Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Opening Date18 Nov 2024
Closing Soon26 Nov 2024
Tender Amount₹ 8,52,130 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Infrastructure Facilities to MPPS;Supply and transportation of ......... LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover / temperature protective custom molded polycarbonate diffuser, Thermal shock and impact resistant IK07 fixed to the housing by SS screws Suitable lense on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >120 lumens / watt, with Ingress protection IP66, BIS approved Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates.LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / Capart / Fortune Arrt / Goldwyn / Panasonic / Arraystorm / GM / Goldmedal / Silicon / Orient / HPL / Valmont / Transrail MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs

1

4964

4965

... More
Infrastructure Facilities to MPPS;Providing independent earthling by excavating a trench to a depth of 2.25 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters including cost & conveyance of all material, all labour charges, and all taxes etc., complete for small quarters but excluding VAT.

1

5293

5293

... More
Infrastructure Facilities to MPPS;Supply and transportation of 20W +/- 10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM / Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies . LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

4

602

2409

... More
Infrastructure Facilities to MPPS;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable of makes KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White Sun Cab / Fortune Art. with Run 1 of 14/0.3mm(1.0Sqmm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable of makes KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White / Sun Cab / Fortune Art including cost and conveyance of all material and labour chages but excluding VAT.

50

138

6925

... More
Infrastructure Facilities to MPPS;Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and 16A switch control (5 in 1) duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth connections and all labour charges etc., complete.

3

447

1342

... More
Infrastructure Facilities to MPPS;Wiring with run of 2 of 14/0.3mm (1.0 Sq.mm) FR / FRLS PVC insulated flexible ISI mark copper cable ( 100V grade as perIS:694/1990 ) of KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White / Sun Cab / Fortune Art make in existing pipe with 6A 1 Way flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega, Ceiling rose 3 Plate of makes Anchor / Gold Medal Olive / Million Zoom. and Supply of Decolam Board of Size 8" x 10" as switch control box including cost and conveyance of all material and all labour charges but excluding VAT etc., complete for light, bell, fan and exhaust fan points including cost and conveyance of all material and labour charges but excluding VAT.

10

624

6240

... More
Infrastructure Facilities to MPPS;Supply and laying of 25mm dia 1.8mm thick P.V.C.pipe ISI mark of Sudhakar / Maco Plast / Modi make concealed in wall with PVC / Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size Metallic deep box including all labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding VAT.

10

104

1041

... More
Infrastructure Facilities to MPPS;Providing & placing on Terrace polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes with all fittings including supply and fixing of 76.20mm dia PVC elbow 1st quality and 38.10mm dia PVC waste pipe outlet including coat and conveyance of all materials all labour charges etc. complete for finished item of work but excluding VAT.

500

11

5774

... More
Infrastructure Facilities to MPPS;Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, but excluding seignorage charges and VAT complete for finished item of work.

1

4786

4786

... More
Infrastructure Facilities to MPPS;Providing & fixing UPVC SWR pipes TYPE-B (Double socket 4 Kg/sq.cm - Prince/Sudhakar or any ISI Brand ) conforming to IS 13592:1992 including necessary specials,jointing with adhesives ,fixing vertical pipes over wooden battens including cost and conveyance of all materials at site, all taxes etc., complete for finished item of work but excluding VAT.

10

333

3337

... More
Infrastructure Facilities to MPPS;Supply and Fixing of CPVC Pipes ( 28.60 mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges, and over heads but excuding VAT.

15

322

4840

... More
Infrastructure Facilities to MPPS;Supply and Fixing of CPVC Pipes ( 22.20mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges, and over heads but excuding VAT.

15

202

3034

... More
Infrastructure Facilities to MPPS;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 including cost and conveyance of all materials to site, all labour charges complete for finished item of work for All Floors but excluding VAT.

10

312

3124

... More
Infrastructure Facilities to MPPS;Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995 including cost and conveyance of all material and labour charges etc complete, but excluding VAT.

3

1249

3749

... More
Infrastructure Facilities to MPPS;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Double C.P. Pillar cock

2

3088

6176

... More
Infrastructure Facilities to MPPS;Supply & fixing 580mm x 440mm size white virerous orissa pan with attached footrests of approved make confirming to IS 2556 (part - III) with 'P' or 'S' trap, including 10 lit. low level PVC flusihing system confirming to IS 7231 with all internal fittings, CI brackets, 32mm dia CP flush pipe, 15mm dia 450mm long PVC connerctor, 15mm dia Cp brass strop cock 300 grams of ISI make, cutting and making good the walls and floors wherever required including cost & conveyance of all material to work site, all labour charges for all operations for fixing etc., complete for finished item of work.

3

5110

15331

... More
Infrastructure Facilities to MPPS;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including over heads & contractor profitcost and conveyance of all materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab but excluding VAT and seignorage charges etc,, complete for finished item of work (50% Natural Sand+50% Manufactured Sand)

25.5

548

13979

... More
Infrastructure Facilities to MPPS;Providing Mild steel flats and bars for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, all operational, incidental, and labour charges such as cutting, bending, placing in position etc., but excluding VAT for finished item of work (APSS No.126) in all floors. For window grills, staircase railing & Compound wall grills etc

120

121

14588

... More
Infrastructure Facilities to MPPS;Supply and fixing of door shutters made of rigid PVC extruded hollow section(Nandi or equivalent ) of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking arrangements. The shutter frame is made of 30mm X 79mm with the wall thickness of 1.5mm +/-0.15mm section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter shall be horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door shutter during the fabrication of the door shutter at those points wherever the hardware is fixed onto the door shutter. (TBSC-L.III-14) Including PVC frame

3

6838

20516

... More
Infrastructure Facilities to MPPS;Painting to new walls with 2 coats of Plastic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 912 for external walls.

38.32

250

9589

... More
Infrastructure Facilities to MPPS;Painting to new walls with 2 coats of Plastic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 911 for internal walls

99.34

188

18708

... More
Infrastructure Facilities to MPPS;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs laid over floor bed /VRCC slab set over 12.0 mm th.in CM (1:8 ) prop. base coat and neat grey cement slurry of honey like consistence spread at the rate of 3.3 kg of cement per Sqm and jointed with neat white cement paste mixed with pigment of matching shade including cost and conveyance of all materials to site, including cost of mixing of mortar and watering, leveling to proper slope and curing including over heads & contractor profit, all labour charges etc., and excluding VAT and seignorage charges for finished item of work but excluding cost of CC bed and dadoing to walls . (TBSC-C.I-01).(50% Natural Sand+50% Manufactured Sand)

8.31

888

7387

... More
Infrastructure Facilities to MPPS;Providing dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit, cost of all materials like tiles, cement, sand and water etc., complete including complete for finished item of work, but excluding VAT and seignorage charges. (BLD-CSTN-9-18) (50% Natural Sand+50% Manufactured Sand)

27.29

591

16155

... More
Infrastructure Facilities to MPPS;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.(50% Natural Sand+50% Manufactured Sand)

38.32

495

18991

... More
Infrastructure Facilities to MPPS;Ceiling plastering of 12mm thick with CM (1:3) including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for CEILING PLASTERING.(50% Natural Sand+50% Manufactured Sand)

19.67

194

3826

... More
Infrastructure Facilities to MPPS;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls.(50% Natural Sand+50% Manufactured Sand)

79.68

473

37727

... More
Infrastructure Facilities to MPPS;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding VAT and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

0.3

74245

22274

... More
Infrastructure Facilities to MPPS;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.(50% Natural Sand+50% Manufactured Sand)

25.5

1494

38098

... More
Infrastructure Facilities to MPPS;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure and others but excluding VAT and seignorage chages.(50% Natural Sand+50% Manufactured Sand)

10.61

8641

91702

... More
Infrastructure Facilities to MPPS;Supply and filling of gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and VAT etc., complete.

9.45

360

3402

... More
Infrastructure Facilities to MPPS;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding VAT and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615) (BLD-CSTN-6-12) (50% Natural Sand+50% Manufactured Sand)

6.16

4511

27770

... More
Infrastructure Facilities to MPPS;Plain Cement Concrete of (1:5:10:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding VAT & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402). (50% Natural Sand+50% Manufactured Sand)

3.01

4868

14651

... More
Infrastructure Facilities to MPPS;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and VAT etc., complete, for Ordinary Soil-Manual Means-Upto 3 m depth.

11.61

416

4830

... More
Infrastructure Facilities to MPPS;Providing Mild steel flats and bars for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, all operational, incidental, and labour charges such as cutting, bending, placing in position etc., but excluding VAT for finished item of work (APSS No.126) in all floors. For window grills, staircase railing & Compound wall grills etc

200

121

24314

... More
Infrastructure Facilities to MPPS;Roofing: - Roofing provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove.

15

956

14350

... More
Infrastructure Facilities to MPPS;Providing Mild steel flats and bars for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, all operational, incidental, and labour charges such as cutting, bending, placing in position etc., but excluding VAT for finished item of work (APSS No.126) in all floors. For window grills, staircase railing & Compound wall grills etc

50

121

6079

... More
Infrastructure Facilities to MPPS;Painting to new walls with 2 coats of Plastic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 912 for external walls.

49.68

250

12432

... More
Infrastructure Facilities to MPPS;Painting to new walls with 2 coats of Plastic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per SS 911 for internal walls

32.31

188

6084

... More
Infrastructure Facilities to MPPS;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls.(50% Natural Sand+50% Manufactured Sand)

32.31

473

15299

... More
Infrastructure Facilities to MPPS;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.(50% Natural Sand+50% Manufactured Sand)

49.68

495

24623

... More
Infrastructure Facilities to MPPS;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work

1.44

7266

10464

... More
Infrastructure Facilities to MPPS;Supply and fixing of Country wood Door shutter of frame size 1.05x2.10m with fully pannlled single door shutter and shutter made of side rails 125mm X38, top rail 125mmX38mm, bottom rail 125mmX38mm and intermediate rails of 125 x 38 mm and panels - 3 no's are of 25mm thick as per approved design with fixtures of 300 mm long Stainless Steel aldrop-1 no,125mm long Stainless steel butt hinges 3 No's, Door stoppers-1no, 200mm long Stainless steel Tower bolt - 1no's MS powder coated 300mm long latches - 1no's Stainless steel handles 150mm long 2no's, with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications ( Without Frame)

1

7152

7153

... More
Infrastructure Facilities to MPPS;Supply and fixing of sal wood Door frame of size 1.05x 2.10M section of size 100x75MM and as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications

1

4271

4271

... More
Infrastructure Facilities to MPPS;Supply and filling of gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and VAT etc., complete.

13.82

360

4977

... More
Infrastructure Facilities to MPPS;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure and others but excluding VAT and seignorage chages.(50% Natural Sand+50% Manufactured Sand)

13.7

8641

118391

... More
Infrastructure Facilities to MPPS;Plain Cement Concrete of (1:5:10:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding VAT & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402). (50% Natural Sand+50% Manufactured Sand)

0.82

4868

3972

... More
Infrastructure Facilities to MPPS;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and VAT etc., complete, for Ordinary Soil-Manual Means-Upto 3 m depth.

4.89

416

2037

... More
Infrastructure Facilities to MPPS;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding VAT and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

100

74

7425

... More
Infrastructure Facilities to MPPS;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931

6

312

1875

... More
Infrastructure Facilities to MPPS;Providing & placing on Terrace polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes with all fittings including supply and fixing of 76.20mm dia PVC elbow 1st quality and 38.10mm dia PVC waste pipe outlet including coat and conveyance of all materials all labour charges etc. complete for finished item of work but excluding VAT.

500

11

5774

... More
Infrastructure Facilities to MPPS;Supply and fixing of Ashirvad / Ajay / Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tubes of size 1/2" ton 2" Ashirvad Flowguard) and SDR 11 pipes are made from idential CPVC compounds having the same physical properties for Hot and cold water (IS 15778:2007) including labour charges for fixing of CPVC / PPR Pipes etc., complete

30

322

9680

... More
Infrastructure Facilities to MPPS;Supply and fixing of Ashirvad / Ajay / Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tubes of size 1/2" ton 2" Ashirvad Flowguard) and SDR 11 pipes are made from idential CPVC compounds having the same physical properties for Hot and cold water (IS 15778:2007) including labour charges for fixing of CPVC / PPR Pipes etc., complete

3

202

607

... More
Infrastructure Facilities to MPPS;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable of makes KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White Sun Cab / Fortune Art. with Run 1 of 14/0.3mm(1.0Sqmm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable of makes KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White / Sun Cab / Fortune Art including cost and conveyance of all material and labour chages but excluding VAT.

15

138

2078

... More
Infrastructure Facilities to MPPS;Supply & Fixing of Star Delta Starter 415V, Three phase, 50Hz. With SS enclouser comprising of contactor with bi-metalic relay with necessary push buttons, etc., complete suitable from ------------------- Makes: Siemens / Crompton / L&T / BCH.

1

2907

2907

... More
Infrastructure Facilities to MPPS;Supply and erecting f 1 HP self priming Mono block IP44 motor pumpset Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi / Falco nexculding suction / delivery pipe with nuts duly grouted on existing C.C foundation and bolts, spring washers of requisite size for monoblock motor and pump (IS : 9079).

1

10117

10118

... More
Infrastructure Facilities to MPPS;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including over heads & contractor profitcost and conveyance of all materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab but excluding VAT and seignorage charges etc,, complete for finished item of work (50% Natural Sand+50% Manufactured Sand)

16.91

548

9270

... More
Infrastructure Facilities to MPPS;Supply and placing of the PCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work.

0.3

5981

1794

... More
Infrastructure Facilities to MPPS;Providing dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit, cost of all materials like tiles, cement, sand and water etc., complete including complete for finished item of work, but excluding VAT and seignorage charges. (BLD-CSTN-9-18) (50% Natural Sand+50% Manufactured Sand)

6.8

591

4026

... More
Infrastructure Facilities to MPPS;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls.(50% Natural Sand+50% Manufactured Sand)

10.37

473

4910

... More
Infrastructure Facilities to MPPS;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure and others but excluding VAT and seignorage chages.(50% Natural Sand+50% Manufactured Sand)

4.78

8641

41308

... More
Infrastructure Facilities to MPPS;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.(50% Natural Sand+50% Manufactured Sand)

6

1494

8964

... More
Infrastructure Facilities to MPPS;Construction of CRS Masonry in CM (1:6) 2nd Sort using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding VAT and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 612) (50% Natural Sand+50% Manufactured Sand)

0.76

4906

3729

... More
Infrastructure Facilities to MPPS;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding VAT and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615) (BLD-CSTN-6-12) (50% Natural Sand+50% Manufactured Sand)

1.51

4511

6812

... More
Infrastructure Facilities to MPPS;Plain Cement Concrete of (1:5:10:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding VAT & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402). (50% Natural Sand+50% Manufactured Sand)

1.5

4868

7303

... More
Infrastructure Facilities to MPPS;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and VAT etc., complete, for Ordinary Soil-Manual Means-Upto 3 m depth.

13.01

416

5414



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.