sign boards up to 0.90 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, But Excluding GST.

16

-

36149

... More
Road Work;Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.60mm thick MS sheet, with 600X 600 mm size MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, But Excluding GST

25

-

42595

... More
Road Work;Cost, supply and fixing on road of Reflective Studs - RMP (Twin Moulded Shanks) including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

540

-

194940

... More
Road Work;Cost, supply and Painting on road of Thermoplastic Paint including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

215

-

142545

... More
Road Work;Rountine maintanance for 1 st year

7.99

-

382576

... More
Road Work;Rountine maintanance for 2 nd year

7.99

-

464833

... More
Road Work;Rountine maintanance for 3 rd year

7.99

-

499648

... More
Road Work;Rountine maintanance for 4 th year

7.99

-

583366

... More
Road Work;Rountine maintanance for 5 th year

7.99

-

615259

... More
Road Work;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST etc,. Complete. .

9000

-

20250

... More
Road Work;Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

12556

-

2535308

... More
Road Work;Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C chips) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotaor at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1680

-

2741038

... More
Road Work;Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, but excluding GST etc,. Complete.

2718.75

-

80502

... More
Road Work;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1462.5

-

3091506

... More
Road Work;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1687.5

-

578880

... More
Road Work;Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc,. Complete. for Tack Coat

9750

-

90870

... More
Road Work;Providing and applying primer coat with bitumen emulsion (SS-1) Preparing and applying of water soluble silane nanotechnology (for bitumen emulsion application, IRC approved) with cationic bitumen emulsion CSS1 and water (<1000 ppm TDS) in the ratio of 1 kg silane : 100 kg cationic bitumen emulsion : 200 liter water . Take 1 kg of silane nanotechnology and add in 200 liter water while filling water in tanker/drum and then add 100 kg cationic bitumen emulsion under circulation. Mix the solution completely. Spray the solution at the rate of 1 liter per sqm on compacted stone base. Check quality of bitumen emulsion before bulk use using mechanical means as per Technical Specification Clause 502 MORD , including contractors profit & Over head charges, but Excluding GST etc,. Complete." for Prime Coat

9750

-

173453

... More
Road Work;Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates (Table 500.13) either using penetration grade bitumen 60/70 grade at the rate of 14.6 kg/10 sqm Mixed with Nano Technology Based Organo Silane Compound Zycotherm @0.10% by the weight of bitumen for enhansed performance and durability to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hot Mix plant of 30-40TPH, laying & levelling with mechanical paver and rolling with a three wheel 0-100 kN static roller capacity, finished to required level and grades to be followed by seal coat including cost and conveyance of all materials from approved sources, , labour charges and hire and operational charges of power road roller and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per clause 508 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

9750

-

1267890

... More
Road Work;Providing and laying bituminous premixed seal coat (Type C) comprising of stone chipping of grading as defined in table 500.16 of MOST with Crushed stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by mechanical means .with the bitumunous binder using 6.50 kgs of bitumen VG 30 grade for 10 sqm Mixed with Nano Technology Based Organo Silane Compound Zycotherm @0.10% by the weight of bitumen for enhansed performance and durability and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to required level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specification clause 510 of MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. for seal coat.

9750

-

409208

... More
Road Work;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

300

-

1906596

... More
Road Work;Construction of HP Culvert 1V of 1000mm Dia.NP3 Pipes 2 Nos at 0/650, 1/900 KM ---------------------- Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

62.69

-

6309

... More
Road Work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

12.09

-

12410

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

41.62

-

193466

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

42.68

-

209852

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

22.5

-

209745

... More
Road Work;Construction of 2 v 1000mm Dia NP3 Class Pipes Culvert 2 Nos at KM 0/350, 1/400 --------------------- Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations

88.94

-

8950

... More
Road Work;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

21.02

-

21586

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

55.43

-

257662

... More
Road Work;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

53.29

-

262002

... More
Road Work;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

45

-

419489

... More
Road Work;Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -Ordinary KM Stones

3

-

6410

... More
Road Work;Reinforced cement concrete M15 grade HM stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -200M H.M Stones

12

-

7381

... More
Road Work;Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges,But excluding GST

2

-

19427

... More
Road Work;Providing and fixing of typical PMGSY Citizen informatory sign board as per MORD specifications and drawing. Two MS Plates of 900x750x1.6 mm thick, top and lower plate duly welded with MS flat iron 40mm x 5m size on back on edges.The top & Lower plates will be welded to 2 nos. 75 mm x 75 mm or 75mm dia of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level.All M.s. will be stove enameled on both sides. Lettering and printing arrows, border etc., will be pointed with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 MORD including contractors profit & Over head charges,But excluding GST

2

-

33185

... More
Road Work;Providing and erecting direction and place identifications of semi reflective sign boards up to 0.90 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, But Excluding GST.

6

-

13529

... More
Road Work;Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.60mm thick MS sheet, with 600X 600 mm size MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, But Excluding GST

10

-

16992

... More
Road Work;Cost, supply and fixing on road of Reflective Studs - RMP (Twin Moulded Shanks) including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

296

-

106856

... More
Road Work;Cost, supply and Painting on road of Thermoplastic Paint including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

126

-

83538

... More
Road Work;Rountine maintanance for 1 st year

3

-

139344

... More
Road Work;Rountine maintanance for 2 nd year

3

-

168504

... More
Road Work;Rountine maintanance for 3 rd year

3

-

179680

... More
Road Work;Rountine maintanance for 4 th year

3

-

209332

... More
Road Work;Rountine maintanance for 5 th year

3

-

219524



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.