Panchayat Raj Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Panchayat Raj Engineering Department Tender
Civil And Construction
Building Construction
Opening Date31 Jul 2024
Closing Date7 Aug 2024
Tender Amount₹ 8,78,523
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532387Tender No
D1/ Nit,No.11 DPRE KothagudemTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Building Work;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to S2556-Part-2-2004 of white glazed with Strap supplying and fuong best Indian make plastic seat and lid For European water closets with rubber or plaslic Buffers as per 15 2548-1996 and 10 litres capacity single hush PVC low level cistern with intemal components and fixed using requred size of nails and screws 18 mim brass angle stop valve of quarter tum spindle type of not less than 400 grams weight with external threaded conforming to 15 8931, 15mm PVC connections with brass snion nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc, complete for finished item of work for all floors
1
2229
2229
... More
Building Work;Supplying, laying, filling, jointing and testing SWG SP-t pipe conforming to 157551 & 4177 w tight Cement joints in CM (1.5.1) prop, including excavation of trenches and socket pies in any coll (exce rock requiring blasting and refilling with watering and tamping to the requred slope including cost and conveyance of all materials to site and all tubour charges, overheads & contractor profft es complete for finished them of work (APSIS NO 1301 1318)
5
701
3505
... More
Building Work;Supplying & Fixing Indian maks Flat Bach Wash Hand Basis Tst quality conforming to 15-2556-Part 4:1872 with waste fittings like rubber plag, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to 18:2903-1979 and fitted with 15 min nominal bore Chromium Plated Piliar Tap of tist quality Indian make 400 grams Seiko/ Senior Nicel Esso or equivalent complete with standard Ci brackets including wooden block: 450 x 300 mm Single C.P. Pillar cock
1
1754
1754
... More
Building Work;Providing and Placing on Terrace (at all flour levels) polyethylene water storage tank with double layer approved brand and manufacture with cover and suitable locking wrangement and making necessary holes for wet and sullets and over flow pipes but without fittings and tose support for tanks including coul and conveyance of all materials and labour charges, overheads & contractors profit complete for finished item of work
1000
11
11360
... More
Building Work;Water Supply and Sanitary
-
-
-
... More
Building Work;Supply and fwing of Electronic Regulater of Modular of Anchor Home make thily feng on existing block including giving connections comt of all accessories and all labour charges etc, complete
4
379
1517
... More
Building Work;Supply and nan of 2 of 14/0.3mm (1.10 Sqmm) FR P.V.C. Insulated fleste opper cable in evicting Distribution wilculing all tabour charges ets, complete
100
59
5938
... More
Building Work;Supply and fising TPR Distribution brand with IP-42 protection (Metal Door) suitable for 3 phase Isolator as imcormer and 101A SP MC es outing going including interrul connection and labour charges for surface/hush mounting etc, complete
2
9324
18649
... More
Building Work;Supply and firing of hatten holder / stanting holder in lieu of cailing rose of light point complete with connections and all labour charges with 40W buth (for new installation)
21
124
2610
... More
Building Work;Supply and Transportation of 140W patty type tube light luminaine with copper choke, stater etc., including No 40W tube etc, complete.
10
773
7737
... More
Building Work;Supply of 900 mm (36)/1200 mm (48")/1400 ??? (54) sep 230V, AC 50 Hz. Celling fan with 3 Blades and doutile hall bearings with all standard accessories
4
3779
15119
... More
Building Work;Supply and run of 2 of 36/0.3mm (2.50 Sq.mm) FRP.V.C. inulated flexible copper catile in existing pipe for Mains inicuding all labour charges etc., complete
50
118
5947
... More
Building Work;Supply and fixing of SA 5 pin Modular plug socker with 64 Modular switch control on Rex with carth continuity including wire leads, earth connections along with all labour charges etc., complete.
8
446
3573
... More
Building Work;Wiring with 2 runs of 14/03mm (1.0 Sq.mm) Fire Retardant (FR) PVC mulatent flexible copper cable (15) MARK) in existing pipe with 6A switch, Coiling rose and 3mm thick bylam sheet covering to seeds control box including all labour charges etc, somplete for light, bell, fan and exhaust fan points in Non-Residential Buildings
8
733
5869
... More
Building Work;Cost Supply and hong of different sizes of Modular cover Fresheng sont and comeyence of aff mateman and labour charges ets, complete.( 12 Modular Metal Box)
2
428
856
... More
Building Work;Cost Supply and hong of different sizes of Modular cover Fresheng sont and comeyence of aff mateman and labour charges ets, complete.( 18 Modular Metal Box)
1
428
428
... More
Building Work;Cost Supply and fixing of different sizes of Modular Gained Metal Broves including cost and conveyence of a materials and labour charges etc complete( 12 Modular Metal Box)
2
365
731
... More
Building Work;Cost Supply and fixing of different sizes of Modular Gained Metal Broves including cost and conveyence of a materials and labour charges etc complete( 18 Modular Metal Box)
1
365
366
... More
Building Work;Providing Electrification to Building
-
-
-
... More
Building Work;Supplying and fixing of Pre-patented corrugated Roofing sheets with 8.50mm thickness Coating Ati-Zinc coating AZ150 GSM Tensile Stength: 550 MPA. Paint coating Regutar Modified 10 le 20 Microns, (Bottten) 5 to 7 Microns. Sheet Polyester Watt Thickness (Top) panting Panting 1.020. Length: Maxireum 12 Meters with Regular Flange Cours fled with GIJbuts & mu nun dia with bilurnen & G.1 limpet washers Shed with white inod & mchiding a coat of approved shee primer and two couls of approved paint on over lapping of sheets complete (up to a pich of 600) etc complete, excluding the purliem, rafters, trusses sncluding cost and conveyance of all materials labour charges, overheads and contractors profit etc., complete for finished dem of work in all
62
902
55965
... More
Building Work;Suplying and fabricating, erecting M.S tube conforming to 1.5 and purlins Induding cost of enclosed and including cret in position tabuler trusses of approvest design with specifications including roof frame work consisting of roffers les str foundations bolts, cleats, bearings plates.etc. complete as per the sketch of painting with eneef paint 2 paint including cost and conveyance of aff materials, babour charges for fabriction and fling, he coats over a prenaryomat with red mide charges of all fools and plants, alt incidental charges, overheads and contractor profit etc compete
0.35
157016
54956
... More
Building Work;Supply and Fixing of Iron grills for doors/ windows Railing etc., Complete
50
134
6746
... More
Building Work;Supplying and fixing of Unplastesed Poly Vinyl Chest (UPVC) 3Track-2 wondows and wiremesh duly manufactured using UPVC rainforced profiles Compilion of profiles shall comists amemtumo 5.5 PHR of TiO2 and not more than 12PHR of CaCo3 for every 100 parts of PVC PVCresin) of(62mm x 60 mm)/(60 mm x 45 mm) x 2.20 mm for outer frames, (66 mm x 38mm)/(58 mm x39mm)×2.20mmforsliding shutter frames capable of mounting single glazing system, structurally reinforcedwithhotdipgalvanizedup
2.88
7477
21534
... More
Building Work;Supply and fixing doors as per drawings with Non teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 35 mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-1) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and
3.78
4752
17964
... More
Building Work;Supply and fixing of Sol Wood Deer frame and double shutter of size 1.500 x 1.900mis including liking of & Nos of M.S. Hold fasts, 6 Nos of 125mm leng Mild steel (PC) Bult Hinges. 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos, of 150mm long Alluminium Door Handles No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.
1
13942
13943
... More
Building Work;Pointing to New Interior Walls with two coats of Plastic Emulsion paint of Asian/Borger/ Nerolac/Saicoat/Endocem or equalent quality of approved brand and shade as approved by the Engineer-in-Charge over base coat of cement primer water base grade -Il exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered maleriats, including cast and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, ele sales & other taxes, all operational, Incidental and labour cherges such as scaffolding charges, att charges, curing etc., complete for finished itern of work in all floors for external Walls (APSS No. 911) NOTE = Standard data revised vide Chief Engineer, R&B (Buildings) Proc. No. CEB/TAB/AEE3/SSR: 2010-11 Dt: 21.01.2011
196.84
229
45135
... More
Building Work;Flooring with vitified files of 1st quality, sel over base coaf of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread # 3.3kgs per sqm & jointed neatly with while coment paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sond wafer and tiles etc., complete, including seigniorage charges, etc., complete for finished Item of work, but excluding the cost of conveyance of all materials.
58.01
1294
75085
... More
Building Work;Plastering 12mm thick in two coats with base coat of armm thick in CM (1:5) and lop coat of 4mm thick in CM (1:3) dubara sponge finish including cast and conveyance of all materials the cement, sand, water etc., to site, seigniorage charges, sales & other foxes on off materials all operational, incidental and labour charges such as mixing mortor, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. JAPSS 901.903 & 904)
190.36
557
106061
... More
Building Work;Omamental Plastering with CM[1:3) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water elc. to site, including seigniorage charges, sales & other fakes on all maleriats, all operational, incidental charges and labour charges such as mixing morfar, finishing, curing, etc., complete for finished item of work. (APSS 901.906)
6.48
212
1376
... More
Building Work;Providing high yield strength deformed (HTSD) steel bars (Fe 500 grode as per 5 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shopes placing in position with cover blocks of approved size and binding wire of 205WG, forming grills for reinforcement wark as per approved designs and drawings including cost and conveyorice of bon from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting bending, placing in position, tying etc, and sales & other faxeson cost of all materials complete for finished item of work (APSS No. 126) in alt floors
862.49
79542
68605
... More
Building Work;Brick masonry 230 mm thick for panel walls in superstructure with CM (1.6) proportion using Ind class country bricks of size 23x11x7 cm from approved source having crushing strength not less than 35kg/hgom including cost and conveyance of all materials Re cement sand bricks, water elc., to sile, including seignorage charges sales and other fases on oll materials and all operational, incidental and labour charges such as mixing cement morfor, curing scafolding charges, constructing masanary fl charges.curing etc., complete for finished ilem of work
20.53
8422
172906
... More
Building Work;RCC M-20 Nominal mix (Cement.fine aggregate: coarse aggregate) corresponding to Table 9 of 15 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quany including cast and conveyance of all materials like cement, line aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.sUNSHEDS
7.8
1617
12613
... More
Building Work;RCC M-20 Nominal mix (Cement.fine aggregate: coarse aggregate) corresponding to Table 9 of 15 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quany including cast and conveyance of all materials like cement, line aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.LINTELS
0.26
14699
3822
... More
Building Work;RCC M-20 Nominal mix (Cement.fine aggregate: coarse aggregate) corresponding to Table 9 of 15 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quany including cast and conveyance of all materials like cement, line aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.FOR COLUMNS, MEETING HALL
1.78
14731
26222
... More
Building Work;RCC M-20 Nominal mix (Cement.fine aggregate: coarse aggregate) corresponding to Table 9 of 15 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quany including cast and conveyance of all materials like cement, line aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. FOR PLINTH BEAM
2.58
13985
36083
... More
Building Work;RCC M-20 Nominal mix (Cement.fine aggregate: coarse aggregate) corresponding to Table 9 of 15 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quany including cast and conveyance of all materials like cement, line aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.FOR COLUMN, FOOTINGs
2.59
10672
27643
... More
Building Work;Plain Cement Concrete comesponding to M5 grode as per 5 456 equivalent to [1:5:10) proportion nominal mix (cement: fine aggregale: Coarse aggregate) using 40mm size HBG (SSS) metal from approved quarry with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water efc, to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and tariming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, elc. complete for finished item of work for Foundations and Flooring Bed (APSS No. 402
3.27
5488
17947
... More
Building Work;Earth work excavation for foundations and depasiting on bank for all lifts and with an initial lead of 10m and lift of 2M in Loamy and Clayey soils like BC Soil Red Earth and Ordinary gravel including all operational, Incidental, labour charges such as shoring sheetirig planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per 35-20B (APSS 308)
21.74
297
6462
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements